Construction Analysis for Pavement Rehabilitation Strategies
AASHTO Value Engineering Conference
Sep 2, 2009
Michael Samadian: Caltrans DRI
Dr. E.B. Lee: U. C. Berkeley
AASHTO-FHWA Technology Endorsement
2
CA4PRS, Decision-support Tool for Highway Sustainability Projects
CA4PRS, DecisionCA4PRS, Decision--support Tool for support Tool for Highway Sustainability ProjectsHighway Sustainability Projects
• Highway Sustainability Projects– Over-due Design-life: M & R projects– Capacity Improvement : Roadway widening projects– Work-zone Impacts on Mobility and Safety– FHWA 2008 Regulation: WZ Assessment and TMP
• CA4PRS Software: Pooled-fund (5 DOTs)– AASHTO TIG Promotion: WZ Tools– FHWA Outreach: Market-ready Technology Product
• Group-License (Free) for all 50 State DOTs• Distribute to 20 states and training 1,200 engineers• Caltrans leadership: Standard and implementation stage
– International Road Federation (IRF) Award
3
CA4PRS Modules: Alternatives ComparisonCA4PRS Modules: Alternatives ComparisonCA4PRS Modules: Alternatives Comparison
4
Alternative Criteria and ImplementationAlternative Criteria and ImplementationAlternative Criteria and Implementation• Pavement Design Alternatives
– Pavement Type: PCC, HMA, RHMA, Pre-cast– Cross-section, Thickness, Mix, Base type
• Traffic Lane-closure Schemes – Construction window: Night-time, Day, Weekend, Continuous– Closure-hour Sensitivity and Closure-scale (Full vs Partial)
• Contractor’s Logistic Constraints– Site access and Constructability constraints
• Planning Stage: PSSR or PA&ED– Value Analysis: Alternative Comparison– Life-cycle cost analysis
• Design Stage: PS&E & TMP– Working-days (CPM); Construction-staging; Constructability – Lane-closure charts; Incentives (I/D); TMP; Outreach
• Construction Stage: Contractor’s work-plans
5
I-15 Devore Concrete Reconstruction ProjectsII--15 Devore Concrete Reconstruction Projects15 Devore Concrete Reconstruction Projects
CA4PRSValidation• Two truck-lane PCC Pavement Reconstruction
– 3-4 lanes / direction, 120,000 ADT – 10 lane-mile (2.5 mile x 2 lanes x 2 dir) PCCP – 12” JPCP / 6” ACB, using 12-h mix RSC
• CA4PRS Pre-construction Analysis– Schedule – Traffic – Cost Comparison– Conventional (Nighttime) vs. Innovative (Extended) Closures– Post-construction analysis: $6M (cost) and $2M (delay) Saving
6
I-15 Devore Daily Traffic Patterns- Approximately 120,000 ADT (10% trucks)- Weekdays Commuters + Weekend Leisure
II--15 Devore Daily Traffic Patterns15 Devore Daily Traffic Patterns-- Approximately 120,000 ADT (10% trucks)- Weekdays Commuters + Weekend Leisure
0
1,000
2,000
3,000
4,000
5,000
6,000
1 3 5 7 9 11 13 15 17 19 21 23Time of day
Veh
icle
s pe
r ho
ur
SB (Mon-Thu) SB (Sun)NB (Mon-Thu) NB (Fri)
Expected CWZ capacity
7
II--15 Devore Pre15 Devore Pre--construction Analysis construction Analysis CA4PRS ScheduleCA4PRS Schedule--TrafficTraffic--Cost ComparisonCost Comparison
TotalClosures
ClosureHours
Max.Delay(Min)
Delay (RUC)Cost ($M)
AgencyCost ($M)
TotalCost ($M)
One RoadbedContinuous (24/7) 2 400 80 5.0 25.0 30.0
72-Hour WeekdayNon-stop 8 576 50 8.0 26.0 34.0
55-Hour WeekendExtended 16 880 80 14.0 27.0 41.0
9-Hour NighttimeClosures 230 2,100 50 7.0 31.0 38.0
8-Hour NighttimeClosures 300 2,400 20 3.0 33.0 36.0
7-Hour NighttimeClosures 410 2,900 10 1.0 35.0 36.0
ConstructionScenario
ConstructionSchedule
CostWZ Traffic Delay
8
CA4PRS Interaction with Traffic Database
9
CA4PRS Interaction with Cost Bid Database
10
CA4PRS Integration with Life-Cycle Cost Analysis
11http://www.dot.ca.gov/hq/research/roadway/ca4prs/index.htmhttp://www.dot.ca.gov/hq/research/roadway/ca4prs/index.htmhttp://www.dot.ca.gov/hq/research/roadway/ca4prs/index.htm
Web Info: Google CA4PRS Web Info: Google CA4PRS Web Info: Google CA4PRS
12
More CA4PRS Information?More CA4PRS Information?More CA4PRS Information?• Contacts
– Dr. E.B. Lee: UC Berkeley-ITS• (510) 665-3637; [email protected]
– Keith M. Platte : AASHTO Materials and Product Evaluation• 202 624 7830; [email protected]
– Michael Samadian: Caltrans Research• (916) 324-2048; [email protected]
– Dr. Nadarajah Sivaneswaran (Siva): FHWA Turner-Fairbank • (202) 493-3147; [email protected]
– Ken Jacoby: FHWA Office of Asset Management• 202-366-6503; [email protected]
• GOOGLE “CA4PRS”http://www.dot.ca.gov/hq/research/roadway/ca4prs/index.htm
13
CA4PRS => LCCA Integration: I-15 HOT WideningCA4PRS => LCCA Integration: ICA4PRS => LCCA Integration: I--15 HOT15 HOT WideningWidening
Shoulder
Shoulder
New
Shoulder
GP lanes
New
Express (toll) lane
GP lanes
14
I-15 HOT Pavement Type SelectionSchedule – Traffic – Cost AnalysisII--15 HOT Pavement Type Selection15 HOT Pavement Type SelectionSchedule Schedule –– Traffic Traffic –– Cost AnalysisCost Analysis
0.1' Milling / 0.1' OGFC206510a2nd OGFC
0.6' Mill /0.25' HMA/0.25' PBA-6a/0.1‘OGFC2055201st ACP
Rehabilitation
0.35' Mill / 0.25' PBA-6a / 0.1' OGFC2045102nd ACP CAPM 0.35' Mill / 0.25' PBA-6a / 0.1' OGFC2035101st ACP CAPM
0.1' Milling / 0.1' OGFC202510a1st OGFC
0.1' OGFC/0.85' HMA/0.75' AB/1.1' AS201520ACP Widening
20-yearStandard-Life ACP
CPR "A" (10% Slab, grinding, seal)2065103rd PCCP CAPM CPR "B" (5% Slab, grinding, seal)206052nd PCCP CAPM CPR "C" (2% Slab, grinding, seal)205551st PCCP CAPM
1.0' JPCP/0.5'ACB/0.7'AS201540PCCP Widening40-yearLong-lifePCCP
Pavement Cross-sectionConst-(year)
Life(year)
ConstructionActivity
LCCA Design
LCCA needs 30 Analysis: 10 Constructions x 3 Estimates (Duration-RUC-Cost) <= CA4PRS
15
I-15 Widening Life-Cycle Cost ComparisonII--15 Widening Life15 Widening Life--Cycle Cost ComparisonCycle Cost Comparison
($37)($10)Difference (PCCP-ACP)$108 $61 60ACP Total
$7 $3 Annual Maintenance$4 $1 42 nights102nd OGFC
$24 $5 286 nights201st ACP Rehabilitation$15 $5 143 nights102nd ACP CAPM $15 $7 143 nights101st ACP CAPM
$4 $3 42 nights101st OGFC$38 $382.5 years20ACP HOT Widening
ACP(Alternative)
$71 $51 60PCCP Total$2 $1 Annual Maintenance
$11 $2 165 nights103rd PCCP CAPM $9 $2 105 nights52nd PCCP CAPM $3 $1 41 nights51st PCCP CAPM
$46 $462 years40PCCP HOT Widening
PCCP(Baseline)
Un-discountNPV DiscountedAGENCY COST ($ Millions)
DurationLifeConstructionType