5. Working at Height Check List

download 5. Working at Height Check List

of 1

Transcript of 5. Working at Height Check List

EDC

Egyptian Drilling Company

WORKING AT HEIGHT PERMIT CHECKLISTKAMOSE

Rig:Work Permit Ref.#: Time:

Date:

Precautions Yes No N/A Comment

1.SJA prepared , Revised and issued

2.Work permit displayed

3.

4.IC issued and cross referred to work permit

5.Pre-Job safety Meeting held

6.Stabbing board check list (when applicable)

7.Pre-manriding check list filled in and signed by the STP

8.Barriers/Notices required (special attention to area below the personnel working at heights)

9.Correct tools and equipment available and suitable for work aloft (And tied properly)

10.Lifting equipment in good condition with valid certificates

11.Falling objects prevented

12.Stages and ladders in safe condition (Keep 3 body Points of contact at all times)

13.Lifting arrangement safe, if cranes and work basket/stage used

14.Safety harness and lifeline to be worn by personnel working aloft

15.Sufficient light rigged if work has to be performed during hours of darkness

16. Necessary communication arranged and checked e.g. between Crane Operator/Winch Operator and Person working aloft

Condition of Scaffold / Scaf-tag green

Supervisor Name:Title:

Signature:

Safety Manual, Ch.17 Work Permit Procedure, 3.4.5 Work at Height Permit Checklist

Rev. KAM-01/MAI10