4 th Street Transit Improvement Project Community Presentation Summer 2019

Transcript of 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community...

Page 1: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

4th Street Transit Improvement Project

Community Presentation

Summer 2019

Page 2: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Project Background

• Central Subway construction wrapping up

• Muni service on the 8/8AX/8BX, 30, 45 & 91 OWL has returned

• Transit priority improvements needed so that Muni buses can move safely and efficiently

Page 3: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Major Muni and Traffic Corridor

• 72,000 daily Muni customers

o Up to one bus every 90-100 seconds

o Connection to Caltrain

• Up to 1,000 vehicles per hour prior to Stockton Street reopening

o Connection to 101 South and Bay Bridge (via Folsom)

Page 4: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Current Challenge

Page 5: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Previous Design

• Muni buses shared transit lane

o Shared with right-turning vehicles and through traffic

o Parts of lane were not full-time

o Lane ended before Folsom Street

• 3-4 through lanes for general traffic

Page 6: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Previous Design

Page 7: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Proposed Transit Changes• Dedicated, full-time, red transit-only lane

o Separate from turning traffic

o Extend to Folsom Street

• Improve connectivity

o Combine Howard and Folsom stops at subway station

Page 8: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Transit-Only Lane

• Improved transit-only lane would reduce Muni bus delays and ensure buses can move safety and efficiently on 4th Street.

Page 9: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Stop Locations

• Stops at Howard and Folsom would be combined next to the future Central Subway station.

Page 10: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Smarter Use of Curb Space

• Add more passenger and commercial loading near the Metreon

o Better address existing demand

Page 11: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Safety for People Walking

• Where pedestrian volumes are highest between Market and Folsom, reduce through lanes of traffic to two

o Same as on lower Stockton

• Supports Vision Zero

Page 12: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Improving Transit in SoMa

• 3rd and 4th streets act as a couplet for five high-ridership Muni lines

• 3rd Street Transit and Safety Project already approved

o Improvements coming this fall

• Taking holistic approach to improving transit in SoMa

Page 13: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

Project Timeline

• Timed with the completion of Central Subway

Fall 2019Summer/Fall 2019 End of 2019

Public Outreach/

SFMTA Board Review

Final Design Implementation

Page 14: 4th Street Transit Improvement Project€¦ · 04/07/2019  · Improvement Project Community Presentation Summer 2019. Project Background • Central Subway construction wrapping

For More Information

• SFMTA.com/4thStreet

• Steve BolandProject Manager [email protected]

• Bonnie Jean von Krogh Public Relations Officer [email protected]