Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer...
Transcript of Accelerated Construction Technology Transfer (ACTT)Jerry Blanding, Innovative Contracting Engineer...
Virginia Concrete Conference
March 9, 2006Holiday Inn Select-Koger South Conference Center
Richmond, VA
Jerry Blanding,
Innovative Contracting Engineer
FHWA NRC
Baltimore, MDMarch 9, 2006
Accelerated Construction Technology Transfer (ACTT)
What is ACTT?
ACTT is a strategic ACTT is a strategic processprocess, which uses , which uses various technologies and techniques to various technologies and techniques to reduce construction timereduce construction time while while enhancing enhancing safetysafety and and qualityquality..
(Faster, Safer, Better)
Quality
•• ACTT allows for innovationACTT allows for innovation•• Speeding up does not mean ‘cutting corners’Speeding up does not mean ‘cutting corners’•• Yes, there is a simple cure for poor quality…Yes, there is a simple cure for poor quality…
Do it right the first time, every time!
About the ACTT:
•• Emphasis is to Emphasis is to --“Get in, Get out, Stay out”“Get in, Get out, Stay out”
•• TRB initiated the concept (A5T60)TRB initiated the concept (A5T60)•• FHWA/AASHTO (TIG)FHWA/AASHTO (TIG)
Implementation2-Day Workshop•20-30 national transportation experts•20-30 local counterparts•11 skill sets•Project specific•FHWA/AASHTO/State DOT fund workshop
ACTT Skill Sets
ROW/Utilities/RR PavementsTraffic Engineering/Safety/ITS Construction Structures EnvironmentInnovative Contracting GeometricsInnovative Financing Public RelationsGeotech/Acc.Testing/Materials
Why ACTT?Address customer needs
• Intensified activity• 1995 & 2000 national survey
Vital Few• Environment• Safety • Congestion
Builds momentum for Change• High performance materials• Customer demands change• Utilization of New technologies
Here is an example!
Mammoet Accelerated Bridge Removal
Accelerated Projects
Big I, NMI-40 Bridge, OKHyperfix, INI-84, ORBaldorioty de Castro Bridge, PRChurch Street Bridge, New Haven, CT
Prefabricated Bridge construction
ACTT Workshops:
Held an ACTT workshop
Scheduled an ACTT workshop
Considering an ACTT workshop
Lessons LearnedProject Specific Recommendations
• Montana DOT• Wyoming DOT
General Application• Optimize Pre-fabrication• Aggressive PR, Single POC• WZ Incident Management• Optimize closure
Sharing Lessons LearnedWorkshop ReportWorkshop FlyerInterim ReportHard Copy to DOT/FHWA DOWebsite:
www.fhwa.dot.gov/construction
Benefits of ACTT:• Encouraging the development of strategies that
generate positive change• Creating a framework for informed consideration
of innovations• Facilitating removal of barriers to innovation• Improving motorist and worker safety• Advocating continuous quality improvement
Future WorkshopsOH DOT - 2/21-23/06 (completed)NH DOT- 2/21-23/06 (completed)NYSDOT - 3/21-23/06HI DOT- 4/18-21/ 06NC DOT - 4/23-25/06Alaska - Spring 06ODOT Fall 06
Additional State requests are coming into FHWA routinely
ACTT FundingState
• Project Workshop costs are Federal Aid Eligible
• Employee Local Travel• Employee Time • Invitational Travel – (non-federal)• Logistical Costs
FHWA• Final Workshop Report• Federal employees
ContactsRick Smith, WSDOT, (360)705-7150, [email protected]
Jerry Blanding, FHWA, (410)962-2253, [email protected]
Jim Sorenson, FHWA, 202-366-1333,[email protected]
Christopher Schneider, 202-493-0551,[email protected]