CONTRACT No. W91278-13-D-0012
DESIGN / BUILD EOC / DRW AT IQUITOS AND, EOC / DRW AND SAR AT TRUJILLO.
DESCRIPTION OF ITEM SUBMITTED:
RELAYS
----------------------------------
Alex Vásquez Navarro
QUALITY CONTROL MANAGER
![Page 2: 26 11 13.00 20 - 3 Primary Unit Substation](https://reader033.fdocuments.us/reader033/viewer/2022042905/577c826e1a28abe054b0bc9f/html5/thumbnails/2.jpg)
DATE TRANSMITTAL No.
TO: FROM: CONTRACT No. CHECK ONE: ( X ) THIS IS A NEW TRANSMITTAL ( ) THIS IS A RESUBMITTAL OF TRANSMITTAL
SPECIFICATION SEC. No. CHECK ONE: THIS TRANSMITTAL ISFOR: ( ) FIO ( X ) GOV`T APPROVAL
ITEM MFG. OR CONTR. No. VARIATION FORNo CAT. CURVE OF CE
DRAWING OR COPIES USEBROCHURE NO. SPEC. DRAWING CODE
PARA. No. SHEET No.a c d e f g h i
1 RELAYS SD-03 2 2.2.6.1 N/A A
REMARKS I certify that the above submitted items have been reviewed in detail and areAll materials submitted are the same that have been approved by Electroriente correct and in strict conformance with the contract drawings and specifications
except as otherwise stated
ENCLOSURES RETURNED NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE
SHEET __1__ OF __1___
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, ORMANUFACTURER`S CERTIFICATE OF COMPLIANCE 24-feb-15 26 11 13.00 20 - 3
REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS
U.S. ARMY CORPS OF ENGINEERS PARTENÓN E.I.R.LPERU PROJECT OFFICE W91278-13-D-0012Avenida Encalada, Cuadra 17 Monterrico Task Order 0001Lima, Perú Jr. Miguel Grau Nº 1380 Barrio Partido Alto, Tarapoto, Perú
PROJECT TITLE AND LOCATION26 11 13.00 20 DESIGN / BUILD EOC / DRW AT IQUITOS AND, EOC / DRW AND SAR AT TRUJILLO
DESCRIPTION OF ITEM SUBMITTED CONTRACT REFERENCEFOR
CONTRACTORUSE CODE
PRIMARY UNIT SUBSTATIONS DOCUMENT
b
ALEX VASQUEZ NAVARROQuality Control Manager
NAME AND SIGNATURE OF CONTRACTORSECTION II - APPROVAL ACTION
![Page 3: 26 11 13.00 20 - 3 Primary Unit Substation](https://reader033.fdocuments.us/reader033/viewer/2022042905/577c826e1a28abe054b0bc9f/html5/thumbnails/3.jpg)
![Page 4: 26 11 13.00 20 - 3 Primary Unit Substation](https://reader033.fdocuments.us/reader033/viewer/2022042905/577c826e1a28abe054b0bc9f/html5/thumbnails/4.jpg)
![Page 5: 26 11 13.00 20 - 3 Primary Unit Substation](https://reader033.fdocuments.us/reader033/viewer/2022042905/577c826e1a28abe054b0bc9f/html5/thumbnails/5.jpg)
![Page 6: 26 11 13.00 20 - 3 Primary Unit Substation](https://reader033.fdocuments.us/reader033/viewer/2022042905/577c826e1a28abe054b0bc9f/html5/thumbnails/6.jpg)
![Page 7: 26 11 13.00 20 - 3 Primary Unit Substation](https://reader033.fdocuments.us/reader033/viewer/2022042905/577c826e1a28abe054b0bc9f/html5/thumbnails/7.jpg)
![Page 8: 26 11 13.00 20 - 3 Primary Unit Substation](https://reader033.fdocuments.us/reader033/viewer/2022042905/577c826e1a28abe054b0bc9f/html5/thumbnails/8.jpg)