9.17 - Borough of Woodland Park 062720 · Woodland Park identified specific integration activities...
Transcript of 9.17 - Borough of Woodland Park 062720 · Woodland Park identified specific integration activities...
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-1 June 2020
9.17 BOROUGH OF WOODLAND PARK
This section presents the jurisdictional annex for the Borough of Woodland Park. The annex includes a
general overview of the Borough of Woodland Park; an assessment of the Borough of Woodland Park’s
risk, vulnerability, and mitigation capabilities; and a prioritized action plan to implement prior to a disaster
to reduce future losses and achieve greater resilience to natural hazards.
9.17.1 Hazard Mitigation Planning Team
The following individuals are the Borough of Woodland Park’s identified HMP update primary and
alternate points of contact and NFIP Floodplain Administrator.
Table 9.17-1. Hazard Mitigation Planning Team
Primary Point of Contact Alternate Point of Contact Name / Title: George Galbraith, Director/Woodland Park OEM Address: 5 Brophy Lane, Woodland Park, NJ 07424 Phone Number: 973-256-1264 Email: [email protected]
Name / Title: Kevin Galland, Administrator/Municipal Clerk Address: 5 Brophy Lane, Woodland Park, NJ 07424 Phone Number: 973-345-8100 x201 Email: [email protected]
NFIP Floodplain Administrator Name / Title: Allan Burghardt, Construction Code Official / Bldg Subcode Official / Bldg Inspector / Code Enforcement Officer Address: 5 Brophy Lane, Woodland Park, NJ 07424 Phone Number: 973-345-8100 x208 Email: [email protected]
9.17.2 Jurisdiction Profile
The area of Woodland Park was once the West Park section of the Township of Little Falls. In the early
1900’s, residents in this section felt they were treated unfairly as compared residents in Little Falls. In
1914, the residents of West Park successfully became an independent municipality, West Paterson. In 2009,
the Borough’s name was changed to Woodland Park after nearly 20 years of residents pushing for the
change (Borough of Woodland Park, 2014).
The Borough is governed under the Small Municipality Plan form of government under the Faulkner Act
(Borough of Woodland Park, 2014). According to the U.S. Census Bureau, the Borough has a total land
area of 3.115 square miles, of which 2.964 square miles is land and 0.151 square miles is water. Highway
access is provided by Interstate 80 in the northern edge of town and U.S. 46 along the southern border.
Natural features form the Borough’s other two borders: Garret Mountain on the east and the Passaic River
on the west (Borough of Woodland Park, 2014). According to the U.S. Census, the 2010 population for the
Borough of Woodland Park was 11,819.
According to the U.S. Census, the 2010 population for the Borough of Woodland Park was 11,819. The
estimated 2017 population was 12,542, a 6.1 percent increase from the 2010 Census. Data from the 2017
U.S. Census American Community Survey indicate that 6.4 percent of the population is 5 years of age or
younger and 19.7 percent is 65 years of age or older. Communities must deploy a support system that
enables all populations to safely reach shelters or to quickly evacuate a hazard area.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-2 June 2020
9.17.3 Growth/Development Trends
Understanding how past, current, and projected development patterns have or are likely to increase or
decrease risk in hazard areas is a key component to understanding a jurisdiction’s overall risk to its hazards
of concern. Table 9.17-2 summarizes recent and expected future development trends, including major
residential/commercial development and major infrastructure development. Figures 9.17-1 and 9.17-2 at
the end of this annex illustrate the geographically-delineated hazard areas and the location of potential new
development.
Table 9.17-2. Recent and Expected Future Development
Type of Development 2015 2016 2017 2018 2019
Number of Building Permits for New Construction Issued Since the Previous HMP
Single Family 13 6 2 1 0
Multi-Family 1 0 0 0 0
Other (commercial, mixed-use, etc.)
0 1 0 1 0
Property or Development Name
Type of
Development # of Units / Structures
Location (address
and/or block and lot)
Known Hazard Zone(s)*
Description / Status of
Development Recent Major Development and Infrastructure from 2015 to Present
Since 2015 no major development
Known or Anticipated Major Development and Infrastructure in the Next Five (5) Years
Redevelopment is taking place in the Borough, not new development (i.e., open space to developed property).McBride Avenue near
Lackawanna Ave, – existing
building being taken down
and smaller footprint being
developed to new higher
standards.
Restaurant,
retail and
commercial
1
McBride
Avenue near
Lackawanna
Ave
No
NJDEP reviewed the
plans and ok with
increased greenspace,
building demolition
permit is granted yet
but
* Only location-specific hazard zones or vulnerabilities identified.
9.17.4 Capability Assessment
The Borough of Woodland Park performed an inventory and analysis of existing capabilities, plans,
programs, and policies that enhance its ability to implement mitigation strategies. Section 5 (Capability
Assessment) describes the components included in the capability assessment and their significance for
hazard mitigation planning. This section summarizes the following findings of the assessment:
An assessment of legal and regulatory capabilities.
Development and permitting capabilities.
An assessment of fiscal capabilities.
An assessment of education and outreach capabilities.
Information on National Flood Insurance Program (NFIP) compliance.
Classification under various community mitigation programs.
The community’s adaptive capacity for the impacts of climate change.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-3 June 2020
For a community to succeed in reducing long-term risk, hazard mitigation must be integrated into the day-
to-day local government operations. As part of this planning effort, planning/policy documents were
reviewed, and each jurisdiction was surveyed to obtain a better understanding of their progress in plan
integration. Areas that mitigation is currently integrated are summarized in this section. The Borough of
Woodland Park identified specific integration activities that will be incorporated into municipal procedures
are included in the updated mitigation strategy.
PLANN ING , L EG AL A ND REG U LA TOR Y CAPA BI LI TY
The table below summarizes the legal and regulatory tools that are available to the Borough of Woodland
Park.
Table 9.17-3. Planning, Legal and Regulatory Capability
Do you have this?
(Yes/No)
Authority that enforces
(Federal, State, Regional, County,
Local)
State Mandated / Allowed
Has the HMP been integrated in the last 5 years? If yes- how?
If yes- how? Describe in comments
If no - can it be a mitigation action? If yes, add Mitigation
Action #.
Codes, Ordinances, & Requirements
Building Code Yes Local/State Yes No -
Comment: State mandated on local level under NJAC 5:23-3.14. International Building Code – New Jersey Edition, 2018, NJAC 5:24-3.14. The Construction Official and Department of Inspections enforces the UCC.
Zoning Code Yes Local Yes Yes -
Comment: Per State of NJ Municipal Land Use Law (MLUL) L. 1975, s. 2, eff Aug 1, 1976, 40-55D-62: 49. Power to zone, requires all jurisdictions to have current zoning and other land development ordinances after the planning board has adopted the land use element and master plan. The Zoning Ordinance, Chapter 22 of the municipal code is administered by the Board of Adjustment. The Ordinance was last updated in 2017. For the purpose of limiting and restricting to specified districts, and regulating therein buildings and lands and structures according to their construction and the nature and extent of their use, and to regulate and restrict the height, number of stories, and size of buildings and other structures, the percentage of lot that may be occupied, the size of yards, courts and other open spaces, the density of population and the location and use and extent of use of lands, buildings and structures for trade, industry, residence of other purposes, the municipality is hereby divided into districts as hereafter set forth. The land use pattern as set forth is based upon the Land Use Element of the Master Plan and is intended to effectuate the Master Plan enacted in order to encourage municipal action to guide the appropriate development of land in a manner which will promote the public health, safety, morals and general welfare of the public.
Subdivisions Yes Local Yes No -
Comment: Chapter 297 of the Borough code. Planning and Zoning enforce the Subdivision Code. State mandated - P.L.1975, c.291 (C.40:55D-47): 40:55D-37. Grant of power; referral of proposed ordinance; county planning board approval. Dictated by the Municipal Land Use Law. NJ Statute 40:27-6.2The board of freeholders of any county having a county planning board shall provide for the review of all subdivisions of land within the county by said county planning board and for the approval of those subdivisions affecting county road or drainage facilities as set forth and limited hereinafter in this section. Subdivisions and Site Plan, Chapter 33 of the municipal code, is administered by the M&C/Planning Board. The purpose of the ordinance is to provide rules, regulations and standards to guide land subdivision in the municipality in order to promote the public health, safety, convenience and general welfare of the municipality. It is administered to insure the orderly growth and development, the conservation, protection and proper use of land and adequate provision for circulation, utilities, and services.
Stormwater Management Yes Local Yes No -
Comment: Title 7 of the NJ Administrative Code (N.J.A.C. 7:8); Chapter 29, the stormwater ordinance, is administered by the DPW. The purpose of the ordinance is to prohibit the spilling, dumping, or disposal of materials other than stormwater into the municipal separate storm sewer system (MS4) operated by the Borough of Woodland Park, so as to protect public health, safety and welfare, and to prescribe penalties for the failure to comply.
Post-Disaster Recovery No - - - -
Comment:
Real Estate Disclosure Yes State – Division of Consumer Affairs
Yes No -
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-4 June 2020
Do you have this?
(Yes/No)
Authority that enforces
(Federal, State, Regional, County,
Local)
State Mandated / Allowed
Has the HMP been integrated in the last 5 years? If yes- how?
If yes- how? Describe in comments
If no - can it be a mitigation action? If yes, add Mitigation
Action #.
Comment: N.J.A.C. 13:45A-29.1; Before signing a contract of sale, all purchasers must receive a New Jersey Public Offering Statement (POS) approved by the New Jersey Real Estate Commission. The POS provides information such as proximity to hospitals, schools, fire and police, as well as any hazards, risks or nuisances in or around the subdivision.
Growth Management No Local Yes - -
Comment: State mandated at local level
Shoreline Development No - No - -
Comment:
Site Plan Review Yes Local Yes No -
Comment: MLUL NJ 40:55d. Subdivisions and Site Plan, Chapter 33 of the municipal code is administered by the M&C/Planning Board.
Environmental Protection Yes State, County, and Local
Yes No -
Comment: The rules that are utilized by the NJDEP and other environmental agencies are codified at Title 7 of the NJ Municipal Administrative Code. Environmental Regulations, Chapter 30 of the municipal code are administered by the Police Department.
Flood Damage Prevention Yes Local Yes Yes -
Comment: The Flood Damage Prevention Ordinance, Chapter 28 of the municipal code, is administered by the Floodplain Administrator. It is the purpose of the ordinance to promote the public health, safety, and general welfare, and to minimize public and private losses due to flood conditions in specific areas by provisions designed. Updated flood ordinance was adopted January 2020. a. To protect human life and health; b. To minimize expenditure of public money for costly flood control projects; c. To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public; d. To minimize prolonged business interruptions; e. To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets, bridges located in areas of special flood hazard; f. To help maintain a stable tax base by providing for the second use and development of areas of special flood hazard so as to minimize future flood blight areas; g. To ensure that potential buyers are notified that property is in an area of special flood hazard; and h. To ensure that those who occupy the areas of special flood hazard assume responsibility for their actions."
Wellhead Protection No - - - -
Comment: This is under NJDEP and County Board of Health
Emergency Management Yes Local - No -
Comment: Refer to EOP (authorized by State 2017)
Climate Change No - - - -
Comment:
Disaster Recovery Ordinance No - - - -
Comment:
Disaster Reconstruction Ordinance
No - - - -
Comment: Reconstruction must be done under current building code
Other No - - - -
Comment:
Planning Documents
Comprehensive / Master Plan Yes Local/State Yes Yes, refer to new action 2020-Woodland Park-015
Comment: January 9, 2012 Administered by Planning. The plan includes the following concepts related to hazard mitigation: Incorporate green building and site design techniques into the zoning ordinance to promote a sustainable environment; Promote a more compact mixed-
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-5 June 2020
Do you have this?
(Yes/No)
Authority that enforces
(Federal, State, Regional, County,
Local)
State Mandated / Allowed
Has the HMP been integrated in the last 5 years? If yes- how?
If yes- how? Describe in comments
If no - can it be a mitigation action? If yes, add Mitigation
Action #.
use type of land use pattern in areas with existing infrastructure and density and preserve open space also to promote a sustainable environment; and Incorporate a green buildings and environmental sustainability element into the Master Plan. The Sustainability Element works to promote water conservation and efficiency throughout all sectors of the community; Use sustainable stormwater management techniques in site design to reduce stormwater runoff and control erosion; Provide all segments of the community with information on sustainability, climate change, and strategies for development.
Capital Improvement Plan Yes Local Allowed No -
Comment: Administered by the Local M&C/DPW.
Disaster Debris Management Plan No No - -
Comment: This is in progress. Woodland Park has provided NJDEP the debris staging location 901 McBride Ave and under review.
Floodplain or Watershed Plan No - No - -
Comment:
Stormwater Management Plan Yes Local and State Yes No -
Comment: Per NJDEP Storm Water Management Rule (N.J.A.C. 7:8, et seq.). The Municipal Stormwater Regulation Program was developed in response to the U. S. Environmental Protection Agency’s (USEPA) Phase II rules published in December 1999. The Department issued final stormwater rules on February 2, 2004 and four (4) NJPDES general permits authorizing stormwater discharges from Tier A and Tier B municipalities, as well as public complexes, and highway agencies that discharge stormwater from municipal separate storm sewers (MS4s).The Plan is administered by the DPW. The goals of the plan are:
Reduce flood damage, including damage to life and property;
Minimize, to the extent practical, any increase in storm water runoff from any new development;
Reduce soil erosion from any development or construction project;
Assure the adequacy of existing and proposed culverts and bridges, and other instream structures;
Maintain groundwater recharge;
Prevent, to the greatest extent feasible, an increase in nonpoint pollution;
Maintain the integrity of stream channels for their biological functions, as well as for drainage;
Minimize pollutants in storm water runoff from new and existing development to restore, enhance, and maintain the chemical, physical, and biological integrity of the waters of the state, to protect public health, to safeguard fish and aquatic life and scenic and ecological values, and to enhance the domestic, municipal, recreational, industrial, and other uses of water;
Protect public safety through the proper design and operation of storm water basins;
Meet with adjoining municipalities to cooperatively establish storm water control measures; and
Meet with the county to ascertain regional storm water planning goals and determine their impact on Woodland Park.
Stormwater Pollution Prevention Plan
Yes Local Yes Yes -
Comment: Available online in accordance with NJ DEP.
Urban Water Management Plan No - No - -
Comment:
Habitat Conservation Plan No - No - -
Comment:
Economic Development Plan No - No - -
Comment:
Shoreline Management Plan No - No - -
Comment:
Community Wildfire Protection Plan
No - No - -
Comment:
Community Forest Management Plan
No - No - -
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-6 June 2020
Do you have this?
(Yes/No)
Authority that enforces
(Federal, State, Regional, County,
Local)
State Mandated / Allowed
Has the HMP been integrated in the last 5 years? If yes- how?
If yes- how? Describe in comments
If no - can it be a mitigation action? If yes, add Mitigation
Action #.
Comment:
Transportation Plan Yes Local/State No No -
Comment: The Circulation Plan is an element of the 2012 Master Plan and includes information on roads, passenger rail, bus service, accidents, mass transit, pedestrian and bike circulation. County has a plan in terms of senior transportation and roads upgraded.
Agriculture Plan No - No - -
Comment:
Climate Action Plan No - No - -
Comment:
Tourism Plan No - No - -
Comment:
Business Development Plan No - - - -
Comment:
Other No - - - -
Comment:
Response/Recovery Planning
Comprehensive Emergency Management Plan (CEMP) / Emergency Operations Plan (EOP)
Yes Local Yes Yes -
Comment: Per the NJ Civilian Defense and Disaster Control Act (App.A:9_43.2) Counties and municipalities must have written Emergency Operations Plans to be reviewed every 2 years. The EOP is administered by OEM. Last authorized by State in 2017.
Threat & Hazard Identification & Risk Assessment (THIRA)
No Local Yes Yes -
Comment:
Post-Disaster Recovery Plan No - No - -
Comment:
Continuity of Operations Plan No Local Yes Yes -
Comment: Refer to EOP for continuity of government operations; not a stand-alone plan
Public Health Plan Yes Local Yes Yes -
Comment: Refer to EOP annex; Woodland Park is under the County’s jurisdiction for public health
Other No - - - -
Comment:
Table 9.17-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
- If no, who does? If yes, which department?
Does your jurisdiction have the ability to track permits by hazard area? Yes – permit paperwork indicates
hazard
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-7 June 2020
Criterion Response
Does your jurisdiction have a buildable lands inventory? -If yes, please describe briefly. -If no, please quantitatively describe the level of buildout in the jurisdiction.
Yes, there is an inventory of open space; very few buildable lands in the
Borough because 1/3 is Park and reservoirs
ADM INIS TR AT IV E A ND TECH NI CAL CA PAB IL IT Y
The table below summarizes potential staff and personnel resources available to the Borough of Woodland
Park.
Table 9.17-5. Administrative and Technical Capabilities
Staff/Personnel Resource Available? Department/Agency/Position
Administrative Capability
Planning Board Yes Municipal Board
Mitigation Planning Committee No -
Environmental Board / Commission No -
Open Space Board / Committee Yes Open Space Committee
Economic Development Commission / Committee
No -
Warning Systems / Services (reverse 911, outdoor warning signals)
Yes Reverse 911, NIXLE, outdoor warning sirens in the flood zone, Cable TV
access
Maintenance program to reduce risk Yes Permit issuance and plan review
Mutual aid agreements Yes OFM, M&C
Technical/Staffing Capability
Planners or engineers with knowledge of land development and land management practices
Yes Municipal Engineer
Engineers or professionals trained in building or infrastructure construction practices
Yes Municipal Engineer
Planners or engineers with an understanding of natural hazards
Yes Municipal Engineer
Staff with training in benefit/cost analysis Yes Building Department/OEM
Staff with training in green infrastructure Yes Municipal Engineer
Staff with education/knowledge/training in low impact development
Yes Municipal Engineer
Surveyor Yes Municipal Engineer
Stormwater engineer Yes Municipal Engineer
Personnel skilled or trained in GIS applications Yes County
Local or state water quality professional Yes Licensed Water Operator
Scientist familiar with natural hazards in local area
No -
Emergency manager Yes OEM
Grant writers Yes Administration
Resilience Officer No -
Watershed planner No -
Environmental specialist No Contractor as needed
Other No -
F IS CAL CA PAB IL IT Y
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-8 June 2020
The table below summarizes financial resources available to the Borough of Woodland Park.
Table 9.17-6. Fiscal Capabilities
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants (CDBG, CDBG-DR) Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes, Borough has their own water and has water fees
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Clean Water Act 319 Grants (Nonpoint Source Pollution) No
Other No
EDUCAT IO N AND OU TR EAC H CAPAB I LIT Y
The table below summarizes the education and outreach resources available to the Borough of Woodland
Park.
Table 9.17-7. Education and Outreach Capabilities
Criterion Response
Do you have a public information officer or communications office?
Yes, IT and Police
Do you have personnel skilled or trained in website development? Yes, IT
Do you have hazard mitigation information available on your website?
If yes, briefly describe.Yes, flood
Do you use social media for hazard mitigation education and outreach?
If yes, briefly describe.Yes, Facebook
Do you have any citizen boards or commissions that address issues related to hazard mitigation?
If yes, briefly describe.Flood Board
Do you have any other programs already in place that could be used to communicate hazard-related information?
If yes, briefly describe.
Borough sends out mailings to residents quarterly regarding mitigation operations, information is available in the library and civic organizations
regarding floodingDo you have any established warning systems for hazard events?
If yes, briefly describe. Borough watches the flood elevations and the OEM coordinator notifies Police regarding evacuation, use
reverse 911 and activate sirens
COM M UNIT Y CLAS S IF IC ATI ONS
The table below summarizes the classifications for community programs available to the Borough of
Woodland Park.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-9 June 2020
Table 9.17-8. Community Classifications
Program Participating? Classification Date Classified
Community Rating System Yes 8 2015
Building Code Effectiveness Grading Schedule (BCEGS) Yes TBD 2008
Public Protection (Fire ISO Protection Class) Yes Class 3 2010
Storm Ready Certification No - -
Firewise Community Classification No - -
Sustainable Jersey No - -
ADAPT IV E CA PAC IT Y
Adaptive capacity is defined as “the ability of systems, institutions, humans and other organisms to adjust
to potential damage, to take advantage of opportunities, or respond to consequences” (IPCC 2014). In other
words, it describes a jurisdiction’s current ability to adjust to, protect from, or withstand a hazard event.
This term is often discussed in reference to climate change; however, adaptive capacity also includes an
understanding of local capacity for adapting to current and future risks and changing conditions. The table
below summarizes the adaptive capacity for each hazard and the jurisdiction’s rating.
Table 9.17-9. Adaptive Capacity of Climate Change
Hazard Adaptive Capacity (Capabilities) - High/Medium/Low
Coastal Storms Medium
Dam Failure Medium
Disease Outbreak Medium
Drought High
Earthquake Medium
Extreme Temperature High
Flood High
Geological Hazards Medium
Hazardous Substances Medium
Severe Weather High
Severe Winter Weather High
Wildfire High
Notes:
High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure = Not enough information is known to assign a rating.
NATION AL F LO OD INS U R ANCE PR OG R AM
This section provides specific information on the management and regulation of the regulatory floodplain.
Table 9.17-10. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Code Enforcement
Who is your floodplain administrator? (name, department/position) Allan Burghardt
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? January 2020
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-10 June 2020
Criterion Response Does your floodplain management program meet or exceed minimum requirements?
If exceeds, in what ways?Meets
When was the most recent Community Assistance Visit or Community Assistance Contact?
Scheduled for December 2020
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed?
If so, state what they are.No
Are any RiskMAP projects currently underway in your jurisdiction? If so, state what they are.
No
Do your flood hazard maps adequately address the flood risk within your jurisdiction?
If no, state why.Yes
Does your floodplain management staff need any assistance or training to support its floodplain management program?
No
If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? If yes, is your jurisdiction interested in improving its CRS
Classification? If no, is your jurisdiction interested in joining the CRS program?
Yes, Class 8
How many flood insurance policies are in force in your jurisdiction?* What is the insurance in force? What is the premium in force?
Policies in force: 177 Insurance in force: $49,128,500
Premium in force: $418,476
How many total loss claims have been filed in your jurisdiction?* How many claims are still open or were closed without payment? What were the total payments for losses?
Total loss claims: 588 Claims open or closed without payment:
72 Total payments for losses: $9,788,008
Do you maintain a list of properties that have been damaged by flooding? Yes, maintained by Code Enforcement
Do you maintain a list of property owners interested in flood mitigation? No
*According to FEMA statistics as of 9/30/2018
9.17.5 Integration with Other Planning Initiatives
For a community to succeed in reducing long-term risk, hazard mitigation must be integrated into the day-
to-day local government operations. As part of this planning effort, each jurisdiction was surveyed to obtain
a better understanding of their progress in plan integration. A summary is provided below. In addition, the
community identified specific integration activities that will be incorporated into municipal procedures,
which are indicated below.
EX IS TI NG INT EG R AT ION
In the performance period since adoption of the 2015 HMP, the Borough made progress on integrating
hazard mitigation into other initiatives. The following plans and programs currently integrate components
of the HMP and strategy:
Planning Board: The Planning Board of Woodland Park is empowered to:
Make and adopt and, from time to time, amend the master plan for the physical development
of the Borough;
Administer the provisions of the Land Subdivision and Site Plan Review ordinances of the
Borough in accordance with their provisions and the Municipal Land Use Law;
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-11 June 2020
Consider and report to the Municipal Council within 35 days after referral as to any proposed
development regulation submitted to it, and pass upon other matters specifically referred to the
Board by the Council;
When reviewing an application, grant approval of a subdivision site plan or conditional use to
the same extent and subject to the same restrictions as the Board of Adjustment;
Give site plan review and approval in accord with standards set forth by state statute.
The Borough Master Plan includes the following concepts related to hazard mitigation:
Incorporate green building and site design techniques into the zoning ordinance to promote a
sustainable environment; Promote a more compact mixed-use type of land use pattern in areas with
existing infrastructure and density and preserve open space also to promote a sustainable
environment; and Incorporate a green buildings and environmental sustainability element into the
Master Plan. The Sustainability Element works to promote water conservation and efficiency
throughout all sectors of the community; Use sustainable stormwater management techniques in
site design to reduce stormwater runoff and control erosion; Provide all segments of the community
with information on sustainability, climate change, and strategies for development.
Board of Adjustment (Zoning Board): The Board of Adjustment of Woodland Park is responsible
for hearing and deciding appeals where errors are alleged in the enforcement of the zoning
ordinance by a Borough official; hearing and deciding requests for interpretation of the zoning map
or ordinance; granting a variance to allow a structure or use in a zoning district restricted against
such structure or use, but only with the approval of at least two-thirds of the Board; and referring a
zoning application to the Planning Board for a report.
Prior to zoning and permitting changes, the Borough Engineer reviews the hazard mitigation plan
and other hazard analyses to ensure consistent and compatible land use.
Board of Health: The Board of Health consists of seven members and has the powers and duties
provided in N.J.S.A. 26:3-1 et seq. (1972 Code § 2-22.7).
Open Space Committee: The Open Space Committee is comprised of five members that review,
prioritize, and make recommendations to the Mayor and Council on the funding of qualifying open
space projects.
Regional Flood Board: The Passaic Valley Flood Control Board is charged with the overall
management of the surface water of the Passaic River and the Peckman River Basins. To do so, its
members review potential acquisition, construction, financing, improvement, maintenance and
operation of flood control facilities and make recommendations to the governing bodies of Little
Falls Woodland Park and Totowa, along with other officials. Additionally, the Board shall jointly
purchase, construct, improve, extend, enlarge or reconstruct flood control facilities on behalf of its
member local units subject to the approval of the council or governing body of each of the member
municipalities.
Community Emergency Response Team: The Community Emergency Response Team (CERT)
program helps train people to be better prepared to respond to emergency situations in their
communities. When emergencies happen, CERT members can give critical support to first
responders, provide immediate assistance to victims, and organize spontaneous volunteers at a
disaster site. CERT members can also help with non-emergency projects that help improve the
safety of the community. The CERT course is taught in the community by a trained team of first
responders who have completed a CERT Train-the-Trainer course conducted by their state training
office for emergency management, or FEMA's Emergency Management Institute (EMI). CERT
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-12 June 2020
training includes disaster preparedness, disaster fire suppression, basic disaster medical operations
and light search and rescue operations.
CodeRed: Woodland Park has implemented CodeRED, an emergency notification system that
functions as a reverse 9-1-1 system. For example, in the event of a weather emergency, the
CodeRED system will call your landline telephone to alert you to the emergency situation.
Department of Public Works: The DPW is responsible for the maintenance of all municipal roads,
including snow removal, traffic signs and traffic signals. In addition, the DPW maintains all
municipal facilities, parks and vehicles, the storm water drainage system, sewage system, and the
firebox alarm system.
Since Woodland Park operates its own Water Company, the DPW is charged with maintaining
the water system in the sections of the Borough served by the municipally-owned water
company. The Borough owns and maintains a 1-million gallon water tank located on
Washington Drive. A second tank was added on Garret Mountain at the site of the Four
Seasons At Great Notch community to serves as a back-up and to maintain water pressure
during emergencies. The Department of Water Pollution Control, headed by the Superintendent
of the DPW, is responsible for the sanitary sewer system. So, it also falls upon the DPW to
maintain the Borough’s sanitary sewers. Sewage treatment is no longer done at a DPW facility.
Instead, Woodland Park’s sewage is carried to the Passaic Valley Sewage Commission’s
treatment plant in Newark by the same main that serves Little Falls and Totowa.
The Borough adheres to the latest stormwater management policies through the State.
OPPOR TUNI TI ES F OR FU TU R E INTEG R A TI ON
As this HMP update is implemented, the Borough of Pompton Lakes will use information from the plan as
the best available science and data for natural hazards. The capability assessment presented in this annex
identifies codes, plans, and programs that provide opportunities for integration. The Passaic County and
local action plans developed for this HMP update actions related to plan integration, as well as progress on
these actions, will be reported through the progress reporting process described in Volume I. New
opportunities for integration also will be identified as part of the annual progress report.
9.17.6 Hazard Event History Specific to the Jurisdiction
Passaic County has a history of hazard events, as detailed in Section 4 (Risk Assessment) of this plan. A
summary of historical events is provided in each of the hazard profiles in Section 4.4 (Hazard Profiles) and
includes a chronology of events that affected Passaic County and its jurisdictions. The Borough of
Woodland Park’s history of federally-declared (as presented by FEMA) and significant hazard events (as
presented in NOAA-NCEI) is consistent with that of Passaic County. Table 9.17-11 provides details
regarding municipal-specific loss and damages the Borough experienced during hazard events. Information
provided in the table below is based on reference material or local sources.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-13 June 2020
Table 9.17-11. Hazard Event History
Date(s) of Event
Event Type (disaster
declaration if applicable)
Passaic County
Designated? Summary of Event Summary of Local
Damages and Losses March 6-7,
2018
Severe Winter
Storm and
Snowstorm
DR-4368 A strong low-pressure system
developed along the Middle
Atlantic coast during the morning
of Wednesday, March 7, 2018.
The low tracked along the coast
through the early morning hours
on Thursday, March 8, 2018. The
storm brought heavy wet snow,
strong gusty winds, and even
some thundersnow across
northeast New Jersey.
The Borough was reimbursed
for tree removal.
August 11,
2018
Flash Flood No A stalled stationary boundary
within a very moist airmass
provided a focusing mechanism
for several rounds of heavy rain
that resulted in widespread flash
flooding across northeast New
Jersey. The Caldwell, NJ ASOS
recorded 4.92 inches of rain, and
multiple other stations across
northeast New Jersey received
between 2.5 inches and 4 inches
of precipitation. The Little Falls
area of Passaic County was
particularly hard hit with rising
water from the Peckman River.
Flooding from the Peckman
River impacted the Party City
and Best Buy shopping centers
as well as the Planet Fitness
gym in Woodland Park. Cars
were underwater in the Best
Buy parking lot. Overall,
approximately 210 homes, 70
businesses, and 222 parked cars
were impacted by flooding in
Woodland Park.
9.17.7 Jurisdiction-Specific Vulnerabilities and Hazard ranking
The hazard profiles in Section 4 (Risk Assessment) provide detailed information regarding each plan
participant’s vulnerability to the identified hazards. Table 9.17-12 summarizes the Borough of Woodland
Park risk assessment results and data used to determine the hazard ranking.
In an attempt to summarize the confidence level regarding the input utilized to populate the hazard ranking,
a gradient of certainty was developed. A certainty factor of high, medium or low was selected and assigned
to each hazard to provide a level of transparency and increased understanding of the data utilized to support
the resulting ranking. The following scale was used to assign a certainty factor to each hazard:
High—Defined scenario/event to evaluate; probability calculated; evidenced-based/quantitative
assessment to estimate potential impacts through hazard modeling.
Moderate—Defined scenario/event or only a hazard area to evaluate; estimated probability;
combination of quantitative (exposure analysis, no hazard modeling) and qualitative data to
estimate potential impacts.
Low—Scenario or hazard area is undefined; there is a degree of uncertainty regarding event probability; majority of potential impacts are qualitative.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-14 June 2020
Table 9.17-12. Summary of Risk Assessment Results
Hazard of Concern
Hazard/ Scenario Area Evaluated Population Buildings Economya
Certainty Factor
Coastal Storm* 100-Year Mean Return Period
Hurricane 100-year MRP
Hurricane: 12,542
100-year MRP
Hurricane: 3,473
100-year MRP
Hurricane: $821,475 High
Dam Failure
Partial or complete failure of a dam
Population impacted is dependent on the location and capacity of the dam, the extent of the dam failure inundation area and the severity of
the failure.
The number of buildings impacted is dependent on the
capacity of the dam, the extent of the dam failure inundation area and the severity of the failure.
Economic impacts include dam/building/infrastructure repairs;
debris removal/disposal; utility impacts. Low There are 155 dams in the
County; 49 are high hazard according to NJDEP.
Disease Outbreak
Disease Outbreaks which include: Mosquito-Borne
Diseases, Tick-Borne Diseases, Foodborne Illnesses, Infectious Disease (Influenza, Enterovirus
D68, Hepatitis C, Measles, Ebola) MRSA
Population impacted is dependent on the disease and severity of the outbreak; in some cases, immuno-
compromised persons are more vulnerable.
Structural impacts due to disease outbreak would be
limited.
Economic losses can include County financial impacts to monitor/address outbreaks; lost wages or commercial interruptions; depends on the severity
and type of disease outbreak.
Low
Drought
Prolonged drought event - The County is serviced by water supplies who primarily get water from surface water, reservoirs and unconfined
groundwater sources.
Entire population exposed. Population on surface water
supplies may be impacted first; water restrictions/contamination;
increased wildfire risk.
Droughts are not expected to cause direct damage to
buildings.
Losses include aesthetic, landscape/nursery/agricultural industry
impacts Low
Earthquake*
100, 500-, 2,500-Year Mean Return Period (MRP) Events
evaluated NEHRP D&E: 927 NEHRP D&E: 349
100-year MRP building damages/loss:
$0
High
NEHRP Soils D&E (soft soils that amplify ground shaking are
present in the County)
Liquefaction Class 4:
43 Liquefaction
Class 4: 17
500-year MRP building damages/loss:
$4,602,483
2,500-year MRP building damages/loss:
$69,401,268
Extreme Temperature
Extreme temperature event (heat or cold)
Over 65 Population: 2,472 Structural impacts due to
extreme temperatures would be limited.
Loss of business function is possible due to unexpected repairs (i.e. pipes bursting) or power failures; increased operational costs due to increased use of generators
Low
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-15 June 2020
Hazard of Concern
Hazard/ Scenario Area Evaluated Population Buildings Economya
Certainty Factor
Population Below Poverty Level:
778 and HVAC; thermal expansion and other
impacts to infrastructure.
Flood* 100- and 500-Year Mean Return
Period Event
1% annual chance 1,029 1% annual
chance 392 1% annual chance
$27,310,317 High 0.2% annual chance 1,680
0.2% annual chance
1,007
Geological High Landslide Susceptibility
Areas and Areas developed over carbonate rock
Class A: 62 Class A: 19 Class A: $19,367,697
Moderate Class B: 0 Class B: 0 Class B: $0
Carbonate Bedrock: 0 Carbonate Bedrock:
0 Carbonate Bedrock: $0
Hazardous Substanceb
Release of a hazardous substance from a fixed site.
Population impacted will depend on the type of material and scale of
the incident. May include population within small radii of
site.
The degree of damages to a building depends on the scale
of the incident.
The degree of damages depends on the scale of the incident.
Low
Severe Weather*
Severe Weather Event
Entire population exposed; the degree of impact to the population
depends on the scale of the incident.
Entire building stock is exposed; The degree of
impact depends on the scale of the incident.
Economic impacts depend upon the degree of impact.
Low
Severe Winter Weather
Severe Winter Weather Event
All residents/commuters/visitors are exposed; socially-vulnerable populations may be at increased
risk
All buildings are exposed; the degree of impact depends on
the scale of the incident.
The cost of snow and ice removal and repair of roads/infrastructure can impact
operating budgets. Low
Wildfire Wildfire Fuel Hazard areas (High, Very High, Extreme)
Population residing in the hazard area:
0 Number of
buildings the hazard area:
1
Replacement cost value of buildings
located in the hazard area:
$948,522 Moderate
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-16 June 2020
REP ET ITIV E FL OOD L OS S ES
The following summarizes the repetitive and severe repetitive flood losses in the Borough of Woodland
Park.
Number of repetitive loss (RL) properties: 9
Number of severe repetitive loss (SRL) properties: 3
Number of RL/SRL properties that have been mitigated: This number is constantly being updated
and is kept on file at the Code Enforcement offices.
Note: Policies and Claims from https://bsa.nfipstat.fema.gov/reports/1011.htm and
https://bsa.nfipstat.fema.gov/reports/1040.htm as of 09/30/2018
Note: The number of SRL properties excludes RL properties.
CR ITI CAL FA CI LI TI ES
The table below identifies critical facilities in the community located in the 1-percent and 0.2-percent
floodplain.
Table 9.17-13. Potential Flood Losses to Critical Facilities and Lifelines
Name Type
Exposure
Status of Mitigation 1%
Event0.2% Event
Beatrice Gilmore E.S. School X
McBride Ave Pump Station Wastewater Pump
X X 2020-Woodland Park -01
Memorial Middle School School/Shelter X X 2020-Woodland Park -02
Pulse Medical Transportation EMS X X
Borough has no jurisdiction on this building; Borough sends out mailings of location along with map regarding flood risk; 2020-Woodland Park -03
Woodland Park FD – Pv Hose Company 2
Fire X Privately owned but Borough supplements their operations; 2020-Woodland Park -03
Woodland Park Youth Senior Center
Shelter X X
2020-Woodland Park -04; Borough owned; slab on grade foundation; may not be feasible to elevate due to the large footprint; water rises very fast so not feasible to set up flood walls
ADDIT IO NAL ID ENT IF I E D VU LN ER A BI LI TI ES
The jurisdiction has identified the following vulnerabilities within their community:
The Borough has numerous repetitive loss and severe repetitive loss properties
The Borough has numerous critical facilities in the 100-year floodplain.
HAZ AR D AR E A EXT ENT AND LOCA TI ON
Hazard area extent and location maps were generated for the Borough of Woodland Park that illustrate the
probable areas impacted within the municipality. These maps are based on the best available data at the
time of the preparation of this plan and are adequate for planning purposes. Maps have been generated only
for those hazards that can be clearly identified using mapping techniques and technologies and for which
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-17 June 2020
the Borough of Woodland Park has significant exposure. Refer to Figures 9.17-1 and 9.17-2 at the end of
this annex.
HAZ AR D RAN KI NG
This section includes the community specific identification of the primary hazard concerns based on
identified problems, impacts and the results of the risk assessment as presented in Section 5 (Risk
Assessment). The ranking process involves an assessment of the likelihood of occurrence for each hazard;
its potential impacts on people, property, and the economy; community capability and changing future
climate conditions. This input supports the mitigation action development to target those hazards with
highest level of concern.
As discussed in Section 4.3 (Hazard Ranking), each plan participant may have differing degrees of risk
exposure and vulnerability compared to Morris County as a whole. Therefore, each jurisdiction ranked the
degree of risk to each hazard as it pertains to their community factoring in their capabilities to withstand
impacts and bounce back after the event. The table below summarizes the hazard rankings of potential
natural hazards for the Borough of Woodland Park. The Borough of Woodland Park has reviewed the
Passaic County hazard ranking table, as well as its individual results, to reflect the relative risk of the
hazards of concern to the community.
Table 9.17-14. Borough of Woodland Park Hazard Ranking Input
Coastal Storm Dam Failure Disease
Outbreak Drought Earthquake Extreme
Temperature
High Medium Medium Medium Low Medium
Flood Geological
Hazard Hazardous Substances
Severe Weather
Severe Winter
Weather Wildfire
High Medium Medium Medium Medium Low
9.17.8 Mitigation Strategy and Prioritization
This section discusses past mitigations actions and status, describes proposed hazard mitigation initiatives,
and provides action prioritization.
PAS T M ITIG AT IO N IN IT IAT IV E STATUS
The following table summarizes the jurisdiction’s progress on their mitigation strategy identified in the
2015 HMP. Actions that are carried forward as part of this plan update are included in the following
subsection in its own table with prioritization. Previous actions that are now on-going programs and
capabilities are indicated as such in the following table and can also be found under ‘Capability Assessment’
presented previously in this annex.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-18 June 2020
Table 9.17-15. Status of Previous HMP Mitigation Actions
2015 Action Number Action Description Responsible Party
Status (In Progress, No Progress,
Ongoing Capability, or Completed)
Include in the 2020 HMP Update?
Check if Yes Enter 2020
HMP Action # Obtain backup power to ensure continuity of operations for critical facilities. The following have been identified to date: - Charles Olbon School (shelter) - Youth and Senior Center (shelter) - Beatrice Gilmore School - Memorial School
OEM
Complete:
-Charles Olbon School (shelter) – installed
- Youth and Senior Center (shelter) – installed
-Beatrice Gilmore School – not proceeding because funding source from the Board of Education is not proceeding
- Memorial School - not proceeding because funding source from the Board of Education proceeding
Youth and Senior Center (shelter) – purchase/construct flood walls/berm OEM See Mitigation Strategy Table X
2020-Woodland Park
-004School #1 located at 648 McBride Ave– upgrade the facilities as a future shelter to replace the Little Falls Shelter that the Borough use to utilize. Currently this building is leased out to a private entity and the Borough is looking to get it back into operations.
Woodland Park Board of Education
Discontinue; This site is no longer identified as a shelter
Peckman River at McBride Ave bridge – remove gravity sewer main and replace with a pump station to increase conveyance capacity of Peckman River
Borough In progress, being funded by
FEMA X
2020-Woodland Park
-007
McBride Ave Pump Station – flood-proof the building with door dams, seal transformers
Borough See Mitigation Strategy Table X 2020-Borough of Woodland
Park-001Utilize the HMP to update the Master Plan Borough
Master Plan Update is 2012; this is still needed
X 2020-Borough of Woodland
Park-015Support the mitigation of vulnerable structures via retrofit (e.g. elevation,
flood-proofing) or acquisition/relocation to protect
structures from future damage, with repetitive loss and severe repetitive loss properties as a priority when
applicable.
Three homes have been identified for acquisition/demolition through CDBG-DR and add to parkland.
Engineering
Develop a plan to systematically mitigate properties year to year; prioritize properties and implement by conducting outreach to property owners and applying for grant funding.
X - carry over but modify with
prioritization plan
2020-Woodland Park
-008
Relocate (480 students) from Memorial School (located in Zone A in floodplain) to School #1 during flood events (Construct)
Woodland Park Board of Education
Not feasible project other than to rebuild a new school outside the floodplain, or add onto another school
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-19 June 2020
2015 Action Number Action Description Responsible Party
Status (In Progress, No Progress,
Ongoing Capability, or Completed)
Include in the 2020 HMP Update?
Check if Yes Enter 2020
HMP Action #
No longer a priority of the current administration; remove
Develop site plans for temporary/Alt classrooms at School #1 property for students of Memorial School to be relocated to School 1 site during flood events.
Woodland Park Board of Education
Not feasible project other than to rebuild a new school outside the floodplain, or add onto another school
No longer a priority of the current administration; remove
Retrofit Municipal Building/Police/Tri-Town EOC (Woodland Park / Totowa / Little Falls) on 5 Brophy Lane with improved technology (wiring, equipment)
OEM Completed; funded through local sources
Clear waterways of snags, debris and shoals
DPW Routine maintenance activity that the Borough takes care of
In addition to the above progress, the Borough of Woodland Park identified the following mitigation
projects/activities that were completed but not identified in the 2015 HMP mitigation strategy:
Borough cleans storm drains as part of routine maintenance and flood prevention
The Borough, in cooperation with Little Falls, obtained a State grant to purchase an excavator and
cleaned the Peckman River and tributaries regularly
PR OPOS E D HAZ AR D M I TIG AT ION IN ITI ATIV ES FOR T HE PL AN UPDAT E
The Borough of Woodland Park participated in a risk assessment workshop in January 2020 in which
detailed information was provided about assets exposed and vulnerable to the identified hazards of concern.
The Borough of Woodland Park participated in a mitigation action workshop in February 2020 and was
provided a Mitigation Toolbox that included a mitigation catalog developed specifically for Passaic County
and its hazards of concerns; challenges and opportunities identified during the capability and risk
assessments; and the following FEMA publications to use as a resource as part of their comprehensive
review of all possible activities and mitigation measures to address their hazards: FEMA 551 Selecting
Appropriate Mitigation Measures for Floodprone Structures (March 2007) and FEMA Mitigation Ideas –
A Resource for Reducing Risk to Natural Hazards (January 2013). Section 6 (Mitigation Strategy) and
Appendix F (Mitigation Strategy Supplement) provide a more complete description of the Mitigation
Toolbox and its resources.
Table 9.17-16 summarizes the comprehensive-range of specific mitigation initiatives the Borough of
Woodland Park would like to pursue in the future to reduce the effects of hazards. Some of these initiatives
might be previous actions carried forward for this HMP update. Initiatives are dependent upon available
funding (grants and local match availability) and can be modified or omitted at any time based on the
occurrence of new hazard events and changes in municipal priorities. Both the four FEMA mitigation action
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-20 June 2020
categories and the six CRS mitigation action categories are listed in the table below to further demonstrate
the wide-range of activities and mitigation measures selected.
As discussed in Section 6 (Mitigation Strategy), 14 criteria are used to evaluate and prioritize each proposed
mitigation action. A numeric factor is assigned (-1, 0, or 1) to each criterion to provide a relative indication
of the opportunities and constraints of each action. A numerical sum of the input provides the basis of the
prioritization of actions wherein each action is assigned a category of Low, Medium, or High to indicate an
implementation hierarchy. A High priority action indicates the jurisdiction will prioritize its implementation
and apply for funding, if needed, as opportunities become available during the plan period of performance.
This does not prevent the jurisdiction from implementing other ranked actions; however, this provides a
snapshot of implementation priority at the time of this plan update.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-21 June 2020
Table 9.17-16. Proposed Hazard Mitigation Initiatives
Initiative Number
Mitigation Initiative
Name Description of the Problem
Description of the Solution
New or Existing Assets?
Hazard(s) to be
Mitigated
Goals
Met
Lead and Support Agencies
Potential Funding Sources
Esti
mat
ed
Be
ne
fits
Esti
mat
ed
Co
st
Tim
elin
e
Pri
ori
ty
Mit
igat
ion
Cat
ego
ry
CR
S C
ate
gory
2020- Woodland Park-001
McBride Ave Pump Station
Problem: McBride Ave Pump Station is located in the 1% annual chance floodplain. IT is the main pump station for the sanitary sewer system, capacity of 8MGD and is critical because if this goes down you have sanitary sewage released into the Borough. There is already backup power at this location.
Existing Flood 2 DPW and Engineer
HMGP, Municipal budget
High $200,000
Short
High
SIP PP
Solution: Install door dams, caulking of all conduits, sealing transformers, elevate and waterproof adjacent transition collection structure.
2020- Woodland Park-002
Memorial Middle School floodproofing
Problem: Memorial Middle School, which serves as a shelter, is located in the floodplain; installed door dams to date but the mechanicals are located below grade and are vulnerable to flood. There is a small generator for emergency power only.
Existing Flood 2 Engineer, Board of Ed, OEM
HMGP, Municipal budget
High High Short
High
SIP PP
Solution: Raise mechanicals.
2020-Woodland Park -003
Expanded outreach to private property owners
Problem: Property in the Borough that is not owned by the municipality that is located in the floodplain is not under their jurisdiction to mitigate.
All Flood 1 Floodplain Administrator/CRS Coordinator
Municipal budget
High Low Within 1 year
High
EAP PI
Solution: The Borough will distribute quarterly mailings to flood-prone residents and shows them on a map– add mitigation options so they can evaluate a mitigation option and contact the Borough for implementation
2020-Woodlan
Woodland Park Youth
Problem: Woodland Park Youth and Senior Center (Shelter) – impacted by flash flood events; Borough owned;
Existing Flood 1,2 Mayor and
FEMA HMA;
High High Withi
Medium
SIP PP
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-22 June 2020
Initiative Number
Mitigation Initiative
Name Description of the Problem
Description of the Solution
New or Existing Assets?
Hazard(s) to be
Mitigated
Goals
Met
Lead and Support Agencies
Potential Funding Sources
Esti
mat
ed
Be
ne
fits
Esti
mat
ed
Co
st
Tim
elin
e
Pri
ori
ty
Mit
igat
ion
Cat
ego
ry
CR
S C
ate
gory
d Park -004
Center flood wall
slab on grade foundation; may not be feasible to elevate due to the large footprint; water rises very fast so not feasible to set up flood walls
Council/OEM
Local match
n 1 year
Solution: Build a flood wall around the building
2020-Woodland Park -005
Peckman River Flood Tunnel
Problem: Heavy rainfall results in the Peckman River overflowing its banks.
New and Existing
Flood 1, 2 USACE, Township of Little Falls, Borough of Woodland Park
USACE Reduction in flooding of neighborhood and businesses
$172 million
Within 3 years
High
SIP SP
Solution: The USACE will construct a double box diversion culvert, or tunnel structure to be built under roadways to divert floodwater from the Peckman River into the Passaic River.
2020-Woodland Park -006
McBride Avenue Stormwater Upgrades
Problem: Tributary surcharge backs up and causes roadway and private property flooding – this happens several times a year and from larger events
Existing Flood 1, 2 Borough Administration and County Engineers
FEMA HMA
High High Within 5 years
High
SIP SP
Solution: Increase capacity of culverts on McBride Ave
2020-Woodland Park -007 (Previous Action)
Peckman River pump station
Problem: Currently restricting conveyance of the river and obstruction needs to be removed
Existing Flood 1, 2 DPW and OEM
FEMA HMA
High High $1.9 Million
Within 1 year
High
SIP PP
Solution: Peckman River at McBride Ave bridge – remove gravity sewer main and replace with a pump station to increase conveyance capacity of Peckman River – in progress
2020-Woodland Park -008
Support the mitigation of vulnerable
Problem: Frequent flooding events have resulted in 91 repetitive loss properties and 6 severe repetitive loss properties.
Existing Flood 1, 2 Administration and OEM, CRS
FEMA HMGP and FMA, local cost
High Low Short
High
SIP PP
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-23 June 2020
Initiative Number
Mitigation Initiative
Name Description of the Problem
Description of the Solution
New or Existing Assets?
Hazard(s) to be
Mitigated
Goals
Met
Lead and Support Agencies
Potential Funding Sources
Esti
mat
ed
Be
ne
fits
Esti
mat
ed
Co
st
Tim
elin
e
Pri
ori
ty
Mit
igat
ion
Cat
ego
ry
CR
S C
ate
gory
structures via retrofit
Solution: Conduct outreach to flood-prone property owners, including RL/SRL property owners and provide information on mitigation alternatives. Assist property owners in grant applications.
Coordinator
share by residents
2020-Woodland Park -009
Flood Cameras Problem: Stream gauges in the Borough lag in reporting of current conditions. This prevents proper response to events. Some events also result in gauge failure.
New and Existing
Flood 1, 2, 3, 4
Police Department, Woodland Park OEM, Department of Public Works, Little Falls
Borough budget, private grant opportunities, PDM, FMA
Reduction in flood response requirements, Public information, quicker response to flooding
$10,000
Within 2 years
High
LPR, EAP
ES, PI
Solution: The Borough will provide cameras on the Franciso Bridge, E. Main Street, Lackawanna Avenue, and Route 46 East and West Bridge and connect the live footage to the Police headquarters and the Borough website. This will be a collaborative effort with the Township of Little Falls.
2020-Woodland Park -010
All Hazard Public Education and Outreach
Problem: There is no all-natural hazard public education and outreach program in the Borough
Both All 1, 2 NFIP Floodplain Administrator/CRS Coordinator
Borough High Low Short
Medium
EAP PI
Solution: Develop an all hazards public education and outreach program for hazard mitigation and preparedness on natural hazard risk including information regarding flood insurance and flood issues.
2020-Woodland Park -011
Early Warning System
Problem: There is no automated early warning system in the Borough
Both All 1, 2 OEM Borough High High Short
High
EAP ES, PP
Solution: Expand the early warning communication system in the Borough
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-24 June 2020
Initiative Number
Mitigation Initiative
Name Description of the Problem
Description of the Solution
New or Existing Assets?
Hazard(s) to be
Mitigated
Goals
Met
Lead and Support Agencies
Potential Funding Sources
Esti
mat
ed
Be
ne
fits
Esti
mat
ed
Co
st
Tim
elin
e
Pri
ori
ty
Mit
igat
ion
Cat
ego
ry
CR
S C
ate
gory
so that it is automated and does not require man-power to activate.
2020-Woodland Park -012
Compile Hazard Loss Information
Problem: There is no standardized or structured record-keeping system to document hazard loss information including high water marks to inform residents of the hazard as well as support future mitigation grant applications.
Both All 1,2 CRS Coordinator/OEM
Borough High – Assists with benefit quantification for future FEMA HMA grants; educates residents; improves CRS rating
Medium
Short
Medium
EAP PP
Solution: Improve understanding of natural hazards and compile and archive flood loss information, record high water marks to promote flood hazard awareness.
2020-Woodland Park -013
Establish Local Funding Source
Problem: The Borough does not have the funding available to support an on-going mitigation program and to contribute to the local match of federal grant applications.
Both All 1,2 Mayor and Council
Borough Medium
Short
Medium
EAP PP
Solution: Develop a funding source to fund mitigation program on a yearly basis for municipal mitigation projects.
2020-Woodland Park -014
Morris Canal Streambank Stabilization
Problem: The Morris Canal is susceptible to high flow rates and bank erosion.
Both Flood 1,2 DPW High High Short
Medium
NSP NR
Solution: Implement a streambank stabilization project using native plant species.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-25 June 2020
Initiative Number
Mitigation Initiative
Name Description of the Problem
Description of the Solution
New or Existing Assets?
Hazard(s) to be
Mitigated
Goals
Met
Lead and Support Agencies
Potential Funding Sources
Esti
mat
ed
Be
ne
fits
Esti
mat
ed
Co
st
Tim
elin
e
Pri
ori
ty
Mit
igat
ion
Cat
ego
ry
CR
S C
ate
gory
2020-Woodland Park -015
Update Master Plan and Integrate HMP
Problem: The Master Plan is dated 2012 and is due for an update. Needs to integrate the hazard mitigation plan further.
N/A All 1,2 Administration
Borough High Low Short
Medium
LPR PR
Solution: Utilize the HMP to update the Master Plan
Notes:
Acronyms and Abbreviations: Potential FEMA HMA Funding Sources: Timeline:CAV Community Assistance VisitCRS Community Rating System DPW Department of Public Works FEMA Federal Emergency Management Agency FPA Floodplain Administrator HMA Hazard Mitigation Assistance N/A Not applicable NFIP National Flood Insurance Program OEM Office of Emergency Management
FMA Flood Mitigation Assistance Grant Program HMGP Hazard Mitigation Grant Program PDM Pre-Disaster Mitigation Grant Program
The time required for completion of the project upon implementation
Cost: The estimated cost for implementation.
Benefits: A description of the estimated benefits, either quantitative and/or qualitative.
Mitigation Category:
Local Plans and Regulations (LPR) – These actions include government authorities, policies or codes that influence the way land and buildings are being developed and built.
Structure and Infrastructure Project (SIP) - These actions involve modifying existing structures and infrastructure to protect them from a hazard or remove them from a hazard area. This could apply to public or private structures as well as critical facilities and infrastructure. This type of action also involves projects to construct manmade structures to reduce the impact of hazards.
Natural Systems Protection (NSP) – These are actions that minimize damage and losses and preserve or restore the functions of natural systems.
Education and Awareness Programs (EAP) – These are actions to inform and educate citizens, elected officials, and property owners about hazards and potential ways to mitigate them. These actions may also include participation in national programs, such as StormReady and Firewise Communities.
CRS Category:
Preventative Measures (PR) - Government, administrative or regulatory actions, or processes that influence the way land and buildings are developed and built. Examples include planning and zoning, floodplain local laws, capital improvement programs, open space preservation, and storm water management regulations.
Property Protection (PP) - These actions include public activities to reduce hazard losses or actions that involve (1) modification of existing buildings or structures to protect them from a hazard or (2) removal of the structures from the hazard area. Examples include acquisition, elevation, relocation, structural retrofits, storm shutters, and shatter-resistant glass.
Public Information (PI) - Actions to inform and educate citizens, elected officials, and property owners about hazards and potential ways to mitigate them. Actions include outreach projects, real estate disclosure, hazard information centers, and educational programs for school-age children and adults.
Natural Resource Protection (NR) - Actions that minimize hazard loss and preserve or restore the functions of natural systems. Actions include sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation.
Structural Flood Control Projects (SP) - Actions that involve the construction of structures to reduce the impact of a hazard. Structures include dams, setback levees, floodwalls, retaining walls, and safe rooms.
Emergency Services (ES) - Actions that protect people and property during and immediately following a disaster or hazard event. Services include warning systems, emergency response services, and the protection of essential facilities.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-26 June 2020
Table 9.17-17. Summary of Prioritization of Actions
Initiative Number
Mitigation Initiative Name L
ife
Sa
fety
Pro
pe
rty
Pro
tect
ion
Co
st E
ffe
ctiv
en
ess
Te
chn
ica
l
Po
liti
cal
Le
ga
l
Fis
cal
En
vir
on
me
nta
l
So
cia
l
Ad
min
istr
ati
ve
Mu
lti-
Ha
zard
Tim
eli
ne
Ag
en
cy C
ha
mp
ion
Oth
er
Co
mm
un
ity
O
bje
ctiv
es
To
tal High /
Medium / Low
2020-Woodland Park -001
McBride Ave Pump Station
0 1 1 1 1 1 0 1 1 1 1 1 1 1 12 High
2020-Woodland Park -002
Memorial Middle School floodproofing
1 1 1 1 1 1 0 1 1 1 1 1 1 1 13 High
2020-Woodland Park -003
Expanded outreach to private property owners
1 1 1 1 1 1 0 0 1 1 1 1 1 1 13 High
2020-Woodland Park -004
Woodland Park Youth Center flood wall
0 1 1 1 1 1 0 0 1 1 0 0 1 0 9 Medium
2020-Woodland Park -005
Peckman River Flood Tunnel
1 1 1 1 1 1 1 1 1 1 0 0 1 1 12 High
2020-Woodland Park -006
McBride Avenue Stormwater Upgrades
0 1 1 1 1 1 0 1 1 1 1 1 1 1 12 High
2020-Woodland Park -007
Peckman River pump station
0 1 1 1 1 1 0 1 1 1 1 1 1 1 12 High
2020-Woodland Park -008
Support the mitigation of vulnerable structures via retrofit
1 1 1 1 1 1 0 1 0 0 1 0 1 1 10 High
2020-Woodland Park -009
Flood Cameras 1 1 1 1 1 1 0 0 1 1 0 1 1 1 11 High
2020-Woodland Park -010
All Hazard Public Education and Outreach
1 1 1 1 1 1 0 0 1 1 1 1 1 1 12 Medium
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-27 June 2020
Initiative Number
Mitigation Initiative Name L
ife
Sa
fety
Pro
pe
rty
Pro
tect
ion
Co
st E
ffe
ctiv
en
ess
Te
chn
ica
l
Po
liti
cal
Le
ga
l
Fis
cal
En
vir
on
me
nta
l
So
cia
l
Ad
min
istr
ati
ve
Mu
lti-
Ha
zard
Tim
eli
ne
Ag
en
cy C
ha
mp
ion
Oth
er
Co
mm
un
ity
O
bje
ctiv
es
To
tal High /
Medium / Low
2020-Woodland Park-011
Early Warning System 1 1 1 1 1 1 0 0 1 1 1 1 1 1 12 High
2020-Woodland Park-012
Compile Hazard Loss Information
0 0 1 1 1 1 0 0 1 1 1 1 1 1 10 Medium
2020-Woodland Park-013
Establish Local Funding Source
0 0 0 0 1 1 0 0 1 1 1 1 1 1 8 Medium
2020-Woodland Park-014
Morris Canal Streambank Stabilization
0 1 1 1 0 0 0 1 0 1 1 1 1 1 9 Medium
2020-Woodland Park -015
Update Master Plan and Integrate HMP
0 0 1 1 1 1 0 0 1 1 1 1 1 1 10 Medium
Notes: Section 6 (Mitigation Strategy) conveys guidance on prioritizing mitigation actions.
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-28 June 2020
Table 9.17-18. Analysis of Mitigation Actions by Hazard and Category
Hazard Prevention Property
Protection
Public Education
and Awareness
Natural Resource
Protection Emergency
Services Structural
Projects Climate
Resilient
Community Capacity Building
Coastal Storms
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Dam Failure
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Disease Outbreak
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Drought
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Earthquake
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Extreme Temperature
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-29 June 2020
Hazard Prevention Property
Protection
Public Education
and Awareness
Natural Resource
Protection Emergency
Services Structural
Projects Climate
Resilient
Community Capacity Building
Flood
2020-Woodland Park -015
2020- Woodland Park-001, 2020- Woodland Park-002, 2020-Woodland Park -004, 2020-Woodland Park -007, 2020-Woodland Park -008, 2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -003, 2020-Woodland Park -009, 2020-Woodland Park -010
2020-Woodland Park -014
2020-Woodland Park -009, 2020-Woodland Park -011
2020-Woodland Park -005, 2020-Woodland Park -006
Geological Hazards
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Hazardous Substances
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Severe Weather
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Severe Winter Weather
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-
2020-Woodland Park -010
2020-Woodland Park -011
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-30 June 2020
Hazard Prevention Property
Protection
Public Education
and Awareness
Natural Resource
Protection Emergency
Services Structural
Projects Climate
Resilient
Community Capacity Building
Woodland Park -013
Wildfire
2020-Woodland Park -015
2020-Woodland Park -011, 2020-Woodland Park -012, 2020-Woodland Park -013
2020-Woodland Park -010
2020-Woodland Park -011
Note: Section 6 (Mitigation Strategy) provides for an explanation of the mitigation categories.
RED = high ranked hazard
ORANGE = medium ranked hazard
YELLOW = low ranked hazard
9.17.9 Staff and Local Stakeholder Involvement in Annex Development
The Borough of Woodland Park followed the planning process described in Section 2 (Planning Process). This
annex was developed over the course of several months with input from many jurisdiction representatives. All
departments were asked to contribute to the annex development through reviewing and contributing to the capability
assessment, reporting on the status of previously identified actions, and participating in action identification and
prioritization. The following table summarizes who participated and in what capacity. Additional documentation
on the municipality’s planning process through Planning Partnership meetings is included in Section 2 (Planning
Process) and Appendix C (Meeting Documentation).
Table 9.17-19. Contributors to the Annex
Entity Title Method of Participation
George GalbraithDirector/Woodland Park
OEMPrimary POC, attended plan participant meetings, provided impact data,
contributed to mitigation strategy, reviewed draft
Kevin Galland Administrator/Municipal
ClerkSecondary POC
Allan Burghardt
Construction Code Official / Bldg Subcode Official / Bldg Inspector
/ Code Enforcement Officer
NFIP Floodplain Administrator
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-31 June 2020
Figure 9.17-1. Borough of Woodland Park Hazard Area Extent and Location Map 1
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-32 June 2020
Figure 9.17-2. Borough of Woodland Park Hazard Area Extent and Location Map 2
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-33 June 2020
Action Worksheet
Project Name: McBride Ave Pump Station
Project Number: 2020- Woodland Park-001
Risk / Vulnerability
Hazard(s) of Concern: Flood
Description of the Problem:
McBride Ave Pump Station is located in the 1% annual chance floodplain. IT is the main pump station for the sanitary sewer system, capacity of 8MGD and is critical because if this goes down you have sanitary sewage released into the Borough. There is already backup power at this location.
Action or Project Intended for Implementation
Description of the Solution:
Install door dams, caulking of all conduits, sealing transformers, elevate and waterproof adjacent transition collection structure.
Is this project related to a Critical Facility or Lifeline?
Yes No
Level of Protection: 1-percent plus 2 feet Estimated Benefits (losses avoided):
Reduction in flood exposure to pump station
Useful Life: 50 years Goals Met: 2
Estimated Cost: $200,000 Mitigation Action Type: Structure and Infrastructure Project
Plan for Implementation
Prioritization: High Desired Timeframe for Implementation:
1 year
Estimated Time Required for Project Implementation:
1 year Potential Funding Sources:
HMGP, Municipal budget
Responsible Organization:
DPW and Engineer Local Planning Mechanisms to be Used in Implementation if any:
Hazard mitigation
Three Alternatives Considered (including No Action)
Alternatives:
Action Estimated Cost Evaluation No Action $0 Current problem continues
Build new pump station uphill
$500,000 Too expensive
Sandbags $1,000 Requires deployment Progress Report (for plan maintenance)
Date of Status Report:
Report of Progress:
Update Evaluation of the Problem and/or Solution:
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-34 June 2020
Action Worksheet
Project Name: McBride Ave Pump Station
Project Number: 2020- Woodland Park-001
Criteria Numeric Rank
(-1, 0, 1) Provide brief rationale for numeric rank when
appropriate
Life Safety 0
Property Protection 1 Protects pump station
Cost-Effectiveness 1
Technical 1
Political 1
Legal 1 The Borough has the legal authority to complete the project
Fiscal 0 Project requires funding support
Environmental 1
Social 1
Administrative 1
Multi-Hazard 0 Flood
Timeline 1 2 years
Agency Champion 1 DPW and Engineer
Other Community Objectives
1 Protection of critical facilities
Total 11
Priority (High/Med/Low)
High
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-35 June 2020
Action Worksheet
Project Name: Memorial Middle School floodproofing
Project Number: 2020- Woodland Park-002
Risk / Vulnerability
Hazard(s) of Concern: Flood
Description of the Problem:
Memorial Middle School, which serves as a shelter, is located in the floodplain; installed door dams to date but the mechanicals are located below grade and are vulnerable to flood. There is a small generator for emergency power only.
Action or Project Intended for Implementation
Description of the Solution:
The Borough will work with the school to raise mechanicals in the Memorial Middle School.
Is this project related to a Critical Facility or Lifeline?
Yes No
Level of Protection: 500-year flood level Estimated Benefits (losses avoided):
Reduction in flood exposure to Memorial Middle School
Useful Life: 50 years Goals Met: 2
Estimated Cost: High Mitigation Action Type: Structure and Infrastructure Project
Plan for Implementation
Prioritization: High Desired Timeframe for Implementation:
1 year
Estimated Time Required for Project Implementation:
1 year Potential Funding Sources:
HMGP, Municipal budget
Responsible Organization:
DPW and Engineer Local Planning Mechanisms to be Used in Implementation if any:
Hazard mitigation
Three Alternatives Considered (including No Action)
Alternatives:
Action Estimated Cost Evaluation No Action $0 Current problem continues
Relocate Middle School $3 Million Too expensive Sandbags $1,000 Requires deployment
Progress Report (for plan maintenance)
Date of Status Report:
Report of Progress:
Update Evaluation of the Problem and/or Solution:
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-36 June 2020
Action Worksheet
Project Name: Memorial Middle School floodproofing
Project Number: 2020- Woodland Park-002
Criteria Numeric Rank
(-1, 0, 1) Provide brief rationale for numeric rank when
appropriate
Life Safety 0
Property Protection 1 Protects mechanicals in Middle School
Cost-Effectiveness 1
Technical 1
Political 1
Legal 1 The Borough has the legal authority to complete the project
Fiscal 0 Project requires funding support
Environmental 1
Social 1
Administrative 1
Multi-Hazard 0 Flood
Timeline 1 2 years
Agency Champion 1 DPW and Engineer
Other Community Objectives
1 Protection of critical facilities
Total 11
Priority (High/Med/Low)
High
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-37 June 2020
Action Worksheet
Project Name: Woodland Park Youth Center flood wall
Project Number: 2020-Woodland Park -004
Risk / Vulnerability
Hazard(s) of Concern: Flood
Description of the Problem:
Woodland Park Youth and Senior Center (Shelter) – impacted by flash flood events; Borough owned; slab on grade foundation; may not be feasible to elevate due to the large footprint; water rises very fast so not feasible to set up flood walls
Action or Project Intended for Implementation
Description of the Solution:
The Mayor and Council will oversee an action to build a flood wall around the Woodland Park Youth Center.
Is this project related to a Critical Facility or Lifeline?
Yes No
Level of Protection: TBD by flood wall design Estimated Benefits (losses avoided):
Reduction in flood risk
Useful Life: 50 years Goals Met: 1, 2
Estimated Cost: High Mitigation Action Type: Structure and Infrastructure Projects
Plan for Implementation
Prioritization: Medium Desired Timeframe for Implementation:
Within 1 year
Estimated Time Required for Project Implementation:
1 year Potential Funding Sources:
FEMA HMA, Local match
Responsible Organization:
Mayor and Council Local Planning Mechanisms to be Used in Implementation if any:
Hazard mitigation planning
Three Alternatives Considered (including No Action)
Alternatives:
Action Estimated Cost Evaluation No Action $0 Current problem continues
Elevate building $3 million May not be possible due to structure of the building,
costly Relocate Youth Center $3.5 million Costly
Progress Report (for plan maintenance)
Date of Status Report:
Report of Progress:
Update Evaluation of the Problem and/or Solution:
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-38 June 2020
Action Worksheet
Project Name: Woodland Park Youth Center flood wall
Project Number: 2020-Woodland Park -004
Criteria Numeric Rank
(-1, 0, 1) Provide brief rationale for numeric rank when
appropriate
Life Safety 0 .
Property Protection 1 Reduction in flooding risk
Cost-Effectiveness 0
Technical 1 Technically feasible project
Political 1
Legal 1 The Borough has the legal authority to conduct the project.
Fiscal 0 Project will require grant funding.
Environmental 0
Social 1 Project would reduce flooding impacts.
Administrative 1
Multi-Hazard 0 Flood
Timeline 0
Agency Champion 1 Mayor and Council
Other Community Objectives
1
Total 8
Priority (High/Med/Low)
Medium
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-39 June 2020
Action Worksheet
Project Name: Peckman River Flood Tunnel
Project Number: 2020-Woodland Park -05
Risk / Vulnerability
Hazard(s) of Concern: Flood
Description of the Problem:
Heavy rainfall results in the Peckman River overflowing its banks. Flooding impacts neighborhoods in Township of Little Falls and Borough of Woodland Park, including businesses.
Action or Project Intended for Implementation
Description of the Solution:
The USACE will construct a double box diversion culvert, or tunnel structure to be built under roadways to divert floodwater from the Peckman River into the Passaic River. Proposed project aspects include:
A 1,500-foot-long, 40-foot diameter double box diversion culvert would be constructed between the Peckman and Passaic rivers to divert floodwater from the Peckman into the Passaic River.
Approximately 2,170 linear feet of levees and/or floodwalls.
An additional 1,207 linear feet of levees and/or floodwalls would be constructed in the vicinity of Little Falls High School, between the track and baseball fields.
As many as 16 structures would be elevated so their main floor elevations would be to a final height of one foot above the base flood elevation.
As many as 38 structures to be wet floodproofed and four structures to be dry floodproofed.
Is this project related to a Critical Facility or Lifeline?
Yes No
Level of Protection: To be determined by completed project design
Estimated Benefits (losses avoided):
Reduction in flooding of neighborhood and businesses
Useful Life: 50 years Goals Met: 1, 2
Estimated Cost: $172 million Mitigation Action Type: Structure and Infrastructure Project
Plan for Implementation
Prioritization: High Desired Timeframe for Implementation:
Within 3 years
Estimated Time Required for Project Implementation:
5 years Potential Funding Sources:
USACE
Responsible Organization:
USACE, Township of Little Falls, Borough of Woodland Park
Local Planning Mechanisms to be Used in Implementation if any:
Hazard Mitigation Planning
Three Alternatives Considered (including No Action)
Alternatives:
Action Estimated Cost Evaluation No Action $0 Current problem continues
Buyout all properties that could be impacted by
flooding $250,000 per property
Unlikely to buyout all properties
Increase warning time by increasing warning
systems $50,000
Lives and property still at risk
Progress Report (for plan maintenance)
Date of Status Report:
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-40 June 2020
Report of Progress:
Update Evaluation of the Problem and/or Solution:
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-41 June 2020
Action Worksheet
Project Name: Peckman River Flood Tunnel
Project Number: 2020-Woodland Park -05
Criteria Numeric Rank
(-1, 0, 1) Provide brief rationale for numeric rank when
appropriate
Life Safety 1 Project will protect lives from flooding
Property Protection 1 Project will protect homes and businesses from flooding
Cost-Effectiveness 1
Technical 1 The USACE has developed plans for the project
Political 1 There is public support for the project
Legal 1
Fiscal 1 The project could be supported by USACE funds
Environmental 1
Social 1
Administrative 1
Multi-Hazard 0 Flood
Timeline 0 Within 3 years
Agency Champion 1 USACE, Township of Little Falls, Borough of Woodland Park
Other Community Objectives
1
Total 12
Priority (High/Med/Low)
High
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-42 June 2020
Action Worksheet
Project Name: Support the mitigation of vulnerable structures via retrofit
Project Number: 2020-Woodland Park -008
Risk / Vulnerability
Hazard(s) of Concern: Flood, Severe Storm
Description of the Problem:
Frequent flooding events have resulted in 91 repetitive loss properties and 6 severe repetitive loss properties.
Action or Project Intended for Implementation
Description of the Solution:
Conduct outreach to flood-prone property owners, including RL/SRL property owners and provide information on mitigation alternatives. After preferred mitigation measures are identified, collect required property-owner information and develop a FEMA grant application and BCA to obtain funding to implement acquisition/purchase/moving/elevating residential homes that experience frequent flooding (high risk areas).
Is this project related to a Critical Facility or Lifeline?
Yes No
Level of Protection:
1% annual chance flood event + freeboard (in accordance with flood ordinance)
Estimated Benefits (losses avoided):
Eliminates flood damage to homes and residents, creates open space for the municipality increasing flood storage.
Useful Life: Acquisition: Lifetime Elevation: 30 years (residential)
Goals Met: 1, 2
Estimated Cost: $3Million Mitigation Action Type: Structure and Infrastructure Project
Plan for Implementation
Prioritization: High Desired Timeframe for Implementation:
6-12 months
Estimated Time Required for Project Implementation:
Five years Potential Funding Sources:
FEMA HMGP and FMA, local cost share by residents
Responsible Organization:
NFIP Floodplain Administrator, Engineering, supported by homeowners
Local Planning Mechanisms to be Used in Implementation if any:
Hazard Mitigation
Three Alternatives Considered (including No Action)
Alternatives:
Action Estimated Cost Evaluation No Action $0 Current problem continues
Elevate homes $500,000 per home
When this area floods, the entire area is impacted; elevating homes would not eliminate the problem and still lead to road closures and impassable roads
Elevate roads $500,000 per quarter mile Elevated roadways would not protect the homes from flood damages
Progress Report (for plan maintenance)
Date of Status Report:
Report of Progress:
Update Evaluation of the Problem and/or Solution:
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-43 June 2020
Action Worksheet
Project Name: Support the mitigation of vulnerable structures via retrofit
Project Number: 2020-Woodland Park -008
Criteria Numeric Rank
(-1, 0, 1) Provide brief rationale for numeric rank when
appropriate
Life Safety 1 Families moved out of high-risk flood areas.
Property Protection 1 Properties removed from high-risk flood areas.
Cost-Effectiveness 1 Cost-effective project
Technical 1 Technically feasible project
Political 1
Legal 1 The Borough has the legal authority to conduct the project.
Fiscal 0 Project will require grant funding.
Environmental 1
Social 0 Project would remove families from areas of Borough where
acquisitions are used.
Administrative 0
Multi-Hazard 1 Flood, Severe Storm
Timeline 0
Agency Champion 1 NFIP Floodplain Administrator, supported by homeowners
Other Community Objectives
1
Total 10
Priority (High/Med/Low)
High
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-44 June 2020
Action Worksheet
Project Name: Flood Cameras
Project Number: 2020-Woodland Park -009
Risk / Vulnerability
Hazard(s) of Concern: Flood
Description of the Problem:
Stream gauges in the Borough lag in reporting of current conditions. This prevents proper response to events. Some events also result in gauge failure.
Action or Project Intended for Implementation
Description of the Solution:
The Borough will provide cameras on the Franciso Bridge, E. Man Street, Lackawanna Avenue, and Route 46 East and West Bridge and connect the live footage to the Police headquarters and the Borough website. This will be a collaborative effort with the Township of Little Falls.
Is this project related to a Critical Facility or Lifeline?
Yes No
Level of Protection: N/A Estimated Benefits (losses avoided):
Reduction in flood response requirements, Public information, quicker response to flooding
Useful Life: 10 years Goals Met: 1, 2, 3, 4
Estimated Cost: $10,000 Mitigation Action Type: Local Plans and Regulations, Education and Awareness Programs
Plan for Implementation
Prioritization: High Desired Timeframe for Implementation:
Within 2 years
Estimated Time Required for Project Implementation:
1 month Potential Funding Sources:
Borough budget, private grant opportunities, PDM, FMA
Responsible Organization:
Police Department, Woodland Park OEM, Department of Public Works, Little Falls
Local Planning Mechanisms to be Used in Implementation if any:
Hazard Mitigation Planning, Flood Warning
Three Alternatives Considered (including No Action)
Alternatives:
Action Estimated Cost Evaluation No Action $0 Current problem continues
Post emergency staff at bridge
Staff time Removes staffing capability
elsewhere Increase resilience of
stream gauges to prevent failure
$10,000 Still includes a lag in flood
reporting
Progress Report (for plan maintenance)
Date of Status Report:
Report of Progress:
Update Evaluation of the Problem and/or Solution:
Section 9.17 - Borough of Woodland Park
DMA 2000 Hazard Mitigation Plan Update – Passaic County and All Municipalities, New Jersey 9.17-45 June 2020
Action Worksheet
Project Name: Flood Cameras
Project Number: 2020-Woodland Park -009
Criteria Numeric Rank
(-1, 0, 1) Provide brief rationale for numeric rank when
appropriate
Life Safety 1 Project will result in less chance of flood exposure
Property Protection 1 Cameras will allow movable property to be moved as flooding
begins (cars)
Cost-Effectiveness 1
Technical 1
Political 1
Legal 1 The Borough has the legal authority to complete the project.
Fiscal 0 Project requires funding support.
Environmental 0
Social 1
Administrative 1
Multi-Hazard 0 Flood
Timeline 1 Within 2 years
Agency Champion 1 Police Department, Woodland Park OEM, Department of
Public Works, Little Falls Other Community Objectives
1 Community education
Total 11
Priority (High/Med/Low)
High