27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

34
27 - 28 February 2006 M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet

Transcript of 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

Page 1: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

SPIRAL II

27 – 28 February 2006

Marcel Jacquemet

Page 2: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Spiral II View

Spiral II Layout

Status of the Project

Project Management

Main tasks of the Project Team during 2006

Summary

To build project managementTo take technical decisionsTo begin the Spiral 2 constructionTo share the work packages

Page 3: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Spiral 2 Layout

Super conducting LINAC

40MeV d - 5mA -14MeV/n HI

Production buildingC converter+UCx target 1014 fissions/s

GANIL facility

DESIR

(LIRAT)

Stable Heavy-Ion Exp. Hall

CIME Cyclotron Acceleration of RI Beams E < 25 MeV/n, 6-8 MeV/n

for FF

CIME Cyclotron Acceleration of RI Beams E < 25 MeV/n, 6-8 MeV/n

for FF

RFQ

Heavy-Ion ECRsource (A/q=3)

1mA

Page 4: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Spiral 2 Layout

Page 5: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

End of 2004 Technical report publishedSituation of the APD phase :

* Accelerator : APD studies finished

* Radioactive Isotope Beams : not completely finished

* Infrastructure : not completely finished

Status of the project

Page 6: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

From January to September 2005

Project structure maintained during a “transition period”

Objectives :Contract for definition of the production

buildingSafety studies and authorisation proceduresR& DEnd of APD studies

Status of the project

Page 7: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

May 2005 : Project approved

July 2005 : Appointment of Project Leader and Scientific by DSM and IN2P3 Directors

October – December 2005 : Organization of the Project Team

Status of the project

Page 8: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

For 2006 :

• To build project management Project team Work breakdown structure Quality Assurance Plan Planning and budget

• To take technical decisions Separator Nuclear studies

• To share the Work packages• To begin the Spiral 2 construction

Tasks of the Spiral 2 management

Page 9: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

For 2006 :

•To build project management

• To take technical decision

• To share the work packages

• To begin the Spiral 2 construction

Tasks of the Spiral 2 management

Page 10: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Project ManagementDécideurs

Pilote stratégique

Pilote opérationnel

Sections

Laboratoires

CEA /DSM CNRS/IN2P3

Project Direction

Accélérateur Infrastructure

GANIL

TAC – SAC

Project management

Other labs

19

STEERING COMMITTEE

National & International Partners

ScientificCommu

RIB production

Page 11: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Accelerator Leader T. JunqueraRadioactive Isotope Beams Leader M. H. Moscatello

Infrastructure Leader Ch. ChéronQuality Engineer M. Perret GatelSystem Engineer E. PetitProject Control Engineer Ph. LaborieManpower & budget Assistant X

Direction Team

Project Leader M. Jacquemet

Project scientist M. Lewitowicz

Safety & radioprotection B. Rannou Assistant A. Latour

Page 12: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

For 2006 :

• To build project management

•To take technical decisions

• To share the work packages

• To begin the Spiral 2 construction

Tasks of the Spiral 2 management

Page 13: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Risks analysis and “reduction of the causes”

Nov. 05 – May 2006

Nuclear engineering studies April 06

Technical Decisions

Page 14: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Nuclear engineering studies April 06

Technical Decisions

Target area – RED ZONE

Zone IIIA- Yellow zone

Intensities limitations to few 10 10 pps(variable limitation according to masses) EXISTING

EXPTsAREAS

1+

1+ N+

Page 15: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Technical Decisions

target in oven

Assembly of 1st prototype of tantalum ovenTests and temperature measurements

Converter and UCx target

Page 16: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

For 2006 :

• To build project management

• To take technical decisions

•To share the work packages

• To begin the Spiral 2 construction

Tasks of the Spiral 2 management

Page 17: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Work packages sharingCEA /DSM CNRS/IN2P3

Project Direction

Accélérateur Infrastructure

GANIL

TAC – SAC

Project management

Other labs

STEERING COMMITTEE

National & International Partners

ScientificCommu

RIB production

Page 18: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Research Construction

DSM DAPNIA/SPhN DAPNIA/SACM – SIS - SENAC

DAM DASE et DP2I

DEN Expertise

DPSN Expertise

The French Laboratories involved in Spiral 2

Page 19: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Research and Construction

CEN de Bordeaux-Gradignan

Centre de Spectroscopie Nucléaire et Spectroscopie de Masse OrsayInstitut de Physique Nucléaire Orsay

Institut de Recherches Subatomiques Strasbourg

Laboratoire de Physique Corpusculaire de Caen

Laboratoire de Physique Subatomique et de Cosmologie Grenoble

The French Laboratories involved in Spiral 2

Page 20: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Accelerator Work packages

Injector

Superconducting Linac

High Energy Beam Transport

Cryogenic system

RF System

Diagnostics

Page 21: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Accelerator Work packages

Page 22: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Accelerator Work packages

PROJE

CTInjector Coordination C. Van

Hille DAPNIA

Deutons source DAPNIAH.I q/A=1/3 LPSC

RFQ DAPNIABeam test injector DAPNIA

Linac Supra Coordination R. Ferdinand

GANILCryomodules A DAPNIACryomodules B IPNO RF LPSC

Cryomodule tests(hors faisceau)

DAPNIA /IPNO

Page 23: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

RIB Work packages

ECS

Transport faisceaux radioactifs

GANIL existant

Page 24: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Injector Coordination

Deuterons Source

q/A=1/3 Source

RFQ cavity

Test of Injector Beam

Superconducting Linac

Coordination

Cryomodules A

Cryomodules B

RF Power Coupler

Cryomodules Tests(without Beam)

Accelerator Work packages

Page 25: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

HEBT CoordinationBeam Dump

Connexions to :* RIB Production station* Experimental Hall for stable ions

Cryogenics Coordination

Liquefier - refrigerator

He lines

Accelerator Work packages

Page 26: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

RF System CoordinationRFQ Amplifiers

Superconducting cavity amplifiers

Low-level RF control

Buncher cavities

Diagnostics CoordinationIntensity measurement

Beam measurements

Beam-Loss measurements

Diagnostics « Plate forme »

Accelerator Work packages

Page 27: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

RIB Work packages

ECS

Transport faisceaux radioactifs

GANIL existant

Page 28: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

RIB Work packages

Test station for ECS

Surface Ion Source

Laser Ion Source

Febiad Source

ECR Source

Other targets

U Cx Target

Converter

Coordination – tunning maintennace

ConverterTarget & Sources

Intégration

ECS tests

ECS & Converter environment

Page 29: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

RIB Work packages

Diagnostics

Intégration

Identification bench

Tests Bench

Multi- charged Beam Lines

Charge Breeder

Separator

Coordination – Procédure exploitation

Beam transport Beam lines for RIB

Page 30: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

RIB Work packages

Diagnostics

Beam Lines

Cime Cyclotron

Coordination – Procédure exploitation

Exist. GANIL experim. area

Page 31: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

For 2006 :

• To build project management

• To take technical decision

• To share the work packages

•To begin the Spiral 2 construction Preparation of safety documents Realization of sub systems

Page 32: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Intense Ion sourcesp,d; HI (mA)

RFQ tests in Grenoble

(Sept. 2005)

Techn. specs for call for tender

In progress

Page 33: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Linac Accelerator : SC cavities

SPIRAL-2 QWR 88 MHz (beta 0.12) - Test @ 4.2 K (February 2005)

1,0E+08

1,0E+09

1,0E+10

1,0E+11

0 1 2 3 4 5 6 7 8 9 10 11 12

Eacc (MV/m)

Qo

Spiral-2 operating gradient

6,5

E max = 11 MV/m (Bpeak = 110 mT) (Epeak = 60 MV/m)

acc

Multipacting

Light Field Emission

High beta cavity 0.12 ZANON

Tested in Orsay Feb 2005

« Pre serial » fabrication :

Order in progressbefore end of 2006

Page 34: 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

27 - 28 February 2006 M. Jacquemet

Linac Accelerator: SC cavities

Low beta cavity 0.07 -ACCEL

Tested in Saclay Nov. 2004

« Pre serial » fabrication Order in on monthbefore end of 2006

1,0E+07

1,0E+08

1,0E+09

1,0E+10

0 1 2 3 4 5 6 7 8 9 10

Eacc (MV/m)

Qo