    WORKING DRAWING CHECK LIST

    LIST DRAWINGS TO BE PROVIDED

    Site plan

    Floor plans

    Foundation plan

    Ceiling plan

    Roof plan

    Sewer and storm water layout plan

    Sewer elevations

    Electrical layout plan

    Water layout plan

    Elevations

    SectionsConstruction details

    Window and door details

    Bathroom, Sluice room and Toilet layouts

    Kitchen layouts

    Shelving and cupboard details

    Joinery details

    Window schedule

    Shop front schedule

    Door schedule

    Finishing scheduleSanitary schedule

    Exterior specifications

    GENERAL INFORMATION TO APPEAR ON ALL DRAWINGS

    Title block

    Consultants data (name, address and tel. nos)

    Clients data

    Project name

    Project address and stand number

    Project number

    Drawing numberScales

    Date

    Drawn block

    Approved block

    Revisions column with date column

    General instructions to contractor

    North point (pointing upward)

    Orientation block plan

    Drawing title with scale adjacent

    Module linesNo loose furniture, shading or colouring to appear on working drawings

    Minimum height of text to be 2mm

  • 8/13/2019 Working Drawing Check List

    2/12

    2

    SITE PLAN (Scale 1 in 500 or 1 in 200)

    Drawing list

    Boundary dimensions

    Detailed stand description

    Position and description of all adjoining sites

    Adjoining streets and roads (Names and widths)

    Adjoining sidewalks and kerbs (position and width)

    Existing elements on sidewalks (Trees, electrical mini subs, poles, manholes, storm waterinlets etc.)

    Servitudes (description and width)

    Building line & distance to boundary

    Footprint of all new buildings with names and floor levels

    Bench mark (position, level and full description)

    Setting out points and distances of new buildings to nearest site boundary lines andexisting buildings

    New paved areas, walkways, aprons, etc. (Materials, dimensions, etc.)Existing buildings and paved areas (names and levels)

    Refuse removal areas + levels

    Parking layout with dimensions, radii, kerbs, finishes, parking bay numbers

    Position, dimensions and description of entrance

    Gates (width and description)

    Boundary fences and walls (new and existing, description and height)

    Free standing walls and fences on site (New and existing, height and description)

    Fences and walls to be removed or demolished

    Trenches to be filled

    Roads and paving to be removedTemporary roads and fencing

    All existing elements on site (Trees, electrical mini subs, poles, manholes, storm waterinlets etc.)

    Contours (existing)

    New ground levels (excavated and filled)

    Level changes (embankments, stairs, ramps, berms, retaining walls, etc.show levelsand describe materials.)

    All existing services on site (Sewer lines, electrical cables, manholes, storm water drains,water lines, telephone lines, poles, etc.)

    Sewer layout with manholes, GL, IL and D, ies, ces, gullys, pipe sizes, falls etc.

    Municipal sewer (Position, direction of fall, sewer connection)Storm water layout (manholes, inlets, catch pits, pipe sizes, materials, falls, levels,outlets, connections etc.)

    Site water layout (Water connection, pipe sizes, position and description of fire hydrantsand garden taps)

    New trees (description, and drip line circumference of tree in mature state)

    Existing trees (Position, and drip line circumference )

    Trees to be removed (Position and trunk diameter)

  • 8/13/2019 Working Drawing Check List

    3/12

  • 8/13/2019 Working Drawing Check List

    4/12

    4

    CEILING PLAN (Scale 1 in 100 and 1 in 50)

    Wall thicknesses

    Chimneys and service ducts

    Lintels

    Truss and rafter lines

    Width and direction of gypsum and fibre cement ceilings

    Grid lines for suspended ceilings

    Ceiling hatchesdescription and size

    Position of geyser

    Ceiling specification

    Ceiling details

    Section lines

    ROOF PLAN (Scale 1 in 100 1 in 50)

    Position of walls

    Position of gables and parapets

    Position of chimneys and service ductsDimensions of overhangs

    Directions of falls

    Gutters

    Rain water down pipes

    Trusses, beams and purlins with centreline distances

    Position of geyser

    Position of flashings ridges and valleys

    Description of roof structure

    Description of isolation

    Specification of roof coveringSpecification of water proofing

    Section lines

    Reference symbols to details

    SEWER AND STORM WATER LAYOUT PLAN (Scales 1 in 100 1 in 50)

    Description, position and direction of fall of Municipal sewer line

    Description, position and depth of municipal sewer connection

    Position of all sanitary appliances

    Sewer Layout

    Sewer line levels (ground level, invert level and depth)

    All wastewater pipesSewer Pipe dimensions and description

    Sewer falls

    Ramp pipes

    Position, size and levels of manholes

    Ventilation pipes

    Anti siphon pipes

    Gullies

    Grease traps

    Cleaning eyes

    Inspection eyesFrench drains

    Septic tanks

    Storm water layout

  • 8/13/2019 Working Drawing Check List

    5/12

    5

    Storm water pipe dimensions and description

    Storm water connection (position and depth)

    Storm water levels

    Catch pits (position, size and levels)

    SEWER ELEVATIONS (Scales 1 in 100 1 in 50)

    Description, position and direction of fall of Municipal sewer line

    Description, position and depth of municipal sewer connection

    Position of all sanitary appliances

    Sewer Layout

    Sewer line levels (ground level, invert level and depth)

    All wastewater pipes

    Sewer Pipe dimensions and description

    Sewer falls

    Ramp pipes

    Position, size and levels of manholes

    Ventilation pipes

    Anti siphon pipesGullies

    Grease traps

    Cleaning eyes

    Inspection eyes

    French drains

    Septic tanks

    ELECTRICAL LAYOUT PLAN (Scale 1 in 100 1 in 50)

    Symbols key diagram

    Light points (for ordinary and waterproof fittings)Light points (fluorescent)

    Light switches (single, two way and pull)

    Power skirtings (position and description)

    Power points (low and high with heights above finished floor level)

    Stove connection

    Geyser connection

    Floor, wall and ceiling mounted heaters

    Distribution and sub-distribution boards

    Electrical connection point position of meter

    Position of supply cable

    Position of sleevesTelephone points and connection

    Television points and position of arial

    Door alarms and bells

    Communication system

    Site lighting

    Time switches

    Incinerator connections

    Extraction fan connections

    Shaving connections

    Schedule of fittings

  • 8/13/2019 Working Drawing Check List

    6/12

    6

    WATER LAYOUT PLAN (Scale 1 in 10 1 in 50)

    Water meter and connection point (position and size)

    Reticulation over site (pipe sizes)

    Garden and other outside taps

    Fire hydrants (position and size)

    Swimming pool or fountain supply

    Reticulation in building (pipe sizes)

    Supply to reservoirs, tanks and pressure tanks

    Supply to geyser

    Reticulation of hot water from geyser

    Fire hose reels (position and size)

    Closing valves

    Taps

    Pressure reducing valves

    One way valves

    Pressure valves

    ELEVATIONS (Scales 1 in 100 - 1 in 50)

    Module lines

    Natural ground level

    Excavated ground level

    Back filled ground level

    Floor levels at level changes, stairs, ramps, inside and outside (top of concrete TOC)

    Show height of floor above ground level

    Lintel levels

    Top of slab levels

    Soffit of slab levelsTop of beam levels

    Soffit of beam levels

    Landing levels

    Wall plate level

    Foundation walls

    Windows (indicate opening sections and show cills)

    Lintels

    Doors

    Other openings and height references

    Air bricks, grills and louvres

    Thresholds, stairs and rampsPodiums, platforms berms, retaining walls, screen walls etc, (show and describe )

    Verandas and pergolas

    Roof finishes and flashings (describe)

    Parapets and copings (describe)

    Fascias and barge boards (show and describe)

    Rainwater gutters and down pipes (show and describe)

    Expansion joints

    Wall finishes

  • 8/13/2019 Working Drawing Check List

    7/12

    7

    SECTIONS (Scale 1 in 100 1 in 50 1 in 20))

    Natural ground level

    Excavated ground level

    Back filled ground level

    Floors with levels, inside and outside (top of concrete TOC)

    Stairs and ramps

    Show height of floor above ground levelShow height from FFL to underside of ceiling

    Lintel levels

    Top of slab levels

    Soffit of slab levels

    Top of beam levels

    Soffit of beam levels

    Landing levels

    Wall plate level

    Foundations (min 255 x 600mm)

    Foundation walls (min 220 mm)Consolidated fill

    Hardcore fill

    Damp proof membrane (describe)

    Concrete bed

    Screed

    Brick walls

    Slabs and beams

    Damp proof courses at floor and window cill level

    Room names and numbers

    Wall finishes

    Tile lines and dado heights

    Window and door openings

    Thresholds

    Sanitary ware in elevation (name)

    Window cills (describe)

    Door and window lintels (describe)

    Wall plate (Size and description)

    Beam filling

    Ceiling (describe material, thickness, fixing and finish)

    Ceiling brandering (describe material, spacing, size and fixing)

    Roof insulationRoof truss (material, spacing, fixing and sizes of rafters, tie beams, struts and posts)

    Purlins and battens (describe material, spacing, size and fixing

    Flashings and counter flashings (describe)

    Parapets and side walls (show vertical height above roof finish)

    Copings (show and describe)

    Flat roof water proofing (screed, waterproofing material, fixing and finishing)

    Roof insulation (material, size and fixing)

    Roof finish (material, size and fixing)

    Rain water gutters and downpipes (material and sizes)

    Sections through concrete beams, slabs, stairs and landingsReferrals to details and detailed sections

    Hatching to SABS

  • 8/13/2019 Working Drawing Check List

    8/12

    8

    CONSTRUCTION DETAILS (Scale 1 in 10 1 in 5)

    Foundation and wall details showing fill, hardcore, dpm, bed, screed skirting and plaster

    Cill details showing brickwork, outer cill, inner cill, dpc and plaster

    Lintel details showing brickwork and plaster

    Beam and slab details showing brickwork, screed, floor finish and plaster

    Eaves details showing brandering, ceiling, cornice, wall plate, beam filling, rafters, purlins,battens, tilting batten, underlay, roof tiles/sheeting, fascia, gutter

    Verge details showing rafters, purlins/battens, underlay, roof tiles/sheeting, barge board

    Ridge details showing rafters, purlins/battens, underlay, roof tiles/sheeting, ridge tile,ridge flashing, serrated closers, sealing strips

    Valley details showing rafters, purlins/battens, underlay, roof tiles/sheeting, valley gutter

    Hip details showing rafters, purlins/battens, underlay, roof tiles/sheeting, hip tile

    Top and side parapet details showing brickwork, rafters, purlins/battens, underlay, rooftiles/sheeting, flashing, counter flashing, serrated closers, sealers, concealed gutter

    Box gutter details showing brickwork, timberwork and sheet metal work, dimensions

    Stair details showing brickwork, concrete, plaster, screed, floor finish, balustrade with

    handrail, bottom rail and stiles, dimensions of risers, treads and handrail

    BATHROOM/SLUICE ROOM/TOILET LAYOUTS (Scale 1 in 20)

    Detailed plans

    Wall thicknesses

    Plaster

    Floor tile layout

    Sanitary equipment in plan and to scale

    Windows in plan with cills

    Doors in plan with door swings and frames

    Sewer and waste water pipes in plan and to scale

    Position of mirrors in plan

    Toilet roll holders, trowel rails, towel roll holders, electric hand driers, sanitary padutensils, soap holders, soap dispensers, disposal bins in plan

    Horizontal dimensions

    Section lines and arrows

    Detailed sectional elevations

    Wall thicknesses, plaster and ceiling lines

    Windows in elevation

    Doors in elevation

    Wall tiles in elevationSanitary equipment in elevation and to scale

    Sewer and waste pipes in elevation and to scale

    Mirrors in elevation showing position and size

    Toilet roll holders, towel roll holders, electric hand driers, sanitary pad utensils, soapdispensers, disposal bins in elevation

    Vertical dimensions

  • 8/13/2019 Working Drawing Check List

    9/12

    9

    KITCHEN LAYOUTS (Scale 1 in 20)

    Detailed plans

    Wall thicknesses

    Plaster

    Floor tile layout

    Kitchen cupboards, stove, sink and fridge in plan and to scale

    Kitchen cupboard codes

    Windows in plan with cills

    Doors in plan with door swings and frames

    Sewer and waste water pipes in plan and to scale

    Horizontal dimensions

    Section lines and arrows

    Detailed sectional elevations

    Wall thicknesses, plaster and ceiling lines

    Windows in elevation

    Doors in elevation

    Wall tiles in elevationKitchen cupboards, stove, sink and fridge in elevation and to scale

    Sewer and waste pipes in elevation and to scale

    Kitchen cupboard codes

    Kitchen cupboard specifications

    Vertical dimensions

    SHELVING LAYOUT (Scale 1 in 20)

    Detailed plans of storage areas

    Wall thicknesses

    PlasterShelving in plan and to scale

    Windows in plan with cills

    Doors in plan with door swings and frames

    Horizontal dimensions

    Section lines and arrows

    Detailed sectional elevations of storage areas

    Wall thicknesses, plaster and ceiling lines

    Windows in elevation

    Doors in elevation

    Shelving in elevation and to scale

    Shelving in section and to scaleVertical dimensions

    Brackets, fixing details, etc

    Shelving specification (material and finishes)

    JOINERY DETAILS ( Scale 1 in 10 1 in 5 - 1 in 2)

    Plans of joinery items

    Elevations of joinery items

    Large scale detail sections

    Horizontal and vertical dimensions

    Description of material, fixing methodsDescription of any ironmongery like handles, rails, drawer slides etc

    Description of finishes

  • 8/13/2019 Working Drawing Check List

    10/12

    10

    WINDOW SCHEDULE (Scale 1 in 50 1 in 20)

    Reference number

    Number of windows

    Drawing - Indicating unfinished floor level, fixed and opening sections and swing

    DimensionsIndicating window size and lintel height above TOC

    Description - Indicating material, profile type and profile size of frame and burglar bars,gauze and fixed louvres

    Ironmongery - Indicating handles, stays, hinges etc.

    GlazingIndicating type and thickness of glass, fixing method and type of opacity

    FinishesIndicating factory finish, undercoat, final coats and colour of paint

    SHOP FRONT SCHEDULE (Scale 1 in 50 1 in 20)

    Reference number

    Number of shop front units

    Elevation - Indicating FFL, fixed and opening sections and indicating swing

    Sections and plans if needed

    DimensionsIndicating all sizes and heightsDescriptionDescribing material, profile type and profile size of frames, doors andopening sections, position of opaque panels etc

    Ironmongery - Indicating handles, stays, hinges, door closers etc

    GlazingIndicating type and thickness of glass, fixing method and type of opacity

    FinishesIndicating factory finish, undercoat, final coats and colour of finish

    DOOR SCHEDULE (Scale 1 in 50 1 in 20)

    Reference number

    Number of doors indicating LH or RH door swings

    ElevationShowing door frame, door, glazing, louvers, fanlights kick plates, TOC andFFL

    Section and plan if needed

    DimensionsIndicating size of frame, size of door, height above TOC, size of insets, kickplates, louvers, glazed panels, fanlights, size of bottom gap in toilet doors etc.

    Description of frameDescribing material, type and size of profile, number of rebates,sidelights, fanlights, striking plate

    Description of doorDescribing material, construction method, sizes of stiles, rails,braces, lock blocks, door thickness, weather bar, door leaves, veneer, cover strips,rebates, kick plates

    GlazingIndicating type and thickness of glass in sidelights, fanlights, and glazed insetsin doors, method of fixing

    IronmongeryDescribing locks and lock sets, door handles, hinges, door closers, slidingbolts, door stops, name plates, indicator bolts, signage, sliding rails, panic bolts, masterkeys, clothes hooks

    Finish on frameIndicating factory finish, undercoat, top coats

    Finish on doors - Indicating factory finish, undercoat, top coats

  • 8/13/2019 Working Drawing Check List

    11/12

    11

    FINISHING SCHEDULE

    Column indicating all rooms and interior spaces

    Differentiate between floors and separate buildings

    FloorsDescribe type of fill, hardcore, damp proof membrane, ant poisoning, concretebed, screed, floor finish, floor tiles, carpet, colour, skirtings

    WallsDescribe one or two coat plaster, undercoat, paint coats, wall tiles, specialfinishes, colours, curtain rails

    Window cillsDescribe materials and method of laying of inside and outside cills

    CeilingsDescribe material, method of fixing, cover strips, cornices, insulation, finish,colours

    SANITARY SCHEDULE

    Column indicating all rooms and interior spaces

    Differentiate between floors and separate buildings

    Sinks - Name, catalogue no, size, material, fixing method, taps, traps, plugs, pipe sizes,stop cocks

    Wash troughs - Name, catalogue no, size, material, fixing method, taps, traps, plugs, pipesizes, stop cocks

    Wash hand basins - Name, catalogue no, size, material, fixing method, taps, traps, plugs,pipe sizes, stop cocks

    Showers - Name, catalogue no, size, material, fixing method, taps, traps, plugs, pipesizes shower roses

    Baths - Name, catalogue no, size, material, fixing method, taps, traps, plugs, pipe sizes ,stop cocks

    Water closets - Name, catalogue no, size, material, fixing method, flush valves flushpipes, cisterns, direction of S bend, pipe sizes, stop cocks

    Urinals - Name, catalogue no, size, material, fixing method, flush valves flush pipes,

    cisterns, traps, pipe sizes, stop cocksBidets and squat pans - Name, catalogue no, size, material, fixing method, flush valvesflush pipes, cisterns, traps, pipe sizes, stop cocks

    Laboratory sinks - Name, catalogue no, size, material, fixing method, taps, traps, plugs,pipe sizes, stop cocks

    Sanitary pad bins and incinerators

    Toilet roll holders

    Soap dispensers

    Towel roll holders

    Mounted bins

    Electrical hand driersMirrors

    Soap holders

    Clothes hooks