June 2018 Land adjacent to Dinnington Road, Woodsetts Construction of a well site and creation of a new access track, mobilisation of drilling, ancillary equipment and contractor welfare facilities to drill and pressure transient test a vertical hydrocarbon exploratory core well and mobilisation of workover rig, listening well operations, and retention of the site and wellhead assembly gear for a temporary period of 5 years on land adjacent to Dinnington Road, Woodsetts, Rotherham. Application Drawings 5.

Transcript of 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar...

Page 1: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

June 2018

Land adjacent to Dinnington Road, Woodsetts

Construction of a well site and creation of a new access track, mobilisation of drilling, ancillary equipment and contractor welfare facilities to drill and pressure transient test a vertical hydrocarbon exploratory core well and mobilisation of workover rig, listening well operations, and retention of the site and wellhead assembly gear for a temporary period of 5 years on land adjacent to Dinnington Road, Woodsetts, Rotherham.

Application Drawings

5.

Page 2: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

List of Application Plans

P304-S21-PA-1001 Pre-Site Access Plan

P304-S21-PA-00 Strategic Location Plan

P304-S21-PA-01 Application Site Plan

P304-S21-PA-04 Existing Ground Plan

P304-S21-PA-05 Proposed Site Entrance & Highway works

P304-S21-PA-06 Proposed Site Layout Plan - Construction

P304-S21-PA-07 Proposed Site Layout Plan - Drilling Stage

P304-S21-PA-08 Proposed Site Layout Plan - Listening Stage

P304-S21-PA-09 Proposed Site Restoration

P304-S21-PA-10 Proposed Lighting Plan - Drilling & Coring

P304-S21-PA-11 Proposed Drainage Plan

P304-S21-PA-12 Proposed Site Layout Plan - Suspension

P304-S21-PA-13 Proposed Internal Access Plan

P304-S21-PA-16 Proposed Sections & Details

P304-S21-PA-17 Proposed Site Layout Plan - Possible workover

P304-S21-PA-21 Parameter Sections - Develop. & Establish

P304-S21-PA-22 Parameter Sections - Drilling & Coring

P304-S21-PA-23 Parameter Sections - Suspension

P304-S21-PA-24 Parameter Sections - Work over of Well

P304-S21-PA-25 Parameter Sections - Listening Stage

P304-S21-PA-26 Parameter Sections - Abandonment

P304-S21-PA-30 Fence Details

P304-S21-PA-31 Lighting Examples

Page 3: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

K

STORE(DRILL Co.)

WASTE AREA

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

MU

D

CH

EMIC

AL

STO

RE

WELFARE(DRILL Co.)

OFFICE(DRILL Co.)

BIT STORE(DRILL Co.)

CEMENT

WATEROFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

MU

D

MU

D

WATER

DIE

SEL

TAN

K

GATEHOUSE

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CABINCABINCABIN

COMP HSE

DIE

SEL

DIE

SEL

GEN

ERA

TOR

GEN

ERA

TOR

GEN

ERA

TOR

SCR

BA

CK

UP

GEN

ERA

TOR

VA

RC

O E

LEC

HSE

DOG HOUSE

CHOKE

MU

D M

IX A

REA

MU

D P

UM

P 2

MU

D P

UM

P 1

MUD TANK SETTLING TANK SHAKER TANK

CUTTINGS HANDLING

EMERGENCY VENT

SURGE TANK

KO

OM

EY

BOP AREA

DERRICK IN TEMPORARYLAIN DOWN POSITION

PROPOSED ACCESS TRACK

DEWIDALESWOOD

DINNINGTON ROAD

WOODSETTS ROAD

PROPOSED SITE ACCESS(SEE DRAWING No.65863-P304-S21-6002)

CABINCABINCABIN

EXISTING BRIDLEWAY

PASSING PLACEINCORPORATINGWHEEL WASH

1:2500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-1001

17061

04.07.17

PRE SITE ACCESS PLAN

Revision:

A3

Paper Size:

Date:

N

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

Page 4: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

1:10,000

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

PRELIMINARY

P304 - S21

COMPOUND

P304-S21-PA-00

17061

11.08.17

STRATEGIC

LOCATION PLAN

Revision:

A3

Paper Size:

Date:

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

N

DATEDESCRIPTIONREV

Page 5: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

PROPOSED ACCESS TRACK

DEWIDALESWOOD

DINNINGTON ROAD

WOODSETTS ROAD

PROPOSED SITE ACCESS(SEE DRAWING No.65863-P304-S21-6002)

EXISTING BRIDLEWAY

PASSING PLACEINCORPORATINGWHEEL WASHP1 P2

P3

P4P5

P6P7

30m WIDEECOLOGICALBUFFER

POSITIONNE

CO-ORDINATE

P2P3P4

P1 383707.300454230.400

P5P6P7

383707.300454359.700383634.000454359.700383623.000454359.700383623.000454348.700383611.000454348.700383611.000454230.400

1:2500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-01

17061

APPLICATION SITE PLAN

Revision:

A3

Paper Size:

Date:

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

N

DATEDESCRIPTIONREV

APPROVAL

11.08.17

Page 6: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

DEWIDALES

82.85

82.46

83.50 82.50 80.39

80.01

81.00

81.50

82.49

80.57

80.75

81.25

80.43

80.0080.2980.57

81.33

80.6081.60

82.20 80.90

1:1250

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-04

17022

EXISTING GROUND PLAN

Revision:

A3

Paper Size:

Date:

N

AREA WITHIN RED LINEBOUNDARY IS CURRENTLY

IN AGRICULTURAL USE

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

APPROVAL

11.08.17

Page 7: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

6000

2400

0

PROPOSED ACCESSTRACK TO TIE INTO

EXISTING FIELDBOUNDARY

PROPOSED ACCESSTO SITE

215m

215m

1:1000/500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-05

17061

PROPOSED SITE ENTRANCE

AND HIGHWAY WORKS PLAN

Revision:

A3

Paper Size:

Date:

N

PROPOSED SITE ACCESS

VISIBILITY SPLAYS2.4m x 43m

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

HERAS FENCINGTERMINATED ATSECURITY GATES

APPROVAL

11.08.17

PROPOSED ACCESS TRACKTO TIE INTO EXISTING

FIELD BOUNDARY

FLOODLIGHT &CCTV POSITION

CCTV CAMERALOCATIONS AREINDICATIVE

Page 8: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

K

STORE(DRILL Co.)

WASTE AREA

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

CH

EMIC

AL

STO

RE

WELFARE(DRILL Co.)

OFFICE(DRILL Co.)

BIT STORE(DRILL Co.)WATER

OFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

DIE

SEL

TAN

K

GATEHOUSE

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CABINCABINCABINCABINCABINCABIN

TEM

POR

AR

Y S

TOR

AG

EA

REA

FO

R C

ON

STR

UC

TIO

NST

AG

E O

NLY

WELL PAD

32m CONDUCTOR/ SURFACE RIG

WELLHEADCELLAR

BELOW GROUND SURFACEWATER DRAIN WITH IN-PIPESTORAGE CAPACITY

TEMPORARYHERAS FENCE

PEDESTRIANGATE

HERAS FENCE TOSITE PERIMETER

EMER

GEN

CY

EX

IT

OPERATIONAL SITE FENCEPOSITIONED CENTRALLYON TOP OF EARTH BUND

X

X

YY

81.600

81.600 81.600

81.60081.550

81.55081.550

81.550 82.000

82.85

82.46

83.50

82.5080.39

80.01

81.00

81.5081.25

80.43

81.550

82.000

86.00084.000

84.00085.350

81.880

MAXIMUM AREA FOR CONDUCTOR / SURFACERIG AND ANCILLARY EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-06

17061

PROPOSED SITE LAYOUT

PLAN

CONSTRUCTION STAGE

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Development

Stage:

STAGE 1: SITE DEVELOPMENT

AND ESTABLISHMENT

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKSMONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

CATCH PITWITH COVER

30m WIDEECOLOGICALBUFFER

WELLHEAD CELLAR

APPROVAL

11.08.17

Page 9: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

K

STORE(DRILL Co.)

WASTE AREA

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

MU

D

CH

EMIC

AL

STO

RE

WELFARE(DRILL Co.)

OFFICE(DRILL Co.)

BIT STORE(DRILL Co.)

CEMENT

WATEROFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

MU

D

MU

D

WATER

DIE

SEL

TAN

K

GATEHOUSE

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CABINCABINCABIN

COMP HSE

DIE

SEL

DIE

SEL

GEN

ERA

TOR

GEN

ERA

TOR

GEN

ERA

TOR

SCR

BA

CK

UP

GEN

ERA

TOR

VA

RC

O E

LEC

HSE

DOG HOUSE

CHOKE

MU

D M

IX A

REA

MU

D P

UM

P 2

MU

D P

UM

P 1

MUD TANK SETTLING TANK SHAKER TANK

CUTTINGS HANDLING

EMERGENCY VENT

SURGE TANK

KO

OM

EY

BOP AREA

DERRICK IN TEMPORARYLAIN DOWN POSITION

CABINCABINCABIN

TEM

POR

AR

Y S

TOR

AG

EA

REA

FO

R C

ON

STR

UC

TIO

NST

AG

E O

NLY

PEDESTRIANGATE

HERAS FENCE TOSITE PERIMETER

EMER

GEN

CY

EX

IT

OPERATIONAL SITE FENCEPOSITIONED CENTRALLYON TOP OF EARTH BUND

X

X

YY

81.600

81.600 81.600

81.60081.550

81.55081.550

81.550 82.000

82.85

82.46

83.50

82.5080.39

80.01

81.00

81.5081.25

81.550

82.000

86.00084.000

84.00085.350

81.880

MAXIMUM AREA FOR DRILLING RIGAND ANCILLARY DRILLING EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-07

17061

PROPOSED SITE LAYOUT

PLAN

DRILLING STAGE

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Development

Stage:

STAGE 2: DRILLING, CORING

AND SUSPENSION

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKSMONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

CATCH PITWITH COVER

30m WIDEECOLOGICALBUFFER

ALL CABINS TO BESTACKED DOUBLE

HEIGHT

WELLHEAD CELLAR

FENCING AROUNDTEMPORARY STORAGEAREA REMOVED

APPROVAL

11.08.17

Page 10: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

K PEDESTRIANGATE

HERAS FENCE TOSITE PERIMETER

EMER

GEN

CY

EX

IT

OPERATIONAL SITE FENCEPOSITIONED CENTRALLYON TOP OF EARTH BUND

X

X

YY

35m CRANE OR32m WORKOVER RIG

LISTENINGTRUCK

DIE

SEL

TAN

KTO

ILET

BLO

CK

SITE

OFF

ICE

(IN

EOS)

WEL

FAR

E(I

NEO

S)SU

RFA

CE

WA

TER

STO

RA

GE

TAN

KG

ENER

ATO

R

MAXIMUM AREA FOR POSITIONINGOF LISTENING EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-08

17061

PROPOSED SITE LAYOUT

PLAN

LISTENING STAGE

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Development

Stage:

STAGE 4: LISTENING STAGE

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKSMONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

CATCH PITWITH COVER

30m WIDEECOLOGICALBUFFER

WELLHEAD CELLAR

APPROVAL

11.08.17

Page 11: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

PROPOSED ACCESS TRACK

DEWIDALESWOOD

WELL CASTINGS CUTDOWN TO 2m BELOWORIGINAL GROUND LEVEL

1:1250

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-09

17061

PROPOSED

SITE RESTORATION

Revision:

A3

Paper Size:

Date:

N

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

Development

Stage:

STAGE 5: ABANDONMENT

AND RESTORATION

SITE TO BE RESTOREDTO AGRICULTURAL USE

ALL IMPORTED MATERIALTO BE TAKEN OFF SITE WITHEXISTING GROUND LEVELS

REINSTATED USING STOREDHARDCORE AND TOPSOIL.

SITE SHOWN IN THEFINAL STAGES

APPROVAL

11.08.17

Page 12: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

K

STORE(DRILL Co.)

CA

SIN

G &

DR

ILL

PIPE

STO

RA

GE

AR

EA

WASTE AREA

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

CH

EMIC

AL

STO

RE

WELFARE(DRILL Co.)

OFFICE(DRILL Co.)

BIT STORE(DRILL Co.)WATER

OFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

DIE

SEL

TAN

K

CASING & DRILL PIPESTORAGE AREA

GATEHOUSE

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CABINCABINCABINCABINCABINCABIN

PEDESTRIANGATE

HERAS FENCE TOSITE PERIMETER

EMER

GEN

CY

EX

IT

OPERATIONAL SITE FENCEPOSITIONED CENTRALLYON TOP OF EARTH BUND

X

X

YY

82.85

82.46

83.50

82.5080.39

80.01

81.00

81.5081.25

21 1 1 1 1

1

1

1

2

1

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-10

17061

PROPOSED LIGHTING PLAN

STAGE 2 DRILLING, CORING

AND SUSPENSION

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKSMONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

CATCH PITWITH COVER

WELLHEAD CELLAR

1

FOR EXAMPLES OF LIGHTINGSEE DRAWING No.

P304-S21-PA-31.

1 LIGHT OVER DOOR:1 LIGHT OVER DOORAT BOTH LEVELS: 2

APPROVAL

11.08.17

30m WIDEECOLOGICALBUFFER

Page 13: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

K

CA

SIN

G &

DR

ILL

PIPE

STO

RA

GE

AR

EA

CASING & DRILL PIPESTORAGE AREA

X

X

YY

81.600

81.600 81.600

81.60081.550

81.55081.550

81.550 82.000

82.85

82.46

83.50

82.5080.39

80.01

81.00

81.5081.25

FALL FALL FALLFALL

FALL

FALL

FALL

FALL

FALL

81.550

82.000

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

CATCH PIT FORMEDUSING 900 Ø 'T'SECTION POLYPIPEOR SIMILAR WITHCONTENTS PUMPEDINTO WATER TANK

BELOW GROUNDSURFACE WATERDRAIN WITH IN-PIPESTORAGE CAPACITY(POLYPIPE ORSIMILAR) I.L.= 79.700

86.00084.000

84.00085.350

81.880

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-11

17061

PROPOSED DRAINAGE PLAN

STAGES 1 - 4

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

APPROVAL

11.08.17

Page 14: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

K PEDESTRIANGATE

HERAS FENCE TOSITE PERIMETER

EMER

GEN

CY

EX

IT

OPERATIONAL SITE FENCEPOSITIONED CENTRALLYON TOP OF EARTH BUND

X

X

YY

82.85

82.46

83.50

82.5080.39

80.01

81.00

81.5081.25

DIE

SEL

TAN

KTO

ILET

BLO

CK

SITE

OFF

ICE

(IN

EOS)

WEL

FAR

E(I

NEO

S)SU

RFA

CE

WA

TER

STO

RA

GE

TAN

KG

ENER

ATO

R

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S2-PA-12

17061

PROPOSED SITE LAYOUT

PLAN

SUSPENSION STAGE

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Development

Stage:

STAGE 3: SUSPENSION

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

30m WIDEECOLOGICALBUFFER

APPROVAL

11.08.17

Page 15: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

KX

X

YY

82.85

82.46

83.50

82.5080.39

80.01

81.00

81.5081.25

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P304 - S21

COMPOUND

P304-S21-PA-13

17061

PROPOSED INTERNAL

ACCESS PLAN

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

APPROVAL

11.08.17

Page 16: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

OPERATIONALSITE FENCE

HERAS FENCE

TEMPORARY SOILSTORAGE AREAAPPROXIMATELY3m HIGH

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L. = 80.150

300mm COMPACTED RECYCLED AGGREGATEBELOW LINER ON TERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

CONCRETE SUPPORTSFOR SKID BEAMS

HDPE LINER

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

Y - Y(1:200)

EXTENT OF WELL PAD

OPERATIONALSITE FENCE

OPERATIONALSITE FENCE

HERAS FENCE

PROFILE OF EXISTINGGROUND

TEMPORARY SOILSTORAGE AREAAPPROXIMATELY3m HIGH

HDPE LINER INSTALLED ACROSS THESITE TO PROVIDE IMPERMEABLEBARRIER TAKEN UP FACE OF BUND900 Ø DRAIN & STORAGE

PIPE OR SIMILARI.L. = 80.150

CAR PARK

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

TOP SOIL REMOVED AND REPLACEDWITH COMPACTED GRANULAR FILLTO MAKE UP LEVELS

81.150

HDPE LINER SEALEDAGAINST DRILL PIPECASING

SECTION THROUGH WELL CELLAR(1:50)

SKID SUPPORT COMPRISING300mm DEEP REINFORCEDCONCRETE STRIP REMOVABLE ACCESS

COVER150 TYPE 1 STONEDRESSING

DRILL PIPE CASING

300mm THICKNESSOF RECYCLEDAGGREGATE

2mm HDPE LINER INSTALLEDTO MANUFACTURERSSPECIFICATION WITH 1000GSM NEEDLE PUNCHEDGEOTEXTILE MEMBRANEABOVE AND BELOW FORPROTECTION

MASS CONCRETESURROUND

MIN 600mm DEEP MASSCONCRETE POUREDAGAINST DRILL PIPECASING

2.4m Ø MANHOLE RINGSSUPPORTED ON MASSCONCRETE

300mm THICKNESSOF RECYCLEDAGGREGATE

TERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

TYPICAL SECTION THROUGH ACCESS TRACK(1:50)

300mm COMPACTEDRECYCLED AGGREGATE

TYPE1 STONE FINISH

6000

150

FALLFALL

HERAS FENCE

X - X(1:200)

EXTENT OF WELL PAD

CONCRETE SURROUNDTO WELL CELLAR

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

HDPE LINER

300mm COMPACTED RECYCLED AGGREGATEBELOW LINER ON TERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

OPERATIONALSITE FENCE

TEMPORARY SOILSTORAGE AREAAPPROXIMATELY3m HIGH

HERAS FENCE

PROFILE OF EXISTINGGROUND

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L. = 80.150

HDPE LINER INSTALLED ACROSS THESITE TO PROVIDE IMPERMEABLEBARRIER TAKEN UP FACE OF BUND

HERAS FENCE

OPERATIONALSITE FENCE

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L. = 80.150

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

TOP SOIL REMOVED AND REPLACEDWITH COMPACTED GRANULAR FILLTO MAKE UP LEVELS

450

2mm HDPE LINER TAKEN UP THE INSIDEFACE OF THE BUND AND TUCKED INWITH ADDITIONAL SOIL OVER TOPROVIDE FIXING FOR COVAMAT

150

GREENFIX COVAMAT - PLUS TYPE 3OR SIMILAR APPROVED FIXED TOFACE OF BUND

300mm THICKNESS OFRECYCLED AGGREGATE

150mm TYPE 1 STONE FINISH

1:200/50

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-16

17061

PROPOSED SECTIONS

& DETAILS STAGE 1

SITE DEVELOPMENT

& ESTABLISHMENT

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

BUNDS FORMED USING GRANULAR SUB-SOIL EXCAVATEDFROM SITE WITH A TOP SOIL FINISH TO PROVIDE A GROWING

MEDIUM FOR COVAMATS.TERRAM GEOTEXTILE MEMBRANE (OR SIMILAR) TO BE USEDAS A SEPARATION LAYER BETWEEN IMPORTED GRANULAR

MATERIALS AND EXCAVATED SITE MATERIALS

TEMPORARY SOIL STORAGE AREAS

11.08.17

Page 17: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

CA

R P

AR

K PEDESTRIANGATE

HERAS FENCE TOSITE PERIMETER

EMER

GEN

CY

EX

IT

OPERATIONAL SITE FENCEPOSITIONED CENTRALLYON TOP OF EARTH BUND

X

X

YY

82.85

82.46

83.50

82.5080.39

80.01

81.00

81.5081.25

32m WORKOVER RIG

MAXIMUM AREA FOR POSITIONINGOF WORK OVER EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-17

17061

PROPOSED SITE LAYOUT

PLAN

POSSIBLE WORK OVER

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Development

Stage:

STAGE 3a:

POSSIBLE WORK OVER

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

30m WIDEECOLOGICALBUFFER

CATCH PITWITH COVER

WELLHEAD CELLAR

11.08.17

Page 18: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

X - X

32m

2m 2m

5.5m

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

9m

32m

Y - Y

2m

2m

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR CONDUCTOR /SURFACING RIGMAXIMUM HEIGHT 32m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-21

17061

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 1: SITE DEVELOPMENT

AND ESTABLISHMENT

11.08.17

Page 19: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

X - X

2m 2m

60m

5.5m

5.5m

9m

15m

WELL PAD LEVEL

GROUND LEVEL VARIES

WELL PAD LEVEL

GROUND LEVEL VARIES

15m

5.5m

9m

Y - Y

2m

2m

60m

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR SUBSTRUCTURE &ANCILLARY DRILLING EQUIPMENTMAXIMUM HEIGHT 15m

ZONE FOR DRILLING RIGMAXIMUM HEIGHT 60m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-22

17061

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 2: DRILLING, CORING

AND SUSPENSION

11.08.17

Page 20: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

X - X

2m 2m

5.5m

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

9m

Y - Y

2m

2m

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-23

17061

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 3: MAINTENANCE

AND SUSPENSION WELL

11.08.17

Page 21: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

32m

X - X

2m 2m

5.5m

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

WELL PAD LEVEL

GROUND LEVEL VARIES5.

5m

9m

32m

Y - Y

2m

2m

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR WORK OVER RIGMAXIMUM HEIGHT 32m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-24

17061

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 3a: POTENTIAL

WORK OVER OF WELL

11.08.17

Page 22: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

35m

X - X

2m 2m

5.5m

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

9m

35m

Y - Y

2m

2m

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR CRANE AND LISTENINGEQUIPMENT MAXIMUM HEIGHT 35m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-25

17061

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 4: LISTENING STAGE

11.08.17

Page 23: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

X - X

Y - Y

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-26

17061

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 5: ABANDONMENT AND

RESTORATION

SITE TO BE RESTORED TOORIGINAL LAND PROFILE

SITE TO BE RESTORED TOORIGINAL LAND PROFILE

11.08.17

Page 24: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

2000

3500

HERAS ROUND TOP PANEL

HERAS PANEL SPECIFICATIONS

PANEL DIMENSIONS 2000mm (H) 3500mm (W)HORIZONTAL TUBE 38.1mmVERTICAL TUBE 38.1mmREINFORCED CORNERS YESWEIGHT 17kgFINISH COLOUR TO BE AGREED WITH MINERALS PLANNING AUTHORITY

POST AND WIRE FENCE SPECIFICATIONS

POSTS MIN 1500mm (L) 75mmØ TREATED SOFTWOODPOST CENTRES 2000mm - 3000mm

WIRE TYPE COLOUR AND MATERIAL TO BE AGREED WITH MINERALS PLANNING AUTHORITY

POST AND WIRE FENCE

1000

MA

X50

0A

PPR

OX

1:20

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-30

17061

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Drawing Title:

FENCE DETAILS

11.08.17

Page 25: 5. Application Drawings - ineos.com · all cabins to be stacked double height wellhead cellar fencing around temporary storage area removed approval 11.08.17. car park pedestrian

N.T.S.

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S21

COMPOUND

P304-S21-PA-31

17061

LIGHTING EXAMPLES

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

EXAMPLES OF THE PROPOSED LIGHTING UNITS ARE:

TOWARDS TOMORROWENERGY - TTE-FL-80

80W LED FLOODLIGHTSILVER POWDER COATED ALLOYSENSOR COMPATIBLESIZE 365mm x 285mm x 120mm

DESIGNPLAN LIGHTING -QUADRATO

22W LEDBLACK POWDER COATED DIECAST ALUMINIUM BODYSENSOR COMPATIBLESIZE 305mm x 305mm x 145mm

DESIGNPLAN LIGHTING -BERGEN

21W LEDTITANIUM POWDER COATED STEELSIZE 400mm x 200mm x 100mm

VT1 ECO LIGHTINGTOWER 9m

10kva MOVABLE UNITWITH 360° ROTATION

11.08.17