ABJ Presentation
-
Upload
marvincastelino -
Category
Documents
-
view
188 -
download
0
Transcript of ABJ Presentation
AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 1 23 Mar. 2008
Fabrication Facilities
2AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Parent Company : Kharafi National KSC (Closed)Operations : Kuwait, UAE, Bahrain, Egypt & Lebanon
Annual Turn over : US Dollars 1.0 BillionOperating Divisions & respective Portfolios
• ABJ (wholly owned subsidiary) : engaged in design/ manufacture / supply of Process Equipment Modules & Skids, Piping & Valve Skids, Pressure Vessels, Architectural Steel Structures, Pressurized & Atmospheric Storage Tanks, Pre-fabricated Piping Spools, Evaporators ……
• Infrastructure Projects Development : undertakes BOT, BOO & (BOOT) Plants in Water & Waste Water & Reclamation Projects and O&G Industrial Sector
Company profile
3AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
• EPCM : undertakes EPC Projects in Oil & Gas, Power, Water & Waste Water Sectors, Infrastructure Projects and associated core sector industries
• Construction (O&G) : engaged in site Construction – Civil, Mechanical, Electrical & Instrumentation - of projects in Oil & Gas, Power, Water and Infrastructure Projects
Company profile
4AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
• Facilities Management (FM) : offers Services Projects Development in Operation and Maintenance of Process Plants
• Trading Operations : Marketing and Agency representation of Products, Systems and Technology innovations
Company profile
5AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
IPD EPCM
Kharafi National KSC (Closed)(Kuwait, UAE, Bahrain,
Lebanon, Egypt)
ABJ Engineering & Contracting KSC
(Closed) –
Construction
Facilities Management
Trading
ABJ - MANUFACTURING HUB
6AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Process Equipment Modules/Skids
Architectural Roof Structure - Stadiums
Pressure Vessels
Storage Tanks
ABJ - product portfolio
7AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
ABJ PORTFOLIO
Piping Spools Desalination Plant Equipment
8AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
• Oil & Gas sector
• Petrochemicals
• Water & Waste water and Reclamation projects
• Power plants
• Infrastructure projects
Industries catered
9AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
• Engineered PackagesProcess Equipment Modules & SkidsPiping & Valve SkidsIndustrial Steel Structure & Pipe Racks
• Pressure VesselsSeparators, Desalters, Glycol Regeneration / Dehydration Vessels, Reactors, Columns, Knock-out Drums …..
• Heat ExchangersShell & Tube Heat Exchangers
• Desalination PlantsPackaged Evaporators
• Architectural StructureStadiums, Malls, Amusement Parks ….. etc.
• Storage TanksPressurized and Atmospheric Shop Fabricated Storage Tanks
• Piping (Process & Pressure)Pressure Piping and Process Piping Spools
• Porta Cabins : Design, Built & Supply (As per Client’s requirements)• Corrosion Protection Services• Refurbishment/Conditioning of Static Equipment
Lines of business
10AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Owners/End Users• Saudi Aramco
• SABIC
• ADCO
• BAPCO
• KOC
• KNPC
• PIC
• Equate
• Joint Operations (JO)
• Qatar Petroleum
• MEW (Kuwait)
• MPW (Kuwait)
• Indian Oil Corporation Ltd (IOCL)
• Cairn Energy
EPC Contractors/Consultants• Tecnimont
• Saipem
• Fluor
• Bechtel
• Linde
• Petrofac
• Tecnicas Reunidas
• Thermo Design Engineering
• Aker Process Systems
• Hamworthy
• SKEC
• Daelim
• JGC
• Petreco
• NATCO
• Siemens Water Technologies
• Fisia Italimpianti
• Sidem
• Birdair
Clients
11AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
• ISO 9001:2008 – Quality Management Systems
• ASME “U”STAMP – Pressure Vessels
• ASME “U2” STAMP – Pressure Vessels
• ASME “S” Stamp – Power Boilers
• ASME “PP” Stamp – Process / Pressure Piping
• NB – National Board Registration (Boilers & Pressure Vessels)
• NBIC – “R” – Repair of Pressure Vessels
Accreditations
12AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Product Mechanical Design Code
Design Software Detailing Software
Pressure Vessels
ASME Section VIII Div 1 & Div 2
• PVEllite• COMPRESS
• AUTOCAD
Heat Exchangers
ASME Section VIII Div 1 & TEMA
• PVEllite • AUTOCAD
Pressurized Tanks
• API 650• API 620• UL 142
• TANK/E-TANK• E-TANK• E-TANK
• AUTOCAD
Atmospheric Tanks
• AISC • Staad Pro • Strucad• AUTOCAD• Tekla Structures
Steel Structure • AISC• BS 5950
• Staad Pro • Strucad• AUTOCAD• Tekla Structures
Design & Engineering capabilities
13AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
• ASME Sec VIII Div. 1& 2 - Pressure vessels
• ASME Sec 1 - Power Boilers
• ASME B 31.1 - Process / Pressure Piping
• ASME B 31.3 - Process Piping
• ASME B 31.4 - Pipeline Transportation Systems – Liquid Hydrocarbon
• ASME B 31.8 - Gas Transmission & Distribution Piping System
• ANSI/ NB-23 - National Board Inspection Code
• API – 1104 - Welding of Pipelines and Related Facilities
• API 650 - Welded Steel Tanks for Oil Storage
• AWS D1.1 - Structural Steel – Welding Code
Practicing construction codes
14AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Shop Area• Mina Abdulla : 173,000 Sq. M• Shuaiba : 30,000 Sq. M
Shop Capacity
• Pressure Vessels : 500 TPM• Steel Structure : 500 TPM• Piping Spools : 2300 ID/D
Total Strength : 1700 to 2000
Shop facilities
15AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
FABRICATION SHOP (MAJOR EQUIPMENT)
• CNC Profile Plate Cutting Machine (Gas 200 mm thk
/ Plasma 50 thk)
• Plate Rolling Machine (100 mm thk & 20 thk)
• Bevelling Machine
• CNC Pipe Cutting Machine (1000mm Dia)
• CNC Pipe / Profile Bending Machine (12” Dia)
• Clad removing Machines
• Hydraulic Press (400 T)
• Press Brake (3 M (L) x 12 mm thk)
• Tube Expanders
Plate Rolling Machine - 100 mm thk
CNC Plate Profile Cutting Machine - 200 mm Thk
Shop facilities
16AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
FABRICATION SHOP (MAJOR EQUIPMENT)
• Shearing Machine 3 M (L) x 16 mm thk
• Circular SAW Machine (Beam Size 350 MM)
AUTOMATIC WELDING MACHINES
• Column & Boom SAW Welding Machine
• Column & Boom FCAW Welding Machine
• Bore Cladding Machine (2” minimum)
PWHT
• Oil Fired Stress Relieving Furnace
CNC Pipe Profile Cutting Machine - 1000mm dia
Stress Relieving Furnace – 7.5m x 7.5m x 40m
Shop facilities
17AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
NOZZLE CLADDING 2” & 24”.
Small Bore Mechanized Nozzle Cladding
18AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
MACHINE SHOP (MAJOR EQUIPMENT)
• CNC Deep Hole Drilling Machine (Multi Spindle – 4 m (W) x 6 M (L) x 200 thk.
• CNC Quick Mill Drilling Machine (120 x 120, Single Spindle – 3.5 M (W) x 3 M (L) x 200 thk
• CNC Quick Mill Drilling Machine (120 x 144, Single Spindle – 3 M (W) x 4 M (L) x 200 thk
• Vertical Milling Machine
CNC Quick Mill Drilling Machine (3 Nos.)
CNC Pipe / Profile Bending Machine (12” dia)
Shop facilities
19AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
MACHINE SHOP (MAJOR EQUIPMENT)(MAJOR EQUIPMENT)
• Horizontal CNC Floor Type Boring Machine
Table size (Rotary 360 Degrees) 2000 x 1800 mm 3 axis interpolation Longitudinal Travel X axis : 6000 mm Ram In/Out Y axis : 1080 mmVertical Travel (Head) Z axis : 2800 mmTable Load : 12,500 Kgs
• Radial Drilling Machines (63 Dia x 2.3 M (L) & 63 mm Dia x 800 mm (L)
• Table Milling Machine (Bed Length 2 M)
• Lathe Machines (1.6 M Dia x 4 M (L)
• Portable Milling Machines
Horizontal drilling machine
Shop facilities
Lathe machine – 1.6 M Dia x 4 M (L)
20AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
SURFACE PREPARATION
• Covered Blast Area : 1,200 Sq. M
• Covered Paint Area : 1,650 Sq. M
• Open Blast Area : 6,200 Sq. M
• Open Paint Area : 11,700 Sq. M
Shop facilities
Blasting Chambers - 25M (L)x14M (W) x12M (H)
Automatic Airless Blasting Machine - Window Size 2 M (W) x 1.5 M (H)
21AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Lifting Capacity
• Shop EOT : 60T
• Tower Crane : 5T at 55 M radial span
• Gantry Crane : 20T
• Mobile Cranes : 25T, 50T, 80T, 100T,
120T, 180T, 200T,
300T & 350T
Shop facilities
350 T Mobile Crane
22AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Level - I
Level - II
Level - III
Quality Assurance Manual(QAM)
Quality Manual establishes and states how we meet the requirements of ISO 9001
Administration Work Instructions (AWI)(Instructions for organization
wide application)
Department Work Instructions (DWI)(Instructions for department’s
application)
Technical Work Instructions (TWI)
(Instructions for technicalapplication in the projects)
Project Specific Work Instruction(PSWI)
(Instructions applicable to a specific project)
Quality Management System (ISO 9001:2000)
23AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Level - I
Level - II
Level - III
Quality Control Manual(QCM)
Quality Manual establishes and states how we meet the requirements of ASME & NBIC
Technical Work Instructions (TWI)
(Instructions or technical application in the ASME & NBIC requirement)
Project Specific Work Instruction(PSWI)
(Instructions applicable to a specific job/ project)
Quality Management System (ASME & NBIC)
24AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
NON-DESTRUCTIVE EXAMINATION
In-house Facilities
• Dye Penetrant
• Magnetic Particle
• Thickness Measurement
• Ferrite Testing
• Hardness Testing
• Hydro Test
• Pneumatic Test
Third Party Facilities
• X-RAY .
• Gamma Rays
• Ultrasonic Testing
• Positive Material Identification
All Destructive Testing
Quality Control
RT Bunkers
25AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
MATERIALS• Carbon Steel & LTCS• Low Alloy Steels• Stainless Steel 304L,316L,321,347• Duplex Stainless Steel• Super Duplex Stainless Steel• Lean Duplex Stainless Steel• Cu-Ni• Titanium• Incoloy• Inconel• 6 mo Steels• Monel
PROCESSES• SMAW
• GTAW
• FCAW – (Machine & Semi Auto
• GMAW – (Machine & Semi Auto)
• SAW
• Stud Welding
• Bore Cladder using GMAW Process
CODES• As Per ASME Sec IX• As Per AWS D1.1• As Per API -1104
APPROVALS BY• LLOYDS • BUREAU VERITAS• GERMANISCHER LLOYD• HEARTFORD STEAM BOILERS• WELLUSEY• TUV
Welding processes & materials
26AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
WPS:• Carbon Steel – 78 Nos. • Stainless Steel – 32 Nos.• Low Alloy Steel – 02 Nos.• C.S – S. S – 15 Nos.• Nickel Alloy – 08 Nos.• S.S. Overlay – 10 Nos.• Nickel Alloy - Overlay – 11 Nos.• C.S – Nickel Alloy – 02 Nos.• Duplex Stainless Steel – 10 Nos.• S.S.-Nickel Alloy – 01 Nos.• C.S.-Nickel Alloy – 01 Nos.• C.S -Duplex Stainless Steel – 09 Nos• Duplex Stainless Steel - LDSS – 02 Nos• Copper Alloy – C.S – 03 Nos• Copper Alloy – D.S.S – 01 Nos• Copper Alloy – S.S – 01 Nos• S.S – D.S.S – 03 Nos• D.S.S – Overlay – 03 Nos• Copper Alloy – Overlay – 06 Nos• Copper Alloy – 01 Nos.• Total Numbers Of WPS : 199 Nos.
Maximum Thickness of WPS Qualified : 200 mm
PQR:• Carbon Steel – 55 Nos. • Stainless Steel – 22 Nos.• Low Alloy Steel – 03 Nos.• C.S – S. S – 17 Nos.• Nickel Alloy – 07 Nos.• S.S. Overlay – 11 Nos.• Nickel Alloy - Overlay – 08 Nos.• C.S – Nickel Alloy – 02 Nos.• Duplex Stainless Steel – 07 Nos.• S.S.-Nickel Alloy – 01 Nos.• C.S.-Nickel Alloy – 03 Nos.• C.S -Duplex Stainless Steel – 06 Nos• Duplex Stainless Steel - LDSS – 02 Nos• Copper Alloy – C.S – 01 Nos• Copper Alloy – D.S.S – 01 Nos• Copper Alloy – S.S – 01 Nos• S.S – D.S.S – 01 Nos• D.S.S – Overlay – 04 Nos• Copper Alloy – Overlay – 04 Nos• Copper Alloy – 01 Nos
• Total Numbers Of PQR : 157 Nos.
Summary - Welding procedures
27AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
• Document Register ( MS Access based program)
• Document Storage & Handling
• Issue of Controlled Copies
• Maintaining Master Copies
• Un Controlled Copies to Client
• Marking obsolete Copy when new revisions received
• Issue of documents through transmittals
• Documents/ Records Retention
• Electronic copies of Manufactures Record Book
Document Control System
28AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
• Body Harness (PPE)• Ensure periodic Calibration, Inspection &
Maintenance of lifting equipment• Reporting Near Misses, Incidents• Conduct Safety Training programs • Emergency Evacuation Drill• Fire Extinguisher Training • Posting Safety signboards, bulletins, posters • Hazard identification & Risk Assessment• Audit of PPE prior to commencement of
critical activity• Use of standard Scaffolding methods &
materials.• Promote safe working attitude through
incentives• Enforce disciplinary action for violating HSE
Policy
Health, Safety & Environment
Fire Fighting Training in ABJ
29AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Dispensed Oil Expelling Unit (DOX) – 20 M (L) x 6 M (W) x 20 M (H) – 270 MTShipped to Saudi Kayan Petrochemical Co., KSA;
Logistics
30AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Glycol Regeneration Modules 11 M (L) x 5 M (W) x 5 M (H) – 40 MTTransported to BAPCO, Bahrain
Logistics
31AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Track Record….
Oil & Gas Petrochemicals
32AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Dispensed Oil Expelling Unit (DOX); 20 M (L) x 6 M (W) x 20 M (H) – 270 MTProject : Ethylene Plant; Client : Tasnel Petrochemical Co., KSA; EPC Contractor : Linde, Germany / NATCO, USA
Process plant modules & Skids
33AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Dispensed Oil Expelling Unit (DOX) – 20 M (L) x 6 M (W) x 20 M (H) – 270 MTProject : Olefins Plant; Client : Saudi Kayan Petrochemical Co., Al Jubail, KSA; EPC Contractor : KBR, Singapore / NATCO, USA
Process plant modules & Skids
34AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Glycol Regeneration Skids 11 M (L) x 5 M (W) x 5 M (H) – MT (7 Nos.) + Off-skid PipingProject : New Khuff Dehydration Unit, Khuff Development Program; Client : BAPCO, Bahrain EPC Contractor : Petreco Process Systems (Cameron), UAE
Process plant modules & Skids
35AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
HP Discharge Scrubber : ID 3500 mm x (78+3) mm thk x 5500 mm T/T – SA 516 Gr. 70N + SS 316L Clad; Project : BS 160; Client : KOC, Kuwait; EPC Contractor : Saipem (Snamprogetti), Italy (Under Execution)
Pressure vessels
Rolling of 81mm thick SS Clad Plate in progress
36AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Debutanizer, ID 4000 mm x 27mm thk x 38,700 mm T/T – SA 516 Gr. 70; 204 TProject : Aromatics Complex; Client : Kuwait Paraxylene Production Co., EPC Contractor : Tecnimont, Italy + SKEC, Korea JV Consortium
Pressure vessels
37AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Separator Column, ID 6200 mm X 20 mmthk X 6700 MM T/T Project : Aromatics Complex; Client : Kuwait Paraxylene Production Co., (EQUATE),EPC Contractor : Tecnimont, Italy + SKEC, Korea JV Consortium
Pressure vessels
38AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Pressure vessels
Stripper Column, ID 3500 mm X 17 mm thk X 27700 mm T/T Project : Aromatics Complex; Client : Kuwait Paraxylene Production Co., (EQUATE),EPC Contractor : Tecnimont, Italy + SKEC, Korea JV Consortium
39AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Pressure vessels
Desalter / Degasing Vessels (12 NOS), ID 2200~3200 mm X 12~18 mm thk X 4500~10700 mm T/T ASME “U” Stamped, Project : Dehydration & Desalting Units; Client : South Oil Co., Iraq; EPC Contractor : Axia Howmar Limited.
40AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Depentanizer, ID 1100 mm X 12 mm thk X 26350 mm T/T – SA 516 GR. 70Project : Aromatics Complex; Client : Kuwait Paraxylene Production CO., (EQUATE), EPC Contractor : Tecnimont, Italy + SKEC, Korea JV Consortium
Pressure vessels
41AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Refurbishment : HP Gas Separator, ID 3125 mm X 35+2 mm thk X 8840 mm T/T – Carbon Steel Cladded with SS 321, Design as per ASME SEC VIII Div 2; Project : Up Gradation of GC 23; Client : Kuwait Oil Company; EPC Contractor : Petrofac
Pressure vessels
42AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Pre-fabricated Piping Spools
43AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Pre-fabricated Piping Spools
44AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Pre-fabricated Piping Spools
45AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
SIGNATURE PROJECTS…
INFRASTRUCTURE SECTOR
46AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Jaber Al Ahmed International Stadium – Kuwait, Aerial view : 285 M (L) x 260 M (W) x 40 M (H); Client : Ministry of Public Works; Main Contractor : M.A.Kharafi & Sons, Kuwait Membrane Design: Birdair, USA; Compression Ring fabricated by ABJ -– 2700T
Stadiums - Kuwait
47AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Nelson Mandela Bay Multipurpose Stadium, Port Elizabeth, South Africa 256 M (L) x 196 M (W) x 32.3 M (H); Client : Nelson Mandela Petropolitan Munacipality, SA; Main Contractor : Grenekar / Interbeton LTA, SA; Membrane Design : Taiyo Birdair, USARoof Structure fabricated by ABJ -– 2500 T
Stadiums – South Africa
48AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
Green Point Stadium, South Africa - Section view from inside 265 M (L) x 245 M (W) x 54 M (H);Client : City of Cape Town, SA; ractor : Murray & Roberts; Membrane Design : Birdair, USA / PFEIFER, Germany. Compression Ring fabricated by ABJ - 1800T
Stadiums – South Africa
49AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
LANDMARKS…
WATER & WASTE WATER SECTOR
50AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
MBR Modules; 6.5 M (L) x 4.5 M (W) x 5.2 M (H) – 11 MT (12Nos)Project : Waste Water Treatment Plant; Client : Saudi Aramco, KSA; EPC Contractor : Siemens, USA
MBR Modules - KSA
51AWI 106-ABJ Att. 5 Rev. 0 26 Jan. 2008 Rev. 2 04 Feb. 2009
ABJ Engineering & Contracting Co. KSC (Closed)
Resources to respond !
Thank You