· 2021. 1. 19. · Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr....

130
Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A. Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net January 11, 2021 CYNTHIA FINLAYSON 4484 BRANDON DR DELRAY BEACH FL 33445 2233 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A Site Address: 4484 BRANDON DR, DELRAY BEACH FL 33445 Dear CYNTHIA FINLAYSON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right- of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Transcript of  · 2021. 1. 19. · Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr....

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 CYNTHIA FINLAYSON 4484 BRANDON DR DELRAY BEACH FL 33445 2233 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4484 BRANDON DR, DELRAY BEACH FL 33445 Dear CYNTHIA FINLAYSON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 WILLIAM C & JULIA A BURTON 4468 BRANDON DR DELRAY BEACH FL 33445 2233 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4468 BRANDON DR, DELRAY BEACH FL 33445 Dear WILLIAM C & JULIA A BURTON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 PETER W & CLAUDIA MAIER 4454 BRANDON DR DELRAY BEACH FL 33445 2233 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4454 BRANDON DR, DELRAY BEACH FL 33445 Dear PETER W & CLAUDIA MAIER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 ALBERTO E & DEBRA MAJORS 4440 BRANDON DR DELRAY BEACH FL 33445 2233 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4440 BRANDON DR, DELRAY BEACH FL 33445 Dear ALBERTO E & DEBRA MAJORS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 ALEXANDER C SIMEUS & JOSEPH CENEUS 4426 BRANDON DR DELRAY BEACH FL 33445 2233 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4426 BRANDON DR, DELRAY BEACH FL 33445 Dear ALEXANDER C SIMEUS & JOSEPH CENEUS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 SAMUEL BROWN 4874 SW 98 ST OCALA FL 34476 4019 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4400 BRANDON DR, DELRAY BEACH FL 33445 Dear SAMUEL BROWN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 JEFFREY KASH & KIMBERLY FEDRIGON 164 DRIFTWOOD DR SAXONBURG PA 16056 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4382 BRANDON DR, DELRAY BEACH FL 33445 Dear JEFFREY KASH & KIMBERLY FEDRIGON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 SEAN W & SUSAN J KEMNUIR 4368 BRANDON DR DELRAY BEACH FL 33445 2231 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4368 BRANDON DR, DELRAY BEACH FL 33445 Dear SEAN W & SUSAN J KEMNUIR: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 HANS VOGT 4354 BRANDON DR DELRAY BEACH FL 33445 2231 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4354 BRANDON DR, DELRAY BEACH FL 33445 Dear HANS VOGT: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 DAVID S STONE 4326 BRANDON DR DELRAY BEACH FL 33445 2231 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4326 BRANDON DR, DELRAY BEACH FL 33445 Dear DAVID S STONE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 JAMES H & MICHELLE H EHLERS 4312 BRANDON DR DELRAY BEACH FL 33445 2231 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4312 BRANDON DR, DELRAY BEACH FL 33445 Dear JAMES H & MICHELLE H EHLERS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 JONATHAN & REBECCA SWARD 4298 BRANDON DR DELRAY BEACH FL 33445 2229 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4298 BRANDON DR, DELRAY BEACH FL 33445 Dear JONATHAN & REBECCA SWARD: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 GORE & KATHLEEN SIMERVIL 4268 BRANDON DR DELRAY BEACH FL 33445 2229 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4268 BRANDON DR, DELRAY BEACH FL 33445 Dear GORE & KATHLEEN SIMERVIL: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 CHRISTOPHER R & JESSICA R GARDNER 4240 BRANDON DR DELRAY BEACH FL 33445 2229 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4240 BRANDON DR, DELRAY BEACH FL 33445 Dear CHRISTOPHER R & JESSICA R GARDNER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 LATISHA & STEVEN SANDERS 4226 BRANDON DR DELRAY BEACH FL 33445 2229 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4226 BRANDON DR, DELRAY BEACH FL 33445 Dear LATISHA & STEVEN SANDERS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 RICHARD D DAWGIERT & DARLENE R RADTKE 4209 BRANDON DR DELRAY BEACH FL 33445 2229 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4209 BRANDON DR, DELRAY BEACH FL 33445 Dear RICHARD D DAWGIERT & DARLENE R RADTKE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]

  • Board of Supervisors

    James M. Alderman Stephen Bedner

    Jeffrey P. Phipps, Sr. Harry Raucher

    John I. Whitworth III Executive Director

    Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

    Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

    January 11, 2021 MICHAEL S & BOBETTE E MCCURDY 4184 BRANDON DR DELRAY BEACH FL 33445 2227 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-32 Canal Rehabilitation

    from Barwick Rd to ~300ft east of E‐3.5‐4 Canal CRP 17-9769P.03; Job No. 236A

    Site Address: 4184 BRANDON DR, DELRAY BEACH FL 33445 Dear MICHAEL S & BOBETTE E MCCURDY: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-32 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by Florida Licensed Surveyors beginning the week of January 18, 2021 to identify the boundaries of the District’s L-32 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, February 4, 2021. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/197704037. You can also participate via phone by dialing (872) 240-3311; Access Code 197-704-037. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

    https://global.gotomeeting.com/join/197704037http://www.lwdd.net/

  • Project No. CRP #17-9769P.03; Job No. 236A 1/11/2021 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin near the end of March 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

    Brian Tilles, P.E. Director of Right-of-Way Regulation c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

    http://www.lwdd.net/mailto:[email protected]:[email protected]