9-Feb-141 Monitoring & Evaluation in NIE Module 20.

70
Jun 16, 2022 1 Monitoring & Evaluation in NIE Module 20

Transcript of 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Page 1: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 1

Monitoring & Evaluation in NIE Module 20

Page 2: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 2

Learning objectives

• Be familiar with the basic concepts and main characteristics of monitoring and evaluation

• Understand the differences between various kinds of evaluations

• Explain the different kinds of indicators• Describe the very basics of a ‘log frame’• Optional: Be familiar with the monitoring and

evaluation of CMAM interventions

Page 3: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 3

Page 4: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 4

The project cycle

ASSESSMENT

PROGRAMME DESIGN

EVALUATION

Monitoring

IMPLEMENTATION

Disaster

Page 5: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Monitoring &Evaluation

*

Page 6: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

M&E

A WASP NEST………?

outputseffectiveness

performance

impact

outcomes

assessment

target

accountability

Qualitative indicators

DO NO HARM

INPUTS

timeliness

Logframes

Quantitative indicators

connectedness

efficiency

coverage

appropriateness

*

Page 7: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

DefinitionMonitoring‘The systematic and continuous assessment of theprogress of a piece of work over time….’

‘To continuously measure progress against programmeobjectives and check on relevance of the programme’

It involves collecting and analysing data/information

It is NOT only about PROCESS

*

Page 8: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Purpose of monitoring• to document progress and results of project

• to provide the necessary information to Management for timely decision taking and corrective action (if necessary)

• to promote accountability* to all stakeholders of a project (to beneficiaries, donors, etc)

*

Page 9: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Information collected for monitoring

must be:• Useful and relevant• Accurate• Regular• Acted upon• Shared• Timely

*

Page 10: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Monitoring is an implicit part of an evaluation.

It is often done badly:– Routine data collection not done routinely!– Data collection done poorly– Information not processed/used in a timely manner– Focus only on process indicators and neglecting (lack

of) preliminary impact

*

Page 11: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Can you give examples of Monitoring in your current work?

For example - From a CMAM programme?- From a Micronutrient programme?- From a General Food Distribution?- From a Health programme?- From a Livelihoods programme?

*

Page 12: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Monitoring

• Monitoring compares intentions with results• It guides project revisions, verifies targeting criteria

and whether assistance is reaching the people intended.

• It checks the relevance of the project to the needs.• It integrates and responds to community feedback • It enhances transparency and accountability

Page 13: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Difference between

Monitoring of

• Process/activities

• Impact/results

*

Page 14: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

The project cycle

ASSESSMENT

PROGRAMME DESIGN

EVALUATION

Monitoring

IMPLEMENTATION

Disaster

*

Page 15: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Why would you do an evaluation of a programme?

*

Page 16: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Definitions

Evaluation The aim is to determine relevance and fulfilment ofobjectives, as well as efficiency, effectiveness, impact

and sustainability of a project.

It involves the objective assessment of anongoing or completed project/programme, itsdesign, implementation and results.

*

Page 17: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

There has been an increased focus on evaluation of humanitarian action as part of efforts to improve quality and standards

*

Page 18: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Evaluation

It aims to

– Improve policy and practice– Enhance accountability

*

Page 19: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Evaluations are done when / because:

– Monitoring highlights unexpected results– More information is needed for decision making– Implementation problems or unmet needs are identified– Issues of sustainability, cost effectiveness or relevance

arise– Recommendations for actions to improve performance

are needed– Lessons learning are necessary for future activities

Page 20: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 20

Evaluations• Evaluation involves the same skills as assessment

and analysis• Evaluation should be done impartially and ideally

by external staff• Evaluation can also occur during (e.g. mid-term)

and after implementation of the project

*

One of the most important sources

of information for evaluations is

data used for monitoring

Page 21: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

The OECD-DAC criteriaOrganisation for Economic Co-operation and Development

• The Development Assistance Committee (DAC) evaluation criteria are currently at the heart of the evaluation of humanitarian action.

• The DAC criteria are designed to improve evaluation of humanitarian action.

*

Page 22: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

• Relevance/Appropriateness: Doing the right thing in the right way at the right time.

• Connectedness (and coordination): Was there any replication or gaps left in programming due to a lack of coordination?

• Coherence: Did the intervention make sense in the context of the emergency and the mandate of the implementing agency? Are their detrimental effects of the intervention on long run?

• Coverage: Who has been reached by the intervention, and where: linked to effectiveness?

• Efficiency: Were the results delivered in the least costly manner possible?

• Effectiveness: To what extent has the intervention achieved its objectives?

• Impact: Doing the right thing, changing the situation more profoundly and in the longer-term.

*

Evaluation looks at

Page 23: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

• Relevance/Appropriateness: Doing the right thing in the right way at the right time.

• Connectedness (and coordination): Was there any replication or gaps left in programming due to a lack of coordination?

• Coherence: Did the intervention make sense in the context of the emergency and the mandate of the implementing agency? Are their detrimental effects of the intervention on long run?

• Coverage: Who has been reached by the intervention, and where: linked to effectiveness?

• Efficiency: The extent to which results have been delivered in the least costly manner possible.

• Effectiveness: The extent to which an intervention has achieved its objectives –• Impact: Doing the right thing, changing the situation more profoundly and in

the longer-term.

*

Evaluation looks at

Page 24: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Example on General Food Distribution

• Relevance/Appropriateness: Doing the right thing in the right way at the right time. Was food aid the right thing to do, not cash?

• Connectedness: Are their detrimental effects of the intervention on long run?Did food aid lower food prices? Did local farmers suffer from that?

Page 25: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

• Coverage: Who has been reached by the intervention, and where: linked to effectiveness? Were those that needed food aid indeed reached?

• Efficiency: Were the results delivered in the least costly manner possible? Was it right to import the food or should it have been purchased locally? Could the results have been achieved with less (financial) resources? Food aid was provided, would cash have been more cost-effective?

Page 26: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

• Effectiveness: To what extent has the intervention achieved its objectives?Did food aid avoid undernutrition? (assuming it was an objective)

• Impact: Doing the right thing, changing the situation more profoundly and in the longer-term. Did the food aid avoid people becoming displaced? Did the people become dependent on food aid?

Page 27: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

• Impact: - Very much related to the general goal of the

project- Measures both positive and negative long-term

effects, as well as intended and unintended effects. GFD: did it lower general food prices with long-term economic consequences for certain groups ? Were people that received food aid attacked because of the ration? (therefore more death…?)

- Need for baseline information!!!! (to measure results against….)

Page 28: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

To evaluate projects well is a real skill!

And you often need a team…

*

Page 29: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

M&E in emergencies?

Any project without Monitoring and/or Evaluation

is a BAD project

*

Page 30: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Help!

*

Page 31: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

The “M” and the “E”…Monitoring Evaluation

Primary use of the data

Project management

AccountabilityPlanning (future projects)

Frequency of data collection

Ongoing Periodic

Type of data collected

Info on process and effects

Info on effects

Who collects the data

Project staff External evaluators

Page 32: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Evaluations in Humanitarian Context

• Single-agency evaluation (during/after project)

• There is an increasing move towards:– Inter-agency evaluations: the objective is to

evaluate responses as a whole and the links between interventions

– Real-time evaluations: carried out 8 to 12 weeks after the onset of an emergency and are processed within one month of data collection

Page 33: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Real-time evaluations (1)• WHY?

Arose from concern that evaluations came too late to affect the operations they were assessing

• Various groups of organizations aim to undertake real-time evaluations

• Same purpose as any other evaluation• Common characteristics:

– Takes place during the course of implementation– In a short time frame

*

Page 34: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Real-time evaluations (2)• It is an improvement-oriented review; it can be regarded

more as an internal function than an external process.• It helps to bring about changes in the programme, rather

than just reflecting on its quality after the event. • A real-time “evaluator” is a “facilitator”, working with staff

to find creative solutions to any difficulties they encounter. • It helps to get closer to the people affected by crisis, and

this enables to improve accountability to ‘beneficiaries’.

*

Page 35: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 35

Monitoring & Evaluation systems• Main components of M&E systems:

– M&E work plan for data collection and analysis, covering baseline, on-going M&E

– Logical framework, including indicators and means/source of verification

– Reporting flows and formats– Feedback and review plan– Capacity building design– Implementation schedule– Human resources and budget

Page 36: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Examples of data collection methods for M&E

Quantitative Methods Qualitative methods

Administering structured oral or written interviews with closed questions

Semi structured interviews e.g. key informant

Population based surveys Focus group discussion

Reviewing medical and financial records Observing

Completing forms and tally sheets Case studies

Direct measurement (anthropometry, biochemical analysis, clinical signs)

Mapping, ranking, scoring

Lot quality assessment Problem sorting, ranking

Page 37: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Focus on INDICATORS

Page 38: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Indicators

• An indicator is a measure that is used to show change in a situation, or the progress in/results of an activity, project, or programme.

• Indicators:– enable us to be “watchdogs”;– are essential instruments for monitoring and

evaluation.– are objectively verifiable measurements

Page 39: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

What are the Qualities of a Good Indicator?

• Specific

• Measurable

• Achievable

• Relevant

• Time-bound

And there is also the SMART initiative….Standardised Monitoring and Assessment in Relief and Transition Initiative - interagency initiative to improve the M&E of humanitarian assistance

The Sphere Project provides the most accepted indicators for nutrition and food security interventions in emergencies: see Module 21.

Page 40: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Types of indicatorsIndicators exist in many different forms:

Direct

Global / standardised

Locally developed

Indirect / proxy

QualitativeQuantitativ

e

Direct indicators correspond precisely to results at any performance level.

Indirect or "proxy" indicators demonstrate the change or results if direct measures are not feasible.

Indicators are usually quantitative measures, expressed as percentage or share, as a rate, etc.

Indicators may also be qualitative observations.

Standardised global indicators are comparable in all settings.

Other indicators tend to be context specific and must be developed locally.

Page 41: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Outcome

Impact

Output

Input

Page 42: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Outcome

Impact

Output

Input Related to Activities/Resources

Related to Objectives (or Purposes)

Related to Goal

Related to Outputs

Page 43: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Outcome

Impact

Output

Input Related to Activities/Resources

Related to Objectives (or Purposes)

Related to Goal

Related to Outputs

Nutritional education to mothers on complementary food

X number of mothers know about good complementary food and how to prepare that

% of young children getting appropriate complementary food

Malnutrition rates amongst young children reduced

*

Page 44: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.
Page 45: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

What is a Log Frame?

The logical framework or logframe is an analytical toolused to plan, monitor, and evaluate projects.

Victim of a log frame?

? ? ?

?

Page 46: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

INPUTS

Log Frames

IMPACT

OUTCOME

Page 47: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Impact

Outcome OutcomeOutcome

OutputOutput Output Output Output OutputImpact

Outcome

Output

Output

Output

INPUTS

Page 48: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

• The means of verification of progress towards achieving the indicators highlights the sources from where data is collected. The process of identifying the means of verification at this stage is useful as discussions on where to find information or how to collect it often lead to reformulation of the indicator.

• Assumptions are external factors or conditions that have the potential to influence the success of a programme. They may be factors outside the control of the programme. The achievement of a programme’s aims depends on whether or not assumptions hold true or anticipated risks do not materialise.

Apr 10, 2023 48

Other terms that can be found in a logframe:

Page 49: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

logical framework for M&EProject description Indicators Source / mean of

verificationAssumptions / risks

Goal

Objectives / outcomes

Deliverable outputs

Activities

If the OBJECTIVES are produced, then this should contribute to the overall GOAL

If adequate ACTIVITIES are conducted, then OUTPUT/RESULTS can be produced

If OUTPUTS/RESULTS are produced, then the OBJECTIVES are accomplished

If adequate RESOURCES/INPUTS are provided; then activities can be conducted

Page 50: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Activities versus Results

Completed activities are not results.• e.g. a hospital was built, does not mean that injured

and sick people can be treated in the hospital, maybe the hospital has no water and the beds have not been delivered.

Results are the actual benefits or effects ofcompleted activities:• e.g. Injured and sick people have access to a fully

functional health facility.

*

Page 51: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Log frames

Page 52: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Example

Page 53: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Another Example…

*

Page 54: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.
Page 55: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Key messages• The monitoring of nutrition interventions in emergencies is an

integral part of saving lives and maintaining nutrition status of the affected population.

• Successful monitoring systems allow for improvements in interventions in ‘real time’.

• Evaluations are important tools for learning, assessing interventions, comparing the costs of the interventions and their impact. Essential evaluation parameters are: effectiveness; efficiency; relevance/appropriateness; impact and coverage

• Involving communities in M&E places the affected population at the heart of the response, providing the opportunity for their views and perceptions to be incorporated into programme decisions and increases accountability towards them.

• A common mistake of designing M&E systems is creating a framework which is overly complex. Always make an M&E system practical and doable.

• The logical framework or logframe is an analytical tool used to plan, monitor, and evaluate projects.

Page 56: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 56

Monitoring for CMAM interventions

• Types of monitoring, e.g.– Individual case monitoring, – Programme / activities monitoring

Page 57: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 57

Individual monitoring for CMAM• It is the basic follow up of cases in SFP / OTP /

SC services:– Anthropometric / clinical assessment

• Tools for individual case follow up include:

– Medical / nutrition and action protocols– Individual follow up card– Referral forms– …

Page 58: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 58

Objectives of monitoring CMAM activities

• Assess service performance / outcomes• Identify further needs

– Support decision-taking for quality improvement (staffing, training, resources, site location,…)

• Contribute to the analysis of the general situation– Assessing the nutrition trends in the area

Page 59: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Methods and tools for monitoring CMAM interventions

• Monthly / weekly reporting:• Reporting needs to be done per site (service unit)

and compiled per area (district…) up to the national level

• Routine supervision

• External evaluations• Coverage surveys are one of the most important

tools for evaluation of CMAM interventions

Apr 10, 2023 59

Page 60: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Routine data collection for monitoring CMAM interventions

• Routine data is collected for specified time-periods:– Nb. of new admissions , – Nb. of discharges (total and by category: cured, died,

defaulted, non-recovered – Nb. of cases in treatment (nb. of beneficiaries

registered at the end of the reporting time-period)

Data on admissions should be disaggregated by gender

Apr 10, 2023 60

Page 61: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Category Criteria (Children 6 – 59 months)

New admissions for children 6 – 59 months (or > 60 months but <130 cm height)

MUAC <11.5 cmorW/H < -3 Z scores (WHO) or <70% of median (NCHS)or Bilateral pitting oedema grade + or ++ and child is alert, has appetite, and is clinically well

Other new admissions Carer refuses inpatient care despite advice

Returned Defaulter Child has previously defaulted and has returned to OTP(the child must meet admission criteria to be re-admitted).

Readmissions/Relapses A child is treated in OTP until discharge after meeting discharge criteria but relapses hence need for readmission

Transfer from inpatient care (SC)

From in-patient care after stabilisation treatment

Transfer from OTP Patients moved in from another OTP site

Apr 10, 2023 61

Page 62: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Category Criteria (Children 6 – 59 months) Cured

MUAC > 12.5cm and WFH > -2Z scores and no oedema for two consecutive visits AndChild is clinically well

Defaulted

Absent for 3 consecutive visits

Died

Died during time registered in OTP

Non-Cured

Has not reached discharge criteria within four months of treatment Link the child to other programmes e.g. SFP. IYCF, GMP, targeted food distributions

Transferred to SC

Condition has deteriorated and requires inpatient care

Transfer to other OTP

Child has been transferred to another OTP site

Apr 10, 2023 62

Page 63: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Monitoring of CMAM interventions: key indicators for SAM (Sphere)

• The proportion of discharges from therapeutic care should be:– Recovered > 75 %– Deaths < 10 %– Defaulter < 15 %

They are primarily applicable to the 6–59 month age group, although others may be part of the programme.

• Distance: > 90 % of the target population is within less than one day’s return walk (including time for treatment) of the service / site.

• Coverage is > 50 % in rural areas, > 70 % in urban areas and >90 % in camp situations

Apr 10, 2023 63

Page 64: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Monitoring of CMAM interventions: key indicators for MAM (Sphere)

• The proportion of discharges from targeted SFP should be:– Recovered > 75 % – Deaths < 3 % – Defaulter < 15 %

They are primarily applicable to the 6–59 month age group,although others may be part of the programme.

• Distance: > 90 % of the target population is within less than one day’s return walk (including time for treatment) of the programme site for dry ration SFP and no more than one hour’s walk for on-site wet SFP

• Coverage is > 50 % in rural areas, > 70 % in urban areas and > 90 % in a camp situation

Apr 10, 2023 64

Page 65: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Additional data for monitoring CMAM interventions

Derived from routine monitoring and other sources:• Average length of stay • Average weight gain• Relapse rate • Distribution of admissions per

type, per age, per origin…• Causes of death• Reasons for defaulting• Investigation of non-recovery

cases

Sources of data:• Registration books• Individual follow up charts• Interviews and Focus group

discussions• Observation, home-visits • …

Apr 10, 2023 65

Page 66: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 66

M&E for CMAM interventions: Supervision

Supportive supervision visits to sites are designed to ensure / improve the quality of care offered by:

• Identifying weaknesses in the performance of activities, taking immediate action and applying shared corrective solutions

• Strengthening the technical capacity of health workers and motivating staff through encouragement of good practices

Supervisors and managers ensure that the performance of activities and organization of the services meet quality standards.

Page 67: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 67

Evaluation of SAM management interventions

• Effectiveness: programme performance with a strong focus on coverage

• Appropriateness: e.g. distribution and time of opening of treatment sites

• Connectedness: relates to the links with health system and shows levels of possible integration

• Cost-effectiveness has also been measured with various methods and showing high differences between contexts and different approaches

Page 68: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 68

M&E of CMAM interventions: population level assessments

• Community level assessment can be done through:– Repeated anthropometric surveys– Programme coverage

Page 69: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Evaluation of coverage for CMAM• Coverage is one of the most important

elements behind the success of the CMAM approach. – It is measured through studies using two main

approaches:• The centric systematic area sampling (CSAS)• The Semi-Quantitative Evaluation of Access and

Coverage (SQUEAC)• Coverage should reach at least 90% of severe cases in

camps situation, 70% in urban setting, 50% in rural setting (SPHERE standards)

Apr 10, 2023 69

Page 70: 9-Feb-141 Monitoring & Evaluation in NIE Module 20.

Apr 10, 2023 70

Evaluation of management of MAM interventions

• Same criteria as for all other interventions (relevance, efficiency, etc.)

• SFP evaluations are rarely shared, but evidence showed that defaulting and non-response are very common

• Needs for evaluating use of Ready-to-Use-Supplementary Food products in terms of efficiency: gain of weight, effect of defaulting, effect on easiness for beneficiaries, etc.