Case Study : Alfortville Rue Nelson Mandela Context Construction of an apartment complex with 200 flats and an underground car park with a capacity of 234 parking spaces. Characteristics and Key Informations Total volume managed - 27 026 Metric Tons : - 16 300 Metric Tons of Polluted Soils - 10 726 Metric Tons of Non-contamined Soils Evacuation : 500 Cubic Metres per day via road transportation Our clients : Bouygues Batiment and Brézillon HesusAdded Value Reduced the carbon footprint Scientific expertise to categorise the soil, post-levelling work, as a recoverable natural field (sand) Setting up a circular management : repurposing the sand through on-site blinding concrete production for an on-site use

Transcript of › wp-content › uploads › 2017 › 05 › HESUS-Case-Studies.p… · Case Study : Alfortville...

Page 1: › wp-content › uploads › 2017 › 05 › HESUS-Case-Studies.p… · Case Study : Alfortville Rue Nelson Mandela - HesusHesus’ Added Value Reduced the carbon footprint Scientific

Case Study : Alfortville – Rue Nelson

Mandela

Context

Construction of an apartment complex with 200 flats and an underground car park with a capacity of 234 parking spaces.

Characteristics and Key Informations

Total volume managed - 27 026 Metric Tons : - 16 300 Metric Tons of Polluted Soils - 10 726 Metric Tons of Non-contamined Soils

Evacuation : 500 Cubic Metres per day via road transportation Our clients : Bouygues Batiment and Brézillon

Hesus’ Added Value

▪ Reduced the carbon footprint

▪ Scientific expertise to categorise the soil, post-levelling work, as a recoverable

natural field (sand)

▪ Setting up a circular management : repurposing the sand through on-site

blinding concrete production for an on-site use

Page 2: › wp-content › uploads › 2017 › 05 › HESUS-Case-Studies.p… · Case Study : Alfortville Rue Nelson Mandela - HesusHesus’ Added Value Reduced the carbon footprint Scientific

Case Study : Extension of the Metro Line 14

Context

The extension of the Metro Line 14 aims to connect both ends to a business center in the North and Orly international airport in the South. The project requires using a Tunneling Boring Machine (TBM) which produces an important amount of wastes.

Characteristics and Key Informations

Total volume managed : 10 800 Metric Tons of polluted soils Our client : Cemex Barge capacity : 1200 or 2000 Metrics Tons Duration : from Septembre to November 2016

Hesus’ Added Value

▪ Working with a hardly transportable and manipulable material : mud

(thixotropy)

▪ Organising and optimising the logistics with multiple transportation modes

(inland navigation and road transport)

▪ Optimised the cost of the operation and decreased the environmental impact

Page 3: › wp-content › uploads › 2017 › 05 › HESUS-Case-Studies.p… · Case Study : Alfortville Rue Nelson Mandela - HesusHesus’ Added Value Reduced the carbon footprint Scientific

Case Study : Lyon – Cours Lafayette

Context

Creation of two traffic lanes reserved only for trolleybuses in one of Lyon’s major boulevard.

Characteristics and Key Informations

Total volume managed : 760 Metric Tons of surfacing Our client : Cardem Container capacity : 10-15 Metric Cubes Duration : From 01/04/2016 to 10/05/2016

Hesus’ Added Value

▪ Working with a hazardous material : asbestos

▪ Adapting the logistics to the material : specific containers (Body Benne)

and specific trucks (Ampliroll)

▪ Managing under a short deadline : 3 days to gather and evacuate the material

Page 4: › wp-content › uploads › 2017 › 05 › HESUS-Case-Studies.p… · Case Study : Alfortville Rue Nelson Mandela - HesusHesus’ Added Value Reduced the carbon footprint Scientific

Case Study : Saint-Denis – Zac Montjoie

Context

Revitalisation of a neighborhood in Saint-Denis with the construction of appartment buildings, working offices, parks and a future highschool.

Characteristics and Key Information

Total volume managed : 20 000 Metric Tons - Polluted soils - Non-contamined soils

The 20 000 tons were sent to 4 different treatment centers Our client : Dubrac TP Truck Pace : 30 Metrics Tons evacuated every day Duration : From 2015 to 2016

Hesus’ Added Value

▪ Managing massive amounts and different types of materials

▪ Organising transportation with inland navigation and road transport

▪ Working with contingencies : discovery of tar within the soils