#6a modular construction (1)

20
1 MODULAR CONSTRUCTION BSB 602 Modular vs. Standard Construction (Conventional) A modular building is a pre-engineered structure that is flexible enough to satisfy virtually any requirement... tougher than standard drywall construction, expandable, can be relocated and completely re-usable. One obvious advantage that modular construction has over conventional construction is cost. Not only can one save up to 35% on the initial construction costs like labor and materials, but there are other benefits as well. BSB 602 MODULAR CONSTRUCTION

description

 

Transcript of #6a modular construction (1)

Page 1: #6a    modular construction (1)

1

MODULAR CONSTRUCTION

BSB 602

Modular vs. Standard Construction (Conventional)A modular building is a pre-engineered structure that is flexible enough to satisfy virtually any requirement... tougher than standard drywall construction, expandable, can be relocated and completely re-usable.

One obvious advantage that modular construction has over conventional construction is cost. Not only can one save up to 35% on the initial construction costs like labor and materials, but there are other benefits as well.

BSB 602

MODULAR CONSTRUCTION

Page 2: #6a    modular construction (1)

2

With increasing industrialization to the building industry, steadily larger parts of buildings are made up of prefabricated components, delivered to the building site from the factories.

Evidently, some sort of dimensional coordination of these component themselves and with the design are of paramount importance.

The full benefit of the industrialization is impossible without standardization. No effective standardization is possible in the building industry, without dimensional coordination.

BSB 602

Modular coordination is a concept of coordination of dimension and space in which buildings and components are dimensioned and positioned in terms of basic unit or module.

The basic module is known as 1M which is equivalent to 100mm.

It is internationally accepted by the International Standard Organisation and many other countries including Malaysia.

What is Modular CoordinationWhat is Modular Coordination

BSB 602

Page 3: #6a    modular construction (1)

3

• Industrialization friendly i.e. able to cater for manufacturing, transportation and assembly requirements.

• Small enough in term of size in order to provide the necessary flexibility in design.

• Large enough to promote simplification of the number of sizes for various components.

• Internationally accepted to ensure that it can be mass produced to cater for global market.

• Ergonomic i.e. able to improve people efficiency by providing adequate space for human livings and working conditions.

The Module developed has the The Module developed has the following characteristicsfollowing characteristics

BSB 602

• It provides a practical and coherent: method for coordinating- the position and dimension of elements, components and spaces in the planning and design of buildings.

• To improve productivity in the building industry through industrialization. MC can facilitate the achievement of industrialization.

• Provide guide to building component sizing: this can reduce as much as possible the needs to further trim and shape the materials to fit together in construction; thus, reducing wastage of labour and material.

Why MC?Why MC?

BSB 602

Page 4: #6a    modular construction (1)

4

• Mass production of building components factories: thus, ensuring good and consistent of workmanship and quality.

• To permit standardization, which encourages the use of standardized building components for the construction of different types of building; to simplify site operation by rationalizing setting out, positioning and assembling of building components at the site.

…….why MC?.why MC?

BSB 602

• To ensure dimensional coordination between installation (equipment, storage units, other fitted furniture etc) as well as with the rest of the building.

• To encourage open systems: the interchangeability of components, whatever their material, form or method of manufacture,

…….why MC?.why MC?

BSB 602

Page 5: #6a    modular construction (1)

5

• CIDB encourages the standardization and improvement of construction techniques and materials in line with its role in Malaysian construction.

• It is also to promote and stimulate the development, improvement and expansion of the construction industry.

BSB 602

MC in MalaysiaMC in Malaysia

How can Modular Coordination improve productivity?

Facilitates the attainment of three objectives of all industrial developments:-

• mass production of selected components by specialist firms thus achieving economy of scale

• the components can be sold on the open and possibly international market as they are of standard dimensions; and

• other specialist firms can concentrate on the assembly of components into a final consumers products.

STANDARDIZATIONSTANDARDIZATION

BSB 602

Page 6: #6a    modular construction (1)

6

MC ConceptMC ConceptModular Coordination

Promote Industrialization(component manufactured in factory)

Promote Industrialization(component manufactured in factory)

Improves ProductivityImproves

Productivity

Through Standardization

Through Standardization

Less wet work on siteNon dependence on unskilled labour

Less modification on site

Less wet work on siteNon dependence on unskilled labour

Less modification on site

BSB 602

MC ConceptMC Concept

1 - DIMENTIONAL CO-ORDINATIONA convention for the co-ordination of the dimensions of building components and building incorporating them in their design, manufacture and assembly by means of a three dimensional spatial references system points, lines and planes to which the position and size of a components, assembly of element may be related.

BSB 602

Page 7: #6a    modular construction (1)

7

MC ConceptMC ConceptThe dimensional coordination is essential in order to:-

• simplify design and documentation procedures and allow the implementation of computer techniques;

• achieve optima efficiency in the manufacture and use of components and assemblies;

• avoid cutting or modifying components andassemblies on site;

• standardize the profile and detail of jointsbetween components;

• Reduce non-standard or dimensionallyincompatible components and assemblies; and

• maximize the Interchangeability of components and assembliesBSB 602

MC ConceptMC Concept

2 - MODULAR CO-ORDINATIONDimensional co-ordination employing the basic module or some whole multiple thereof as basic dimensional unit and increments of it.

The basic module which is generally accepted at an international level is 100mm which may be represented by the letter M.

BSB 602

Page 8: #6a    modular construction (1)

8

Sub-modules

Basic Module M=100mmBasic Module M=100mm

e.g : 50mm25mm

Multi-modules

e.g : 3m, 6m, 12m…..

300mm, 600mm, 1200mm

Basic Module M = 100mm

BSB 602

Modular Reference SystemModular Reference System

In Modular co-ordination:- the term modular reference systemsis the three-dimensional system of orthogonal space co-ordinates within the positions and sizes of components, elements and installations can be related by references to points, lines, or planes.

BSB 602

Page 9: #6a    modular construction (1)

9

Modular CoordinationModular CoordinationThe Modular Reference SystemThe Modular Reference System

BSB 602

Modular Reference SystemModular Reference System

Within this references system, dimensional increments are in terms of the basic module (100mm) or some multiple thereof.

Reference planes can be identified which locate the main vertical and horizontal elements of construction, e.g. floor, walls, and columns.

BSB 602

Page 10: #6a    modular construction (1)

10

Modular Reference SystemModular Reference System

Location of the Main Elements by Means of a modular Reference SystemBSB 602

Modular Reference SystemModular Reference System

Floor Zone – Vertical Section

BSB 602

Page 11: #6a    modular construction (1)

11

Modular Reference SystemModular Reference System

Wall Zone – Horizontal SectionBSB 602

Modular Reference SystemModular Reference System

Use of Additional Grid Lines Modular Floor HeightBSB 602

Page 12: #6a    modular construction (1)

12

Modular Reference SystemModular Reference System

Use of Additional Grid Lines Non-Modular Floor HeightBSB 602

Horizontal CoordinationHorizontal Coordination

Traditionally, modular theory has distinguished between boundary planning and axial planning. In practice, however, such a clear-cut distinction may not exist.

Modular co-ordination – component locationBSB 602

Page 13: #6a    modular construction (1)

13

Horizontal CoordinationHorizontal Coordination

Modular co-ordination – Boundary Planning & Axial Planning

BSB 602

Vertical CoordinationVertical Coordination

In the vertical section that modular floor plane is the reference plane from which modular dimensions are taken.

BSB 602

Page 14: #6a    modular construction (1)

14

Location of Modular Floor Plan

Vertical CoordinationVertical Coordination

BSB 602

Additional Grid Line

Vertical CoordinationVertical Coordination

Ceiling Level

BSB 602

Page 15: #6a    modular construction (1)

15

Main Components to Go ModularMain Components to Go Modular

1. Structural Components

• Beams• Columns• Floor Slabs• Walls• Staircase & Lift Cores

BSB 602

Main Components to Go ModularMain Components to Go Modular

2. Non-Structural Components

• Cladding• Partition• Doors• Windows• Bricks & Blocks

BSB 602

Page 16: #6a    modular construction (1)

16

Main Components to Go ModularMain Components to Go Modular

3. Finishes

• Ceiling Finishes• Floor Finishes

BSB 602

BSB 602

Page 17: #6a    modular construction (1)

17

Conventional - Concrete based construction

ROOFROOF

Steel construction

BSB 602

Conventional - Concrete based construction

FLOORFLOOR

Steel construction

BSB 602

Page 18: #6a    modular construction (1)

18

Conventional - Concrete based construction

Beam & ColumnBeam & Column

Steel construction

BSB 602

Conventional - Concrete and brickwall

WallWall

Pre-fabricated wall panel

BSB 602

Page 19: #6a    modular construction (1)

19

Quicker return on investmentDepreciation is usually over seven years vs. 31-1/2 years for conventional construction

Accelerated Depreciation

10

Substantial noise level reduction produces a more productive work environment

Fire & Sound panels provide superior sound deadening

Sound Resistance

9

Provides maximum flexibility to meet your company's needs

Quickly and easily relocatable, expandable, and reusable

Adaptability8

Long lasting product will perform for years without deterioration

Reinforced cavity and tough quality facings decrease chances of damage

Durability7

Eliminates costly painting and other maintenance and repairs

Pre-finished walls require little maintenance beyond occasional surface cleaning

Low Maintenance

6

Eliminates additional labor costs and minimizes plant disruption

No need to seal off areas against dustNo Mess5

Maintains plant productivity during building installation

Fewer disruptions to plant operationsSpeedy Installation

4

Consistent high quality in both appearance and design

Attractive integrated systems manufactured to your exact specifications

Appearance3

Buying is simple with local support and assistance

Ability to supply single source installation through factory-trained distributor network

Ease of Coordination

2

No hidden design costsNo need for an engineer or architectPre-Engineered

1

BenefitsAdvantagesFeature#

Reasons to Choose Modular Construction over Conventional Construction

BSB 602

BSB 602

HOW MODERN METHODS MIGHT CONTRIBUTE TO POLICY OBJECTIVES?

Page 20: #6a    modular construction (1)

20

BSB 602

If modern methods of construction are to play a role in addressing the drivers for change they must achieve some or all of the following at least as well as traditional construction:

• Be affordable

• Be of good quality

• Be able to cope with a shortage of skilled labour

• Be available in quantity

• Be capable of responding to changing construction regulations

• Have good environmental credentials