27 - 28 February 2006 M. Jacquemet
SPIRAL II
27 – 28 February 2006
Marcel Jacquemet
27 - 28 February 2006 M. Jacquemet
Spiral II View
Spiral II Layout
Status of the Project
Project Management
Main tasks of the Project Team during 2006
Summary
To build project managementTo take technical decisionsTo begin the Spiral 2 constructionTo share the work packages
27 - 28 February 2006 M. Jacquemet
Spiral 2 Layout
Super conducting LINAC
40MeV d - 5mA -14MeV/n HI
Production buildingC converter+UCx target 1014 fissions/s
GANIL facility
DESIR
(LIRAT)
Stable Heavy-Ion Exp. Hall
CIME Cyclotron Acceleration of RI Beams E < 25 MeV/n, 6-8 MeV/n
for FF
CIME Cyclotron Acceleration of RI Beams E < 25 MeV/n, 6-8 MeV/n
for FF
RFQ
Heavy-Ion ECRsource (A/q=3)
1mA
27 - 28 February 2006 M. Jacquemet
Spiral 2 Layout
27 - 28 February 2006 M. Jacquemet
End of 2004 Technical report publishedSituation of the APD phase :
* Accelerator : APD studies finished
* Radioactive Isotope Beams : not completely finished
* Infrastructure : not completely finished
Status of the project
27 - 28 February 2006 M. Jacquemet
From January to September 2005
Project structure maintained during a “transition period”
Objectives :Contract for definition of the production
buildingSafety studies and authorisation proceduresR& DEnd of APD studies
Status of the project
27 - 28 February 2006 M. Jacquemet
May 2005 : Project approved
July 2005 : Appointment of Project Leader and Scientific by DSM and IN2P3 Directors
October – December 2005 : Organization of the Project Team
Status of the project
27 - 28 February 2006 M. Jacquemet
For 2006 :
• To build project management Project team Work breakdown structure Quality Assurance Plan Planning and budget
• To take technical decisions Separator Nuclear studies
• To share the Work packages• To begin the Spiral 2 construction
Tasks of the Spiral 2 management
27 - 28 February 2006 M. Jacquemet
For 2006 :
•To build project management
• To take technical decision
• To share the work packages
• To begin the Spiral 2 construction
Tasks of the Spiral 2 management
27 - 28 February 2006 M. Jacquemet
Project ManagementDécideurs
Pilote stratégique
Pilote opérationnel
Sections
Laboratoires
CEA /DSM CNRS/IN2P3
Project Direction
Accélérateur Infrastructure
GANIL
TAC – SAC
Project management
Other labs
19
STEERING COMMITTEE
National & International Partners
ScientificCommu
RIB production
27 - 28 February 2006 M. Jacquemet
Accelerator Leader T. JunqueraRadioactive Isotope Beams Leader M. H. Moscatello
Infrastructure Leader Ch. ChéronQuality Engineer M. Perret GatelSystem Engineer E. PetitProject Control Engineer Ph. LaborieManpower & budget Assistant X
Direction Team
Project Leader M. Jacquemet
Project scientist M. Lewitowicz
Safety & radioprotection B. Rannou Assistant A. Latour
27 - 28 February 2006 M. Jacquemet
For 2006 :
• To build project management
•To take technical decisions
• To share the work packages
• To begin the Spiral 2 construction
Tasks of the Spiral 2 management
27 - 28 February 2006 M. Jacquemet
Risks analysis and “reduction of the causes”
Nov. 05 – May 2006
Nuclear engineering studies April 06
Technical Decisions
27 - 28 February 2006 M. Jacquemet
Nuclear engineering studies April 06
Technical Decisions
Target area – RED ZONE
Zone IIIA- Yellow zone
Intensities limitations to few 10 10 pps(variable limitation according to masses) EXISTING
EXPTsAREAS
1+
1+ N+
27 - 28 February 2006 M. Jacquemet
Technical Decisions
target in oven
Assembly of 1st prototype of tantalum ovenTests and temperature measurements
Converter and UCx target
27 - 28 February 2006 M. Jacquemet
For 2006 :
• To build project management
• To take technical decisions
•To share the work packages
• To begin the Spiral 2 construction
Tasks of the Spiral 2 management
27 - 28 February 2006 M. Jacquemet
Work packages sharingCEA /DSM CNRS/IN2P3
Project Direction
Accélérateur Infrastructure
GANIL
TAC – SAC
Project management
Other labs
STEERING COMMITTEE
National & International Partners
ScientificCommu
RIB production
27 - 28 February 2006 M. Jacquemet
Research Construction
DSM DAPNIA/SPhN DAPNIA/SACM – SIS - SENAC
DAM DASE et DP2I
DEN Expertise
DPSN Expertise
The French Laboratories involved in Spiral 2
27 - 28 February 2006 M. Jacquemet
Research and Construction
CEN de Bordeaux-Gradignan
Centre de Spectroscopie Nucléaire et Spectroscopie de Masse OrsayInstitut de Physique Nucléaire Orsay
Institut de Recherches Subatomiques Strasbourg
Laboratoire de Physique Corpusculaire de Caen
Laboratoire de Physique Subatomique et de Cosmologie Grenoble
The French Laboratories involved in Spiral 2
27 - 28 February 2006 M. Jacquemet
Accelerator Work packages
Injector
Superconducting Linac
High Energy Beam Transport
Cryogenic system
RF System
Diagnostics
27 - 28 February 2006 M. Jacquemet
Accelerator Work packages
27 - 28 February 2006 M. Jacquemet
Accelerator Work packages
PROJE
CTInjector Coordination C. Van
Hille DAPNIA
Deutons source DAPNIAH.I q/A=1/3 LPSC
RFQ DAPNIABeam test injector DAPNIA
Linac Supra Coordination R. Ferdinand
GANILCryomodules A DAPNIACryomodules B IPNO RF LPSC
Cryomodule tests(hors faisceau)
DAPNIA /IPNO
27 - 28 February 2006 M. Jacquemet
RIB Work packages
ECS
Transport faisceaux radioactifs
GANIL existant
27 - 28 February 2006 M. Jacquemet
Injector Coordination
Deuterons Source
q/A=1/3 Source
RFQ cavity
Test of Injector Beam
Superconducting Linac
Coordination
Cryomodules A
Cryomodules B
RF Power Coupler
Cryomodules Tests(without Beam)
Accelerator Work packages
27 - 28 February 2006 M. Jacquemet
HEBT CoordinationBeam Dump
Connexions to :* RIB Production station* Experimental Hall for stable ions
Cryogenics Coordination
Liquefier - refrigerator
He lines
Accelerator Work packages
27 - 28 February 2006 M. Jacquemet
RF System CoordinationRFQ Amplifiers
Superconducting cavity amplifiers
Low-level RF control
Buncher cavities
Diagnostics CoordinationIntensity measurement
Beam measurements
Beam-Loss measurements
Diagnostics « Plate forme »
Accelerator Work packages
27 - 28 February 2006 M. Jacquemet
RIB Work packages
ECS
Transport faisceaux radioactifs
GANIL existant
27 - 28 February 2006 M. Jacquemet
RIB Work packages
Test station for ECS
Surface Ion Source
Laser Ion Source
Febiad Source
ECR Source
Other targets
U Cx Target
Converter
Coordination – tunning maintennace
ConverterTarget & Sources
Intégration
ECS tests
ECS & Converter environment
27 - 28 February 2006 M. Jacquemet
RIB Work packages
Diagnostics
Intégration
Identification bench
Tests Bench
Multi- charged Beam Lines
Charge Breeder
Separator
Coordination – Procédure exploitation
Beam transport Beam lines for RIB
27 - 28 February 2006 M. Jacquemet
RIB Work packages
Diagnostics
Beam Lines
Cime Cyclotron
Coordination – Procédure exploitation
Exist. GANIL experim. area
27 - 28 February 2006 M. Jacquemet
For 2006 :
• To build project management
• To take technical decision
• To share the work packages
•To begin the Spiral 2 construction Preparation of safety documents Realization of sub systems
27 - 28 February 2006 M. Jacquemet
Intense Ion sourcesp,d; HI (mA)
RFQ tests in Grenoble
(Sept. 2005)
Techn. specs for call for tender
In progress
27 - 28 February 2006 M. Jacquemet
Linac Accelerator : SC cavities
SPIRAL-2 QWR 88 MHz (beta 0.12) - Test @ 4.2 K (February 2005)
1,0E+08
1,0E+09
1,0E+10
1,0E+11
0 1 2 3 4 5 6 7 8 9 10 11 12
Eacc (MV/m)
Qo
Spiral-2 operating gradient
6,5
E max = 11 MV/m (Bpeak = 110 mT) (Epeak = 60 MV/m)
acc
Multipacting
Light Field Emission
High beta cavity 0.12 ZANON
Tested in Orsay Feb 2005
« Pre serial » fabrication :
Order in progressbefore end of 2006
27 - 28 February 2006 M. Jacquemet
Linac Accelerator: SC cavities
Low beta cavity 0.07 -ACCEL
Tested in Saclay Nov. 2004
« Pre serial » fabrication Order in on monthbefore end of 2006
1,0E+07
1,0E+08
1,0E+09
1,0E+10
0 1 2 3 4 5 6 7 8 9 10
Eacc (MV/m)
Qo