Transcript of A profile of the Tirana's river planned Hydro Power Plant
Municipality of TiranaAlbania
Profile of the Tirana ’s River Basin and Hydro Power Plant
Prof.Dr. Edmond Panarit iDeputy/Mayor
Tirana-Albania
Capital of AlbaniaTirana c ityTirana is the capital of Albania. Included surrounding villages, Tirana counts in total about 800.000 inhabitants among which about 500 000 are located in Tirana Municipality. The surface extension of the city is 1238 km2
The BasinRiver Tirana Tirana river constitutes the principal branch of Ishmi river . It has an ovearll length of 35 km , and collects the water of Lana river and Limuthi branch. The main river Ishem is formed downstream Tirana city.
The hydrographic catchment of Ishmi river has a total area of 673 km2. It has a total length of about 75 km and an average elevation of 357 m. The Ishmi river is formed by three main rivers Tirana river, Tercuza river and Zeza river
Tirana river January 2012
Restoration and Rehabil itation of the Tiranas River ’Banks one of the largest project of Tirana |
Municipal ityTirana River is the most polluted river in Albania
Rivers crossing the Capital TiranaTwo relevant rivers cross the city; the Lana River and the Tirana river. Those two
water bodies meet the main Ishem River downstream of Tirana city.
Point where Tirana river join’s Lana river
Lana River
Lana River is a tributary of River Tirana, which crosses from East to West the urban area of the Capital.
POPULATION AND AGRICULTURE IN WATERSHEDS AREA
The historic and actual archive of HI is usedData to be collected
Land use and urban density (Population) of connected watersheds
Detailed maps of the river area 1:25.000
Density of populationSq/km
Rural land(%)
Arable land(%)
Arboriculture(%)
Forest(%)
Pasture(%)
Tirana River
385.5 36.3 29.1 7.2 33.9 4.3
Tirana 460.4 25.4 19.1 6.3 39.7 6.1
Tirana’s Watershed Chart
4370000 4375000 4380000 4385000 4390000 4395000 4400000 4405000
4576000
4578000
4580000
4582000
4584000
4586000
4588000
4590000
4592000
4594000
4596000
4598000
4600000
4602000
4604000
4606000
4608000
4610000Untitled
ISH
EM
0-5
7531.1
Lana 0-22862.6
22112
Tirana River Cascade Hydropower Potential
• Tirana’s river watershed energy project, will include the constructions of two hydropower plants situated in two sites along the Tirana river flow Zall-Dajt and Brar.
• Average perennial flow rate is 2,7 cubic m/s. The output energy shall enter the 20 kV substation situated 1000 m far from the HP plant. The plant will be placed at approximately 8 km from the capital.
• A concession contract is expected to be concluded with the Ministry of Economy and Energy, once an investor shall be identified and will take it over.
• Construction permit will be granted by the Government following the presentation of a detailed design of the work.
Card
• Name of the work: HP watershed on Tirana’s river
• Installed Power 18,20 MW (Average Annual Energy 68,20 MWh) supplied by two hydropower plants
HPP-s technical Data• Zall-Dajt-HPP• Q average=0,70m3/sec• Derivation pipeline Nr1 (Pipe/C/R) 1Ø1m and L=1250 m length• Derivation pipeline Nr 2 (Pipe/C/R) 1Ø 0,8 m and L=1550 m length• Pipeline of turbines (Steel) 2Ø0.90 m and L=130 m length.• Installed Power N=2,60 MW• Average Annual Energy E=11,35 million kWh.• Brar-HPP• Dam from gravel H Dam=55m• Total Volume of Reservoir, V reservoir=41.50 million m3• Regulator volume of Reservoir, V regulator=31.50 million m3• Dead Volume of Reservoir, V dead=10 million m3• Average perennial inflow rate Q average=2,70m3/sec• Derivation: Pipeline C/R Di= 1Ø2.2 m, L=3100 length an tunnel Di=Ø2.2m, L=3100m length• Balance Tower with DT=8m and Height H T=20m• Pipeline of Turbines (Steel) 2Ø1,60 m and L=1100 m length• Installed Power N=15.60 MW• Average annual energy output=68.20 million kWh
HP Turbines• ZALL-DAJT – HPPPELTON type turbine, two sets capacity 1500 kW.• BRAR – HPPPELTON type turbine, two sets capacity 8000 kW.• Energy produced by two HPP-s to be dispatched through a
10.300 m long line of 350 kv in Brari/Tirana substation.• Current Status of Work – Pending a concessionary biding
process.• List o Conducted studies include: Hydrology, geology-
engineering report, hydrotechnical and hydroenergetic report. Information by the Regional Water Basin Council on details of the concessionary operations, advantages and amounts of water to be used,
Project’s time Lines and Financial terms
• The anticipated expected investment amounts at 42.60 millions of euro.
• Operational Costs (running and maintenance)at 0.015 euro/kW
• Electricity selling price: 0.09-0.12 euro/kWh• Deadline for self-settlement: 9.0-7.3 years• Construction period 3.5 years• Land to be used for the works: To be purchased by
the investor in accordance with the price set by the state.