AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
ABJ Engineering and Contracting Co Presentation
Fabrication Services and Beyond
2AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Contents• Introduction• Services• Products• Prominent Clients• Certifications• Our Strength• Quality Assurance• Production Capacity• Growth• Equipment• Facility• Summary of Projects
3AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Introduction
ABJ Engineering & Contracting Co, an ISO 9001 certified company, specialized in fabricating surface equipment for the Oil & Gas, Petrochemical, Fertilizer, Water Treatment and Desalination Plants etc. and structural fabrication services for public utility sector like Stadiums, Malls and Amusement Parks. ABJ has supplied a variety of equipment and systems to many countries around the world.
4AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Services
• Process Equipment Fabrication
• Structural Steel Fabrication
• Pipe Fabrication and Cladding
• Corrosion Protection Services
• Process Internal equipment
5AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Products
• Pressure vessels• Pressure piping • Tanks• Skids• Evaporators • Dehydrators• Structures• Columns• Reactors
6AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Venders of
Registered Venders of
ARAMCO, Saudi ArabiaSABIC, Saudi ArabiaKOC, KuwaitKNPC, KuwaitPIC, Kuwait,QP, Qatar
7AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Cliental
• Snamprogetti, Italy• Ticknor, France• Tecnimont, Italy • JGC, Japan• Daelim, S.Korea • Hyundai, S.Korea• SK Eng, S.Korea • GC Eng, S.Korea• Petrofac, UAE • Petreco, UAE• Birdair, USA
8AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Organization Chart
9AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Vision
10AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Mission
11AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Certification
INTERNATIONAL CERTIFICATION
12AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
ISO Certification
• ISO – 9001: 2000 Certificate of Approval for Quality System
13AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
ASME Certification
• ASME –”PP” Certificate of Authorization for Power Piping
14AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Certification
• ASME – “U” Certificate of Authorization for Pressure Vessels
15AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Certification
• ASME – “U2” Certificate of Authorization for Pressure Vessels
16AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Certification
“PP”Certificate of AuthorizationFor Power Piping
17AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Certification
ASME – “S”Certificate of AuthorizationFor Power Boilers
18AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
NBIC Certification• NBIC – “R” Certificate of
Authorization for Repair of Pressure Vessels
• NBIC – “NB” Certificate of Authorization for Register Boilers & Vessels
19AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Our Strength
• Quality Standards• Safety Standards• Manpower: 1,250• Modern Equipment• Resources• Investment Capability
20AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
HEALTH, SAFETY & ENVIRONMENT
HSE
21AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
• Good Tools & Equipments,
• Safety Hand book,
• Safety Training Passport,
• Training programme,
• Pension Scheme,
• Good living conditions
• E-learning
Safety
22AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
• Safety News Letter, • Results communication,• Award Safe Man of Month, • Best near miss, • Corporate Magazine, • HSE bulletins, • Daily pre-job start briefings, • Daily reports to Management.
Safety Awareness
23AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
• ABJ introduced new and more detailed audit check list
• Analysis of every accident,
• Increased Corporate Management involvement
• OHSAS 18001 certified.
Safety Audit
24AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Quality Assurance & Control
25AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
IMTE Calibration Laboratories
Quality Assurance & Quality Control
Quality Assurance Procedures
Quality Auditing
Quality Control
Calibrating / Testing Laboratories
Welders Training School
Six Sigma
Sulaibiya Testing Lab., Kuwait
Corporate Director
Deputy Managing Director
Quality Assurance & Control
Quality Control Setup
26AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Current Quality Certification
ASME & National Board’s CertificationsFABRICATION FACILITIES LOCATED at
QMS : Certified ISO 9001:2000
MAB FACILTYSHU FACILITY
ASME “U” STAMP
ASME “PP” STAMP
NBIC “R” STAMP
NBIC “NB” STAMP
ASME “S” STAMP
ASME “U” STAMP
NBIC “U2” STAMP
NBIC “NB” STAMP
27AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Production Capacity
• Pressure Vessels:500 Tons / Month• Piping:70,000 Inch- Dias / Month• Structural Steel: 500 Tons / Month
28AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Infrastructure - WorksMena Abdulla Facility
OverviewMan power Strength: 1200 nos.Total Work Shop Area:60,000 Sq.mTotal Covered Area:150,000 Sq.m
29AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Infrastructure - WorksMena Abdulla Facility Layout
30AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Infrastructure - Works
OverviewMan power Strength: 800 nos.Total Work Shop Area:26,000 Sq. MtrTotal Covered Area:8000 Sq.Mtr
Shuaiba Facility
31AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
MACHINARY & EQUIPMENTSAT A GLANCE
Infrastructure
32AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Infrastructure – Design & Eng
Software Used
• COMPRESS• NOZZLE PRO• PVELITE • STAAD PRO• STRUCAD• STRUCTURAL DESKTOP• AUTOCAD • EX STEEL
33AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Equipment
Rolling Machine (Up to 100mm) - 03 No.PWHT Furnace (6m x 6m x 32m) - 01 Nos.Automatic Welding Machine - 14 Nos. Bore cladding machine - 2 Nos.CNC Cutting Machine150 mm thick –03 Nos.Welding Machine - 260 Nos.Overhead Crane 20 ton - 1No.Overhead Crane 10 ton - 7No.Overhead Crane 05 ton -5 Nos.Overhead Crane 30 ton - 4 Nos.Yard Crane 10 ton - 3 Nos.Bevelling Machine - 450 mm dia - 2 Nos.
34AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Equipment
CNC Vertical Drilling Machine - 02 NosCNC Hole Punching Machine - 01 Nos.Plasma Cutting Machine 20/50 mm -03 Nos.Shearing Machine 16 mm thick - 01 Nos.Press Brake - 01 Nos.SAW Machine - 09Nos.FCAW Machine - 05 Nos.Radial Drilling Machine - 02 NosProfile Bending Machine 150 mm - 02Nos.Hydraulic Press - 03 Nos.Circular Saw Machine. - 01 Nos.Pipe Flame cutting machine 60”Dia– 04 Nos.Lathe Machine - 04 Nos.
35AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Equipment
Post Weld - Heat Treatment - Diesel Furnace 32 x 6 x 6 MtrTemp – 800º C
36AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Infrastructure - Works
OverviewMan power Strength: 1250 nos.Total Work Shop Area:150,000 Sq. MtrTotal Covered Area : 26,000 Sq.Mtr
Mena Abdulla Facility
37AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
100 MM THK x 3.0 MTRS. - WEIGHT-140 TON
Equipment
38AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
PWHT Furnace : Size : 31.2 m Long x 6m Wide x 6m Height
Equipment
39AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
PWHT Furnace – Inside View showing Insulation
Equipment
40AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Nozzle Bore Cladding Machine – Automatic / Vertical (Range: from 2” to 24” NB Nozzles)
Equipment
41AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Nozzle Bore Cladding Machine – Welding in Progress using Inconel 625 Filler wire with GMAW Process
Equipment
42AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
6 M x 6 M LONG COLUMN & BOOM SAW MACHINE
9 Nos. - Column & Booms SAW Machines.
5 Nos. - Column & Boom FCAW Machines.
(Maximum Number of Boom and Columns in the Region)
Equipment
43AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
PRESS BRAKE MACHINE
Equipment
44AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
HYDRAULIC POWER PRESS (400 TON )
Equipment
45AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
NEW LATHE MACHINE (24” x 3M LONG)
Equipment
46AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
MULTI HEAD CNC FLAME CUTTING MACHINE WITH SIGMA NESTING SOFTWARE - (4.5 M WIDE x 18.0 M LONG x 250 MM THK.
WITH 9 TORCHES)
Equipment
47AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
CNC CIRCULAR BANDSAW M/C (400 MM x 1.5 MTR CAPACITY)
Equipment
48AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
CNC HOLE PUNCHING MACHINE
Equipment
49AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
RADIAL DRILLING MACHINE ( 2 NOS)
Equipment
50AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
BAND SAW CUTTING MACHINE-Up to 400 x 400 mm size (2 Nos.)
Equipment
51AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
PLATE SHEARING MACHINE ( Up to 16.0 mm Thick.)
Equipment
52AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
SUMMARY OF PROJECTS
53AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Recent Projects SUMMARY OF PROJECTS
Job No. CLIENT PROJECT OWNER SCOPE OF WORKCONTRACT VALUE
in K.D
PERIOD
2120Flour / World
Service Intalia/ Kharafi National
Ethylene Glycol ProjectEquate
Petrochemical Company
Pre Fabrication of piping & pipe Support Work 819,115 2007
2124 - 2 NATCO-UK Korchagin IFP - 1STG
Engineering LLC
Design,Supply and Fabrication of Pressure
Vessels ( 11 Nos )690,463 2007
2128 Cameron Petreco
PNZ Eozene EOR Project – Evaporative Water
Treatment Facilities , Al Wafra, PNZ, Kuwait
Joint Operations -
Saudi Arabian Chevron Inc./
Kuwait Gulf Oil Company (PNZEOR Project)
Design, Fabrication & supply of Pressure Vessels
(4 Nos) Tank (1 No) & SKIDS
550,930 2007
2129 S.K.E.C JPME
Aromatics Complex Project
Kuwait ParaxylineProduction Company
Fabrication of Columns (8 Nos)
& Pressure Vessels (3 Nos)
596,460 2007
2130 NatcoSaudi Kayan Olefins
Plant Al Jubail, Kingdom of Saudi Arabia
KBRFabrication & Supply of
Pressure Vessels ( 8 Nos) & SKIDS 3 Nos
621,225 2007
2131 TECNIMONT, SpA.
Aromatics Complex Project
Kuwait ParaxylineProduction Company
Design, Fabrication & Supply of Carbon steel
Coloumns136,150 2007
54AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Recent Projects
Job No. CLIENT PROJECT OWNER SCOPE OF WORKCONTRACT VALUE
in K.DPERIOD
2132 S.K.E.C
Building New Gathering Centre GC-24 at Sabriyah
Field NorhtKuwait,CONTRACT No.
32757
Kuwait Oil Company (K.O.C)
Design, Supply & Fabrication Pressure Vessels 740,000 2007
2133 BIRDAIRNELSON MANDELA BAY
Multi Purpose Stadium for South Africa
Nelson Mandela Bay Metropolitan
Municipality
Supply & Fabrication of Roof Structure & Misc. Items 2,600,000 2007
2134 BIRDAIR Green Point Stadium, Cape Town. South Africa
City of Cape Town. South
Africa
Supply & Fabrication of Roof Structure & Misc. Items 1,600,000 2007
2135 Kharafi National
Phase 1 – Airfield and Infrastructure in Central
Utility Complex – 1 (CARGO) for Dubai World
Central Project.
Kharafi NationalSupply & Fabrication of
Structural steel support for Jabel Ali Airport
227,888 2008
2136 Joint Operations Kharafi National
Large Scale Pilot (LSP) Steam Flood Project, Al
Wafra, PNZ, Kuwait
Kuwait Gulf Oil Co./ Saudi
Arabian Chevron Inc
Supply & Fabricationof Skid Packages, Structral, Piping
& Tanks1,124,437
2008 (On
Going)
55AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Recent Projects
Job No. CLIENT PROJECT OWNER SCOPE OF WORKCONTRACT
VALUE in K.D
PERIOD
2139 Siemens Water Technologies
Membrane Biological Reactor Module
Fabrication Kuwait
Paraxylene
Production Co.(KSC)
Supply & Fabrication of Skid Packages, &
Tanks315010 2008 (On
Going)
2140The Kuwait
Styrene Co (K.S.C.C)
EBSM (OL2K)Supply & Fabrication of
Pressure Vessel & Hoppers
119,519 2008 (On Going)
2141 Fisia ItalimpantiEvoporator, Tank,
Vessels, Piping, Structure,
Ministry of Water &
Electricity
Supply & Fabrication of various equipment 8,227,808 2008 (On
Going)
56AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
PROJECT PHOTOSAT A GLANCE
Projects
57AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Piping Erection on Skids
Dox Unit Skid with pressure vessels Skid A & B – Piping & valve assembly
Pipe rack structure erection on Skids
58AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Skid Fabrication at a glance
59AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Skid Fabrication at a glance
60AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Separator for Technimont
61AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Crude oil Desalter
62AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Separator Vessels for KOC.
63AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Wet Seprator for Axsia Howmmer
64AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Stripper for SK Engineering Co
65AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Urea & Ammonia Plant – For Petrochemical Industries Company
66AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Lift Gas Distributing System for KOC / SAMPROGETTI
67AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Ardiya Waste Water Pumping Unit
68AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Sulabiya Waste Treatment & Reclamation Plant – RO & UF Piping
69AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Replacement of North Kuwait Crude Oil Export System
70AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
ESDV Buffer Vessels
71AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
HP Gas Separator KO Drum
72AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
MEA Solution Regenerator Vessel
73AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Surge Vessels (18 Nos.) Water Treatment Plant
74AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Projects
Column for Technimont
75AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Sheikh Jabber Al Ahmad International Stadium, Kuwait
Scope of Work.Compression Ring:1700 tons.Flying Mast : 180 tons.Cat Walk Structure:250 tons.Total Man hour : 212,342 mhr.
76AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Structural work at Green Point Stadium, South Africa.
77AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects,
Structural work at NM Stadium, Cape Town.
78AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Graphical inside view of Al Jaber Al Ahmed Stadium
79AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Overall view of Jaber Al Ahmed Stadium, Kuwait after erection of Compression Ring Beams
80AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Panoramic view of Stadium before and during erection of Compression Ring Elements
81AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Panoramic view of Jaber Al Ahmed Stadium, Kuwait during erection of Compression Ring Beams
82AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Panoramic view of Stadium after completion of Compression Ring Beam Erection
83AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Project
Aerial view of Jaber Al Ahmed Stadium, Kuwait after erection of Compression Ring Beams
84AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Erection of last Compression Ring Element
Stadium Projects
85AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Fixing of fabric
86AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Project
Erection under process
87AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Compression Ring Element after Erection
88AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Compression Ring Element after Painting
89AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Trail Assembly of Girder
90AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Trail Assembly of Girder
91AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Trail Assembly of Compression Ring
Stadium Projects
92AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
DESALTER VESSELS Stage: NDT in Progress after PWHT
Trail Assembly of Compression Ring
Stadium Projects
93AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Stadium Projects
Trail Assembly of Compression Ring
94AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Fabrication of Side Chord
Stadium Projects
95AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Fabrication of End Girder
Stadium Projects
96AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Fabrication of Connecting Plates
Stadium Projects
97AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
LOCATION MAP IN KUWAIT
Location Map
98AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
Location Map
99AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.
FOR ALL QUERIES PLEASE CONTACT
Queries
SAIF MOHAMMEDBusiness Development Manager
ABJ Engineering & Contracting CompanyP.O. Box – 10331, Shuaiba – 65454,
KuwaitTel: +965 -22259522 EXT. 6529
Fax: +965-22259523 Mob: +965-97251958E-Mail: [email protected]
Website: http://www.abjengineering.com