7 TH AVENUE CREEK PROJECT UPDATE OCTOBER 29, 2015

Transcript of 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 ....

Page 1: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

7TH AVENUE CREEK PROJECT UPDATE OCTOBER 29, 2015

Page 2: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Meeting Agenda • Study Area & Constraints • Project Options

• Public Involvement

• Next Steps

• Open House

Page 3: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

7th Avenue Creek Study Area

Page 4: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Project Constraints

Page 5: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Project Options

• Option #1 – Engineered Solution

• Option #2 – Greenway Solution • Option #3 – Hybrid of Option #1 & #2

Page 6: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Options Considered Option #1 – Engineered

Channel Excavation and Culvert Replacement

Option #2 – Greenway Greenway and Stream Restoration with Culvert Replacement

Page 7: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Option #1 Engineered

Channel Excavation and Culvert Replacement

• Focuses on reducing flood risk by:

• Culvert Replacements • Channel Improvements

• Land Acquisition – Most Likely • Grant Funding – Low Eligibility • Project Cost – $13.0 Million

Typical Section

Plan View

Page 8: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Option #2 Greenway

Greenway and Stream Restoration

with Culvert Replacement • Focuses on reducing flood risk by:

• Culvert Replacements • Channel Improvements • Stream Restoration • Native Plantings

• Land Acquisition – Yes • Grant Funding – High Eligibility • Project Cost - $22.3 Million

Typical Section

Plan View

Page 9: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Summary of Options

Option #1 - Engineered Channel Excavation and

Culvert Replacement

Option #2 - Greenway Greenway and Stream Restoration and

Culvert Replacement

Channel & Stream Work Channel Excavation Only Channel Excavation with wider/flatter creek

Culvert Replacement Yes Yes

Greenway Improvements Minimal Yes

Environmental Benefits Moderately improved water quality through bank stabilization and low flow channel

Improved water quality through bank stabilization, meandered stream and

native plantings.

Land Acquisition Most Likely Yes

Reduces Flood Risk 100 Year Storm 100 Year Storm

Grant /Loan Funding Low Eligibility High Eligibility

Roadway Flooding Eliminates or Minimizes Eliminates or Minimizes

Cost ($ FY 15/16 DRAFT) $13.0 Million $22.3 Million

Option #3

Page 10: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Public Involvement

• Public Meeting (January 2015)

• Surveys

• Elevation Certificates

• Tonight’s meeting

Residential Commercial Total Proposed # 90 19 109 Actual # 74 16 90

Page 11: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Next Steps City of St. Charles • Presentation to City Council – Nov. 2015 – Feb. 2016

• Update on feedback from Public Meetings • Define next steps based on feedback and considerations moving

forward

• Budgeting & Funding Considerations • Development of Master Plan • Project Phasing & Schedule • Funding Evaluation

Page 12: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Next Steps Federal Emergency Management Agency – Mapping

Draft Map Public Meetings – Winter 2015/2016

• FEMA will discuss the mapping process & timeline • Provide an opportunity for you to:

• Review the Preliminary map panels, Flood Insurance Report (FIS) & Summary of Map Actions (SOMA)

• Submit written comments • 90 Day Appeal Period

• Begins after comment period (dates to be determined) • Disagreements based on technical data • Data is required to support appeals (Elevation Certificates)

• Maps become Effective – Earliest 2017

Page 13: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will

Project Questions and Comments

• Comment Cards • Turn in at the back of the room in the comment box

• City of St. Charles Public Works Department Re: 7th Avenue Creek Project 2 E. Main Street St. Charles, IL 60174 630-584-5353 [email protected]

• Website http://www.hlplanning.com/portals/stcharles/