![Page 1: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/1.jpg)
Santos Ltd ABN 80 007 550 923 Ground Floor, Santos Centre 60 Flinders Street Adelaide South Australia 5000
GPO Box 2455 Adelaide South Australia 5001
Direct: + 61 8 8116 5000 Facsimile: + 61 8 8116 6723
TO: Company Announcements Office ASX Limited FROM: Company Secretary DATE: 30 November 2011 SUBJECT: Asian Roadshow Presentation Please find attached Santos’ Asian Roadshow Presentation, being presented in Singapore and Hong Kong during November and December. David Lim Company Secretary
![Page 2: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/2.jpg)
1
d hAsian RoadshowSingapore & Hong Kong
30 November & 1 December 2011
Disclaimer and Important Notice
This presentation contains forward looking statements that are subject to risk factors associated with the oil and gas industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a range of variables which could cause actual results or trends to differ materially, including but not limited to: price fluctuations, actual demand, currency fluctuations, geotechnical factors, drilling and production results, gas commercialisation, development progress, operating results, engineering estimates, reserve estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial markets conditions in various countries approvals and cost estimates
2
various countries, approvals and cost estimates.
All references to dollars, cents or $ in this document are to Australian currency, unless otherwise stated.
![Page 3: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/3.jpg)
2
Australia’s largest domestic gas producer
Strong 50 year track record
Santos overview
Fergana Basin
Bay of Bengal Phu Khanh Basin
A leading energy company in Australia and Asia
Strong 50-year track record of safe, sustainable operations
Diverse asset portfolio, including oil, conventional gas, CSG and shale gas assets in Australia and Asia
Current production of 565 mmscf/d gas and 30 kbbls/d liquids Otway Basin
Nam Con Son Basin
East Java BasinPapua New Guinea
Carnarvon Basin
Browse Basin
Timor Sea
Bonaparte Basin
Amadeus Basin
Cooper Basin
Surat/Bowen Basins
ExplorationGunnedah Basin
South Sumatra
3
liquids
Operations located in high-growth, attractive Australian and Asian markets with increasingly oil-linked pricing
Top 25 ASX listed company: market capitalisation of US$12 billion (Nov 2011)
Gippsland Basin
Exploration
Production
1P reserves 646 mmboe
2P reserves 1,445 mmboe
Contingent resources 2,261 mmboe
2010 production 50 mmboe
2010 2P reserve replacement ratio 331%*
Key statistics (YE 2010)
* 2010 2P organic RRR
Santos vision and strategy
LNG markets
Strong
LNGCHANNEL
DOMESTICCHANNEL
A leading Focused Asian
4
Australian base
A leading gas producer in high-growth
markets
genergy
companyin Australiaand Asia
growth
![Page 4: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/4.jpg)
3
Cooper to GLNG
Transforming to oil-linked pricing
70% of 1.4bn boe 2P reservesexposed to oil prices
Asset base is transformed through sanctioned projects
80Production (mmboe)
WA legacy d
Asia domgas
EA legacy domgas contracts
NSWCSG
LNG
20
30
40
50
60
70Oil-linked Legacy domgas
5
Crude, condensate,
LPGWA oil-linked domgas and uncontracted
domgas
domgas contracts
0
10
20
2011 2012 2013 2014 2015
Contingent resources of 2.3bn boehave a similar pattern
Production exposed to oil price rises from 30% in 2011 to 70% in 2015
Chart includes producing, sanctioned and likely sanction projects
Safety
Personnel safety
Process safety
A balanced focus on personnel and process safety
0
1
2
3
4
5
6
7
2006 2007 2008 2009 2010 2011Tota
l re
cord
able
case
fre
quency
ra
te (
per
mill
ion h
ours
work
ed)
Santos TRCFR performance(Employees and contractors)
3.1
80%
90%
100%Safety critical compliance long-term trend
95%
85%
2005 2006 2007 2008 2009 2010 2011
6
Focus on work practices, management of hazards – typically frequent, lower impact event
Contractor engagement and management
Continuous reduction in injury rate
Focus on “keeping hydrocarbons in the pipes” – low frequency, high impact events
Lifecycle view from design through commissioning, operations and maintenance
Lead indicator – maintenance of safety critical equipment
2006 2007 2008 2009 2010 2011T r
![Page 5: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/5.jpg)
4
Working with local landholders and communities
Australia’s largest domestic gas producer, Santos has a 50-year track record of safe, sustainable operations
W itt d t ki ith l l l dh ld d We are committed to working with local landholders and contributing to communities
We will work in partnership with agriculture for sustainable resource management
7
Delivering 80-90 mmboe of production by 2020
Production (mmboe)
Production from sanctioned and likely sanction projects alone; upside potential exists
Upside potential
Aust: Cooper shale, Amadeus, Zola, Winchester, Sole
LNG: PNG LNG T3, Browse, Caldita/Barossa
mmboe
50
60
70
80
90
100
Likely sanction
Aust: Fletcher/Finucane, Gunnedah
LNG: Bonaparte LNG
Asia: Peluang
Sanctioned
Aust: Reindeer/Devil Creek, Cooper infill, Kipper
LNG: PNG LNG, GLNG
Sanctioned
Likely sanction
Asia: Chim Sáo upside, Dua, Bay of Bengal, Fergana Basin
8
0
10
20
30
40
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Producing
Aust: Cooper Basin, Carnarvon Basin, Queensland CSG, Offshore Victoria
LNG: Darwin LNG
Asia: Chim Sáo, Indonesia, Sangu, SE Gobe
LNG: PNG LNG, GLNG
Asia: Wortel
Producing
![Page 6: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/6.jpg)
5
$6.2 billion of funding capacityDebt maturity profile
Balance sheet capacity to:
fund execution of business strategy minimise refinancing risk
Strong balance sheet to fund growth
2
3
4
5
6
7A$ billion
g p y
600
800
1,000
1,200
1,400
1,600
1,800A$ million
9
0
1
2
Cash Undrawn corporate
lines
Undrawn project line(PNG LNG)
0
200
400
2012 2014 2016 2018 2020
Drawn facilities Euro subordinated notesUndrawn bank facilities
The Euro subordinated notes mature in 2070. Santos has the option to redeem the notes in 2017. Charts as at 30 September 2011.
Capex guidance$million
Base business and sanctioned project capex fully funded; 2012 production guidance of 51-55 mmboe
4,000 $3.75 billion
Capex & production guidance
Production guidance60
mmboe
0
500
1,000
1,500
2,000
2,500
3,000
3,500
2011 2012
$3 billion
$
30
35
40
45
50
55
47-50
51-55
10
Existing $6.2 billion committed undrawn debt and cash at 30 September 2011
Strong free cash flow from base business ($1.3 billion in YE2010)
Underwritten DRP (2 dividends) Potential ECA financing provides further funding
optionality
2011 2012
GLNG PNG LNG EA WA&NT Asia Exploration Range2011 2012
Capital expenditure guidance excludes capitalised interest
2012 production influenced by:
Production from new projects (Chim Sao, Reindeer, Halyard, Wortel) and higher Cooper production
DLNG 35-day planned shutdown
Delayed take-up of Reindeer gas by customer
Higher gas price at Maleo reduces PSC production entitlement combined with planned shutdown
![Page 7: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/7.jpg)
6
11
Leading Australian domestic producer
Devil Creek gas plant, Western Australia
Strong demand for Australian gasDemand set to quadruple by 2025; gas prices will trend towards oil-linked international parity
9,000
PJ/a
3,000
4,000
5,000
6,000
7,000
8,000
12 Source: Santos and Wood Mackenzie
-
1,000
2,000
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
LNG exports Domestic gas demand
![Page 8: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/8.jpg)
7
Diverse portfolio of Australian assets
Browse
Bonaparte Darwin Proposed pipeline
Existing pipeline
Santos presence in every major basin, including oil, conventional gas, CSG and shale gas assets
WA
NT
Browse
Carnarvon
Qld
Cooper Brisbane
Mt Isa
Amadeus
Surat/ Bowen
g p p
Santos assets
13
NSW
Vic
SA
Adelaide
Pt Bonython
CanberraSydney
Melbourne
Gunnedah
OtwayGippsland
Perth
Significant Cooper conventional gas resource potential
Latest US drilling and completion techniques coupled with higher prices provide potential to produce a further 5,700 PJ of conventional gas
Cooper conventional reserves/resources*(>16 Tcf original gas in place)
Multi-stage fracture stimulation
Micro-seismic Reduced facilities/footprint
Multi-well pads Automated skiddable rigs Simultaneous operations
Drilling technologies
Completion techniques
48% recoveryfactor
Produced6,420 PJ
2P1,332 PJ
Additional2,520 PJ
2C1,848 PJ
(>16 Tcf original gas in place)
14
Reduced facilities/footprint
Higher prices increases resource potential
Prices
(40% recoveryfactor)
All volumes gross
USexperience75% recovery
factor
* Santos acreage
All volumes gross(YE2010)
![Page 9: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/9.jpg)
8
Cooper conventional – infill
The Cooper Basin remains significantly under-drilled compared to North American experience…
Cowralli (Cooper Basin) cross-section(50-100 acre spacing)
Multi-well pad drilling( p g)
Second well being drilled
15
New Saxon rigs drilling in the CooperCowralli cross-section demonstrates abundance of gas bearing sands throughout the field
…with material cost reductions achievable through pad drilling, reduced surface facilities and on-site continuous operations
First well completed
Leading the way on unconventional exploration
Prove gas content and recoverable volumes
Achieve gas flowto surface
Demonstrate commercial flows
2P reserve bookings
Targeting production and ~5,000 PJ resource by 2015
Vertical well technology trialsand optimisation
Acquiring further data to enable appraisal optimisation
Dedicated shale well including dedicated shale fracturing
2004–2010 2011–2012 2012–2013 2013+
Acquired the resource
understanding
Australia’s first shale fracture and coring program in 2006
Australia’s first independently certified shale and
Horizontal welltechnology trialsand optimisation
Dedicated shale horizontal drilling trial
Extensive fracturing trials beyond levels currently tested in the Cooper
Evaluation across broader Santos Cooper acreage
Multiple horizontal and vertical appraisal wells
Targeting initial shale reserve bookings in 2013, and production in
16
shale fracturingshale and unconventional resource bookings achieved in 2008
Cooper and production in 2015
4,800 PJ2C*2C*
4,000 PJ2C* 2,600 PJ2,345 PJ2C*
* Santos share – total shale and other unconventional resources
Outlook Outlook Outlook
![Page 10: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/10.jpg)
9
NSW CSG
Gunnedah Basin coals are world-class, with appraisal program confirming confidence and known resources in excess of 12,000 PJ
GoondiwindiQueenslandNSW CSG industry
$1 5 billion al ead in ested
Santos 1,216 PJGross 1,520 PJ
2Preserves
PEL 427
PEL 428
PEL 6
PEL 238
PEL 434
PEL 450
Moree
Narrabri
GunnedahCoonamble
Walgett New South Wales
$1.5 billion already invested
Over 1,000 potential new jobs
Significant local gas production for the first time
A low-carbon alternative to traditional dependence on coal
17
Santos 5,188 PJGross 9,219 PJ
Santos 8,619 PJGross 11,832 PJ
Gross 1,520 PJreserves
Contingent resources (3C)
Prospective resources (P50)
PEL 450
PEL 462
PEL 1PEL 12
PEL 433PEL 456
PEL 452
Tamworth
Quirindi
Scone
GulgongDubbo
Coonabarabran
Gunnedah is a world-class CSG resource
Focus on demonstrating deliverability (current pilots >2.5 TJ/day), reserves build and finalise commercialisation path
PEL 238 t t l il t d ti hi t Excellent coal thickness(up to 90 metres)
High permeability(>1,000 mD)
High gas content(4-20m3/t)
High Bcf/km22 000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
1,000
1,500
2,000
2,500
3,000
3,500
4,000
Wa
ter
(bb
l)
Ga
s (
Mscf)
PEL 238 total pilot production history
Bibblewindi
Tintsfield Dewhurst
Bibblewindi West
1818
Well developed coal cleating system for lateral technology
0
1,000
2,000
0
500
,
Oct 2006 Oct 2007 Oct 2008 Oct 2009 Oct 2010 Oct 2011
Gas Water
![Page 11: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/11.jpg)
10
WA: strategic position in two domestic gas hubs
Varanus Island Halyard-Spar online in June 2011
Strong growth options exist to add to this unique portfolio in 2012
Hurricaney pon budget and on schedule
Beam exploration well planned for Q2 2012
East Spar 9 completion and tie back expected by 2013
Reindeer/Devil Creek
East Spar
Devil Creek
Varanus I sland Dampier
WesternAustralia
John Brookes
Winchester
Zola
ReindeerSpar
Beam
Hurricane
19
On schedule for first gas by end-2011
4 quality offtake contracts in place
Hurricane appraisal well planned for 2H 2012
Legend
Santos acreage
Oil field
Gas field
Oil pipeline
Gas pipeline
Zola and Winchester drilling in 2012
Zola >100m of net gas pay in excellent
quality reservoir
Multiple development options available
Winchester
Corvus
WA-323-P
- LNG (multiple options)
- Domestic gas
New high resolution 3D acquired
Follow-up appraisal drilling planned for 2012
Winchester Santos operated and 75% equity
Material prospectZola
East Spar
WA-290-P
WA-13-L
Spar
Barrow Island
John Brookes
Varanus Island
WA
Corvus
IndianOcean
20
Legend
Santos acreage
Oil field
Gas field
Oil pipeline
Gas pipeline
- Material prospect
- Shallow water (60–80m)
- Different development options
New high-resolution 3D seismic acquired by year-end
Rig secured and well planned for drilling Q3 2012
![Page 12: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/12.jpg)
11
Carnarvon Oil
Mutineer-Exeter Two successful workovers in 2011 7,000
8,000
9,000
10,000 Mutineer- Exeter gross oil production
Arrested decline in mature oil production
- New generation electrical subsurface pumps installed
- Field life extended
Options for new development wells
Stag Two new production wells on line Q3
2011
Additional production well planned to 7 000
8,000
9,000
10,000
Stag gross oil production
0
1,000
2,000
3,000
4,000
5,000
6,000
BO
PD
21
Additional production well planned to be online before end-2011
New production wells in 2012
- Two new production wells
- Appraisal pilot to identify future development well locations
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
BO
PD
Fletcher/Finucane oil development
Successful Finucane South exploration well in May 2011
Currently in FEED on Fletcher Finucane tie-back to Mutineer-Exeter
Targeting FID by Q1 2012 with first oil by 2H 2013
17km pipeline & umbilical
22
14km pipeline & umbilical
![Page 13: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/13.jpg)
12
Material Bonaparte Basin position
NT/ P69BarossaJoint
P t lNT/ P48
Evans Shoal Conditional sale
Caldita BarossaSantos 40%
A critical region for Santos now…
Darwin LNG Continued strong production
NT/ RL1Petrel
NT/ P61Caldita
PetroleumDevelopment
AreaJPDA 03-12
WA-6-R
WA-18-PFrigate
WA-27-RTern
Bayu-Undan
Darwin
NT/ P48Evans Shoal
WA 10-1Santos 100% (operated)
Indian Ocean
Wickham Point
Darwin LNGSantos 11.5%
Bonaparte LNGSantos 40%
JosephBonaparte
Gulf
35-day planned shutdown in 2012
Evans Shoal Sale for up to US$350 million
Expected to complete by end-2011
Caldita Barossa An increasingly strategic asset
23
WesternAustralia Northern
Territory
Legend
Santos acreage
Oil field
Gas field
Gas pipeline
Wyndham
An increasingly strategic asset
WA 10-1 New exploration permit
...and into the future
Browse Basin
Drilling to commence in 2012
Well positioned
- Material prospects
All Santos operated
Argus
WA-410-PWA-274-P
Territory of Ashmore& Cartier Islands
- All Santos operated
- Liquids rich
- Materiality could provide stand-alone development options
Alternative commercialisation options
Exploration program
- Crown well
Ichthys
Burnside
Poseidon
EchucaShoals
Brecknock
Calliance
WA-274-P
WA-281-PWA-411-P
Western Australia
CrownCrown
Torosa
24
Legend
Santos acreage
Oil field
Gas field
Prospect
- Numerous other prospects
Processing 3D seismic on Burnside ahead of appraisal well scheduled 2013
![Page 14: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/14.jpg)
13
25
Growth in LNG
GLNG plant site image, Curtis Island, Australia
Santos’ unique LNG Portfolio
PNG (Santos 13.5% ) First gas exports from PNG
Darwin (Santos 11.5% )Conventional gas supply
GLNG (Santos 30% )CSG-to-LNG
Bonaparte (Santos 40% )Floating LNG
26
![Page 15: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/15.jpg)
14
Santos’ LNG customers and partners
PNG LNG
27
Bonaparte LNGDarwin LNG
GLNG
Santos equity LNG production
5
mtpaGLNG T1
Santos equity LNG productionfrom existing discovered resources
2
3
4
GLNG T1
GLNG T2
BLNG
28
0
1
Darwin LNG
PNG LNGExcludes PNG LNG expansion
2010 2020
![Page 16: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/16.jpg)
15
GLNG: strong progress since FIDFirst LNG expected in 2015 on schedule from US$16 billion two-train project
World-class contractors executing with Strong team
gexperienced project partnership teamStrong team
383 wells drilled, 520 landholder agreements
Fairview capacity of 1.3 TJ/day per wellUpstream
Transparent water management with beneficial use for regional communities
Water management
29
g
Production of line-pipe commenced, >100km already manufactured
Gas transmission
pipeline
Clearing of LNG plant site complete and construction commenced
Bulk earthworks 35% completePlant and port
Upstream
Santos operates on grazing land, not cropping land
383 wells drilled to date, with 207 wells commissioned with capacity of 240 TJ/d
not cropping land
− 520 agreements in place with 200 landowners
− 34,000 hectares of land owned to be used for key development activities and environmental offsets
Field production is optimised
P d i t d ti i ti
Scotia Area
Arcadia Area
Fairview Area
30
− Producing to domestic nomination
− Remaining gas is injected into storage
Roma underground gas storage
− Ramp gas management tool
− Injection commenced and ramping up
Roma Area
![Page 17: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/17.jpg)
16
Fairview wells capacity of 200 TJ/d
7000
800012.00
bbl/d)
J/d)
Fairview wells averaging 1.3 TJ/day, up 30% on Jan 2010
3000
4000
5000
6000
4.00
6.00
8.00
10.00
city
for
indiv
idual w
ells
(b
ty f
or
indiv
idualw
ells
(TJ
Water capacity for individual wells
Current average water capacity is 521 bbl/ d per well, down from 619 bbl/d in Jan 2010
Current average gas capacity is 1.3 TJ/ d per well, up from 1.0 TJ/d in Jan 2010
Gas capacity for individual wells
31
0
1000
2000
0.00
2.00
Wate
r ca
pac
Gas
capaci
Fairview wells - well stock 15 October 2011 (154 wells)
Upstream development
Six drilling rigs and six completion rigs
Expect to drill ~135 wells in 2011 and ~170 wells in 2012;updating rig fleet in 2012
g g p gin operation
Wet weather in first quarter affected the 2011 drilling and reserves build program
Updating the rig fleet− Pad drilling
− Reduced footprint, higher productivity
Fluor to deliver field development
32
− >500 Fluor personnel working on project and mobilisation to field commenced
− All long-lead items ordered
EIS approval for 2,650 wells
− Sufficient for current field development plans
Multi-pad well heads
![Page 18: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/18.jpg)
17
Producing, not reducing, water
Treated CSG water is an t it f l dh ld
Queensland-first partnership between a CSG company and a private landholder
opportunity for landholders
Mount Hope Station irrigation project− Santos providing up to 700 ML
of treated water
− Further projects to be rolled out
Planning Roma aquifer
33
Planning Roma aquifer re-charge − Inject 10 ML of treated water
per day
− Will provide Roma with about 50 years of extra water supply
Transparent water monitoring
Santos GLNG water portal includes detailed results from more than 100 water monitoring locations
34
www.santoswaterportal.com.au
![Page 19: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/19.jpg)
18
Site clearing completed, bulk
LNG plant
Construction commenced on 7.8 mtpa two-train LNG plant and mainland logistics facilities
g p ,earthworks 35% complete
Construction of accommodation facility commenced
Engineering and procurement >33% complete
Completed first factory acceptance test for refrigeration Accommodation units
35
gas turbine
All key equipment purchase orders for train 1 and train 2 issued
Kitchen/ dining building
MacMahonsite offices
Plant site, Curtis Island
PNG LNG
6.6 mtpa, two-train development,
A landmark project for PNG and key component of Santos’ LNG growth
Papua New Guinea 100km
Hidesp , p ,
operated by ExxonMobil
Fully contracted to Sinopec, TEPCO, Osaka Gas and CPC
Santos 13.5% equity
First LNG due 2014, net plateau production of ~9 mmboe p.a.
Long-life asset delivering material
MarineTerminal
PRL 9PDL 3
PDL 1
Gulf of Papua
Hides
LNG Plant
36
Long life asset delivering material cash flow with upside potential
Santos well positioned for expansion through Hides upside, and exploration potential within PDL1
Legend
Santos acreage
Oil field
Gas field
Oil pipeline
Gas pipeline
Port Moresby
![Page 20: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/20.jpg)
19
PNG LNG project update
At the LNG plant site, construction
On target for first LNG in 2014
of process trains, tanks and jetty are well underway
Earthworks and early construction activities at Hides plant site and Komo airfield underway; rate of progress improving
Stringing and burial of onshore pipeline continues; offshore i l h d
LNG plant site LNG plant site
37
pipelay has commenced
Drilling program to begin in 2012 with well targeting the gas/water contact early in sequence
Landowner and logistic challenges being managed Onshore pipeline loweringOnshore pipeline loweringOffshore Offshore pipelaypipelay
PNG expansion
Hides and Angore
Existing infrastructure will provide strong platform for PNG LNG expansion
PDL 1: Hides Deep Prospect SW NEHides Deep-1
Hides Deep Prospect – PDL 1
gdevelopment drilling will provide better understanding of potential
Currently evaluating deeper targets in PDL1, with potential well in 2013-14 (Santos 24% equity)
Koi Iange(Hides Deep target)
Toro(Proven reservoir)
PDL 1
38
(Santos 24% equity)
Potential for third-party gas
Papua New
Guinea
![Page 21: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/21.jpg)
20
Bonaparte LNG on schedule
Santos 40% equity and carried to FID (GDF SUEZ 60% and operator)
150 people working on the project
BLNG building momentum; >2Tcf resource
p p g p j
Substantial progress on pre-FEED: Granherne (upstream) and DORIS Engineering (downstream)
Project remains on schedule:
- FEED 2013
- FID 2014
- First LNG 2018
FID i i ll i i d i S ’ LNG
Petrel-7 appraisal program, Stena Clyde
39
FID timing well positioned in Santos’ LNG portfolio
Successful Petrel-7 appraisal programme in 2011 - prolonged testing to assist with design
40
Focused growth in AsiaOcean Sovereign, Bay of Bengal, Bangladesh
![Page 22: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/22.jpg)
21
Focused Asian portfolio
Asia’s growing energy needs are driving higher domestic gas
i
Asia will contribute 20% of Santos’ production in 2012
prices
Established Indonesian business with strong track record of project delivery
Chim Sáo project in Vietnam delivered on time and on budget and producing ~ 30,000 bbl/day
Focused exploration portfolio
Wortel jacket
41
Focused exploration portfolio, with significant drilling program planned over next 18 months
New Singapore office will consolidate presence in Asia and identify new opportunities
Vietnam – Chim Sáo delivered
Duadevelopmentarea
Dua oilfield
Chim Sáo north-westoil discovery
Chim Sáo project currently delivering ~30,000 bbl/day; additional volumes intersected
Santos equity of 31.9%, Premier operator
Chim Sáo expected capital under budget at US$260m (net)
First oil production on 10 October 2011 on schedule
89 metres of net oil-bearing sands intersected in Upper Dua
Chim Sáodevelopmentarea
area
Chim Sáo productionplatform
5km
Chim Sáo oilfield
China
Laos
42
sands intersected in Upper Duain the fault terrace to the north-west
Development concept being worked for Dua
Chim Sáo,Dua
VietnamLegend
Santos acreage
Oil field
Gas field
Oil pipeline
Gas pipeline
Thailand
Cambodia
![Page 23: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/23.jpg)
22
Vietnam – next steps
Chim Sáo upside potential to be
Medium-term growth through existing oil opportunities supplemented by longer term penetration of the domestic gas market
VietnamChina
established through further exploration and appraisal in 2012
Santos continues to explore Block 123− First well on Block 123 was non-
commercial discovery, but presence of hydrocarbons is encouraging Chim Sáo Dua
Vietnam
123 PSC
Thailand
Cambodia
Laos
Burma
43
− 3D seismic planned for 2012
Further licence acquisition through direct award underway
Legend
Santos acreage
Oil field
Gas field
Oil pipeline
Gas pipeline
Indonesia – established business
Increased margins from rising
Strong base business in East Java with increased margins and incremental growth
MaleoOyongWortelg g
domestic gas prices− New gas volumes sold at ~US$5-6 per
MMBTU with escalation
− New Maleo gas price agreed
Continued strong production- Oyong gross production ~2,400 bbl/d (oil)
and ~60 MMscf/d (gas)
- Madura gross gas production ~110 MMscf/d
MaduraOffshore PSC
East Java
Madura Island
Bali
GratiProcessing
Plant
50km
Surabaya
SampangPSC
MaleoOyongWortel
Peluang
44
MMscf/d
Wortel project on budget, on target for end-2011 start-up
Peluang FID in 2H 2012 ~45 BCF tie-back to Maleo with start-up
expected 2H 2013
Bali
Legend
Santos acreage
Oil field
Gas field
Oil pipeline
Gas pipeline
![Page 24: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/24.jpg)
23
Indonesia – South Sumatra CSG
Santos farm-in to two CSG licences in South Sumatra
Leverages Santos’ CSG experience in Australia and operating experience in Indonesia
Perabumulih O K i I I PSCp
Farm-in agreement with Sugicogives Santos 60% equity and operatorship
Up to 60 metres of coal thickness identified in the west of the licences
Licences are located close to pipelines connected to under-
Sumatra
Perabumulih
Ogan Komering I PSC
Ogan Komering I I PSC
SSWJ pipeline
EOM 2
EOM 1
OIG 6
OIG 2OIG 5
OIG 4
OIG 3
OIG 1
OIG 7,8,9,10
45
pipelines connected to undersupplied West Java gas market
Up to 12-well drilling program to start in December 2011
Opportunity exists for Santos to access further acreage
Legend
Santos acreage
Oil field
Gas field
Oil pipeline
Gas pipeline
2011-12 drilling campaign
Bangladesh – exploration program
Multi-well exploration program targeting short to long term gas production
3D seismic on Magnama and Bangladesh
Sangu area completed in 2010
Current Sangu production ~14 MMscf/d; Chittagong plant capacity of 500 MMscf/d
First well on South Sangu; second well within Sangu field area; if successful production in Q1 2012
Bangladesh
Block 16
Block 16 (Sangu)
Magnama
Bay of Bengal
Hatia
Chittagong
South Sangu
Sangu
46
Legend
Santos acreage
Gas field
Gas pipeline
p Q
Sangu North-East exploration well to follow
Burma
![Page 25: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/25.jpg)
24
Kyrgyz Republic acreage prospectivity
Central Asia
Exploration opportunity targeting short-term oil
Kazakhstan Bishkek
reduced following 2D seismic program; country exit in preparation
Option acreage secured in Tajikistan; initial 2D seismic has identified material oil prospectivity with several 50-100 MMbbl prospects
Awaiting final approval of Production Sharing Contract before entry d i i
500
kilometres
Kyrgyz Republic
China
Tajikistan
Uzbekistan
Dushanbe
Jalalabad
Osh
Tashkent
47
decision
Potential drilling program starting mid-2012
Low financial exposure for Santos with significant upside in the event of success
Legend
Santos acreage
Option acreage
Oil field
Gas field
Oil pipeline
Gas pipeline
Well Name Basin / Area TargetSantos
I nterest
%
Timing
NE Sangu-1 Bay of Bengal Gas 100 Q1 2012
2012 exploration schedule
NE Sangu-1 Bay of Bengal Gas 100 Q1 2012
Indonesia CSG Sumatra Gas 60 Q1 2012
Central Asia 2 Wells Fergana Oil 70 Q2 2012
Beam-1 Carnarvon Gas 45 Q2 2012
Hoss-1 Carnarvon Oil 37.3 Q2 2012
Cooper tight gas Cooper Gas 66 Q2 2012
Winchester-1 Carnarvon Gas 75 Q3 2012
Crown-1 Browse Gas 30 Q3 2012
Chim Sao NW-1 Block 12 Oil 31 875 Q3 2012
48
Chim Sao NW-1 Block 12 Oil 31.875 Q3 2012
Cooper Shale & Deep Coal Cooper Gas 66 Q4 2012
Magnama-2 Bay of Bengal Gas 100 Q4 2012
EA CSG Gunnedah/Bowen/Surat Gas Various 2012
The exploration portfolio is continuously being optimised therefore the above program may vary as a result of rig availability, drilling outcomes and maturation of new prospects
![Page 26: 301111 Asian Roadshow Presentation - Santos...risk factors associated with the oil and gas industry. It is believed that the ... 2010 2P reserve replacement ratio 331%* Key statistics](https://reader034.fdocuments.us/reader034/viewer/2022042205/5ea6a0f6b6e4951ffc4c9bae/html5/thumbnails/26.jpg)
25
Contact information
Head office
Adelaide
Ground Floor, Santos Centre
60 Flinders Street
Andrew Nairn
Group Executive Investor Relations
Level 10, Santos Centre
Adelaide, South Australia 5000
GPO Box 2455
Adelaide, South Australia 5001
Telephone: +61 8 8116 5000
Facsimile: +61 8 8116 5050
Useful email contacts
Share register enquiries:
,
Direct: + 61 8 8116 5314
Email: [email protected]
Nicole Walker
Investor Relations Manager
Level 10, Santos Centre
Direct: + 61 8 8116 5302
Email: [email protected]
49
q p
Investor enquiries:
Website:
www.santos.com