Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer...

23
Virginia Concrete Conference March 9, 2006 Holiday Inn Select-Koger South Conference Center Richmond, VA Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer (ACTT)

Transcript of Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer...

Page 1: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Virginia Concrete Conference

March 9, 2006Holiday Inn Select-Koger South Conference Center

Richmond, VA

Jerry Blanding,

Innovative Contracting Engineer

FHWA NRC

Baltimore, MDMarch 9, 2006

Accelerated Construction Technology Transfer (ACTT)

Page 2: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

What is ACTT?

ACTT is a strategic ACTT is a strategic processprocess, which uses , which uses various technologies and techniques to various technologies and techniques to reduce construction timereduce construction time while while enhancing enhancing safetysafety and and qualityquality..

(Faster, Safer, Better)

Page 3: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Quality

•• ACTT allows for innovationACTT allows for innovation•• Speeding up does not mean ‘cutting corners’Speeding up does not mean ‘cutting corners’•• Yes, there is a simple cure for poor quality…Yes, there is a simple cure for poor quality…

Do it right the first time, every time!

Page 4: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

About the ACTT:

•• Emphasis is to Emphasis is to --“Get in, Get out, Stay out”“Get in, Get out, Stay out”

•• TRB initiated the concept (A5T60)TRB initiated the concept (A5T60)•• FHWA/AASHTO (TIG)FHWA/AASHTO (TIG)

Page 5: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Implementation2-Day Workshop•20-30 national transportation experts•20-30 local counterparts•11 skill sets•Project specific•FHWA/AASHTO/State DOT fund workshop

Page 6: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

ACTT Skill Sets

ROW/Utilities/RR PavementsTraffic Engineering/Safety/ITS Construction Structures EnvironmentInnovative Contracting GeometricsInnovative Financing Public RelationsGeotech/Acc.Testing/Materials

Page 7: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Why ACTT?Address customer needs

• Intensified activity• 1995 & 2000 national survey

Vital Few• Environment• Safety • Congestion

Builds momentum for Change• High performance materials• Customer demands change• Utilization of New technologies

Page 8: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Here is an example!

Page 9: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer
Page 10: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer
Page 11: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer
Page 12: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer
Page 13: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Mammoet Accelerated Bridge Removal

Page 14: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Accelerated Projects

Big I, NMI-40 Bridge, OKHyperfix, INI-84, ORBaldorioty de Castro Bridge, PRChurch Street Bridge, New Haven, CT

Page 15: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Prefabricated Bridge construction

Page 16: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

ACTT Workshops:

Held an ACTT workshop

Scheduled an ACTT workshop

Considering an ACTT workshop

Page 17: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Lessons LearnedProject Specific Recommendations

• Montana DOT• Wyoming DOT

General Application• Optimize Pre-fabrication• Aggressive PR, Single POC• WZ Incident Management• Optimize closure

Page 18: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Sharing Lessons LearnedWorkshop ReportWorkshop FlyerInterim ReportHard Copy to DOT/FHWA DOWebsite:

www.fhwa.dot.gov/construction

Page 19: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Benefits of ACTT:• Encouraging the development of strategies that

generate positive change• Creating a framework for informed consideration

of innovations• Facilitating removal of barriers to innovation• Improving motorist and worker safety• Advocating continuous quality improvement

Page 20: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Future WorkshopsOH DOT - 2/21-23/06 (completed)NH DOT- 2/21-23/06 (completed)NYSDOT - 3/21-23/06HI DOT- 4/18-21/ 06NC DOT - 4/23-25/06Alaska - Spring 06ODOT Fall 06

Additional State requests are coming into FHWA routinely

Page 21: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

ACTT FundingState

• Project Workshop costs are Federal Aid Eligible

• Employee Local Travel• Employee Time • Invitational Travel – (non-federal)• Logistical Costs

FHWA• Final Workshop Report• Federal employees

Page 22: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

ContactsRick Smith, WSDOT, (360)705-7150, [email protected]

Jerry Blanding, FHWA, (410)962-2253, [email protected]

Jim Sorenson, FHWA, 202-366-1333,[email protected]

Christopher Schneider, 202-493-0551,[email protected]

Page 23: Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer FHWA NRC Baltimore, MD March 9, 2006 Accelerated Construction Technology Transfer

Thank You

Jerry Blanding(410)[email protected]