    Purple Line ExtensionSection 1 Construction Community Meeting September 17, 2015

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    2/64

    Agenda

    2

    • Section 2 and 3 Update

    • Construction Update

    • Eat, Shop, Play Highlights

    • Doing Business With Metro• Business Interruption Fund

    • Break Out Q&A

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    3/64

    Purple Line Extension

    Project Alignment

    3

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    4/64

    Section 2 and 3

    Status

    Under Construction Forecasted Schedule

    Section 1 Section 2 Section 3

    Length 3.9 Miles 2.55 Miles 2.48 Miles

    New Stations Wilshire/La BreaWilshire/Fairfax

    Wilshire/La Cienega

    Wilshire/RodeoCentury City/

    Constellation

    Westwood/UCLAWestwood/VA

    Hospital

    Pre-Construction Activities Current - 2016 2015 - 2018 2025 - 2027

    Construction 2015 - 2023 2019 - 2026 2027 - 2035

    Operations 2024 2026 2035 4

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    5/64

    PLE Section 1

    Alignment

    5

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    6/64

    Purple Line Maintenance Facility

    6

    Butterfield Property

    590 S Santa Fe Avenue

    • Located in Arts District

    downtown, near 6th St Bridge

    • Building demolition completed

    • Environmental review of property

     – Department of Toxic Substance

    Control (DTSC) conducting public

    comment period now through

    October 7th on draft removal action

    work plan for site.

     – For more information contact DTSCProject Manager Jessy Fierro at

     [email protected] ,

    818-717-6563

    mailto:[email protected]:[email protected]

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    7/64

    Tie-in at Western Station 

    7

    Pothole Work (Underground Utility Investigation)•September 14 thru October 9th

     – Wilshire between Manhattan Place and Western

     – Daytime: 9:00am to 3:30pm

    Acquire Buildings/Abatement – Properties anticipated to be acquired by October 2015

     – Demo will follow in spring 2016

    Example of utility work at Fairfax

    Rendering of AUR Work

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    8/64

    Crenshaw Yard Staging Site

    Wilshire/Crenshaw • Used throughout Section 1 utility relocation and construction

    • Mitigation efforts and maintenance:

     – “Right Turn Only” signs at Lorraine Gate 

     – “No Metro Contractor Parking on City Street” signs 

     – Noise awareness training – Nightly noise readings

     – Maintenance inside and outside of yard

    8Signage at the Crenshaw Yard

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    9/64

    La Brea Station

    Rendering shows length of the La Brea underground station boxon Wilshire Blvd from Orange Dr to Detroit St 9

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    10/64

    La Brea Station

    ConstructionLADWP Electrical Duct Bank Work• Currently underway on NE corner of Wilshire

    and La Brea, 8pm to 6am, Sunday thru

    Thursday

    • Anticipated completion date September 30th 

    Pothole Work (Underground Utility

    Investigation)• September 14 thru October 23rd

    • Orange Dr to Detroit St

    • Daytime: 9:00am to 3:30pm

    • Nighttime: 8:00pm to 6:00am

    Sewer/Storm Drain• October 4 thru Oct 25

    • Nightime: 8:00pm to 6:00am

    10

    LADWP Electrical Duct bank Work

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    11/64

    • Completed demolition of former Metro

    Customer Service Center, Blockbuster

    and Lawrence of La Brea buildings

    • Sound wall construction underway

    • Daytime operation: 7am to 4pm

    • Work began August 28th and will continue

    until October 29th 

    • Sound wall will be 20 feet high

    La Brea Station

    North La Brea Staging Yard

    11

    Demolition of Buildings at N La Brea Staging Yard

    Construction of Noise Barrier around yard

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    12/64

    • Demolition of former Bank of America

    Property Completed

    • Metro acquired adjacent property on the

    southeast corner of Wilshire/Detroit end of

    August.

     – Abatement activities underway – 7am-4pm, Monday thru Friday

     – Demolition of buildings anticipated to begin in

    October

    • Future South La Brea Staging Yard

     – Sound wall construction anticipated to begin in

    October.

    La Brea Station

    South La Brea Staging Yard

    12

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    13/64

    • Demolition of former

    Bank of America

    Property completed

    • Metro acquired

    adjacent property on

    the southeast corner ofWilshire/Detroit end of

    August.

    La Brea Station

    South La Brea Staging Yard

    13

    Demolition of Buildings at S La Brea Staging Yard

     Abatement work currently underway at former

    business buildings on SE corner of Wilshire/ Detroit

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    14/64

    La Brea Station

    Mitigation 

    14

    Noise Blankets during nighttime Ductbank

    work at NE corner of Wilshire and La Brea

    Design of Sound Wall for N/S La Brea yards

    Crenshaw Staging Yard Maintenance

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    15/64

    La Brea Tree Removal

    • La Brea Tree removal begins end of September• 16 trees will be removed in medians

    • 6 Sidewalk Trees removed and relocated

     – 4 Trees relocated to Crenshaw Staging Yard

     – 2 Trees relocated to LAPD Wilshire Division

    • Trees posted for removal May 9, 2015

    • Board of Public Works approved Tree removalplan July 22, 2015

    • Tree removal schedule

     – Fairfax: summer 2016

     – La Cienega: late 2016

    • End of project trees will be replaced 2:1

    15

    Trees being removed at median located on Wilshire

    between La Brea and Detroit

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    16/64

    La Brea Median Removal

    16

    Median on Wilshire between

    Sycamore and La Brea

    Median on Wilshire between

    La Brea and Detroit

    October 2015• 3 medians removed on Wilshire between Sycamore and Cloverdale 

    • Medians returned after project completion with landscape

    • Work required to reconfigure Wilshire to 2 lanes in each direction for pile drilling operations

    Median on Wilshire between

    Detroit and Cloverdale

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    17/64

    La Brea Station

    Pile Installation

    17

    November 2015 through Summer 2016*• First major construction activity of subway at La Brea.

    • Length of pile installation will be on Wilshire from Orange Dr.

    to Detroit St.

    • Pile installation includes:

     – Rig to construct 95ft (L) deep hole on 7 center to center spacing

     – Crane lifting 95Ft (L) , 24 Inch H-piles into holes

     – 1-2 piles per day, 390 piles total

     – Drilling, pile installation and backfilled concrete completed same

    day

    • All work occurs behind a k-rail.

    • Operation anticipated to take approximately 4-6 months on

    each side of the street.• Typical works hours 7am-11pm.

    • Wilshire will be reduced to two lanes each way during

    construction.*dates subject to change

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    18/64

    La Brea Station

    Pile Installation

    18

    • Wilshire Reconfiguration, Cloverdale to Mansfield• 2 lane westbound Wilshire, 2 lanes eastbound Wilshire

    • No medians, no parking on Wilshire

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    19/64

    La Brea Station

    Pile Installation

    19

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    20/64

    La Brea Station

    Decking Layout 

    20

    • Green: Hard closures at

    Highland and La Brea

    • 7 full weeks

    OR

    • 16 weekends

    • Purple: Hard closure at La

    Brea and Detroit

    • 3 weekends, Detroit to

    La Brea

    • 3 weekends, La Brea

    intersection

    *Dates subject to change 

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    21/64

    La Brea Station

    Decking Options 

    Decking• Construction of a concrete deck, curb to curb on Wilshire, between

    Orange Dr and Detroit St.

    • After concrete panels are installed, traffic can travel over the

    surface while the station is constructed underground.

    • Will follow pile operations; anticipated spring 2016

    Option 1*• 7 week full closure of Wilshire, from Highland and La Brea

     – 7 days a week, 7am-11pm above deck, 11pm-7am below deck

     – 15 Nights of work

    • 6 weekend closures La Brea to Detroit

     – 9pm Friday thru 6am Monday, work continuous

    Option 2*• Approximately 22 weekend closures

     – 9pm Friday thru 6am Monday, work continuous

     – 66 Nights of work

    21

    Have a preferred option? Send comments to

    [email protected], Subject: Decking Options 

    *Dates subject to change 

    mailto:[email protected]:[email protected]

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    22/64

    La Brea Station Decking

    22

    Early detours: South on Crenshaw, west on Olympic, north on La BreaDetour at hard closure: South on Highland, west on Olympic, north on La Brea

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    23/64

    La Brea Station Decking

    23

    • Work Area: Wilshire Blvd from Orange Dr to Detroit StDriveway Access Maintained to Businesses and Residents

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    24/64

    La Brea Station DeckingDecking Photos from Crenshaw/LAX project

    24

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    25/64

    La Brea Station Decking

    Community Outreach 

    25

    • Marketing Campaign• Social Media: Facebook, Twitter

    • Advertising: Newspapers, radio

    • Media Coverage: Press Release, event

    • Business and resident outreach

    • Meetings with local groups, leaders

    • Elected Official Briefings• Safety Presentations

    • School Presentations

    • Community PartnershipsI-405 Freeway Closure “ Carmageddon”  

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    26/64

    La Brea Station Decking

    Process of Determination 

    • August/September: Outreach started directly to businesses and residents,La Brea to Highland

    • September 17-November 11: Outreach continues to businesses and

    residents 

    • November 12: Next Construction Community Meeting

     – Will make determination by this meeting

    • If approved, November - March 2016: Contractor and Metro work to get

    approvals from

     – City Council Member Ryu, CD4

     – LA Department of Transportation

     – LA Bureau of Engineering

     – Board of Public Works

    Have a preferred option? Send comments to [email protected], Subject: Decking Options

    26

    mailto:[email protected]:[email protected]

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    27/64

    Detours: Wilshire Full Closure 

    27

    • LADOT approves all detour routes

    for each construction activity

    • Will avoid local streets

    • Proposed detours

    • South to Olympic

    • North to 3rd Street.

    LADOT Dash Map

    • Bus lines that use Wilshirebetween Fairfax and La Brea

    • Metro 720

    • Metro 20

    • LADOT Dash Fairfax

    • Antelope Valley Transit (AVT)

    • No buses use 8th currently• DASH uses 6th

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    28/64

    Parking Utilization Study 

    • La Brea Utilization study completed

     – Investigated from Highland to Ridgeley, 6th to 8th

    • Station located in Miracle Mile

     – High demand for parking on and off-street – Several Preferred Parking Districts

    • Examined parking utilization rate of existing

    parking spaces

    • Determined initial additional spaces needed for

    Parking Management Plan

    28

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    29/64

    Parking Relocation 

    Proposed Parking Replacement Plan

    • Turn 2 way street into 1 way street

     – Removes parallel parking on one side

     – Replaces one side with angled parking

    • Current prospects: Cloverdale and Ridgeley• Will remain 2 way street up to public parking lots. After lots,

    northbound one way street from Wilshire to 6th

    • Requires 2/3 approval by building owners/managers of both sides of

    each street

    • Meeting with residents/owners August 20, 2015• Overall opinion: NOT SUPPORTED

    • Metro evaluating EIR for any further parking requirements

    29

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    30/64

    Fairfax Station

    Rendering shows length of the Fairfax underground station box

    on Wilshire Blvd from west of Fairfax to just west of Ogden Dr. 30

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    31/64

    Fairfax Station

    Construction Metro Advanced Utility Relocation (AUR) Work• Electrical, water and gas work continues

    • Work Hours:

    Day work:

    o Monday thru Friday: 9am-3:30pm

    o Saturday: 8am-6pm

    Night work:

    o Sunday thru Thursday: 8pm-6am

    o Friday: 10pm-8am

    31

    Photos of recent AUR work for Fairfax Station

    Photos of recent AUR work at Wilshire/Fairfax

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    32/64

    Fairfax Utility Relocation

    2 Years  *Schedule is subject to change. Updated as of July 2015.

    32

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    33/64

    Fairfax Station

    Mitigation • Noisy activities re-scheduled from night to day work or to be completed by

    11 p.m. Activities are monitored throughout each shift.

    • Torch cutters used in place of traditional plate cutters.

    • Sound blankets shifted and additional blankets added when needed.

    • Low impact back up alarms installed on mobile equipment for night work.

    • Battery powered (solar charged) lights eliminate noise from generators. 

    33Photos of noise mitigation at Wilshire/Fairfax

    Fairfax Station

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    34/64

    Fairfax StationOgden Staging Yard

    • Buildings on Wilshire atOgden and Orange

    Grove have been

    abated.

    • Future Ogden Staging

    Yard

    Next Steps:

    • Demo anticipated

    end of October 2015

    34

    Buildings at 6010-6030 Wilshire

    Fairfax Station

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    35/64

    Fairfax Station

    North Fairfax Staging Yard

    • North Fairfax Staging Yard

    • Demolition of Marinello building

     – Scheduled to begin Sept 21- October 19

     – Work hours: 7am-4pm

    • Temporary re-routing of the adjacent alley atWilshire required

     –  Deliveries will be maintained to 99cent store

     – Work hours: 9am-4pm

    35

    Johnnies

    Fairfax Station

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    36/64

    Fairfax StationFairfax Coordinated Construction Projects (FCCP)

    Multiple construction projects are underway within a

    3 block radius of Wilshire and Fairfax.

    • Metro Purple Line Extension

    • The Petersen Automotive Museum

    • The Academy of Motion Pictures Arts and Science

    • Alliance residential and commercial

    The FCCP committee members meet every 2 months to discuss and

    review the specifics of local construction relating to timelines and

    coordinated traffic control as a continuing effort to reduce the impact

    on the community.

    36

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    37/64

    La Cienega Station

    Rendering shows length of the La Cienega underground station

    box on Wilshire Blvd from La Cienega to Tower Dr. 37

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    38/64

    La Cienega Station

    Construction 

    Metro Advanced Utility Relocation (AUR) Work• Electrical, sewer and telecommunication work continues from La

    Cienega to San Vicente and on La Cienega north of Wilshire

    Photo of recent AUR work for the La Cienega Station

    38

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    39/64

    La Cienega Utility Relocation

    30 Months  *Schedule is subject to change. Last updated September 2015  

    39

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    AT&T

    2017

    Fiber

    Gas

    AT&T

    Water, Sewer, Storm Drain and Power

    Fiber

    2014 2015 2016

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    40/64

    La Cienega Station

    What’s Next 

    April through December 2015

    • AUR activities occur mostly during

    daytime hours.

    • Days and Hours

    o Monday thru Friday: 7am – 4pmo Saturday or Sunday: 8am – 6pm

    o Night Time Hours:

    • 8pm – 6am or

    • 1am – 9am

    40

    for La Cienega Station

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    41/64

    La Cienega Station

    Gale Staging Yard • Recently acquired properties for

    future staging yard on Gale

    • Abatement work at 111 N. Gale

    scheduled September 7- 18, 2105

     – Work hours: 7am-3:30pm

    41

    i i

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    42/64

    La Cienega Station

    What’s Next • Future N La Cienega Staging

    Yard

    • Abatement activities in progress

    for properties acquired

     – Former Citibank

     – Former Phoenix Restaurant

    42

    W k d Di ti l Cl

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    43/64

     Weekend Directional Closures 

    Wilshire, La Cienega to San Vicente

    43

    • 7 weekends total

    • September 11-12 complete!

    • This weekend: Friday at 10pm through Sunday, Sept 20

    at 6pm

    • 5 more weekends through October 24, 2015

    • Directional closures (either full EB or WB Wilshire),between La Cienega to San Vicente

    • Days and Hours

    o Start: Friday 10pm or 1am*

    o End: Sunday by 6pm

    *start time depends on the Saban Theatre performance schedule

    Detours:• EB Wilshire closed at La Cienega:

    Detour NB La Cienega, SB SanVicente, EB Wilshire

    • WB Wilshire: One lane open fromSan Vicente to La Cienega.

    • NB San Vicente left turn to WB

    Wilshire: Closed 

    E t Sh Pl Wil hi

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    44/64

    44

    Eat, Shop, Play Wilshire

    Lunch Meet-up at Hill Bar & Grill • On September 1, we held our 2nd #espWilshire Lunch Meet-up at The

    Hill Bar & Grill, a locally-owned restaurant located diagonally across the

    street from the future La Cienega Station. 45 diners attended to show

    their support for EAT, SHOP, PLAY Wilshire.

     – Address: 8442 Wilshire Blvd. Beverly Hills, CA 90211

     – For more info visit: www.thehillbarandgrill.net 

    E t Sh Pl Wil hi

    http://www.thehillbarandgrill.net/http://www.thehillbarandgrill.net/

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    45/64

    45

    Eat, Shop, Play Wilshire

    Vendor Day 

    Zimmer Children’s Museum 

    Vendor Day, Thursday, August 20th (Gateway Lobby)

    The Zimmer is designed for children 8 & under, this museum boasts hands-on

    exhibits and frequent family programs.6505 Wilshire Blvd. , Los Angeles, 90048

    More info: http://www.metro.net/service/discounts/esp-purple-line/zimmer-

    childrens-museum/

    Dysonna City Art GalleryVendor Day, Thursday, July 10th  (Union Station)• Dysonna City Art Gallery presents new and experienced artist

    from across the United States. All types of art are featured every

    month from abstract to figurative fine art to photography. The

    Gallery also has special events, painting classes and so much

    more.

    • Address: 5373 Wilshire Blvd, Los Angeles, 90036• More Info: http://www.metro.net/service/discounts/esp-purple-

    line/dysonna-city-art-gallery/ 

    Eat Shop Play Wilshire

    http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    46/64

    46

    Eat, Shop, Play Wilshire

    Candela Taco Bar and Grill Candela Taco Bar & Lounge serves over 15 types of tacos, entrees and deliciousdrinks. They also have Tango Night Tuesdays starting at 7 p.m. and $1 taco night

    every Wednesday. There’s also a private event space for up to 600 guests.

    Mention “Metro” or “Purple Line Extension” and receive 20% off an appetizer.

     – Address: 831 South La Brea, Los Angeles, CA 90036

     – For more info visit: http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/ 

    Eat Shop Play Wilshire

    http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    47/64

    47

    Eat, Shop, Play Wilshire

    ESP Spotlight LACMA 

    GO METRO: and receive $2.00 discount on general admission 

    Info: http://www.metro.net/service/discounts/esp-purple-line/lacma / 

    Eat Shop Play Wilshire

    http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    48/64

    48

    Eat, Shop, Play Wilshire

    Speedy Computer Center • Speedy Computer Center is a neighborhood computer center that

    provides on-site services, usually within 2 hours of your call or a

    technician can be sent to your home, office and or business. Rates in

    store and on-site are reasonable and most repairs are same day service,

    some even while you wait.

     – Address: 5217 Wilshire Blvd, Los Angeles, CA 90036

     – For more info visit: http://www.metro.net/service/discounts/esp-purple-

    line/speedy-computer-center/ 

    http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    49/64

    How To DoBusiness WithMetro Workshop

    September 17, 2015

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    50/64

      DEOD’s Responsibilities 

     Administer and oversee

    Gather data & generate reports

    Publicize contract opportunities

    Provide training and resources

    Set DBE/SBE/DVBE goals

    Monitor compliance

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    51/64

    About Metro 

    Multimodal transportation agency

    1) Operator of buses and rail

    2) Transportation planning and programmingagency

    3) Construction agency of mobility relatedbuilding projects

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    52/64

    What does that Mean? 

    Largest public works programs in the country

    Dozen of projects

    $30 to $40 Billion over 30 years

    Metro is changing the urban landscape

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    53/64

    Why is that Important? 

    Metro needs contractors to:Design & build projects

    Service & maintain existing projects andinfrastructure

    Metro needs a LOT of:

    Prime contractorsSmall Business Enterprises (SBEs)

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    54/64

    Metro’s Commitment to Small Businesses 

    Long history of support

    Values and encourages participation of smallbusinesses

    We need you

    DEOD’s role 

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    55/64

    DEOD’s Resources Information 

    DEOD website 6 Steps to Doing Business with Metro Small Business Programs Events Calendar Fact Sheets Certification Application Current & Future Solicitations Useful Links Today’s Presentation 

    metro net/connect

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    56/64

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    57/64

    BIF Introduction

    • Metro’s Goal Help small “mom and pop”

    businesses continue to thrive throughout

    construction and post construction

    • Financial assistance to small “mom and pop” businesses directly impacted by Metro transitrail construction along three project areas: – Regional Connector, Little Tokyo area

     – Crenshaw/LAX Transit Project

     – Metro Purple Line Extension, Phase 1

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    58/64

    BIF Eligibility Requirements

    • Small “mom and pop” business with 25 or fewer total employees • Businesses located immediately adjacent to the rail corridor and

    directly impacted by Metro construction

    • For-profit business or non-religious, non-profit

    •Continuous operation for at least 2 years along the corridor

    • Must be a solvent business

    • Must be able to produce relevant financial records demonstratinga loss of business revenue directly related to period of Metro’sconstruction disruption

    • Must be in good standing with all local, state and federal taxingand licensing authorities

    • Must meet all technical qualifications as outlined in Metro’s BIFAdministrative Guidelines

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    59/64

    BIF Financial Threshold

    • Financial threshold: The lesser total of amountof 50,000 or 60% of annual business revenuelosses per business

     – Maximum annual per business not to exceed

    $50,0000

    • Covered fixed operating expenses: Utilities,Insurance, Rent/Mortgage, Payroll and Othersupon review

    Note: Special provisions exists for commercialproperty owners

    BIF P R

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    60/64

    BIF Program Resources

    >

    BIF Program Materials• Factsheet (take one)• 4 Step Easy Guide

    > BIF Application• Online

    • Paper (per request to PCR)• In person

    > BIF Business Advisors> BIF Workshop Series

    • Date: Wednesday, October 14, 2015• Time: 11:30am – 12:30pm• Location: 5200 Wilshire Apartments*Refer to Metro’s BIF Workshop schedule for additional locations, dates and times 

    BIF W k h S i

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    61/64

    BIF Workshop Series

    Purple Line Extension, Phase 1Wednesday, October 14, 2015

    11:30am-12:30pm

    5200 Wilshire Apartments

    Los Angeles, CA 90036

    Community Room, 3rd Floor

    **Street parking only

    Regional Connector, Little Tokyo area

    Tuesday, November 10, 2015

    10:30am-11:30am

    Little Tokyo Branch Library, L.A. Public

    Library203 S. Los Angeles Street

    Los Angeles, CA 90012

    Crenshaw/LAX Transit Project CorridorWednesday, September 30, 2015

    4:00pm-5:00pm

    Metro’s Business Solution Center 

    (Co-located at the L.A. Urban League)

    3450 Mount Vernon Drive

    Los Angeles, CA 90008

    Tuesday, October 27, 2015

    10:30am-11:30am

    Inglewood City Hall

    Community Room A, 9th Floor

    One Manchester Blvd.Inglewood, CA 90301

    For additional infomration and to RSVP, please email Adriana Hernandez

    at [email protected] or call (213) 922-2614.

    d d i i

    mailto:[email protected]:[email protected]

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    62/64

    BIF Fund Administrator

    Pacific Coast Regional, Small BusinessDevelopment Corp. (PCR)

    Angela Winston

    Vice President & Program Manager

    3255 Wilshire Blvd., Suite 1501

    Los Angeles, CA 90010

    (213)739-2999 ext. 223

    [email protected] www.pcrcorp.org 

    mailto:[email protected]://www.pcrcorp.org/http://www.pcrcorp.org/mailto:[email protected]

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    63/64

    Future Community Meetings 

    • Next Section 1 Community Meeting: November 12, 2015 atJohn Burroughs Middle School Auditorium, 600 S.

    McCadden Pl.

    • Community Meetings held on the 3rd Thursday of every other month

    (except November, which is the 2

    nd

     Thursday of the month due to Thanksgiving) – Community Meeting location will rotate along the alignment

     – Section 1 Advisory Group will meet as needed to discuss station

    specific issues. Meetings will be open to the public.

    • Sign up for the newsletter to receive project updates!

    63

  • 8/20/2019 9.17.15 Section 1 Community Meeting Presentation

    64/64

    Stay in Touch 

    www.metro.net/purplelineext

    twitter.com/purplelineext

    facebook.com/purplelineext

    213.922.6934

    [email protected]