PT Len Industri (Persero)
PT Len Industri (Persero)Electrical Industry and Manufacture
PT Len Industri (Persero)
Contents
Introduction PT. Len Industri (Persero)1
PV Systems2
3 Experience and Implementation
4
PT Len Industri (Persero)
Contents
Introduction PT. Len Industri (Persero)1
PV Systems2
3 Experience and Implementation
4
PT Len Industri (Persero)
MAIN BUSINESS
Railway Transportation
Renewable Energy
Telecommunication
Defense Electronics
Navigation System
Halaman 5
PT Len Industri (Persero)
Railway Transportation product and experience
Halaman 6
Signaling / Interlocking sys Fiber Optic for Signaling System
A
u
t
o
m
a
t
i
c
Wa
r
n
i
n
g
S
y
s
t
e
mCentralized Traffic Control
Traction System for KRL
KRD, KRDE
PT Len Industri (Persero)
Navigation System experience procurement and installatian
Halaman 7
Radar
Lighting System Navigasi– ATC Display
DVOR/DME/ ILS
PT Len Industri (Persero)
Telecommunication
Halaman 9
WiMAX 16d & 16e :
SDH Equipment
PT Len Industri (Persero)
Defense Electronics
Halaman 10
Radio Man PackSurveillance & Reconnaissance
SystemCombat Management Sys
Alkom RantisTransponder Sasaran
TorpedoX – Ray (Customs Administration)
PT Len Industri (Persero)
Renewable Energy have product and experience, EPConstruction subsidiary
PT Len Industri (Persero)
Len’s Production Capacity factory assembly
-PV Modul (Solar Panel) 10 MW/year
- WiMAX 16d and 16e
Base Station 5.000 units/year
CPE Out door 15.000 units/year
- Alkom 5.000 units/year
- Signalling System 20 stations/year
Polycrystalline / Monocrystalline
PT Len Industri (Persero)
PT. ELTRAN
INDONESIAPT. SURYA
ENERGIINDOTAMA
PT. LEN
RAILWAYS SYSTEM
Len Polycrystalline and
Monocrystalline Solar Module
Product
• Operated since 1998
• Follow the Indonesia markets
• High efficiency module
• It has dominate 70% of world solar module
production compare to others technology
PT Len Industri (Persero)
SHS 50 Wp (small scale)
•∼ 5 MWp
Hybrid
• 80 system
• 381,6 KWp
Off Grid & Grid
• 36 system
• 469,4 kWp
• 500 kwp Thin film (2011 – on progress)
PLN project (2,34 MWp)
• On Grid 300 kWp (Finish), 900 kwp (progress)
• Off Grid 200 kWp (progress),
• Hybrid 340 kWp (progress)
(2008)
PT Len Industri (Persero)
Contents
Introduction PT. Len Industri (Persero)1
PV Systems2
3 Experience and Implementation
4
PT Len Industri (Persero)
PV SysTech.
Equipment Tech.
PV Tech.
Inverter and Solar Charge
Tech.
Battery Tech.
Grounding, Monitoring, etc.
tech
Implementation Tech.
Off grid Tech.
On Grid Tech.
PV System Technology
www.schoolgen.co.nz
www.inbalance-energy.co.uk
You know better than me
PT Len Industri (Persero)
PV Impl. Tech
OFF GRID
Generated for use locally
With Storage
Small (SHS, Solar Power
Pack) to Large Scale
capacityWithout Storage
Hybrid System
ON GRID
PV system connected to
the main power grid
With Storage (buckup)
Without Storage
Hybrid system??
Solar Power Implementation Technology
www.schoolgen.co.nz
www.inbalance-energy.co.uk
PT Len Industri (Persero)
PV Global Aplication
PT Len Industri (Persero)
Off Grid /
Stand alone
Diagram
(With
Storage)*
*DC Coupling
PT Len Industri (Persero)
On Grid
Diagram
PT Len Industri (Persero)
Low Loads:
Diesel off-line,
battery and
renewable
energy sources operating
through
inverter
Off Grid
(Hybrid)
Diagram
PT Len Industri (Persero)
Medium Loads:Diesel operating at optimal loading,HPC charging battery with excess diesel capacity
Off Grid
(Hybrid)
Diagram
PT Len Industri (Persero)
Peak Loads:
Diesel operating at
optimal loading,
in parallel with
Inverter converting
DC power from the
renewable energy
source and battery
into AC power
Off Grid
(Hybrid)
Diagram
PT Len Industri (Persero)
Off Grid
(Small
Scale)
Diagram
PT Len Industri (Persero)
Contents
Introduction PT. Len Industri (Persero)1
PV Systems2
3 Experience and Implementation
4
24
Grid 200 KWp NTB Grid 105 KWp SBY Grid 100 KWp MALUKU
25
Off Grid (Hybrid) PV 50 KWp +Genset 136 kVA + Wind 40 kW, NTT
Off Grid with storage (Stand alone) PV 80 KWp,
Alor
Off Grid with storage (Stand alone), PV 5 KWp
Off Grid with storageSolar Home System (SHS)
Off Grid with storage Solar Power Pack or
Solar Charger Station
Off Grid with storage (Stand alone)PV 0,8 KWp
(∼2.8 kWh/ day)
Off Grid with storage SEHEN (Super Extra
Hemat Energi)
PT Len Industri (Persero)
Equipments Lampung Project Mixed Off and On Grid
PLN100 ISLANDS PV SYSTEM
PV System Installed 2011 (kWp)*
957.50
420.50
1,199.15
2,757.40 3,104.00
1,100.00 1,435.20
Sumatera Jawa-Bali Kalimantan Nusa Tenggara Sulawesi Maluku Papua
*Until Oct, 2011
Source : PLN, ESDM, PDT, Local gvt
PT Len Industri (Persero)
PV System 2011 Indonesia*
48%
43%
9%
Capacity
Off Grid
On Grid
Small Scale
PV SystemCapacity
(Kwp)
Off Grid 5.205,40
On Grid 4.745,00
Small Scale
(Off Grid) 1.023,35
Total 10.973,75
*Until Oct, 2011
Source : PLN, ESDM, PDT, Local gvt
Electrification Ratio 2011
< 50%
50% - 60%
60% - 70%
> 70%
Source : RUPTL PLN 2010-2019 (data processed)
2 7 1222
37
67
97
127
157
187
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
MWp
Source : RUPTL PLN 2010-2019
Pln Solar Eneregy Development 2010 - 2019
EBTKE/ESDM Solar Energy Development 2010 - 2025
25 35 45 55 65 75
125
175
225
275
324
375
426
477
528
580
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
MWp
Source : Blueprint Pengembangan Energi Baru Terbarukan dan Konservasi Energi EBTKE 2010
PT Len Industri (Persero)
PopulationMore than 70% area In Indonesia have population less than 100 people / km2
PT Len Industri (Persero)
Population and Electricity in Indonesia
Jumlah Keluarga berlistrik (Household appliances) (PLN) 37.099.830
Jumlah Keluarga berlistrik (Household Appliance) (Non PLN) 1.473.635
Jumlah keluarga (Number of Household) 58.194.470
Electrification ratio 66,28 %
Statistik
Ketenagalistrikan
dan Energi
Tahun, ESDM
2009(Ministery of Energi and
Mineral Resource)
Vickner sinaga,
PLN, 2011
Harry JP, PLN, 2011
East Indonesia 56%
NTB – NTT Province 31%
West Indonesia (2011) 62%
PT Len Industri (Persero)
Off Grid and On Grid
Off GridLarge Scale
Hybrid
Goverment ProjectPrivate Investor
Operator / Power Company (PLN)
Not AvailableAvailable
On Grid Large Scale, Hybrid
Goverment ProjectPLN Project
Po
pu
lati
on
/ H
ou
seh
old Urban, Sub
Urban, or Rural
Residence
Rural Scattered Residence
Off GridSmall Scale
Goverment Project
-------