    COSTS OF WATER

    RAW WATER COSTS PUMPING

    PRETREATMENT

    DEMINERALISATION BOILER CHEMICALS

    HEAT

    PUMPING OUT WASTE WATER

  • 8/8/2019 5.Water Losses & Summary

    3/17

    SOURCES OF WATERLOSSES

    BOILER

    BLOW DOWN

    SOOT BLOWING INCLUDINGDRAINAGE

    SAMPLERS

    PASSING DRAINS OR VENTS

    ATOMISING STEAM FOR OIL BURNERS DRAINS FROM OIL HEATERS

    DRAIN DURING START UP

    BOILER EMPTYING OPERATIONS

  • 8/8/2019 5.Water Losses & Summary

    4/17

    SOURCES OF WATERLOSSES

    FEED SYSTEM

    PUMP GLANDS

    DRAIN VESSEL OVER FLOW/DRAINS

    START UP-DRAINAGE VENTING

    WATER TREATMENT PLANT

    REGENERATION LOSSES

    LEAKS IN PIPE LINES

    PUMP GLANDS

    DE SLUDGING

  • 8/8/2019 5.Water Losses & Summary

    5/17

    SOOT BLOWING LOSSST LOW T = 4500 g

    ST LOW BLOW = 4500*84 3600= 105 g

    NT L O STT 25 g cm2 .& 3500 = 745 cal g

    T LOSS WITST BLOW = 10

    = 74025 cal

    NU B O BLOW S = 56TOT L T LOSS OON BLOWING L = 74025*56

    = 41,45,400 cal

    W T LOSS O ON BLOWING L = 5.88 TON

  • 8/8/2019 5.Water Losses & Summary

    6/17

    STEAM LOSS FROM TUBEPUNCTURES

    DIA.OF HOLEIN

    STEAM LEAK RATE K /HrAT

    K / 1K /

    1. 6. 13 6

    . 13

    6 1161 38 1

  • 8/8/2019 5.Water Losses & Summary

    7/17

    61 31

    3

    6

    89

    1

    INCREASED D.M.WATER MAKE UP %

    LOSS DUE TO HIGH WATER MAKE UP

    1% INCREASE IN MAKE UP WATER LEADS TO AN

    ANNUAL LOSS OF Rs .83 LAKHS FOR A 1 MW UNIT

  • 8/8/2019 5.Water Losses & Summary

    8/17

    EFFECT OF THERMAL

    INSULATIONTEMP.DIFF.BETWEENSURFACE AMBIENT

    C

    HEAT LOSSK l/ /Hr

    6

    1 1 1

    1 1

    3

  • 8/8/2019 5.Water Losses & Summary

    9/17

  • 8/8/2019 5.Water Losses & Summary

    10/17

    Conditions usin Poor

    Perfor n e of Boiler Non-Opti u Rehe t or Superhe t

    ste te per tures.

    Hi her th n desi n e ono izerexit s te per ture or furn eexit s te per ture used by

    poor o bustion. Hi her th n desi n Re he ter or

    Super he ter De-Superhe tin

    spr y flows.

  • 8/8/2019 5.Water Losses & Summary

    11/17

    Conditions usin Poor

    Perfor n e of Boiler Fly sh Unburned C rbon or Loss

    on I nition re ter th n % for

    Bitu inous Co ls or re ter th n1% for Li nite.

    Hi h Botto Ash Loss on I nition.

    Non-Opti u utiliz tion ordistribution of pri ry ir,se ond ry ir nd over fire ir, if

    ppli ble.

  • 8/8/2019 5.Water Losses & Summary

    12/17

    Con t ons us n oorPerfor n e of Boiler

    In re sed uxili ry horsepoweronsu ption by o l pulverizers nd

    f ns

    Redu tions in p ity f tors due toex essive furn e or onve tion p sssl in or foulin .

    Ex essive boiler settin ir in-le k e.

    Ex essive ir he ter le k e. In re sed y le losses with in re sed

    sootblowin due to non-opti u

    o bustion.

  • 8/8/2019 5.Water Losses & Summary

    13/17

    Con t ons us n oorPerfor n e of Boiler

    Ex essive pulverizer spill e onverti l spindle, roll nd r e ndb ll be rin type pulverizers.

    Redu tions in p ity f tors dueto pulverizer or f n p ityli it tions.

    Redu tions in p ity f tors dueto Superhe ter or Rehe ter tubeoverhe tin nd/or o l- shorrosion.

  • 8/8/2019 5.Water Losses & Summary

    14/17

    Require ents For A hievinOpti u Conditions

    Furn e exit ust be oxidizin ,prefer bly 3% ex ess O .

    Mini l ir in-le k e between the

    furn e exit nd e ono izer exit.

    Pulverizer fineness of > %p ssin Mesh nd < .3%

    re inin on Mesh. Se ond ry ( o bustion) ir

    b l n ed to within % betweenburners

  • 8/8/2019 5.Water Losses & Summary

    15/17

    Require ents For A hievinOpti u Conditions

    Opti u windbox to furn edifferenti l, typi lly " w. . tfull lo d.

    Opti u Pulverizer Pri ry Airto Fuel R tio. In ost ses, irto fuel r tio of 1.8 to 1 on roll

    nd r e nd b ll be rin typepulverizers, nd 1. to 1 on

    ttrition nd b ll tube

    pulverizers.

  • 8/8/2019 5.Water Losses & Summary

    16/17

    Require ents For A hievinOpti u Conditions

    Fuel b l n ed between e hpulverizers fuel lines to within1 % devi tion fro the e n.

    Pulverized o l line dirty irflowb l n ed between e h pulverizersfuel lines within %.

    Pulverized o l line le n irvelo ities b l n ed to % of thee n.

  • 8/8/2019 5.Water Losses & Summary

    17/17

    Require ents For A hievinOpti u Conditions

    Co l line ini u velo ities of33 Fp .

    Burner e h ni l toler n eswith " ( ir ul r burners),burner bu kets stroked ndsyn hronized to within

    (t n enti lly fired).

    Pri ry irflow etered ndontrolled to 3% ur y.