7TH AVENUE CREEK PROJECT UPDATE OCTOBER 29, 2015
![Page 2: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/2.jpg)
Meeting Agenda • Study Area & Constraints • Project Options
• Public Involvement
• Next Steps
• Open House
![Page 3: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/3.jpg)
7th Avenue Creek Study Area
![Page 4: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/4.jpg)
Project Constraints
![Page 5: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/5.jpg)
Project Options
• Option #1 – Engineered Solution
• Option #2 – Greenway Solution • Option #3 – Hybrid of Option #1 & #2
![Page 6: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/6.jpg)
Options Considered Option #1 – Engineered
Channel Excavation and Culvert Replacement
Option #2 – Greenway Greenway and Stream Restoration with Culvert Replacement
![Page 7: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/7.jpg)
Option #1 Engineered
Channel Excavation and Culvert Replacement
• Focuses on reducing flood risk by:
• Culvert Replacements • Channel Improvements
• Land Acquisition – Most Likely • Grant Funding – Low Eligibility • Project Cost – $13.0 Million
Typical Section
Plan View
![Page 8: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/8.jpg)
Option #2 Greenway
Greenway and Stream Restoration
with Culvert Replacement • Focuses on reducing flood risk by:
• Culvert Replacements • Channel Improvements • Stream Restoration • Native Plantings
• Land Acquisition – Yes • Grant Funding – High Eligibility • Project Cost - $22.3 Million
Typical Section
Plan View
![Page 9: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/9.jpg)
Summary of Options
Option #1 - Engineered Channel Excavation and
Culvert Replacement
Option #2 - Greenway Greenway and Stream Restoration and
Culvert Replacement
Channel & Stream Work Channel Excavation Only Channel Excavation with wider/flatter creek
Culvert Replacement Yes Yes
Greenway Improvements Minimal Yes
Environmental Benefits Moderately improved water quality through bank stabilization and low flow channel
Improved water quality through bank stabilization, meandered stream and
native plantings.
Land Acquisition Most Likely Yes
Reduces Flood Risk 100 Year Storm 100 Year Storm
Grant /Loan Funding Low Eligibility High Eligibility
Roadway Flooding Eliminates or Minimizes Eliminates or Minimizes
Cost ($ FY 15/16 DRAFT) $13.0 Million $22.3 Million
Option #3
![Page 10: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/10.jpg)
Public Involvement
• Public Meeting (January 2015)
• Surveys
• Elevation Certificates
• Tonight’s meeting
Residential Commercial Total Proposed # 90 19 109 Actual # 74 16 90
![Page 11: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/11.jpg)
Next Steps City of St. Charles • Presentation to City Council – Nov. 2015 – Feb. 2016
• Update on feedback from Public Meetings • Define next steps based on feedback and considerations moving
forward
• Budgeting & Funding Considerations • Development of Master Plan • Project Phasing & Schedule • Funding Evaluation
![Page 12: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/12.jpg)
Next Steps Federal Emergency Management Agency – Mapping
Draft Map Public Meetings – Winter 2015/2016
• FEMA will discuss the mapping process & timeline • Provide an opportunity for you to:
• Review the Preliminary map panels, Flood Insurance Report (FIS) & Summary of Map Actions (SOMA)
• Submit written comments • 90 Day Appeal Period
• Begins after comment period (dates to be determined) • Disagreements based on technical data • Data is required to support appeals (Elevation Certificates)
• Maps become Effective – Earliest 2017
![Page 13: 7th Avenue Creek Project Update July 28, 2015 · 2015. 11. 3. · PROJECT UPDATE OCTOBER 29, 2015 . Meeting Agenda •Study Area & Constraints •Project Options ... •FEMA will](https://reader033.fdocuments.us/reader033/viewer/2022060905/60a0426272cd5b05ed7698a0/html5/thumbnails/13.jpg)
Project Questions and Comments
• Comment Cards • Turn in at the back of the room in the comment box
• City of St. Charles Public Works Department Re: 7th Avenue Creek Project 2 E. Main Street St. Charles, IL 60174 630-584-5353 [email protected]
• Website http://www.hlplanning.com/portals/stcharles/