09 24 23-1 Stucco Approved
09 90 00-1.2 Paints and Coatings Approved
22 00 00-3 Plumbing General Purpose Approved
26 05 00.00 40-1 Electrical Commom Work Results Revised Codes
26 05 00.00 40-4 Cable Tray Distribution Approved
03 30 00 2-6 Ready Mix Concrete Trujillo Approved
Project Specs 100% Approved
10 56 13-1 Products Approved
23 81 00.00 20-3 Unitary Air Condition Equipment Approved
05 12 00-5 Erection Plan Approved
08 71 00-1.2 Door Hardware Approved
10 28 13-1.1 Toilet Accessories Approved
21 13 13.00 10-1 Steel Piping Components Approved
26 11 13.00 20 - 3 Primary Unit Substation
Tank Removal Guideline
26 51 00 - 1 Interior Lighting
USACE DESIGN MANUAL
01 10 12-1 50% Design Approved
01 10 12-11 Design Analysis Reply
01 10 12 - 16.1 Design After Award