    Contract No. SS P318 Programme No. 063KA

    Design & Construction

    of

    Tamar Development Project, Hong Kong

    for

    The Government of the Hong Kong Special Administrative Region

    2nd AIP Submission Broadcast Reception Installation for LegCo Complex

    Revision No. Issue on

    a 6 March 2008

    b 9 July 2008

    c 18 Dec 2008

    c1 22 Jun 2009

    Endorsed by

    Company GHHJV

    for and on behalf of

    Signature

    Name Edward Yeung

    Position Project Director

    Distribution List:

    ArchSD - SO GHHJV MVAArchSD SOR/PTL RDL WMArchSD SOR/A MCS (RSE) ERMArchSD SOR/SE LAM (RGE) KAA

    ArchSD SOR/BSE JRP (BSE) LDP

    ArchSD SOR/QS HOK APLArchSD SOR/EME GMB TPSArchSD SOR/LA GTR RWDIArchSD SOR/IT ALT CWArchSD SOR/COW SMW VVArchSD SOR/BSI EDAW

    ArchSD SOR/EM Date

    Independent Design Checker (IDC)

    2nd AIP Drawing

    ( ) in compliance with Contract No.SS P318

    ( ) in compliance with Contract No.SS P318 with conditions

    ( ) NOT in compliance with Contract No.SS P318

    For and on behalf of Scott Wilson Limited

    Building Services Design Checker

    Date:

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    2/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    3/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    4/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    5/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) - 5 - Building Services Installation

    The frequency plan for the BRI and IBCCDS as shown below:

    Frequency Range System

    Frequency Channels between BRI System

    470 MHz to 862 MHz - SMATV System

    - CCTV System

    - FM Radio

    - Pay TV

    Block diagram showing the interconnection between various blocks as follow:

    3.2 The terrestrial television antenna system will include the following:

    (a) Aerials (both terrestrial TV and FM)

    (b) Bandpass filter or preamplifier for terrestrial TV and FM

    (c) Amplifiers (plus, if necessary channel translators, converters) and combining units

    (d) Power supply units

    (e) Equalisers

    (f) Trunk, branch, spur feeders, feeders and tap-off units

    (g) TV/FM duplex outlet units including isolator for safety

    (h) Lead- in connection for the Cable TV services

    (i) Channels for SMATV and STAR TV system

    (j) Channels for meeting broadcasting system

    (k) Interfacing work with the meeting broadcasting system in LegCo Complex so that the information and

    data from the meeting broadcasting system can be broadcasted into the BRI system of LegCo Complexand BRI system of CGC office block(s) and low block

    (l) Channels for other systems such as security CCTV systems, IT network, etc

    3.3 The Satellite Master Antenna Television (SMATV) system will include the following:

    (a) SMATV system including dish antenna for the satellites, feedhorn, low noise block converter, satellite

    receiver, channel amplifier, filter, RF modulator/combiner, etc

    (b) 6.2 metre diameter dish antennae for receiving programmes from following satellites.

    Asiasat 2 (100.5E);

    Asiasat 3s (105.5E);

    BSAT 1A (110.0E); and

    Palapa C2 (113.0E)

    (c) Antenna support

    (d) C-band/Ku-band feedhorns

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    6/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    7/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    8/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) - 8 - Building Services Installation

    Fig. 1 Normal Condition

    The switcher of the system shall then be manually turn ON to allow signals from CGC Office Block BRI

    system to in-jet into the LegCo BRI system to support the TV services of LegCo Complex.

    Fig. 2 Suspension of LegCo Complex Antenna and Head-end Equipment During Expansion

    After the builders work of expansion phase has been completed, the antennas and head-end equipment

    shall be re-installed at the new BRI equipment room and new roof of LegCo High Block.

    The optical fiber and coaxial backbone shall be extended to re-connect the existing BRI system with the

    head-end equipment.

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    9/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    10/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    11/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    12/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-A Building Services Installation

    Appendix A

    Drawing Schedule, Legend andSchematic Diagram

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    13/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-B Building Services Installation

    Appendix B

    Schedule of Major Materials and Equipment

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    14/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-B Building Services Installation

    Appendix B Schedule of Major Materials and Equipment

    1.0 Schedule of Major Equipment for Broadcast Reception Installation

    Offered

    Item Equipment/Material

    Brand Model Origin

    1st 2nd 3rd

    1 UHF Aerial Fagor Di@na Plus Spain - - -

    2 FM Aerial Fagor AN02 Spain - - -

    3 Pre-amplifier Fagor AMB 800 Spain - - -

    4 Channel amplifier Fagor Micro MATV

    plus N

    Spain - - -

    5 Fibre transmitter unit Cabletech - H.K. - - -

    6 Fibre receiver unit Cabletech - H.K - - -

    7 Distribution amplifier Fagor DA 353 Spain - - -

    8 Splitter & Tee unit Antek SFS Series H.K

    9 Trunk coaxial cable Cabletech A-1160-LSZH H.K

    10 Branch coaxial cable Cabletech A-660-LSZH H.K - - -

    11 TV/FM outlet Antek SKK 04 H.K - - -

    12 LNB C-Band Chaparral 11-5205-1 USA - - -

    13 Digital receiver

    modulator

    Fagor SDM 6000+ Spain - - -

    14 LNB Ku-Band Chaparral 11-5205-1 USA - - -

    15 Feedhorn C-Band Chaparral 11-1427-1 USA

    16 Rack Delta 42U PRC - - -

    17 Satellite solid antenna

    6.2m

    JJ 6.2m Dia. P.R.C - - -

    NOTE : Some specified model number of equipment / material will be provided in DDA submission

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    15/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-C Building Services Installation

    Appendix C

    Estimation of Maintenance Cost

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    16/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-C Building Services Installation

    Appendix C Estimation of Maintenance Cost

    1.0 Estimation of Maintenance Cost for Broadcast Reception Installation

    Item Equipment / System Monthly cost

    1BRI System

    (comprehensive)

    - Monthly Inspection 3,900.00

    Total Amount (12 months) : 46,800.00

    2.0 Description of the Maintenance Service Work for Broadcast Reception Installations

    Broadcast Reception Installation

    Monthly Inspection

    (a) General cleaning of headend equipment

    (b) To carry out function test for the BRI system at equipment room

    - Connecting a TV at the test point in headend equipment room for channel reception inspection.

    - Check reception and make fine-tuning, if necessary

    (c) To check the condition of the equipment, if necessary, the BRI system (e.g. Pre-amp, Distribution

    AMP) at the equipment room

    (d) To check the record of complaints of the corresponding equipments with follow-up action. Detail of it

    will be provided in DDA submission.

    3.0 Detail Cost breakdown For monthly inspection of BRI system in LegCo Complex

    Items Description Qty Unite rate (HK$) Sub-total (HK$)

    1) General cleaning of headend equipment 1 lot 600 600

    2) To carry to function test for the BRI system at

    equipment room as follows :

    1 lot 1800 1800

    i) Connecting a TV at the test point in headend

    equipment room for channel reception

    inspection

    ii) Check reception and make fine-tuning, if

    necessary

    c) To check the condition of the equipment, if

    necessary, the BRI system (e.g. Pre-amp,

    Distribution AMP)

    1 lot 1500 1500

    d) To check the record of complaints of the

    corresponding equipments with follow-up action.

    Detail of it will be provided in DDA submission

    1 lot (included) 0

    Total (HK$) : 3900

    Remarks : The maintenance works listed above are offered as a single package of a

    comprehensive maintenance contract

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    17/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    18/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    19/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-D Building Services Installation

    Satellite Programme Video Standard

    Maharishi

    BTV World

    * Fashion TV HK & Asia

    * Aaj TV

    Arirang

    Pacific Century Matrix

    Alijazeera

    Bloomberg

    NOW

    * MTA Internat ional 1

    * MTA Internat ional 2

    DW-TV

    Russia Today

    Supreme Master

    * Star Utsav

    Wik Kid

    * Phoenix Info News

    * Phoenix Chinese

    Sahara Samay

    Alami Saharar

    AsiaSat 3S

    Orbital position: 105.5E

    Azimuth: 204.5

    Elevation: 62.6

    * Sahara Samay Bihar

    MPEG-2

    * Sahara Samay NCR

    * Sahara Samay National

    * Sahara Samay Mumbai

    * Sahara Samay Madhya Pradesh

    * Sahara Samay Uttar Predesh

    VOA

    PTV

    * PTV 1

    PTV World

    ATV

    * ATV Khyber

    Global

    i -

    Pakistani mux

    National

    Global

    Z Music

    Z Smile

    NOTE : Programme channel names from internet / magazines are used.

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    20/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-D Building Services Installation

    Satellite Programme Video Standard

    TVRI Nasional

    RCTI

    Bali TV

    SCTV

    Antv

    Indosiar

    Satelindo

    Metro TV

    Global TV

    Spacetoon

    Palapa C2

    Orbital position: 113.0E

    Azimuth: 185.4

    Elevation: 64.7

    TPI

    MPEG-2

    Wowow

    NHK BS 1

    BSAT 1A

    NHK BS 2

    NTSC

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    21/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-D Building Services Installation

    Proposed famous SMATV channels

    BloombergBreaking financial, business and economic news worldwide from major provider of information

    services

    Phoenix Chinese Offers a diverse variety of Chinese programming with productions from China and abroad.

    Phoenix Info

    Chinese

    The Phoenix InfoNews Channel is the first Chinese language channel that covered news among

    Greater China regions, including mainland China, Taiwan and Hong Kong. There is 24-hour

    broadcasting on financial news, stock market information as well as news hea

    DW

    Deutsche Welles television studios are concentrated in Berlin. Germanys international

    broadcaster, DW-TV, provides news, background information and cultural highlights around the

    clock.

    VOA

    The Voice of America is a multimedia international broadcasting service funded by the U.S.

    government through the Broadcasting Board of Governors. VOA broadcasts more than 1,000

    hours of news, information, educational, and cultural programming every week

    CETV

    -

    Horizon

    / Horizon - A general entertainment satellite channel programmed by the

    i-CABLE group to serve Mainland China as well as Chinese communities in the region. With

    own-produced entertainment news programmes during primetime as backbone, the channel a

    NHK BS1

    Japanese TV showing programs of a more educational, cultural or intellectual nature,

    periodically also showing anime. A similar counterpart would be the Public Broadcasting Service

    of the United States

    NHK BS2

    Japanese TV which is a generalist channel similar to BBC One and it's European counterparts,

    showing News, Drama, Quiz/Variety Shows, Music, Sports, Anime and Specials which directly

    compete with it's commercial counterparts.

    NOW TV

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    22/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-E Building Services Installation

    Appendix E

    Proposed BRI System Channel List

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    23/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-E Building Services Installation

    UHF Frequency Channels list in IBCCDS (470-862 MHz)

    Channel Number Frequncy Range Allocation to be avoided Remark OFTA specified

    E21 470 - 478 MHz TVB (Analogue) (Temple Hill) Existing analogue TV Y

    E22 478 - 486MHz Digital TV Existing digital TV Y

    E23 486 - 494MHz ATV ( Analogue) (Temple Hill) Existing analogue TV Y

    E24 494 - 502MHz SMATV 01 ER requirement

    E25 502 - 510MHz Pearl (Analogue) (Temple Hill) Existing analogue TV Y

    E26 510 - 518MHz SMATV 02 ER requirement

    E27 518 - 526MHz ATV World (Analogue) (Temple Hill) Existing analogue TV Y

    E28 526 - 534MHz SMATV 03 ER requirement

    E29 534 - 542MHz SMATV 04 ER requirement

    E30 542 - 550MHz SMATV 05 ER requirement

    E31 550 - 558MHz SMATV 06 ER requirement

    E32 558 - 566MHz SMATV 07 ER requirement

    E33 566 - 574MHz SMATV 08 ER requirement

    E34 574 - 582MHz SMATV 09 ER requirement

    E35 582 - 590MHz Digital TV HDTV ( TVB ) Y

    E36 590 - 598MHz SMATV 10 ER requirement

    E37 598 - 606MHz Digital TV HDTV ( ATV ) Y

    E38 606 - 614MHz SMATV 11 ER requirement

    E39 614 - 622MHz SMATV 12 ER requirement

    E40 622 - 630MHz SMATV 13 ER requirement

    E41 630 - 638MHz SMATV 14 ER requirement

    E42 638 - 646MHz SMATV 15 ER requirement

    E43 646 - 654MHz SMATV 16 ER requirement

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    24/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    25/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-E Building Services Installation

    Channel Summary:

    Required Channels:

    Analogue TV signal 4

    HD TV signal 3

    CCTV 1

    IT network 1

    Public broadcasting system (Provision future connection) 3SMATV 20

    32

    Vacant Channels 17

    Total Channels 49

    Remarks:1 ) Cable TV channels are allocated in VHF frequency band and will not occupy any BRI channel.. See clause 3.13

    2 ) ER requires 1 channel for LegCo meeting broadcast system ( MBS ) ( ERIV / BS 3.7.1 L), whereas 9 locations were specified. The channel can be one of vacant frequency channels.

    3 ) AV signal of electonic voting and announciator system shall be proposed to combine together with all meeting broadcasting system for more BRI channels reservation for future.

    4) Conventional vacant frequency band can provide 17 channels available for meeting broadcasting system. They are not enough to service 40 frequency channels (36LegCo+4CGC) for meeting

    broadcasting system. The technical method for meeting broadcasting system has been reported to user for their further decision and kind consideration.

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    26/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    27/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-F Building Services Installation

    Estimation of Running Cost

    Running Cost of BRI System for LegCo Complex

    ITEM Description Estimated Loading (kW)Assumed Operation Hour

    per day

    Sub-Total Energy Consumption

    per day (kWh)

    1 Lighting (14.63 sq m) 0.293 1 0.293

    2 BRI Equipment in Head-end room 1.67 24 40.08

    3 BRI from G/F to 3/F 0.32 24 7.68

    4 Air-conditioning for BRI Room 0.672 24 16.13

    Total 64.18

    Notes:

    Electricity charge rate of Year 2008 is used for the estimation of electricity cost.The life cycle of BRI system equipment is around ten Years.

    2. Total Running Cost for BRI system

    Total power consumption for BRI system per month: 1925.49 kWh

    (Assumed 30 days for each month)

    Block Rate Tariff

    Unit charge for the first 1,500 units (Basic Charge) $ 1.177 / kW h

    Unit charge from 1,501 units and above (Basic Charge) $ 1.270 / kW h

    Unit charge for the first 1,500 units (Fuel Clause Adjustment) $ 0.105 / kWh

    Unit charge for the f irst 1,501 units and above (Fuel Clause Adjustment) $ 0.105 / kWh

    Running cost for each month : $ 2507.38

    Annual running cost : $ 30,088.56

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    28/36

    D i d C t ti f T D l t P j t H K B ildi S i J R P t Li it d

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    29/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-F Building Services Installation

    Signal loss estimation of BRI system

    General signal level is estimated on each floors for different individual BRI equipment

    Building LegCo

    Floor Description Signal level Floor Description Signal level

    R/F Channel Amp. 90 100dB 3/F Fibre Rx (elect room) 70 80 dB

    Main splitter 75 85 dB Amp. & Splitter 80 89 dB

    9/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB

    Amp. & Splitter 80 89 dB 2/F Fibre Rx (elect room) 70 80 dB

    End User outlets 60 80 dB Amp. & Splitter 80 89 dB

    8/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB

    Amp. & Splitter 80 89 dB 1M/F Fibre Rx (elect room) 70 80 dB

    End User outlets 60 80 dB Amp. & Splitter 80 89 dB

    7/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB

    Amp. & Splitter 80 89 dB 1/F Fibre Rx (elect room) 70 80 dB

    End User outlets 60 80 dB Amp. & Splitter 80 89 dB

    6/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB

    Amp. & Splitter 80 89 dB GM/F Fibre Rx (elect room) 70 80 dB

    End User outlets 60 80 dB Amp. & Splitter 80 89 dB

    5/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB

    Amp. & Splitter 80 89 dB G/F Fibre Rx (elect room) 70 80 dB

    End User outlets 60 80 dB Amp. & Splitter 80 89 dB

    4/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB

    Amp. & Splitter 80 89 dB

    End User outlets 60 80 dB

    Notes:Detail signal loss calculation for each location on floors will be submitted in DDA.

    Design and Construction of Tamar Development Project Hong Kong Building Services J Roger Preston Limited

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    30/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-H Building Services Installation

    Appendix H

    Corresponding Letters

    Design and Construction of Tamar Development Project Hong Kong Building Services J Roger Preston Limited

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    31/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev. c1

    Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-H Building Services Installation

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    32/36

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    33/36

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedF Th G t f th H K S i l Ad i i t ti R i 2

    ndAIP S b i i 1

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    34/36

    For The Government of the Hong Kong Special Administrative Region 2nd

    AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-I Building Services Installation

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2

    ndAIP Submission rev c1

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    35/36

    For The Government of the Hong Kong Special Administrative Region 2 AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 22 Jun 2009

    BRI System (LegCo Complex) APP-J Building Services Installation

    Appendix J

    Reply to ASD Comments on 1st Submission of 2nd AIP

  • 7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva

    36/36