2nd Series of · Cilegon Fabricator / IHI Competitiveness of Domestic Industry in the Field of...

5
2nd Series of:

Transcript of 2nd Series of · Cilegon Fabricator / IHI Competitiveness of Domestic Industry in the Field of...

Page 1: 2nd Series of · Cilegon Fabricator / IHI Competitiveness of Domestic Industry in the Field of Electricity and Oil and Gas in the Export Market Penetration SKK Migas Policy in the

2nd Series of:

Shell Scheme Package Includes:- Rear and Dividing Wall Partition of 2,44M of Height in White Laminated Panel- 1 x 220V – 2 Amp Power Point- Needle Punch Carpet Flooring- 2 x Fluorescent Tube - 2 x Chairs - 1 x Information Desk - Fascia Board with Company Name - 1 x Waste Paper Basket

Raw Space:- Build Your Booth as Your Liking (Custom Build)- 1 x 220V – 6 Amp Power Point

Page 2: 2nd Series of · Cilegon Fabricator / IHI Competitiveness of Domestic Industry in the Field of Electricity and Oil and Gas in the Export Market Penetration SKK Migas Policy in the

About The EventPowermax 2018 is the international platform that fuels Indonesia’s electrification. Discover projects, funding avalibilities to gain competitive advantage. Showcase your products & services to clinch power, energy & grid related projects. Presents the prospect of power-energy outlook and the latest project, providing market and industrial player, showcase the update new development technology and information to spur the industry sector globally.

Successful Powermax 2017 saw more than 300 key power energy with a record USD 5 million worth of transactions at the event and total number of visitors of 8372 from 15 countries.

Besides supported by potential buyer, Powermax is supported by ITPC, ATASE Industry, ATASE Trade Economic divission from many Indonesia embassies. Also supported by financial sector which specially supporting LPEI in export financial

Expect to connect to over 8000 international visitors & buyers across: 1. Powerplants2. New & Renewable Energy3. Oil & Gas4. Mining5. Energy Connectivity

The government is planning to increase the use of new renewable energy for electricity by 2025. The Electricity Provision Business Plan (RUPTL) 2017-2026 signed in March says that the uptake of new renewable energy will be increased from 19.6 percent to 22.6 percent by 2025.The government also plans to operate power stations with a total capacity of 125 gigawatts (GW), or 125,000 megawatts (MW). Seventy GW of electricity is expected to be installed by 2019.(en.tempo.co)

Ongoing Progress in Power Energy Industrial Sector

10. Electrical & Grid11. Refinery12. Smelter and Mineral Processing13. Industrial 4.0 Application

6. One Belt & One Road Initiative7. Battery8. Energy Storage9. Manufacturing & Automation

Page 3: 2nd Series of · Cilegon Fabricator / IHI Competitiveness of Domestic Industry in the Field of Electricity and Oil and Gas in the Export Market Penetration SKK Migas Policy in the

WHY EXHIBIT ?

• Connect with more than 8.000 global attendees. Be part of over 350 Regional and International brands and products represented.

• As a platform for meetings between Producers and Users of the latest technology to improve the performance of the energy sector

• The right event in the field of technology for Indonesian inventors

• Realizing Government programs in the industrial & electricity sector • Find out the achievement, projection, evaluation & future government policy in the sector of energy in order to elevate energy infestation and spreading local energy products for export purpose, for POWERMAX is connecting to worldwide market.

CONFERENCE SPEAKER:

Ministry of IndustryPLNBKPM

LPEIPJBESDM

DEN (NationalEnergy Council)

PertaminaPGNSKK Migas

Transformer manufacturer goverment Power transmission and distribution Power Producer/ Energy Industry Company Power Generation Parts, Equipment and Services Electric Vehicle related industries Smelter Parts and Components Equipment Manufacturers & Suppliers Machineries & Automation System Meters & Metering Devices IT & Software Companies Policy Makers & Governments Related AgenciesFinancial & Investment Institutions Safety Equipment & System

Mining Parts, Equipment and Services Oil & Gas K3S and VendorsContractors & Services CompaniesInfrastructure & Maintenance Energy Companies

EXHIBITOR PROFILE :

- Qualified Buyers from Overseas- IPP (Indonesia Independent Power Producers)- Title & Deed Owners- Clean Energy Developers - Commercial Buildings Developers and Managers - Energy Consultants and Energy Services Companies- Directors- Maintainance Engineers- Traders

- Central and Regional Goverments- Ambassadors - EPC Contractor (Engineering Procurement, Construction)- Manufacturers- End-Users- Suppliers- OEM

POWERMAX targeted towards international power and energy:

Page 4: 2nd Series of · Cilegon Fabricator / IHI Competitiveness of Domestic Industry in the Field of Electricity and Oil and Gas in the Export Market Penetration SKK Migas Policy in the

Speaker TopicMinistry of industry - ILMATE Director General Domestic Industry Development Policy in Support of the Electricity Project

Ministry of Industry - Head of BPPI Increasing National Industry Competitiveness through Application of Industry 4.0

Ministry of Energy and Mineral Resources - General Secretariat

Energy Infrastructure Development Plan.

Ministry of Energy and Mineral Resources - Director General. EBTKE

Policy Direction for New and Renewable Energy Development

Ministry of Energy and Mineral Resources - Director General. Electricity

Electrification Program through Construction of 35,000 MW Power Plant

PLN - President DirectorPriority for the Use of Domestic Products in building Electricity Infrastructure

Ministry of Energy and Mineral Resources - Director General. Oil and Gas

Priority for the Use of Domestic Products in Upstream - Oil and Gas Activities

Pertamina's Managing Director Implementation of the B-20 Usage Policy in the Infrastructure, Transportation, Industry and Mining Sector

President Director of PT. Industrial Engineering National EPC (Engineering and Procurement Consultant) Ability to Support Electricity and Oil and Gas

Projects

President Director of PT. Barata Indonesia Ability of Domestic Industry to Support Electricity and Oil and Gas Projects

President Director of PT. Cilegon Fabricator / IHI Competitiveness of Domestic Industry in the Field of Electricity and Oil and Gas in the Export Market

Penetration

SKK MigasPolicy in the Procurement / Cooperation Contract in the Oil and Gas Upstream Sector

Energy & Mineral Resources Research & Development Agency

TBA

List of Conference TopicPOWERMAX 2018

subject to change without prior notice

Page 5: 2nd Series of · Cilegon Fabricator / IHI Competitiveness of Domestic Industry in the Field of Electricity and Oil and Gas in the Export Market Penetration SKK Migas Policy in the

VENUE

COST OF PARTICIPATION

JIEXPO Kemayoran Jakarta

POWERMAX 2018 will be held at Jakarta International Expo (JIEXPO) Kemayoran, Jakarta, Indonesia. JIEXPO is known as perfect destination for the MICE industry stakeholder in Indonesia, with Excellent reputation, JIEXPO proven with the success of many events, projects. Located in the center of Jakarta, it is strategic location and easy accessible both to the airport and to the harbor with accessible 4 & 5 star hotel. Shuttle bus will be provided for your convenience transport from hotel to venue - venue to hotel on exhibition days.

DKI Jakarta

Jakarta is the capital city of the Republic of Indonesia, it also has a greater population than other city in Southeast Asia with a current population around 9 million people. Covering of 637.44 square km area, Jakarta is the center of government, commerce and industry and has an extensive communication network with outside world. Strategically positioned in the archipelago, the city also become the gateway of Indonesia. The accessibility to rest of Jakarta spur the development of business in any sectors.

Raw Space Only (Min 18 sqm)6480 USD“Ideal For Companies With LargeExhibits Or Simply For Those WithMore Flair...”

Shell Scheme Package Includes:- Rear and Dividing Wall Partition of 2,44M of Height in White Laminated Panel- 1 x 220V – 2 Amp Power Point- Needle Punch Carpet Flooring- 2 x Fluorescent Tube - 2 x Chairs - 1 x Information Desk - Fascia Board with Company Name - 1 x Waste Paper Basket

Raw Space:- Build Your Booth as Your Liking (Custom Build)- 1 x 220V – 6 Amp Power Point

We are keen to : Exhibit Indoor Raw Space Area ____sqm (Min. 18 sqm)Exhibit Indoor Shell Scheme Area_____sqm (Min. 9 sqm)For provisional bookings please contact us

Standard Shell Scheme (9 sqm)3420 USD“Leave The Work To Us AndWalk Onto A Furnished StandWith Chairs & Tables.”

HAVE IT RAW!

SHELL ME UP!

Contact Us : Myexpo Kreasi IndonesiaAddress : Ruko Plaza PasificTel : (+6221) 2245 7802 / 2245 8392 / 2245 7130Mobile : (+62) 812 8638 3647 Email : [email protected] Web : www.myexpo.co.id