26 11 13.00 20 - 3 Primary Unit Substation

8
DESCRIPTION OF ITEM SUBMITTED: RELAYS ---------------------------------- Alex Vásquez Navarro QUALITY CONTROL MANAGER

description

transmittal form

Transcript of 26 11 13.00 20 - 3 Primary Unit Substation

Page 1: 26 11 13.00 20 - 3 Primary Unit Substation

CONTRACT No. W91278-13-D-0012

DESIGN / BUILD EOC / DRW AT IQUITOS AND, EOC / DRW AND SAR AT TRUJILLO.

DESCRIPTION OF ITEM SUBMITTED:

RELAYS

----------------------------------

Alex Vásquez Navarro

QUALITY CONTROL MANAGER

Page 2: 26 11 13.00 20 - 3 Primary Unit Substation

DATE TRANSMITTAL No.

TO: FROM: CONTRACT No. CHECK ONE: ( X ) THIS IS A NEW TRANSMITTAL ( ) THIS IS A RESUBMITTAL OF TRANSMITTAL

SPECIFICATION SEC. No. CHECK ONE: THIS TRANSMITTAL ISFOR: ( ) FIO ( X ) GOV`T APPROVAL

ITEM MFG. OR CONTR. No. VARIATION FORNo CAT. CURVE OF CE

DRAWING OR COPIES USEBROCHURE NO. SPEC. DRAWING CODE

PARA. No. SHEET No.a c d e f g h i

1 RELAYS SD-03 2 2.2.6.1 N/A A

REMARKS I certify that the above submitted items have been reviewed in detail and areAll materials submitted are the same that have been approved by Electroriente correct and in strict conformance with the contract drawings and specifications

except as otherwise stated

ENCLOSURES RETURNED NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE

SHEET __1__ OF __1___

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, ORMANUFACTURER`S CERTIFICATE OF COMPLIANCE 24-feb-15 26 11 13.00 20 - 3

REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS

U.S. ARMY CORPS OF ENGINEERS PARTENÓN E.I.R.LPERU PROJECT OFFICE W91278-13-D-0012Avenida Encalada, Cuadra 17 Monterrico Task Order 0001Lima, Perú Jr. Miguel Grau Nº 1380 Barrio Partido Alto, Tarapoto, Perú

PROJECT TITLE AND LOCATION26 11 13.00 20 DESIGN / BUILD EOC / DRW AT IQUITOS AND, EOC / DRW AND SAR AT TRUJILLO

DESCRIPTION OF ITEM SUBMITTED CONTRACT REFERENCEFOR

CONTRACTORUSE CODE

PRIMARY UNIT SUBSTATIONS DOCUMENT

b

ALEX VASQUEZ NAVARROQuality Control Manager

NAME AND SIGNATURE OF CONTRACTORSECTION II - APPROVAL ACTION

Page 3: 26 11 13.00 20 - 3 Primary Unit Substation
Alex
Rectángulo
Page 4: 26 11 13.00 20 - 3 Primary Unit Substation
Page 5: 26 11 13.00 20 - 3 Primary Unit Substation
Page 6: 26 11 13.00 20 - 3 Primary Unit Substation
Page 7: 26 11 13.00 20 - 3 Primary Unit Substation
Alex
Rectángulo
Page 8: 26 11 13.00 20 - 3 Primary Unit Substation
Alex
Rectángulo
Alex
Rectángulo