6 DIMENSIONAL
APPROACH TO
CONSTRUCTION
2nd floor, S&R Building,
Soonora Church 1st Cross Road,
Elamkulam, Kochi 20, Kerala, India
www.sandrconsultants.com www.aadspro.com
Empowering engineering
BY
REJI ZACHARAIAH
![Page 2: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/2.jpg)
www.aadspro.com
Aadspro ERP
![Page 3: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/3.jpg)
Engineering
www.aadspro.com
![Page 4: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/4.jpg)
www.aadspro.com
![Page 5: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/5.jpg)
Slab design
www.aadspro.com
![Page 6: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/6.jpg)
Slab detailing
www.aadspro.com
![Page 7: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/7.jpg)
Slab detailing
www.aadspro.com
![Page 8: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/8.jpg)
Slab bbs
www.aadspro.com
![Page 9: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/9.jpg)
Beam design
www.aadspro.com
![Page 10: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/10.jpg)
Beam detailing
www.aadspro.com
![Page 11: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/11.jpg)
Beam bbs
www.aadspro.com
![Page 12: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/12.jpg)
Advantage of BBS
Scheduling and proper bending is strongly
recommended for Fe 500. Fe 500 saves 10%
compared to Fe 415 steel used presently.
Cutting and bending in a cut and bend
factory avoids the wastage completely
(5-7 %). With BBS, bars can be cut with
planning to reduce the wastage in a site
with even the present setup.
There is a general tendency to group slabs
and beams in the usual design methods. www.aadspro.com
![Page 13: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/13.jpg)
Better quality control at site.
Better estimation of steel.
Real time estimation data, with the design.
Better control on stock of steel actually required.
Theft and pilferage of steel can be reduced.
Economical order quantity for better project
management
Bench marking quantity and quality requirements.
Optimize your design based on the quantity of steel.www.aadspro.com
![Page 14: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/14.jpg)
Steel bending and cutting can commence even
before the form work is done.
Steel bending can be done at a separate site,
marked and then can be assembled at site, if
there is space limitations.
Project time can be reduced as the bars can be
cut and bend before form work is done.
What you see in the drawing is what you get at
the site.
www.aadspro.com
![Page 15: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/15.jpg)
With a quality data set, other management
softwares can work on it.
A paper less office concept in the construction
industry and associated advantages.
Total length of bars calculated using Engineering
formula, leaves nothing to approximation.
Mechanization of bending and cutting is
possible. (Cut and bend systems) Reduces labour
and time but increases the reliability.
www.aadspro.com
![Page 16: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/16.jpg)
Column design
www.aadspro.com
![Page 17: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/17.jpg)
Column detailing
www.aadspro.com
![Page 18: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/18.jpg)
Footing design
www.aadspro.com
![Page 19: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/19.jpg)
Footing detailing
www.aadspro.com
![Page 20: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/20.jpg)
Pile detailing
www.aadspro.com
![Page 21: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/21.jpg)
www.aadspro.com
Load Data Methodology
![Page 22: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/22.jpg)
www.aadspro.com
Optimax
![Page 23: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/23.jpg)
Import BBS data
www.aadspro.com
![Page 24: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/24.jpg)
www.aadspro.com
Client Details
![Page 25: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/25.jpg)
Create Bar Sequences
www.aadspro.com
![Page 26: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/26.jpg)
Output
www.aadspro.com
![Page 27: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/27.jpg)
Estimation- EstimaX
www.aadspro.com
![Page 28: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/28.jpg)
EstimaX
www.aadspro.com
![Page 29: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/29.jpg)
Rate Analysis
www.aadspro.com
![Page 30: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/30.jpg)
www.aadspro.com
![Page 31: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/31.jpg)
www.aadspro.com
![Page 32: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/32.jpg)
www.aadspro.com
![Page 33: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/33.jpg)
Generate Estimationwww.aadspro.com
![Page 34: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/34.jpg)
Export
Estimation
Quantities to
MS Excel or
import
estimation file
in aadspro erp
www.aadspro.com
![Page 35: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/35.jpg)
Planning
www.aadspro.com
![Page 36: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/36.jpg)
Project scheduling using
aadspro erp
www.aadspro.com
![Page 37: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/37.jpg)
1. Creating a new project
From menu select – masters – work flow - add / edit projectwww.aadspro.com
![Page 38: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/38.jpg)
Adding project details
Add Project details & Savewww.aadspro.com
![Page 39: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/39.jpg)
2. Creating levels in project
From Menu select – Masters – Work Flow - Add / Edit Levelwww.aadspro.com
![Page 40: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/40.jpg)
Creating levels
Add Level Name & Click Create
www.aadspro.com
![Page 41: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/41.jpg)
3. Creating tasks in project
From Menu select – Masters – Work Flow - Add / Edit Taskwww.aadspro.com
![Page 42: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/42.jpg)
Creating tasks
Add Task Details & Click Create
www.aadspro.com
![Page 43: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/43.jpg)
4. Adding levels in project
www.aadspro.com
From Menu select – Masters – Work Flow - Add / Edit Levels in project
![Page 44: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/44.jpg)
Adding levels in project
Select Project – Click Add levels & Select Levels – Click Create
www.aadspro.com
![Page 45: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/45.jpg)
5. Adding tasks in project
From Menu select – Masters – Work Flow - Add / Edit Tasks in project
www.aadspro.com
![Page 46: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/46.jpg)
Adding tasks in project
Select Project – Select Levels – Click Add tasks & Select Tasks – Click Save
www.aadspro.com
![Page 47: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/47.jpg)
6. Scheduling activities in Gantt chart
From Menu select – Masters – Work Flow – Schedule Activities in Gantt Chartwww.aadspro.com
![Page 48: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/48.jpg)
Scheduling activities in Gantt chart
www.aadspro.com
![Page 49: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/49.jpg)
7. Exporting activities in Gantt chart to ms project A. Download & install MS project File Generator
from Menu – Downloads - MS project File
Generator
B. Click Export Icon to download the Gantt chart
C. Use MS Project File
generator to convert
downloaded file to MS Project
A
B
C
www.aadspro.com
D. MS Project file
created
D
![Page 50: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/50.jpg)
www.aadspro.com
From Menu select – Masters – Work Flow – Upload Estimax File
8. Importing activities and resources from Extimax (.estx) File
![Page 51: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/51.jpg)
Inventory Module
www.aadspro.com
![Page 52: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/52.jpg)
www.aadspro.com
![Page 53: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/53.jpg)
Planning
Consumption
Stock
Resource Purchase Accounts
Data Flow
www.aadspro.com
![Page 54: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/54.jpg)
Resource Category
www.aadspro.com
![Page 55: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/55.jpg)
Resource Location
www.aadspro.com
![Page 56: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/56.jpg)
Resource Item
www.aadspro.com
![Page 57: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/57.jpg)
Project ResourcesTo add resource details for each task in a project
www.aadspro.com
![Page 58: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/58.jpg)
Physical Stock To update stock of resources at specified location
www.aadspro.com
![Page 59: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/59.jpg)
Resource Consumption
To provide consumed quantity of each resource for a task
www.aadspro.com
![Page 60: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/60.jpg)
Stock TransferTransfer resources from one location to another location
www.aadspro.com
![Page 61: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/61.jpg)
Resource Requirement Schedule
• Get a list of task to be completed in a specified period
• Get resource data required for each task
• Create a purchase order based on requirements
www.aadspro.com
![Page 62: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/62.jpg)
Resource Requirement Schedule
www.aadspro.com
![Page 63: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/63.jpg)
Purchase
www.aadspro.com
![Page 64: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/64.jpg)
Reports• Resource Requirement Report
• Stork Register based on each location.
• Consumption.
• Purchase Reports
• Transfer
And more …….
www.aadspro.com
![Page 65: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/65.jpg)
Quality Control
www.aadspro.com
![Page 66: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/66.jpg)
Concrete Pre-Placement Inspection
www.aadspro.com
![Page 67: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/67.jpg)
Dewatering At Site
www.aadspro.com
![Page 68: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/68.jpg)
General Information on RCC Site Practice
www.aadspro.com
![Page 69: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/69.jpg)
Pile-During Casting Report
www.aadspro.com
![Page 70: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/70.jpg)
Post Formwork False work removal Checklist
www.aadspro.com
![Page 71: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/71.jpg)
Accounts
www.aadspro.com
![Page 72: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/72.jpg)
Accounts Groups
www.aadspro.com
![Page 73: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/73.jpg)
Chart of Accounts
www.aadspro.com
![Page 74: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/74.jpg)
Cash payments
www.aadspro.com
![Page 75: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/75.jpg)
www.aadspro.com
![Page 76: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/76.jpg)
Journal Entries
www.aadspro.com
Contra Entries
![Page 77: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/77.jpg)
Accounting Reports
www.aadspro.com
• Cash book
• Bank book
• Day book
• Ledgers
• Cash Flow
• Trial Balance
• Profit and loss account
![Page 78: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/78.jpg)
HR Management
www.aadspro.com
![Page 79: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/79.jpg)
www.aadspro.com
Employee Details
![Page 80: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/80.jpg)
Leave Management
www.aadspro.com
![Page 81: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/81.jpg)
Integrate with punching machines
www.aadspro.com
![Page 82: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/82.jpg)
Salary and Wage Calculations
www.aadspro.com
![Page 83: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/83.jpg)
Geotechnical
www.aadspro.com
![Page 84: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/84.jpg)
Lateral Load
![Page 85: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/85.jpg)
Reports
![Page 86: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/86.jpg)
Axial Load
![Page 87: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/87.jpg)
Footing
![Page 88: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/88.jpg)
![Page 89: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/89.jpg)
![Page 90: 6 DIMENSIONAL APPROACH TO CONSTRUCTION](https://reader031.fdocuments.us/reader031/viewer/2022012015/615a6432a848681068527c7c/html5/thumbnails/90.jpg)
Thank You