DELIVERED VIA REGULAR MAIL AND HAND …€1-half...Headquarters located at 13081 South Military...
Transcript of DELIVERED VIA REGULAR MAIL AND HAND …€1-half...Headquarters located at 13081 South Military...
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 LUIS A. OQUENDO & MARGARITA DE JESUS OQUENDO 23466 SW 57TH AVE APT 501 BOCA RATON FL 33428 7720 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 501 BOCA RATON FL 33428
Dear LUIS A. OQUENDO & MARGARITA DE JESUS OQUENDO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ENRIQUE G. GULDNER TRUST & ENRIQUE G. GULDNER TR. 4260 NW 106TH AVE POMPANO BEACH FL 33065 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 502 BOCA RATON FL 33428
Dear ENRIQUE G. GULDNER TRUST & ENRIQUE G. GULDNER TR.:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 PAMELA ARBULU 22019 MARTELLA AVE BOCA RATON FL 33433 4632 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 503 BOCA RATON FL 33428
Dear PAMELA ARBULU :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 RMCT INTRNTL INVESTMENTS LLC 5100 W COPANS RD STE 410 MARGATE FL 33063 7700 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 504 BOCA RATON FL 33428
Dear RMCT INTRNTL INVESTMENTS LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 PAMELA M. ARBULU 23466 LYONS RD APT 505 BOCA RATON FL 33428 7720 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 505 BOCA RATON FL 33428
Dear PAMELA M. ARBULU :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MARCO SOARES 4173 NW 54TH ST COCONUT CREEK FL 33073 4001 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 506 BOCA RATON FL 33428
Dear MARCO SOARES :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 OAKINVESTA LLC 76 WESTBURY D DEERFIELD BEACH FL 33442 3258 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 507 BOCA RATON FL 33428
Dear OAKINVESTA LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 6654 SELFRIDGE REALTY LLC 128 RIVENDELL CT MELVILLE NY 11747 5343 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 508 BOCA RATON FL 33428
Dear 6654 SELFRIDGE REALTY LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ARSNT PROPERTY GROUP III LLC 2403 NW 49TH LN BOCA RATON FL 33431 4334 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 509 BOCA RATON FL 33428
Dear ARSNT PROPERTY GROUP III LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JOSE A. & MARIA PEREZ 1655 PARKSIDE CIR S BOCA RATON FL 33486 8566 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23466 LYONS RD 510 BOCA RATON FL 33428
Dear JOSE A. & MARIA PEREZ:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 GABLES EAST CONDO ASSN INC BENCHMARK PROPERTY MGMT C/O 7932 WILES RD CORAL SPRINGS FL 33067 2071 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23418 LYONS RD BOCA RATON FL 33428
Dear GABLES EAST CONDO ASSN INC BENCHMARK PROPERTY MGMT C/O:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MUNTHER & MILAD RAYYAN 25918 N ARROWHEAD PL MUNDELEIN IL 60060 4062 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 301 BOCA RATON FL 33428
Dear MUNTHER & MILAD RAYYAN:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ERNEST ANTOKHINE 247 CH DU RUISSEAU PIEDMONT QUEBEC J0R 1K0 CANADA DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 302 BOCA RATON FL 33428
Dear ERNEST ANTOKHINE :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 THAISA SANTANA 1239 E NEWPORT CENTER DR STE 105 DEERFIELD BEACH FL 33442 7711 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 303 BOCA RATON FL 33428
Dear THAISA SANTANA :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JOSE A. & M. TERESA PEREZ 1655 PARKSIDE CIR BOCA RATON FL 33486 8566 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 304 BOCA RATON FL 33428
Dear JOSE A. & M. TERESA PEREZ:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 VICTORIA FARROMEQUE TR. 11000 LADERA LN # A BOCA RATON FL 33498 1524 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 305 BOCA RATON FL 33433
Dear VICTORIA FARROMEQUE TR. :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 IOANNIS FRYGOUDAKIS 23398 SW 57TH AVE APT 306 BOCA RATON FL 33428 7707 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 306 BOCA RATON FL 33428
Dear IOANNIS FRYGOUDAKIS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 BARBARA L. ZEPPONE 23398 LYONS RD APT 307 BOCA RATON FL 33428 7707 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 307 BOCA RATON FL 33428
Dear BARBARA L. ZEPPONE :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JOSE D. PEREZ 23398 LYONS RD # 308 BOCA RATON FL 33428 7707 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 308 BOCA RATON FL 33428
Dear JOSE D. PEREZ :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 TOSANAC LLC 7908 NW 63RD WAY POMPANO BEACH FL 33067 3302 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 309 BOCA RATON FL 33428
Dear TOSANAC LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ANDREA HEGEDUS 23398 LYONS RD # 310 BOCA RATON FL 33428 7707 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23398 LYONS RD 310 BOCA RATON FL 33428
Dear ANDREA HEGEDUS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 GABLES EAST CONDO ASSN INC BENCHMARK PROPERTY MGMT C/O 7932 WILES RD CORAL SPRINGS FL 33067 2071 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address:
Dear GABLES EAST CONDO ASSN INC BENCHMARK PROPERTY MGMT C/O:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 SOUZAN & SAFWAN M. AGHARAAD 23145 BARWOOD PARK LN APT A BOCA RATON FL 33433 7993 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23145 BARWOOD PARK LN A BOCA RATON FL 33433
Dear SOUZAN & SAFWAN M. AGHARAAD:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 AMMAR AL NOORI & NADA AHMED 23145 BARWOOD PARK LN APT B BOCA RATON FL 33433 7993 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23145 BARWOOD PARK LN B BOCA RATON FL 33433
Dear AMMAR AL NOORI & NADA AHMED:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 SANDINO MOREIRA 23145 BARWOOD PARK LN # C BOCA RATON FL 33433 7993 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23145 BARWOOD PARK LN C BOCA RATON FL 33433
Dear SANDINO MOREIRA :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 LUIZ CARLOS D. REIS 23145 BARWOOD PARK LN APT D BOCA RATON FL 33433 7993 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23145 BARWOOD PARK LN D BOCA RATON FL 33433
Dear LUIZ CARLOS D. REIS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 OTACILIO S. ROCHA TRUST 55 SW 2ND AVE APT 205G BOCA RATON FL 33432 4779 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23132 BARWOOD PARK LN A BOCA RATON FL 33433
Dear OTACILIO S. ROCHA TRUST :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 RMCTI 2 INVESTMENTS LLC 5100 W COPANS RD STE 410 MARGATE FL 33063 7700 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23132 BARWOOD PARK LN B BOCA RATON FL 33433
Dear RMCTI 2 INVESTMENTS LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ARYAN NEZAMABADI 23128 BARWOOD PARK LN UNIT A BOCA RATON FL 33433 7906 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23128 BARWOOD PARK LN A BOCA RATON FL 33433
Dear ARYAN NEZAMABADI :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 HILDA G. BERNALES 23128 BARWOOD PARK LN # B BOCA RATON FL 33433 7906 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23128 BARWOOD PARK LN B BOCA RATON FL 33433
Dear HILDA G. BERNALES :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MATEUS F. SANTOS 23128 BARWOOD PARK LN # C BOCA RATON FL 33433 7906 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23128 BARWOOD PARK LN C BOCA RATON FL 33433
Dear MATEUS F. SANTOS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 KEN & IRENE KANASHIRO 23128 BARWOOD PARK LN UNIT D BOCA RATON FL 33433 7906 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23128 BARWOOD PARK LN D BOCA RATON FL 33433
Dear KEN & IRENE KANASHIRO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 KENNETH P. MATHER & PATRICIA WILLIS 23124 BARWOOD PARK LN APT A BOCA RATON FL 33433 7905 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23124 BARWOOD PARK LN A BOCA RATON FL 33433
Dear KENNETH P. MATHER & PATRICIA WILLIS:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JOEY MILAZZO GUASTAFESTE 23124 BARWOOD PARK LN N # B BOCA RATON FL 33433 7905 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23124 BARWOOD PARK LN B BOCA RATON FL 33433
Dear JOEY MILAZZO GUASTAFESTE :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 TERESA CASSATA 23124 BARWOOD PARK LN # C BOCA RATON FL 33433 7905 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23124 BARWOOD PARK LN C BOCA RATON FL 33433
Dear TERESA CASSATA :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 FRANCOIS & MARIE Y. ALPHONSE 23124 BARWOOD PARK LN UNIT D BOCA RATON FL 33433 7905 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23124 BARWOOD PARK LN D BOCA RATON FL 33433
Dear FRANCOIS & MARIE Y. ALPHONSE:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 RAMAZAN & FATIMA PALJEVIC 6958 64TH ST FLUSHING NY 11385 5248 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23120 BARWOOD PARK LN A BOCA RATON FL 33433
Dear RAMAZAN & FATIMA PALJEVIC:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 SIM YAN YUK & KIN MA FU 5208 EAGLE CAY WAY COCONUT CREEK FL 33073 2605 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23120 BARWOOD PARK LN B BOCA RATON FL 33433
Dear SIM YAN YUK & KIN MA FU:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 AMERICO CARACITAS 23120 BARWOOD PARK LN # 12 BOCA RATON FL 33433 7957 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23120 BARWOOD PARK LN C BOCA RATON FL 33433
Dear AMERICO CARACITAS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JOSE GREGORIO MOLINA SR. & YAMILET J. GARCIA 23120 BARWOOD PARK LN APT D BOCA RATON FL 33433 7957 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23120 BARWOOD PARK LN D BOCA RATON FL 33433
Dear JOSE GREGORIO MOLINA SR. & YAMILET J. GARCIA:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 CENTRE OF BOCA BARWOOD HMOWNERS ASSN INC 23116 BARWOOD PARK LN BOCA RATON FL 33433 7903 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23035 LYONS RD BOCA RATON FL 33433
Dear CENTRE OF BOCA BARWOOD HMOWNERS ASSN INC:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 BARWOOD HOMES INC 23155 SW 57TH AVE # A BOCA RATON FL 33428 2002 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22870 LYONS RD BOCA RATON FL 33433
Dear BARWOOD HOMES INC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 RICHARD BOGATIN PALM BEACH COUNTY PREM DIVISION C/O 2633 VISTA PKWY WEST PALM BEACH FL 33411 5613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 9141 SW 3RD ST BOCA RATON FL 33433
Dear RICHARD BOGATIN PALM BEACH COUNTY PREM DIVISION C/O:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 VILLAS OF BOCA BARWOOD HOA GRANT PROPERTY MANAGEMENT C/O 1599 NW 9TH AVE STE 2 BOCA RATON FL 33486 1310 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 8900 SW 20TH ST BOCA RATON FL 33433
Dear VILLAS OF BOCA BARWOOD HOA GRANT PROPERTY MANAGEMENT C/O:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ANNETTE GIAMMARCO 1631 W 13TH ST BROOKLYN NY 11223 1018 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23451 SW 55TH AVE B BOCA RATON FL 33433
Dear ANNETTE GIAMMARCO :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MIKE & FLORA LUCERI 23451 SW 55TH AVE UNIT A BOCA RATON FL 33433 7355 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23451 SW 55TH AVE A BOCA RATON FL 33433
Dear MIKE & FLORA LUCERI:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JOSEPH & NICOLENA MANFREDINI 24 OLIVE PL LYNBROOK NY 11563 3339 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23423 SW 55TH AVE B BOCA RATON FL 33433
Dear JOSEPH & NICOLENA MANFREDINI:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MARSHALL SALZMAN 23423 SW 55TH AVE # A BOCA RATON FL 33433 7396 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23423 SW 55TH AVE A BOCA RATON FL 33433
Dear MARSHALL SALZMAN :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 LOUIS J. & FELICIA VELOTTA 8957 SW 21ST CT APT G BOCA RATON FL 33433 7394 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 8957 SW 21ST CT G BOCA RATON FL 33433
Dear LOUIS J. & FELICIA VELOTTA:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 XPC REAL ESTATE ENTERPRISES LLC 233359 SW 55TH WAY APT A BOCA RATON FL 33433 7335 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23359 SW 55TH WAY A BOCA RATON FL 33433
Dear XPC REAL ESTATE ENTERPRISES LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MEIR & RACHELLE EDISON 23359 SW 55TH WAY UNIT B BOCA RATON FL 33433 7335 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23359 SW 55TH WAY B BOCA RATON FL 33433
Dear MEIR & RACHELLE EDISON:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 DOUG & MARCY KAPLAN 23359 SW 55TH WAY APT C BOCA RATON FL 33433 7335 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23359 SW 55TH WAY C BOCA RATON FL 33433
Dear DOUG & MARCY KAPLAN:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ELAINE GARCIA & PEDRO LIMA 23359 SW 55TH WAY APT D BOCA RATON FL 33433 7335 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23359 SW 55TH WAY D BOCA RATON FL 33433
Dear ELAINE GARCIA & PEDRO LIMA:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ANTHONY & SHERRY FERREIRA 23359 SW 55TH WAY APT E BOCA RATON FL 33433 7348 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23359 SW 55TH WAY E BOCA RATON FL 33433
Dear ANTHONY & SHERRY FERREIRA:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 LINDA CRAFTS 23359 SW 55TH WAY APT F BOCA RATON FL 33433 7348 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23359 SW 55TH WAY F BOCA RATON FL 33433
Dear LINDA CRAFTS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 RAMSES & GILDA INCLAN 23359 SW 55TH WAY APT G BOCA RATON FL 33433 7348 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23359 SW 55TH WAY G BOCA RATON FL 33433
Dear RAMSES & GILDA INCLAN:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 LETITIA M. MACCIA & JONATHAN M. KING 23359 SW 55TH WAY # 27H BOCA RATON FL 33433 7324 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23359 SW 55TH WAY H BOCA RATON FL 33433
Dear LETITIA M. MACCIA & JONATHAN M. KING:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ANTHONY PEPPER 23341 SW 55TH WAY # A BOCA RATON FL 33433 7393 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23341 SW 55TH WAY A BOCA RATON FL 33433
Dear ANTHONY PEPPER :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ZONZINI GROUP LLC 23341 SW 55TH WAY APT B BOCA RATON FL 33433 7393 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23341 SW 55TH WAY B BOCA RATON FL 33433
Dear ZONZINI GROUP LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JERRY REANO 23341 SW 55TH WAY APT C BOCA RATON FL 33433 7393 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23341 SW 55TH WAY C BOCA RATON FL 33433
Dear JERRY REANO :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JACQUELINE WASSERMAN MOLINA 8576 VIA GIARDINO BOCA RATON FL 33433 2211 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23341 SW 55TH WAY D BOCA RATON FL 33433
Dear JACQUELINE WASSERMAN MOLINA :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MICHELE ALTMAN 23341 SW 55TH WAY # E BOCA RATON FL 33433 7393 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23341 SW 55TH WAY E BOCA RATON FL 33433
Dear MICHELE ALTMAN :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 IGNAZIO & DENISE DIFATA 23341 SW 55TH WAY UNIT F BOCA RATON FL 33433 7393 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23341 SW 55TH WAY F BOCA RATON FL 33433
Dear IGNAZIO & DENISE DIFATA:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JOSEPHINE ROZIE 8986 SW 19TH ST APT B BOCA RATON FL 33433 7382 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 8986 SW 19TH ST B BOCA RATON FL 33433
Dear JOSEPHINE ROZIE :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 SEAN BLAIR SR. & GRACIE D. BLAIR 8995 SW 19TH ST APT B BOCA RATON FL 33433 8607 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 8995 SW 19TH ST B BOCA RATON FL 33433
Dear SEAN BLAIR SR. & GRACIE D. BLAIR:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 STOIL I. & ELENA POTCHILEEV 8995 SW 19TH ST APT A BOCA RATON FL 33433 8607 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 8995 SW 19TH ST A BOCA RATON FL 33433
Dear STOIL I. & ELENA POTCHILEEV:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 CLAUDIA BUENO 8960 SW 18TH RD BOCA RATON FL 33433 7976 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 8960 SW 18TH RD BOCA RATON FL 33433
Dear CLAUDIA BUENO :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JUAN & JANE CRUZATTE 18750 CAPE SABLE DR BOCA RATON FL 33498 6376 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23157 SW 56TH AVE BOCA RATON FL 33433
Dear JUAN & JANE CRUZATTE:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 STEVEN A. & CAROL L. FORK 23145 SW 56TH AVE BOCA RATON FL 33433 7941 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23145 SW 56TH AVE BOCA RATON FL 33433
Dear STEVEN A. & CAROL L. FORK:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MARIA ACILEA M. RUSSELL & VOLNIER PAIXAO 23133 SW 56TH AVE BOCA RATON FL 33433 7941 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23133 SW 56TH AVE BOCA RATON FL 33433
Dear MARIA ACILEA M. RUSSELL & VOLNIER PAIXAO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JACK R. & ROBIN V. BAITZ 23121 SW 56TH AVE BOCA RATON FL 33433 7941 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23121 SW 56TH AVE BOCA RATON FL 33433
Dear JACK R. & ROBIN V. BAITZ:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 RICHARD FIELDS 23109 SW 56TH AVE BOCA RATON FL 33433 7941 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23109 SW 56TH AVE BOCA RATON FL 33433
Dear RICHARD FIELDS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ROBERT M. & BETTY J. ROBBINS 23097 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23097 SW 56TH AVE BOCA RATON FL 33433
Dear ROBERT M. & BETTY J. ROBBINS:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 HERBERT D. HOFMANN 23085 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23085 SW 56TH AVE BOCA RATON FL 33433
Dear HERBERT D. HOFMANN :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MICHAEL E. POWELL & HEATHER POWELL MOHR 23073 SW 57TH AVE BOCA RATON FL 33428 2039 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23073 SW 56TH AVE BOCA RATON FL 33428
Dear MICHAEL E. POWELL & HEATHER POWELL MOHR:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 KEN & MAI HO 11133 MISTY RIDGE WAY BOYNTON BEACH FL 33473 4893 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23061 SW 56TH AVE BOCA RATON FL 33433
Dear KEN & MAI HO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 SONDRA BURR 23049 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23049 SW 56TH AVE BOCA RATON FL 33433
Dear SONDRA BURR :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 BARBARA A. TOMCZYK & BARBARA A. TOMCZYK TR. 23037 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23037 SW 56TH AVE BOCA RATON FL 33433
Dear BARBARA A. TOMCZYK & BARBARA A. TOMCZYK TR.:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ANGELA M. PADY & MATEUS F. SANTOS 23025 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23025 SW 56TH AVE BOCA RATON FL 33433
Dear ANGELA M. PADY & MATEUS F. SANTOS:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 VINCENT D. & PATRICIA M. TELFORD 23013 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23013 SW 56TH AVE BOCA RATON FL 33433
Dear VINCENT D. & PATRICIA M. TELFORD:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 GIOVANNA DOYEL 23001 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 23001 SW 56TH AVE BOCA RATON FL 33433
Dear GIOVANNA DOYEL :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JANAINA C. PEDRONI 22989 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22989 SW 56TH AVE BOCA RATON FL 33433
Dear JANAINA C. PEDRONI :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ASHLEY P. & SCOTT D. CARUSO 22977 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22977 SW 56TH AVE BOCA RATON FL 33433
Dear ASHLEY P. & SCOTT D. CARUSO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 RANCHO CHICO CORPORATE OFFICE LLC 104 4TH ST STE B JUPITER FL 33458 7430 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22965 SW 56TH AVE BOCA RATON FL 33433
Dear RANCHO CHICO CORPORATE OFFICE LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 PROGRESS RESIDENTIAL BORROWER 1 LLC PO BOX 4090 SCOTTSDALE AZ 85261 4090 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22953 SW 56TH AVE BOCA RATON FL 33433
Dear PROGRESS RESIDENTIAL BORROWER 1 LLC :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 WILLIAM GUAPO DE VILHENA COELHO & CRISTINA MACHADO COELHO 22941 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22941 SW 56TH AVE BOCA RATON FL 33433
Dear WILLIAM GUAPO DE VILHENA COELHO & CRISTINA MACHADO COELHO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 STEPHEN & EILEEN HAAS 22929 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22929 SW 56TH AVE BOCA RATON FL 33433
Dear STEPHEN & EILEEN HAAS:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 CESAR F. WONG 22917 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22917 SW 56TH AVE BOCA RATON FL 33433
Dear CESAR F. WONG :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ANN M. PRICE 22905 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22905 SW 56TH AVE BOCA RATON FL 33433
Dear ANN M. PRICE :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JOAO C. COSTA 22893 SW 56TH AVE BOCA RATON FL 33433 6236 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22893 SW 56TH AVE BOCA RATON FL 33433
Dear JOAO C. COSTA :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 IH6 PROPERTY FLORIDA LP INVITATION HOMES - TAX DEPT C/O 1717 MAIN ST STE 2000 DALLAS TX 75201 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22881 SW 56TH AVE BOCA RATON FL 33433
Dear IH6 PROPERTY FLORIDA LP INVITATION HOMES - TAX DEPT C/O:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ANNETTE M. GERVAIS-ROBERTS 22853 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22853 SW 56TH AVE BOCA RATON FL 33433
Dear ANNETTE M. GERVAIS-ROBERTS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 SONJA L. JAROSAK 22833 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22833 SW 56TH AVE BOCA RATON FL 33433
Dear SONJA L. JAROSAK :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 JEFFREY DOWDS 2109 COUNTRY VIEW LN LANSDALE PA 19446 6068 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22823 SW 56TH AVE BOCA RATON FL 33433
Dear JEFFREY DOWDS :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 VINH T. DUONG & THO T. NGUYEN 22811 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22811 SW 56TH AVE BOCA RATON FL 33433
Dear VINH T. DUONG & THO T. NGUYEN:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ERIC KUZMICZ 22799 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22799 SW 56TH AVE BOCA RATON FL 33433
Dear ERIC KUZMICZ :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ITZHAK & RONNY GALINSKY 20283 STATE ROAD 7 STE 300 BOCA RATON FL 33498 6903 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22789 SW 56TH AVE BOCA RATON FL 33433
Dear ITZHAK & RONNY GALINSKY:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 PATRICIA A. HUMPHREYS & PATRICIA A. HUMPHREYS TR. 22777 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22777 SW 56TH AVE BOCA RATON FL 33433
Dear PATRICIA A. HUMPHREYS & PATRICIA A. HUMPHREYS TR.:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 CHRISTOPHER M. HOPE 22765 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22765 SW 56TH AVE BOCA RATON FL 33433
Dear CHRISTOPHER M. HOPE :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 VEDUS & RITA BIEN-AIME 22755 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22755 SW 56TH AVE BOCA RATON FL 33433
Dear VEDUS & RITA BIEN-AIME:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 KAREN G. LARATRO TRUST & DEBBY VIENS TR. 275 CARINA DR JUPITER FL 33478 5455 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22751 SW 56TH AVE BOCA RATON FL 33433
Dear KAREN G. LARATRO TRUST & DEBBY VIENS TR.:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 DEVIN T. SCHALLER 22743 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22743 SW 56TH AVE BOCA RATON FL 33433
Dear DEVIN T. SCHALLER :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 HUGUES & DJEMAYAH JOSEPH 22729 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22729 SW 56TH AVE BOCA RATON FL 33433
Dear HUGUES & DJEMAYAH JOSEPH:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 EDUARDO E. & MIRIAM CODOGNOTTO 22721 SW 56TH AVE BOCA RATON FL 33433 6234 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22721 SW 56TH AVE BOCA RATON FL 33433
Dear EDUARDO E. & MIRIAM CODOGNOTTO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 THOMAS E. GLICKMAN 2210 N 51ST AVE HOLLYWOOD FL 33021 4050 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 9050 SW 8TH ST BOCA RATON FL 33433
Dear THOMAS E. GLICKMAN :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 TONY & MELISSA DICICCO 22625 SW 56TH AVE BOCA RATON FL 33433 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22625 SW 56TH AVE BOCA RATON FL 33433
Dear TONY & MELISSA DICICCO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 AVENITHA E. & LUPHETE F. VALCOURT 22615 SW 56TH AVE BOCA RATON FL 33433 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22615 SW 56TH AVE BOCA RATON FL 33433
Dear AVENITHA E. & LUPHETE F. VALCOURT:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 THUY TRAN & THANG TAT NGUYEN 22175 CRESSMONT PL BOCA RATON FL 33428 4280 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22601 SW 56TH AVE BOCA RATON FL 33433
Dear THUY TRAN & THANG TAT NGUYEN:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ROBERT C. LEWERT 22591 SW 56TH AVE BOCA RATON FL 33433 4605 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22591 SW 56TH AVE BOCA RATON FL 33433
Dear ROBERT C. LEWERT :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 REBECCA L. & KYLE W. HANSEN 22579 SW 56TH AVE BOCA RATON FL 33433 4605 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22579 SW 56TH AVE BOCA RATON FL 33433
Dear REBECCA L. & KYLE W. HANSEN:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 CHARLOTTE K. & BRANDON R. EAMES * * CONFIDENTIAL RECORD * * * * * * FS SECTION 119.07 * * * * DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: * * CONFIDENTIAL RECORD * *
Dear CHARLOTTE K. & BRANDON R. EAMES:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing
Project No. 16-9976P.01 February 4, 2019 Page 2 encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MICHAEL K. NADAOKA & CYNDI L. PAVLIK TR. 22555 SW 56TH AVE BOCA RATON FL 33433 4605 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22555 SW 56TH AVE BOCA RATON FL 33433
Dear MICHAEL K. NADAOKA & CYNDI L. PAVLIK TR.:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 FREDERICK DANNEY 22543 SW 56TH AVE BOCA RATON FL 33433 4605 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22543 SW 56TH AVE BOCA RATON FL 33433
Dear FREDERICK DANNEY :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 PATRICK & CONCETTA A. ROMANO 22531 SW 56TH AVE BOCA RATON FL 33433 4605 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22531 SW 56TH AVE BOCA RATON FL 33433
Dear PATRICK & CONCETTA A. ROMANO:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ADRIANNE F. COWAN & JEFFREY K. EDWARDS 22517 SW 56TH AVE BOCA RATON FL 33433 4605 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22517 SW 56TH AVE BOCA RATON FL 33433
Dear ADRIANNE F. COWAN & JEFFREY K. EDWARDS:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MICHAEL SCHEUING 22505 SW 56TH AVE BOCA RATON FL 33433 4605 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22505 SW 56TH AVE BOCA RATON FL 33433
Dear MICHAEL SCHEUING :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 LEONY L. & ANGENA D. CONSTANT 22493 SW 56TH AVE BOCA RATON FL 33433 4603 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22493 SW 56TH AVE BOCA RATON FL 33433
Dear LEONY L. & ANGENA D. CONSTANT:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MARCIA A. KUNF 22481 SW 56TH AVE BOCA RATON FL 33433 4603 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22481 SW 56TH AVE BOCA RATON FL 33433
Dear MARCIA A. KUNF :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ALICE LEE 2009 SW 43RD AVE FORT LAUDERDALE FL 33317 6319 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22469 SW 56TH AVE BOCA RATON FL 33433
Dear ALICE LEE :
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 GLENN P. & UT THI HO DITINICK 22457 SW 56TH AVE BOCA RATON FL 33433 4603 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22457 SW 56TH AVE BOCA RATON FL 33433
Dear GLENN P. & UT THI HO DITINICK:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 NHO REAL ESTATE USA LLC RANAN GAFRI C/O 20283 STATE ROAD 7 STE 300 BOCA RATON FL 33498 6903 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22447 SW 56TH AVE BOCA RATON FL 33433
Dear NHO REAL ESTATE USA LLC RANAN GAFRI C/O:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 MARIO JEFFERSON BORTOLOTI & TAMARA S. BORTOLOTI 22435 SW 56TH AVE BOCA RATON FL 33433 4603 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22435 SW 56TH AVE BOCA RATON FL 33433
Dear MARIO JEFFERSON BORTOLOTI & TAMARA S. BORTOLOTI:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 ALYCE & GILLES DUSABLON 22423 SW 56TH AVE BOCA RATON FL 33433 4603 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 22423 SW 56TH AVE BOCA RATON FL 33433
Dear ALYCE & GILLES DUSABLON:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District
Board of Supervisors
James M. Alderman Stephen Bedner
Jeffrey P. Phipps, Sr. Harry Raucher
John I. Whitworth III Executive Director
Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.
Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net
February 4, 2019 GENE LEOFANTI JR. & GENE LEOFANTI JR. TR. 9106 SW 4TH ST BOCA RATON FL 33433 4608 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY
Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1.5 Canal From Hillsboro Canal to Lyons Road (via barge) Project No. 16-9976P.01; Job No. 183A Site Address: 9106 SW 4TH ST BOCA RATON FL 33433
Dear GENE LEOFANTI JR. & GENE LEOFANTI JR. TR.:
The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1.5 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.
The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1.5 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.
Project No. 16-9976P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.
Sincerely,
Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District