2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based...

62
2014 progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015

Transcript of 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based...

Page 1: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

2014 progressreport

epCor water serviCes inC.2012-2016 perFormanCe based regulation may 2015

Page 2: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

  

EPCOR Water 2014 PBR Prog

 1  EXECU

  NET 1.1  CAPI1.2  OPE1.3  RATE1.4  NON1.5

2  PBR FR

  ELEM2.1  RISK2.2

3  2014 P

  CON3.1  FINA3.2

 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6

  CAPI3.3 3.3.1 3.3.2

  RATE3.4  WAT3.5

 3.5.1 3.5.2 3.5.3

  PBR3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5

4  2014 P

  CON4.1  FINA4.2

 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5

  CAPI4.3  RATE4.4  WAS4.5

 4.5.1 4.5.2 4.5.3

Services gress Report 

TIVE SUMMAR

INCOME AND RETITAL EXPENDITURRATIONAL PERFOES AND BILL COMN‐ROUTINE ADJUS

RAMEWORK ...

MENTS OF PBR ...KS AND INCENTIVE

PBR RESULTS ‐ 

NSUMPTION AND CANCIAL PERFORMA

Net Income Revenue ‐ InOperating COperating CDepreciationInterest Exp

ITAL EXPENDITURCity‐Driven COther Capita

E BASE AND RETUTER RATES AND B

In‐City WateWater Rate Water Bill Co

R OPERATING PERSystem ReliaWater QualiCustomer SeEnvironmenSafety Index

PBR RESULTS ‐ 

NSUMPTION AND CANCIAL PERFORMA

Net income Revenue .....Operating CDepreciationInterest Exp

ITAL EXPENDITURE BASE AND RETUSTEWATER TREAT

WastewaterWastewaterWastewater

RY ..................

TURN ON EQUITYES ...................RMANCE ...........

MPARISONS .........STMENTS ...........

......................

.......................S .....................

IN‐CITY WATE

CUSTOMER COUNANCE ................and Return onn‐City Water ...Costs ................Costs by Operatn Expense .......ense and Cost ES ...................Capital Projectal Projects ......URN ON EQUITY ..BILL COMPARISONer Rates ..........Structure by Comparisons toRFORMANCE MEAability Index ....ity Index .........ervice Index ....t Index ...........x ......................

WASTEWATER

CUSTOMER COUNANCE ................and Return on.......................Costs ................n Expense .......ense and Cost ES ...................URN ON EQUITY ..MENT RATES ANDr Treatment Rar Treatment Rar Bill Compariso

Tabl

.....................

 ...................................................................................................................

.....................

.......................

.......................

ER ..................

NTS ‐ IN‐CITY WA.......................n Equity ‐ In‐Cit..............................................tional Function.......................of Debt ..................................ts ...................................................................S ............................................

Customer Class Other Commu

ASURES .................................................................................................................................

R ...................

NT ........................................... Equity .................................................................................of Debt .........................................................D BILL COMPARISOates .................ate Structure bons to Other C

 le of Conten

.....................

.......................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.....................

ATER ........................................ty Water ..........................................................n ..........................................................................................................................................................................................................................................unities .............................................................................................................................................................

.....................

.......................

.......................

........................

........................

........................

........................

........................

.......................

.......................ONS .........................................y Customer Cla

Communities ....

nts 

.....................

.......................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.....................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................ass .........................................

......................

........................

........................

........................

........................

........................

......................

........................

........................

......................

........................

........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

......................

........................

........................................................................................................................................................................................................................................................................................

......................

.......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

May 2015 

.............. 1 

............... 1 

............... 2 

............... 3 

............... 4 

............... 5 

.............. 6 

............... 6 

............... 6 

.............. 8 

............... 8 

............... 9 

............... 9 

............. 10 

............. 11 

............. 13 

............. 14 

............. 14 

............. 15 

............. 16 

............. 17 

............. 18 

............. 20 

............. 20 

............. 21 

............. 21 

............. 23 

............. 24 

............. 25 

............. 26 

............. 27 

............. 28 

............ 30 

............. 30 

............. 30 

............. 30 

............. 31 

............. 32 

............. 34 

............. 34 

............. 35 

............. 36 

............. 38 

............. 38 

............. 38 

............. 39 

Page 3: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

  

EPCOR Water 2014 PBR Prog

  WAS4.6 4.6.1 4.6.2 4.6.3 4.6.4 4.6.5

5  FUTUR

  FINA5.1 5.1.1 5.1.2 5.1.3 5.1.4

  CON5.2  ENV5.3  PRO5.4

 5.4.1 5.4.2

APPENDIX A

APPENDIX AAPPENDIX A

APPENDIX B

APPENDIX BB‐1‐1:  B‐1‐2:  B‐1‐3:  

APPENDIX BB‐2‐1:  B‐2‐2:  B‐2‐3:  

APPENDIX C

APPENDIX CAPPENDIX C

APPENDIX D

APPENDIX DD‐1‐1: D‐1‐2: 

APPENDIX DD‐2‐1 CD‐2‐2: 

APPENDIX E:

APPENDIX EAPPENDIX E

  

Services gress Report 

STEWATER PBR PSystem ReliaWastewaterCustomer SeEnvironmenSafety Index

RE PLANS AND 

ANCIAL CHALLENGHigher than Non‐RoutineDeclining ReCost of Servi

NSERVATION INITIAIRONMENTAL INITVINCIAL AND FEDWater ........Wastewater

:  HISTORICAL 

A‐1:  HISTORICAL A‐2:  HISTORICAL 

: HISTORICAL S

B‐1:  FINANCIAL PNet Income anRevenue ‐ In‐COperating CosB‐2:  FINANCIAL PNet Income anRevenue ‐ WaOperating Cos

:  AFFILIATE TR

C‐1:  AFFILIATE TRC‐2:  AFFILIATE TR

:   WATER AND

D‐1: WATER RAT Consumption  Fixed MonthlyD‐2: WASTEWATEConsumption a Overstrength 

: OPERATING P

E‐1:  WATER SYSTE‐2:  WASTEWAT

PERFORMANCE Mability Index ....r Quality Indexervice Index ....tal Index.........x ......................

CHALLENGES .

GES AND INITIATIVForecast Capie Adjustments fesidential Consice Study UpdaATIVES ..............TIATIVES ............ERAL GOVERNME.......................r ......................

CONSUMPTIO

CONSUMPTION ‐CONSUMPTION ‐

SUMMARY OF

PERFORMANCE – nd Return on ECity Water ......sts ‐ In‐City WaPERFORMANCE ‐ Wnd Return on Eastewater ........sts ‐ Wastewat

RANSACTIONS 

RANSACTIONS SURANSACTIONS SU

D WASTEWATE

ES ...................Rates ‐ Water y Service ChargER TREATMENT Rand Fixed Montand Additiona

PERFORMANC

TEM SERVICE QUAER TREATMENT S

MEASURES ..................................x ............................................................................................

.....................

VES ...................tal Expenditurefor 2015 and Fsumption .........ate .................................................................ENT INITIATIVES .................................................

ON .................

‐ IN‐CITY WATER‐ WASTEWATER ..

F FINANCIAL PE

IN‐CITY WATER .Equity ‐ In‐City .......................ater .................WASTEWATER ....Equity ‐ Wastew.......................ter ...................

.....................

MMARY ‐ IN‐CITYMMARY ‐ WASTE

ER TREATMEN

.......................

.......................ges ‐ Water .....RATES ................thly Service Chal Overstrength

CE MEASURES .

ALITY MEASURESERVICE QUALITY 

.......................

........................

........................

........................

........................

........................

.....................

.......................es ....................Future Years .........................................................................................................................................................................

.....................

.............................................

ERFORMANCE

.......................Water ....................................................................................water ..............................................................

.....................

Y WATER ..........EWATER ............

NT RATES ........

.......................

........................

........................

.......................arges ‐ Wastewh Surcharges ....

.....................

......................MEASURES .......

.......................

.......................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

 ....................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.....................

.......................

.......................

.......................

.......................water ....................................

.....................

.......................

.......................

...........................................................................................................................................

......................

..........................................................................................................................................................................................................................................

......................

........................

........................

......................

..........................................................................................................................................................................................

......................

........................

........................

......................

............................................................................................................................................

......................

........................

........................

.......................

.......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

......................

.......................

.......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

May 2015 

............. 40 

............. 40 

............. 41 

............. 42 

............. 42 

............. 43 

............ 45 

............. 45 

............. 45 

............. 45 

............. 46 

............. 46 

............. 47 

............. 47 

............. 47 

............. 47 

............. 48 

............ 49 

............. 49 

............. 49 

............ 50 

............. 50 

............. 50 

............. 50 

............. 51 

............. 52 

............. 52 

............. 52 

............. 53 

............ 54 

............. 54 

............. 55 

............ 56 

............. 56 

............. 56 

............. 56 

............. 57 

............. 57 

............. 57 

............ 58 

............. 58 

............. 59 

Page 4: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

1 ExeThis reportfor water Services In31, 2014.   Bylaw  158Performan

Net1.1

In  the  cuconsumptito  control continued Administrahave also bissues and savings haWastewate12.6%, 2.4ahead  of  fmillion and 

Net 

1  2014 2  Rev3  Op4  Dep5  Inte 6  Net7  Ret8  2012‐9  Rev10  Op11  Dep12  Inte13  Net14  Ret

Services gress Report 

ecutive t provides anservices  anc. (“EWSI”) These servi816,  the  EPnce Based Re

t Income 

rrent  PBR  ton (see Sectcosts.    Theimpacts of Eation and Wbeen much lhigher thanve more thaer  earned  c4% greater  tforecast, wid combined 

Income and 

venue erating costs preciation erest  t Income  turn on Equit‐2014 venue erating costs preciation erest  t Income turn on Equit

Summn annual upd wastewatfor the yearces, referredPCOR  Wateegulation (“P

and Retu

term,  EWSItions 3.1 andese  efforts EPCOR’s 201

Water Adminilower than fn forecast lean offset  lowcombined  nethan  the PBth  In‐City Wreturn on eq

 

Return on Eq

ty ‐ % 

ty ‐ % 

ary date to the ter  treatmenr ended Deced to as “In‐Cer  Services PBR”) for the

urn on Eq

  has  facedd 4.1).  In rehave  result13 corporateistration cosforecast, becvels of capitwer than  foet  income  oR  forecast  (Water  and Wquity of 10.5

In‐City WaNet Income

quity 

1 of 59

City of Edmont  services ember 31, 2City Water” and  Waste

ese services 

uity 

  a  steeper esponse to thted  in  signife reorganizasts (see Sectcause of histtalized interrecast revenof  $51.8 milsee Table 1Wastewater 5%, 1.0% gre

Table 1.1ater and Wae and Return($ millions)

In‐City Wate 

 172.8     (90.4)    (20.0)    (22.3)    40.1  

      13.3%

 484.9   (267.9)   (56.2)    (62.7)    98.1  

      11.3%

onton on thprovided w2014 and forand “Wasteewater  Treaover a five y

than  antichis decline, ficant  cost ation have retions 3.2.3 atorically lowest (see Secnues.   As a llion,  yieldin1.1).   Financgenerating 

eater than fo

astewater n on Equity

BActua

er  Wastew

 72. (44.   (9.   (7. 11.

    10.

 200 (124   (26   (21   27

       8.

e operationithin  Edmonr the three yewater”, areatment  Bylayear term fro

cipated  decEWSI has msavings  in  tesulted in reand 4.2.3).   w interest ratctions 3.2.5 aresult,  in 20ng  combineial  results  focombined 

orecast.   

al water  Com

6   244)  (15)    (20)    (27     56%       1

0.1   64.9)  (3.6)    (8.4)    (8.2   12.4%       1

al and finannton  by  EPCyears ended e provided paw,  which om 2012 to 

line  in  per ade substantwo  areas. eductions in Second,  intetes on 2012‐and 4.2.5). 014,  In‐City d  return  onor 2012‐201net  income 

C PB

mbined  C 

45.4 34.8) 29.5) 29.3) 51.8 12.6%   

 85.0 92.8) 82.8) 84.1) 25.3 10.5%    

May 2015

cial results COR Water December 

pursuant to prescribes 2016.     

  customer ntial efforts   First,  the  Corporate erest costs ‐2014 debt These cost Water and n  equity  of 14 are also of  $125.3 

D R Forecast 

Combined  

 252.0   (144.9)    (29.8)    (34.1)    43.2      10.2% 

 713.8   (420.9)    (84.1)    (94.0)    114.8         9.5% 

Page 5: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Cap1.2

In‐City Waforecast an 

C

1  In‐City2  Waste3  Total C

 As part of expenditurindividual delayed,  ocapital promeet City forecast ca In  2014  anchanges  tHypochloriexpenditurSouth‐East Over the 2PBR  forecaexpenditurprojects ($ For Wastewdevelopmethat  the  coforecast.  Acapital  expfacility.   Threplacemeresulted  iexpenditurwithin $1.2

Services gress Report 

pital Expe

ter and Wasnd $343.8 m

 

Capital Expen

y Water ewater Capital Expen

its PBR appres at the beprojects  an

or  changed. ograms to adrequiremenapital expend

nd  for  2012o  the  timinite  Generatres on City‐dt LRT extensi

2012‐2016 Past by $38.3res needed $21.8 million

water, higheent of Wastost of manyAccordingly,penditures  ihe purpose nts needed n  higher  thres  in 2012‐2 million of t

enditures 

stewater’s cillion, or 6.8

nditures 

nditures 

lication, EWeginning of nd  in  aggreg  As well,  inddress the cnts.   Accordiditures.    

2‐2014,  In‐Cng  of  expetor  and  thedriven projeion (see Sect

BR term, EW3 million  (9.to accommo), and increa

er than foretewater’s  cay projects  in, EWSI delayn  2012  andof this revieto ensure phan  forecas2013 and brthe 2012‐20

capital expen8% greater th

Capit

A

Actu  99.  37.137.

WSI provides each term.  gate,  will  din  some  circchallenges ofingly, over  t

City Water’senditures  one  Rossdale ects, primartion 3.3).   

WSI projects6%).   This  iodate city gases in the c

cast capital apital progran Wastewateyed or defer  2013, whilew was to aplant reliabist  capital  eringing Was14 PBR forec

2 of 59

nditures werhan forecast

Table 1.2tal Expendit($ millions)

B 2014 

al PBR 

Forecast3  73.6 7  22.7 0  96.3 

the City of Over the PBiffer  from  tumstances, f aging infrathe PBR  ter

higher  than  significanLaboratory ily water m

that In‐Cityncrease  is pgrowth and cost of the Ro

expendituream.    In  2012er’s  capital rred capital se  it  conducassess asset lity.   The  imexpendituretewater’s cucast (see Sec

re $137.0 mt for 2012‐20

tures 

C 2012

t  

Actual 269.2   74.6 343.8 

Edmonton wBR term, acthe  PBR  forprojects wi

astructure, tm, differenc

n  forecast nt  projects, Building,  aain  relocatio

y Water’s caprimarily attto eliminateossdale Labo

es in 2014 r2,  preliminaprogram wospending, cocted  a  compcondition a

mplementatios  in  2014, umulative caction 4.3).  

million in 201014 (see Tab

D 2‐2014 

PBR Forecast 248.5   73.4 321.9 

with a five ytual capital ecasts  as  pill  be  addedo better resces will aris

capital  expeincluding  t

as  well  as ons needed

pital expendtributable  toe conflicts woratory Build

reflect the reary  engineerould be  signontributing tprehensive  rand  identify on of the reoffsetting 

apital expen

14, 42.6% grble 1.2). 

E 2012‐2

Current Projection 439.2 159.6 598.8 

year forecastexpenditurerojects  are d  to  or  remspond to groe between 

enditures  rethe  Rossdahigher  tha  to accomm

ditures will eo higher  thawith City of ding ($13.8 

e‐prioritizatiring  analysisnificantly grto lower thareview  of  itsrepairs, upgevised capitalower  than

nditures for 

May 2015

reater than 

F 2016 

PBR Forecast 400.9 111.7 512.6 

t of capital es, both on advanced, oved  from owth, or to actual and 

eflect  both le  Sodium n  forecast modate  the 

exceed the an  forecast Edmonton million).   

ion and re‐s  indicated eater  than an forecast s Gold Bar grades and al program n  forecast 2012‐2014 

Page 6: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Over  the  2forecast byasset  condplant mainlevels of ca

Ope1.3

In‐City Waindices  prperformanwith 100 bBonus poindoes not m In  2014,  bperformanpoints.      

  

P

1  Syste2  Wate3  Custo4  Enviro5  Safety6  Aggre

 In 2014, InSection 3.6highlights Appendix E 

Services gress Report 

2012‐2016  Py $47.9 milldition  assessntained.   Basapital spend

erational 

ater  and Waescribed  innce measurebase points ants are availameet the 100

both  In‐City nce  standard

erformance M

m Reliability r Quality Indeomer Service onmental Indy Index egate Points E

n‐City Water6 provides dof  In‐City WE‐1 summari

PBR  term, Wlion  (42.9%)sment  can  bsed on the ring will also 

Perform

astewater’s   Schedule es.   Performavailable if table for perf0 base point 

Water  (Tads,  allowing 

Wa 

Measure Inde

Index ex Index dex 

Earned (sum 

r exceeded tetailed discuWater’s  opeizes In‐City W

 

Wastewater’,  so  that  thbe  fully  addresults of thbe required

ance 

operational 3  of  Bylawance under the standardformance abstandard.  

ble  1.3‐1)  aIn‐City Wat

2014 Perater System 

ex ‐ In‐City W

of all indices

target perfoussions of therational  peWater’s ope

3 of 59

’s  capital  exhe  challengedressed  and e asset condd in the next 

performanw  15816  wieach  index 

ds for all fivebove standa

and Wastewter  to  earn 

Table 1.3‐1rformance MService Qua

Water  S

s) 

rmance stanhe performaerformance, rational perf

xpenditures es of an agin  the  reliabidition asses2017‐2021 

ce  are  eachith  each  in  is measuree performanrds and fina

water  (Table107.2 point

Measures ality Standa

A Index  

Standard Points 

  25.0  25.0  20.0  15.0  15.0 100.0

ndards for aance measuras  well  as formance ov

are  expecteng  infrastruclity  of  the wsment, EWSPBR term (s

h measured ndex  consisted  independnce measureancial penalt

e  1.3‐2)  excts  and Wast

rds B 

Total Actual Points 

M

30.2 25.1 21.1 16.5 16.0 

 108.9   

ll five of theres making uplanned  p

ver the curre

ed  to  exceecture  identiwastewater SI anticipateee Section 5

by  the  resuting  of  onedently on a pe indices areties are appl

ceeded  PBR tewater  to e

C Maximum Available Points 

28.5 25.523.016.516.5

     110.0 

e performanup each of trocess  imprent PBR term

May 2015

ed  the  PBR fied  in  the treatment s that high 5.1.1).   

ults  of  five e  or  more point basis e achieved.  ied if EWSI 

  operating earn 110.0 

D Total  Points  Earned 

28.525.121.116.516.0

 107.2 

nce indices.  the indices, rovements.  m.   

Page 7: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

 In 2014, WThese  indiup  each  inperformanperformanoperationa

Rat1.4

In accordaadjustmen2014 PBR fto water coa 5.8% rebAfter  applmonthly coresidentialwas $14.21 EWSI undethat the Ccomparisocommunitithe customcomparisocompetitivsurvey.   

  

P

1  System2  Waste3  Custo4  Enviro5  Safety6  Aggre

Services gress Report 

Wastewater ces are simindex  tailorence  measurence,  as  well al performan

es and Bi

nce with Bylt plus speciaforecast rateonsumptionbasing adjusying  these onsumption customer’s1 in 2014, co

ertakes annuity’s water ans  were  baies  in the Edmer and inclns  (see  Secve and,  in m

Performance 

m Reliability Iewater Qualitmer Service Ionmental Indey Index gate Points E

Wastew

exceeded  thilar to thosed  to wastewes  making as  planned

nce over the

ill Compa

law 15816, Sal rate adjuse of 2.0% (sen rates for thtment for wadjustments of 16.2 m3

 wastewateompared to $

ual bill compand wastewased  on  surdmonton meude fixed chctions  3.5.3 most cases  lo

 

Measure Ind

ndex ty Index ndex ex 

Earned (sum o

2014 Perwater Treatm

he performae of  In‐City Wwater  treatmup  each  od  process  im current PBR

arisons 

Schedule 3, Sstments.  In 2ee Section 3he Acceleratwastewater ts,  the  avera, was $37.2r treatment$13.19 in 20

parison survwater treatmrveys  of  Caetropolitan harges, consand  4.5.3) 

ower, than r

ex ‐ Wastewa

of all indices)

4 of 59

Table 1.3‐2rformance Mment Service

ance standarWater with tment.    Sectof  the  indicmprovementR term.       

Section 1.0, 2014, the PB3.5.1).  Spected Water Mtreatment fiage  resident0  in 2014 ct bill, based 013.   

veys with vaent rates aralgary,  Vancarea.   Theseumption chashow  that rates  in the 

ater  S

Measures es Quality St

rds  for all  fithe  individution  4.6  proces,  highlights.    Append

rate increasBR inflation ial rate adju

Main Renewaixed and vartial  customeompared  toon average 

arious cities re reasonabcouver  and e comparisoarges, plus awater  and communitie

A Index 

Standard Points 15.0 40.0 5.0 

20.0 20.0 

100.0 

tandards 

ive performual performaovides  detaihts  of  Wasdix  E‐2  sum

ses are limitadjustment ustments incal program (riable charger’s water  bo $36.20  in monthly co

and  local cle and compWinnipeg, 

ons are baseany applicabwastewatees  included 

B Total  Actual Points 

16.9 80.3 5.1 

22.0 23.0 

147.3 

ance measuance measurled  discussiotewater’s  omarizes Wa

ed to the PBwas 1.9%, ccluded a 1.1(see Section ges (see Sectbill,  based  o2013 and  thonsumption 

ommunitiespetitive.      Inas  well  as ed on the toble surchargr  treatmentin the bill c

C MaximumAvailable Points 16.0 44.0 5.0 

22.0 23.0 

110.0 

May 2015

ure  indices.  res making ons  of  the operational astewater’s 

BR inflation close to the % increase  3.5.1) and tion 4.5.1).  on  average he average of 15.5 m3 

s  to ensure n 2014, bill four  local 

otal cost to ges.   These t  rates  are comparison 

D Total  Points Earned 16.0 44.0 5.0 

22.0 23.0 

110.0 

Page 8: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Non1.5

Under the non‐routinwhich are non‐routinimpact of t In  review criteria outor wastew

Services gress Report 

n‐Routine

PBR framewne adjustmenunusual, signe adjustmenthe non‐rout

of  its  2014 tlined in Bylater treatme

e Adjustm

work, EWSI mnts from thenificant in sints are provtine adjustm

operations,aw 15816, Sent rates.    

ments  

may requeste City.  Non‐rize or naturevided either ment on In‐C

,  EWSI  did Schedule 3, 

5 of 59

 adjustmentroutine adjue and beyonto the City Mity Water an

not  identifySection 5.0 

ts to In‐Cityustments ared the scopeManager or nd Wastewa

y  any  non‐rothat would 

Water and We defined in  of control oto City Couter’s revenu

outine  adjueither incre

WastewaterBylaw 15816of EWSI”.  Rencil, dependue requireme

stments  thaease or decre

May 2015

r’s rates for 6 as “items equests for ding on the ents.   

at met  the ease water 

Page 9: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

2 PBRPBR is a mto  inflatiomeasures decisions pframeworkpredictable

Elem2.1

• PBR  RincrearebasiWateron a CIndex (CANSAnnua

EWSI aensureEWSI’sSectio

• PerforassurasacrificEWSI’sauditefor im

• Returncosts a

Risk2.2

The PBR frcost  savingassumes  tcosts, ensuEWSI’s stra • Water 

fluctua

Services gress Report 

R Framethod of can  less  an and return oprovide a bak  encouragee rates, whil

ments of 

Rates.    Undses are  limitng and  for  tr and WasteConsumer PrcomponentIM  series Val Growth in 

also undertae  that  the  Cs  customer ns 3.5 and 4

rmance Meaance to custced to keep s  performaned performaprovements

n on Equity.and earn a fa

ks and Inc

ramework prgs  through he  risks  assuring that cuategies to m

Consumptiotions  in wat

ework lculating andefficiency  fon equity.  Talance betwes  EWSI  toe safeguard

PBR 

er  the  PBR ted to  inflatthe Accelerawater Treatice Index cois measure41694625) aAverage Ho

akes annual City’s water classes,  rat

4.5. 

asures.    EWomers that rates low.  

nce measurence measurs are shown 

  The regulaair return on

centives 

rovides inceprocess  imsociated witustomers areitigate them

on Risk.  Unter consump

d setting utifactor.    EWThis framewween operatio  be  more ing system r

frameworktion,  less a 0ated Water tment Bylawmponent aned by Statistand  the Laburly Earning

bill comparand wastew

te  structure

WSI’s  PBR  frwater and wEWSI faces es  are  audite results, toin Section 3.

ted rates fon its investm

ntives for EWprovementsth water  coe provided wm include: 

nder PBR, EWption and w

6 of 59

lity rates usWSI’s  PBR  frwork is desigonal perforefficient, 

reliability an

k  for  2012‐20.25% efficieMain Renew

w defines  infnd 35% on a tics Canada’bour Cost cogs for Alberta

ison surveyswater  treats  and  resul

ramework  iwastewater financial peted  annuallogether with.6 and 4.6.  

r In‐City cusment.     

WSI to imprs  and  othernsumption,with stable a

WSI bears alwater quality

ing a formuramework  ened to ensumance, rateproviding  rd service qu

2016,  waterency factor,wal programflation as a w Labour Coss Annual Gromponent  isa (CANSIM S

s with varioument  rates lts  of  bill  co

ncludes  pertreatment nalties if pey  by  an  indh EWSI’s com

tomers are 

rove operatir means.    Uoperating  cnd predictab

l of the risksy, as well as

la that adjusencompasseure that capies and returatepayers  wuality.   

r  and waste plus speciam.   For PBRweighted avt componenrowth  in Alls measured Series V1603

us cities andare  reasonomparison 

rformance  csystem serverformance mdependent  ammentary o

designed to 

onal performUnder  this  fcosts,  finanble rate incr

s associateds  the  longer

sts utility raes  rates,  peital and opern on equitywith  fair,  s

ewater  treatal rate adjus purposes,  tverage rate nt. The Cons  Items CPI  fby Statistic3533).   

d local commable  and  cosurveys  are

criteria  whicvice quality wmeasures araccounting on highlights

allow EWSI 

mance whileframework, cing  costs  aeases.  Thes

d with weathr‐term  risks 

May 2015

te changes erformance erating cost y.   The PBR stable  and 

tment  rate tments for the EPCOR based 65% umer Price for Alberta s Canada’s 

munities to ompetitive. e  shown  in 

ch  provide will not be re not met. firm.    The s and areas 

to recover 

e achieving EWSI  also and  capital se risks and 

her‐related associated 

Page 10: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  7 of 59  May 2015 2014 PBR Progress Report 

with declining consumption per customer.  While EWSI expects the impacts of short‐term weather‐related  volatility  to  even  out  over  the  five  year  PBR  term,  longer  term  declines  are  of  greater concern  (see  Section  5.1.3).    In  the  current  PBR  term,  per  customer  consumption  has  been significantly  lower  than  forecast,  resulting  in  substantial  revenue  shortfalls.   Accordingly, EWSI  is reviewing  its  forecasting  process,  so  that  its  forecasts  will more  accurately  capture  long‐term trends in water consumption.  

 • Operating Cost Risk.   EWSI actively works  to minimize  fluctuations  in  input prices  through  long‐

term power contracts, chemical optimization processes, and continuous efforts to implement cost reduction strategies in all areas of its operations.   

 • Interest Risk.  Fluctuations in short‐term interest rates, long‐term debt issue costs and in the level 

of capitalized  interest have significant  impacts on EWSI’s net  income and return on equity.   EWSI mitigates  interest risk through timing of  long‐term debt  issuances and optimizing working capital, so that short‐term debt is utilized effectively, and, where practicable, advancing or delaying capital projects.   

 • Capital Cost Risk.  In‐City Water and Wastewater’s operations are capital intensive.  Over the 2012‐

2014  period,  EWSI  has  found  that  construction  costs  have  increased  at  rates  in  excess  of  PBR inflation, that a much higher than  forecast  level of capital replacements are required at the Gold Bar Wastewater Treatment Plant to maintain plant reliability, and that City‐driven LRT water main relocates  are  also  much  greater  than  forecast.    EWSI  seeks  to  minimize  these  risks  through comprehensive  capital  project  and  asset management  programs,  ensuring  that  new  projects  or changes  to existing projects are  justified and  that  there  is an appropriate  level of management, senior management and executive oversight over capital spending.   

Page 11: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

3 201 Con3.1

In 2014, al2.3% less tin  the  Resdifferences 

  

1  Annu2  Res3  Mu4  Com5  Tot   6  Aver7  Res8  Mu9  Com10  Tot   11  Mon12  Res13  Mu14  Com

 EWSI,  like per customplacing greuse water promote  wincreased term, the lower thanPBR term, for the rem

Services gress Report 

4 PBR nsumptio

though custthan forecassidential  cus in Commer

Custo

ual Consumptsidential ulti‐Residentiammercial tal 

age Monthlysidential ulti‐Residentiammercial tal 

thly Consumsidential ulti‐Residentiammercial 

many othermer.  At the seater demanefficiently awater  conseuse of wateresulting den forecast rethe trend to

mainder of th

Resultsn and Cu

tomer countst (2.9% lessstomer  clasrcial consum

 

omer Class 

tion ‐ ML 

al 

 Customer Co

al 

ption per Cus

al 

r water utilisame time, Ends on EWSInd has implervation.    Rer‐efficient aecline  in conevenues.  Wowards declhe 2012‐201

s - In-Cstomer C

ts were esse for 2012‐20ss;  differencmption.    

InConsumptand Consu

ount 

stomer ‐ m3 

ities,  is expeEdmonton’s ’s raw wateemented incesidential  cappliances ansumption phile EWSI islining reside16 PBR term 

8 of 59

City WatCounts ‐ I

ntially equa014).  As Taces  in  Mult

Table 3.1n‐City Watetion, Customumption per

A

Actua

  44,8  17,6  28,5  91,1

 232,1     3,5   18,0253,7

       16     418     132

eriencing a  loverall grow

er supply.  Aclining rate scustomers  hand by  reducer customer developingential consumand beyond

ter n‐City W

l to the PBRble 3.1 showti‐Residentia

er mer Counts r Customer

2014 

al PB

Fore 

876     47696     16572     29144     93

  

194   232522        3014      18730   253

  

6.1         8.7        42.2        1

long‐term dwth has increAccordingly, structures inhave  responcing seasonr has been gg enhanced fmption per d (see Sectio

Water 

R forecast, wws, this diffeal  consumpt

BR ecast  A

 7,236   16,708  9,301  3,245   2

  

2,130    223,465  8,221    13,816    24

  

17.0  401.8  134.0  

decline  in  reeased the toEWSI encoun the resideded  to  theal water usgreater thanforecasting customer  ison 5.1.3).      

water consumerence is contion  essenti

C 2012‐20

Actual  

31,815 51,758 86,002 69,575 

  

26,621   3,466  17,843  47,930  

  

 16.2   414.8   133.9  

sidential cootal demandrages its cuntial customse  incentivee.    In  the cun  forecast, rprocesses fos expected t 

May 2015

mption was ncentrated ially  offset 

D 014 

PBR Forecast 

 140,681  50,253  86,822  

277,756    

228,160   3,439  

 17,997  249,596  

  

 17.1   405.9   134.0  

nsumption d for water, stomers to mer class to es  through urrent PBR resulting  in or the next o continue 

Page 12: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Fina3.2

In‐City Waderived  froEWSI also with regionservice agr EWSI operprotectionexpense anthese experegional wapplicable 

N3.2.1

In 2014, colower  conmillion  gre13.3%, 2.4return on enet  incomperforman 

  

Ne

1  Reve2  Oper3  Depr4  Inter5  Net I6  Equit7  Retu

 Over 85% consumpticapital‐inte

Services gress Report 

ancial Per

ter’s net  incom  the provprovides wanal water sereement.     

rates a  fully   share  facilnd depreciatenses, calculater service Table.  Capi

et Income

ontrol of opesumption  oeater  than  it% greater thequity for th

me  and  retunce in 2012 (

et Income an

enue rating costs reciation rest Income  ty portion of urn on Equity 

of EWSI’s won can varyensive  utility

rformanc

come  includvision of waater serviceervice comm

integrated lities  and  setion, are prelated  in accocommissiontal expendit

e and Retu

erating costsn  revenue, ts  forecast nhan its approhe three yeaurn  on  equsee Append

nd Return on 

rate base  (%) 

water  revenuy significantlyy with  relat

ce 

es the reveter servicess  to surroun

missions, and

water systeervices  (theesented and ordance witns and the Ctures and rat

rn on Equi

s and lower enabling  Innet  incomeoved returnars ended 20uity  in  201ix B‐1). 

InNet Income

Equity 

ues are deriy  in any singtively  high  f

9 of 59

nues, opera within Edmnding commd fire protect

em where  Ine  “total  systanalyzed onh a cost of sity of Edmonte base are p

ity ‐ In‐City

than forecan‐City Waterand provid on equity o014 are also3  and  201

Table 3.2.1n‐City Watee and Return($ millions)

Actua 172.8  (90.4  (20.0  (22.3  40.1302.0

     13.3

ived  from cogle year becfixed  costs, 

ting costs, dmonton’s bomunities undtion services

n‐City Watertem”).    Then a total systservice modnton, is showpresented a

y Water 

ast interest cr  to  earn  ning  In‐City Wof 10.875% (o ahead of fo4  off‐settin

er n on Equity

B2014 

al PB

Fore8    174)    (90)    (203)    (21     330  303%       10

onsumptioncause of weathere  can  b

depreciationundaries.   Bder bulk wats to the City

r,  regional werefore,  opetem basis.  Indel developewn as a sepand analyzed

costs offset tet  income Water with (see Table 3orecast, witng  lower  th

BR ecast  A5.9    47.5)   (0.0)     5.1)     3.3    6.6   0.9%       

n charges  (seather  impacbe  substant

n and  intereBesides  thester supply ay of Edmonto

water serviceerating  costn‐City Watered  jointly byarate line ited on a similar

the negativeof  $40.1 ma  return on.2.1).  Net inh higher thahan  forecas

C 2012‐20

Actual 484.9  267.9) (56.2) (62.7)   98.1     n/a  11.7% 

ee Table 3.2cts and sincetial  fluctuati

May 2015

st expense se services, greements on under a 

es and  fire ts,  interest r’s share of y EWSI, the em on each r basis.    

e impact of illion,  $6.8 n equity of ncome and an forecast st  financial 

D 014 

PBR Forecast  503.4   (284.1)    (56.0)    (69.1)    94.2      n/a 

      10.9% 

2.2).   Since e EWSI  is a ons  in  net 

Page 13: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

income anevaluated 

Re3.2.2

In‐City Wamillion (3.7related  to customersforecast fo 

  

1  Consu2     Resi3     Mult4     Com5  Tota   

6  Fixed 7     Resi8     Mult9     Com

10  Tota   

11 Total Reven

12  Other13  Total 

 PBR inflatirevenue.  Ito temporaEdmonton 

Services gress Report 

d return onover the ent

evenue ‐ I

ater’s  revenu7%)  less for lower  than , was withinor 2012‐2014

Revenue by

umption Revedential ti‐Residential

mmercial al Consumpti

Charge Revedential ti‐Residential

mmercial al Fixed Charg

Consumptionnue r revenue Revenue ‐ In

on (see SectIn‐City Wateary services in 2014.    

n equity  fromtire PBR term

n‐City Wat

ues  in  20142012‐2014.forecast con $0.2 millio4 (see Table 

  

y Customer Cl

enue 

ion Revenue 

nue 

ge Revenue 

n and Fixed C

‐City Water 

tion 3.5.1) wer also had  sand water p

m year to yem, rather tha

ter 

4 were  $3.1   As  in 2012onsumption; on of  the PB3.2.2).   

InRevenue

lass 

Charge 

was within 0slightly highpermits, bot

10 of 59

ear.   Accordan any single

million  (1.82 and 2013, fixed charg

BR  forecast 

Table 3.2.2n‐City Watee by Custom($ millions)

A

Actu  

 85  26  32144

  20     0     2  23

   168

       4   172

0.25% of foreer than foreh of which r

dingly, returne year within

8%)  less  thalower than 

ge  revenue, for 2014 an

er mer Class  

2014 

ual P

For

5.4  6.1  2.6  4.1   1

  

0.1      0.9      2.9      3.9      

 8.0        17

4.8         2.8        17

ecast and, thecast Other reflect high v

n on equity n the term.  

an  in  the  PBforecast revwhich variend within $0

PBR recast  A

  91.1        24.9      32.6        

148.6          

19.9          0.9         2.9       23.7        

 72.3        

  3.6        75.9        

herefore, harevenue in 2volumes of c

is more app  

BR  forecast venues weres with  the 0.1 million o

C 2012‐20

Actual  

238.5       72.8        93.1     404.4     

  

   56.9          2.6         8.3      67.8     

 472.2     

   12.7     484.9      

ad minimal i2014, primaconstruction

May 2015

propriately 

and  $18.5 e primarily number of of  the PBR 

D 014 

PBR Forecast 

    260.4       71.9       92.6     424.9  

  

     56.9          2.5          8.3       67.7  

    492.6  

     10.8     503.4  

impacts on rily related n activity in 

Page 14: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

O3.2.3

3.2.3.1 OTotal  systemillion (5.0were allocthe PBR  foProtection2012‐2014to that of t

   

1  Salar2  Corp3  EWSI4  Custo5  Powe6  Chem7  Cont8  Mate9  Vehic

10  Othe11  Franc12  Total13  In‐Cit14  In‐Cit

Actual to fo

• Corpor

Lower reorgandecreaheadcophase staff trSharedareas, process

 

Services gress Report 

Operating C

Operating Cem operatin0%) less for ated to  In‐Corecast. The  (4.6%).   Th4,  is consistethe regional 

 Cost

ries and beneorate AdminiI Shared Servomer billing er micals ractors erials and supcles er chise fees l System Opety Water Shaty Water Sha

orecast diffe

rate Adminis

than forecanization undse  in  the  oount reductioof  this  reorgansferred fr Services,  inusing a  costs.  The net c

Costs  

Costs by Cg costs  in 22012‐2014 City Water ce  remaining e slight decent with the water custo

t Category 

fits istration ices 

pplies 

erating Costs re (%) are ($)  

erences for 2

stration ‐ $7

st Corporatedertaken  in verall  level ons and fromganization, rom EUI withn  turn, provt allocation ost savings f

 

ost Catego2014 were $(see Table 3customers thcosts were crease  in  thedecline  in I

omers.   

TaOperating C

2014 and for

7.4 million le

e Administra2013.   The of  Corporatm the transfEWSI establh EWSI’s Finvides  these  sprocess  thafrom the cor

11 of 59

ory $8.2 million 3.2.3.1‐1).  Inhrough the callocated  toe costs allocn‐City Wate

 able 3.2.3.1‐Costs by Cos($ millions)

A

Actua         40.         13.           9.           8.           8.           5.           6.           3.           2.           (0         13.      109.

82.890.

r 2012‐2014

ess than fore

ation costs first phase te  Administfer of staff alished a Shanance and otservices  to at parallels  trporate reor

(7.0%)  less n 2014, 82.8cost of servo  regional wcated  to  In‐Cer’s proporti

‐1 st Category

B2014 

al PB

Fore.1            4.1            2.5  .8             .2             .6             .1             .0             .2             .7)            .3            1.2        118%  8.4  9

4 for the Tota

ecast, $12.8 

are attributof  this  reortration  costsnd functionared Servicether adminisIn‐City Watthe Corporarganization a

than  the PB8% of total svice model, cwater  customCity Water  iion of water

BR ecast  A45.5         20.5         

‐        9.3         7.3         7.2         6.0         3.3         2.1         2.4         

13.8         17.4         3.0% 97.5 

al System in

million less f

able to an Erganization ps  charged  tos from EUI ts business ustrative stafer and  to Eate Adminisare summari

BR  forecast system opercompared tmers  (12.6%in 2014, as r consumpti

C 2012‐20

 Actual 128.1        47.4        12.2       26.7        23.1        15.8       18.0          8.7         5.9         0.8       37.3      324.0     82.7% 267.9 

clude: 

for 2012‐201

EPCOR‐wideprovided a po  EWSI,  botto EWSI.  In tunit, consoliff and functiWSI’s othertration  costized in Table

May 2015

and $16.9 rating costs o 83.0%  in %) and Fire well as  for on relative 

D 14 PBR 

Forecast    131.6       60.2              ‐       27.2       21.5       21.3       17.4          9.4          6.3          6.6       39.4     340.9  83.3% 284.1 

14 

e corporate permanent th  through the second idating  the ons.  EWSI r operating t allocation e 3.2.3.1‐2: 

Page 15: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  12 of 59  May 2015 2014 PBR Progress Report 

Table 3.2.3.1‐2 Corporate Reorganization Impacts 

($ millions)     A  B   Corporate Reorganization Impacts  2014  2012‐2014 

1  Reduction in Corporate Administration costs     (7.4)  (12.8) 2  Reduction in Salaries and Benefits    (5.0)    (5.0) 3  Reduction in Other expenses     (0.9)    (2.7) 4  Reduction in Operating Costs  (13.3)  (20.5) 5  EWSI Shared Services cost allocation      9.5  12.2 6  Net cost savings     (3.8)    (8.3) 

• Salaries and Benefits ‐ $5.4 million less than forecast, $3.5 million less for 2012‐2014.   

In  addition  to  the $5.0 million  reduction  in  Salaries  and Benefits  from  staff  transferred  to EWSI Shared Services in 2014, the net reduction in Salaries and Benefits also includes $1.0 million ($2.0 million  for  2012‐2014)  in  net  savings  from  various  cost  control  initiatives.    These  savings were partially offset by  additional  incentive plan  costs of  $0.6 million  ($3.5 million  for 2012‐2014)  as EWSI exceeded incentive plan targets for financial and operating performance.   

• EWSI Shared Services ‐ $9.5 million greater than forecast, $12.2 million greater for 2012‐2014. 

Charges from EWSI Shared Services are attributable to the corporate reorganization.   To facilitate comparability  with  the  PBR  forecast,  EWSI  Shared  Services  are  presented  as  a  separate  cost category in Table 3.2.3.1‐1.  

• Chemicals ‐ $1.6 million less than forecast, $5.5 million less for 2012‐2014. 

The decrease in chemical costs reflects savings from reduced chemical usage of $0.6 million in 2014 ($2.9 million  for  2012‐2014)  resulting  from  better  than  expected  spring  run‐off  conditions  and chemical optimization.   As noted  in 2013,  in the PBR forecast, the costs of caustic soda and alum were based on a 0% dilution factor, instead of the normal dilution factor of 50%, resulting in lower annual costs of $0.8 million in each year of the 2012‐2016 PBR term.  In June 2014, the use of the low dilution  factor was  reviewed with City Administration and  it was determined  that no  further action would be required.  The remainder of the actual to forecast variance in chemicals is related to lower than forecast chemical costs. 

• Other ‐ $3.1 million lower than forecast, $5.8 million lower for 2012‐2014. 

The $3.1 million decrease in Other operating costs is partly comprised of a $0.9 million ($2.7 million for 2012‐2014) reduction in Other costs which were transferred to EWSI Shared Services as part of the  corporate  reorganization  (see Table 3.2.3.1‐2).    Lower  than  forecast Other  costs also  reflect numerous small cost savings which, in aggregate, provide lower than forecast costs of $1.1 million ($0.1 million  for 2012‐2014).   The  remainder of  the decrease  in Other  costs  results  from higher than forecast capital overhead recoveries based on higher than forecast capitalized overhead costs of $1.1 million ($3.0 million for 2012‐2014) associated with higher levels of capital spending.  EWSI accounts  for  capitalized overhead  costs as a  credit against Other expenses.   The  increase  in  the capitalized overhead credit, combined with cost reductions in the remaining expenses in the Other cost category, placed the Other cost category in a credit balance in 2014.   

Page 16: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  13 of 59  May 2015 2014 PBR Progress Report 

• Franchise Fees ‐ $0.5 million less than forecast, ($2.1 million less for 2012‐2014). 

Lower  than  forecast  franchise  fees  in  2014  and  in  2012‐2014  result  from  lower  than  forecast revenue.    

• Actual to forecast differences in other cost categories are not significant, amounting to $0.3 million greater than forecast in 2014 ($0.6 million greater for 2012‐2014).    

3.2.3.2 Operating Costs by Operational Function EWSI’s operating costs are analyzed on a functional basis, as well as a cost category basis.  Actual and forecast total system operating costs by operational function are summarized in Table 3.2.3.2.    

Table 3.2.3.2 Operating Costs by Operational Function 

($ millions)   A  B  C  D 

 Operational Function  2014  2012‐2014 

Actual PBR 

Forecast  Actual PBR 

Forecast 1  Water Treatment Plants   30.8    33.1    89.1    96.4  2  Distribution and Transmission   23.9    22.7    67.6    65.8  3  Quality Assurance and Environment   4.5    5.0    13.7    14.5  4  Operations Support Services   4.7    8.8    19.8    26.6  5  Administrative Services  0.6    4.2   9.7    10.8  6  Customer billing  8.8    9.3    26.7   27.2 7  Corporate Administration   13.1    20.5    47.9    60.2  8  EWSI Shared Services  9.5  ‐  12.2  ‐ 9  Franchise fees   13.3    13.8    37.3    39.4  

10  Total System Operating Costs  109.2  117.4   324.0    340.9   Significant differences between 2014 actual and PBR forecast costs by Operational Function include:     • Water Treatment Plants ‐ $2.3 million less than forecast, ($7.3 million less for 2012‐2014). 

The variance for this function is primarily attributable to lower than forecast chemical costs of $1.6 million ($5.5 million for 2012‐2014).  The remainder of the actual to forecast difference is made up of numerous small items, none of which are individually significant.  

• Operations Support Services ‐ $4.1 million less than forecast, ($6.8 million less for 2012‐2014). 

Lower than forecast costs for this function include $3.6 million ($5.0 million for 2012‐14) of savings related to the transfer of personnel and functions to EWSI Shared Services as part of the corporate reorganization.  The remainder of the variance ($0.5 million in 2014 and $1.8 million for 2012‐2014) results from numerous small items, none of which are individually significant,      

• Administrative Services ‐ $3.6 million less than forecast, ($1.1 million less for 2012‐2014).    

Lower  than  forecast  costs  include $2.3 million  ($2.7 million  for 2012‐2014) of  savings  related  to transfer  of  personnel  and  functions  to  EWSI  Shared  Services  as  part  of  the  corporate 

Page 17: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

reorganthan foincentithis cat

• Actual are not2012‐2

• Actual Corpor

D3.2.4

In  2014,  tgreater forrates are uIn‐City Wain water  sregional w 

1  Gross D2  Less: A3  Total S4  In‐City 5  In‐City

In3.2.5

In  2014,  toforecast ($2012‐2014capitalizedthe propor0.6% greatrevisions to     

Services gress Report 

nization, as orecast capitve plan costtegory is ma

to forecast t significant,2014).    

to  forecastrate Adminis

epreciatio

otal  systemr 2012‐2014unchanged fter through sales  to  regiater custom

 Deprecia

Depreciation Amortization oSystem DepreWater ShareWater Share

nterest Exp

otal  system $7.3 million l4  debt  issued  interest, rertion of EWSter than foreo the cost of

well as addital overheadts of $0.6 mde up of num

differences  amounting 

t  differencestration are e

on Expense

  net  deprec4).   This diffefrom the PBthe cost of ional water 

mers’ share o

  

ation Expens

Expense of Contributioeciation Expe (%) e ($) 

pense and 

interest  exess for 2012es  and  on elated to deSI interest execast.  This df service mo

 

tional creditd costs (see illion ($3.4 mmerous sma

in other Quto $0.7 mill

es  in  Franchexplained in

ciation  expeerence resulR forecast.   service modcustomers f depreciatio

Depre

e  

ons nse 

Cost of De

xpense,  net 2‐2014).  Thishort‐term lays  in compxpense allocdifference isdel (see Tab

14 of 59

ts of $1.1 miSection 3.2.million for 2all items, non

uality Assuraion greater 

hise  fees,  C Section 3.2

ense  is  $0.2ts from slighThe proportdel is 0.6% loincreased  aon.    

Table 3.2.4eciation Exp($ millions)

A

Actu34.1  (8.425.7

  77.820.0

ebt  

of  capitalizeis differenceborrowingspleting majoated to In‐Cs attributableble 3.2.5). 

illion ($3.0 m.3.1).  These2012‐2014).ne of which 

nce and Wathan forecas

Customer  bi.3.1 above. 

2 million  grehtly higher ation of net dower than foat  higher  th

pense 

2014 

ual P

For1   34)    (7   28%    780  2

ed  interest e results from,  as  well  aor capital prity Water the to change

million for 20e savings we The remainare individu

ater Distribust in 2014 ($

illing,  EWSI 

eater  than  fasset balancdepreciationorecast, primhan  forecast

PBR recast 3.4  7.9) 25.5  8.4%   20.0 

is  $3.8 millm historicallas  higher  throjects (see hrough the cs in allocatio

012‐2014) frere offset bynder of the vually significa

ution and Tra$1.0 million 

Shared  Se

forecast,  ($0ces, since den expense amarily becaut  rates,  incr

C 2012‐20

Actual 96.4   (23.8) 72.6   77.4% 56.2 

ion  less  thay low interehan  forecastSection 3.3)cost of servicon processe

May 2015

rom higher y additional variance in ant. 

ansmission greater for 

rvices  and 

0.8 million epreciation llocated to use growth reasing  the 

D 014 

PBR Forecast 94.8   (23.0) 71.8  

  78.0% 56.0 

an  the  PBR est rates on t  levels  of ).    In 2014, ce model is s following 

Page 18: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

 

Int

1  Interes2  Capital3  Interes4  Averag5  Averag6  Total Sy7  In‐City 8  In‐City 

Cap3.3

EWSI provthe beginnprojects  anchanged.  Ato  addressrequiremecapital exp Over half oprojects in

• Constru• Rehabi• Relocat

bridge • The Ac

The remain

• Addres• Meet h• Mainta

useful • Improv• Provide

Total systeprojections 

Services gress Report 

terest Expens

t expense ized interest t expense, nee Debt Balane Cost of Debystem IntereWater Share Water Share

pital Expe

ides the Cityning of eachnd  in  aggregAs well, in ss  the  challents.    Accordpenditures.   

of  total systclude:  

uction projelitation and tion of transwork; and  celerated W

nder of In‐Ci

ss current anhealth and saain reliabilitylives;    ve operatione general fac

em actual ans of total spe

 

se and Cost o

et of capitalizece bt st Expense  (%) 

e ($) 

enditures 

y with a five PBR term. gate, may dome circumenges  of  agdingly,  over 

tem capital 

cts to accomrevitalizatiosmission and

Water Main R

ity Water’s c

nd upcomingafety requirey and manag

nal efficiencycilities that d

nd PBR forecending over 

Interest Exp

of Debt  

ed interest  

e year forec Over the Pdiffer  from  tstances, proging  infrastrr  the  PBR  te

program ex

mmodate prion projects dd distributio

Renewal prog

capital progr

g regulatory ements;   ge risk by reh

y and lower fdirectly affec

cast capital the 2012‐20

15 of 59

Table 3.2.5pense and C($ millions)

Actua   29.6     (1.3   28.3  567.0    4.99%  28.3 

     78.8% 22.3

cast of capitaPBR term, acthe PBR  foreojects will beucture,  to  berm,  differe

penditures 

ivate develodriven by Cityn mains as r

gram.   

ram includes

requiremen

habilitating 

future costs;ct EWSI staff

expenditure016 PBR term

Cost of Debt 

B2014 

l PB

Fore    32)     (0     320   570%        5.    32%       78

  25

al expendituctual capitalecasts  as pre added to obetter  respences will  ar

relate  to Cit

opment growy departmenrequested b

s projects ne

nts;  

or replacing

; and  f.    

es for 2014 am are summ

 

BR ecast  A2.7 0.6)   2.1  0.9  .62% 2.1  8.2%     5.1 

ures for the l expenditurrojects  are  aor removed ond  to  growrise  betwee

ty‐driven ca

wth within thnts;  y the City to

eeded to:  

g existing ass

and 2012‐20marized in Ta

C 2012‐20

Actual  84.9   (3.0)  81.9  

  

81.9   76.6% 62.7 

total waterres, both onadvanced, dfrom capitawth,  or  to en  actual  an

apital projec

he city; 

o accommod

sets at the e

014, as well ble 3.3.   

May 2015

D 014 

PBR Forecast  91.0   (1.8)  89.2  

  

89.2    77.5% 69.1 

r system at n  individual delayed, or l programs meet  City 

nd  forecast 

ts.     These 

date LRT or 

end of their 

as current 

Page 19: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

 

1  City‐D2  Acc

Prog3  Rea4  Priv

T5  Wat6  Proj7  Sub   

8  Other9  Ros

10  Ros11  Proa12  Wat13  Met14  Plan15  Proj16  Sub

   17  Total 

Ci3.3.1

Actual to P

• Accele2014 a

This prscheduon thisCity pa

• Reactivless ov

This  prbased 2014 afor rep

Services gress Report 

 

Capital Pro

Driven elerated Watgram ctive Renewavate DevelopmTransmission ter Main Relojects < $10 Mb‐total: City‐D

r  sdale Sodiumsdale Laboratactive Renewter Main Cathter Change Ont Residuals jects < $10 mb‐total:  Othe

Capital Expe

ity‐Driven 

PBR forecast 

rated Watend $0.6 mill

ogram suppuled to be res program ovving program

ve Renewal er the 2012‐

rogram  invoon past brend  for 2012

placement un

oject 

ter Main Rene

al Program ment Mains ocations Million  Driven 

m Hypochlorittory Building wal Program hodic Protectuts 

million  r  

nditures 

Capital Pr

variances fo

r Main Reneion less over

ports the Cityhabilitated bver the 2012m plans. 

‐ $1.4 millio‐2016 PBR te

olves  the  reak histories 2‐2014 resulnder this pro

Capital Ex

A

Actua

ewal   18.8

   9.6   6.6

   9.6   4.9  49.5

e      5.1    11.7

    1.2ion  2.0

   2.6   0.2 27.0 49.8

  99.3

rojects 

or City‐drive

ewal  ‐ $1.2 r the 2012‐2

y’s request fby the City’s2‐2016 PBR 

on less than erm). 

ehabilitationand customt  from  feweogram.  Tota

16 of 59

Table 3.3penditures ($ millions)

B 2014 

al PBR 

Forecas 

8    20.0 

6    11.0 6      5.2 

6      2.2       2.5 

5    40.9              ‐

7          ‐       2.5 

0   2.0 6      2.3       2.1 

0     23.7 8     32.7 

3   73.6

n capital pro

million  less 2016 PBR ter

for EWSI to s Transportaterm are ex

forecast ($0

  or  replacemer service  ier main breaal expenditu

by Project 

C 201

st  Actual

   61.8 

    34.7     16.6 

    11.6     12.2    137.0 

  

    14.9      15.5       7.4   5.8        7.0        5.8      75.8 

 132.2  

 269.2 

ojects in 201

than forecarm).  

replace wattion Servicexpected to b

0.3 million le

ement  of  seinterruptionaks resultingures on this

D 12‐2014 

PBR Forecast 

   60.0  

   35.0     15.4  

     7.8       7.4   125.5  

  

   17.0     12.3       7.5  

6.0       6.9       4.8     68.4   122.9  

  248.5  

14 and for 20

ast ($1.8 mi

ter mains unes departmebe close to f

ess for 2012

everely  detens.   Actual tog  in  fewer wprogram ov

E 2012‐

Current Projection

 99.4 

55.7 30.0 

21.2 20.1 

226.4   

15.6 26.1 12.3 9.8 

12.3 5.8 

131.0 212.8 

 439.2 

012‐2014 inc

llion greater

nder roadwant.  Total exorecast, dep

‐2014 and $

eriorated  wao forecast vwater mainsver the 2012

May 2015

F ‐2016  

PBR Forecast 

 100.0  

    56.0     26.1  

   10.0     12.5   204.6  

  

    17.0      12.3      13.0  10.0  

    11.7      12.1    120.2    196.3  

     400.9  

clude: 

r for 2012‐

ys that are penditures pending on 

$0.3 million 

ater mains ariances  in s qualifying 2‐2016 PBR 

Page 20: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

term aconditi 

• Privatefor 201

EWSI anetworprivatecost ofanticipsubdivimatch 

• Water 2014 a

These expansresult  iwith pr

• City Drfor 201

These C

o Disand

o Waof l

o New

Higher of consreplacipurcha

O3.3.2

Significant include: 

• Rossdaand $1

This prwater related

Services gress Report 

re expectedons over the

e Developme12‐2014 and 

and private drk to new sue developersf this prograated populaision plans; historical lev

Main Relocnd $11.3 mi

projects  incsion.   EWSI ein higher  throjected cost

riven Capita12‐2014 and 

City‐driven p

tribution Syd appurtena

ater Service ead services

w Water Me

than forecastruction acng  lead  sersed from US

Other Capit

actual  to  P

ale Sodium H.3 million les

oject includtreatment  pd, because  t

d to be on tae last two ye

ent Transmi$3.8 million

developers subdivisions. s  to extend m  is consistation growthas of April vels, with a s

ation Projecllion greater

clude  the  cexpects thatan  forecast ts exceeding

l Projects < $7.6 million

projects con

ystem Modifnces to elim

Connections; and   

eter Purchas

ast costs for tivity associrvice  lines  aS suppliers.  

tal Projects

PBR  forecas

Hypochloritess over the P

es the constplant.    Highhis project w

arget, with ears of the P

ission Mainsn greater ove

share  in the This projecthe  transmitent with theh.  EWSI cont2015  the paslight reduct

cts ‐ $7.4 mir over the 20

osts  of  watt the  large ncosts  to  In‐g the 2012‐2

$10 Millionn greater ove

sist of three

fications, whinate conflic

ns for  infill d

ses and Insta

these prograted with gand  increas 

st  variances 

e – $5.1 millPBR term) 

truction of aher  than  forwas  resched

17 of 59

the potentiaBR term.  

s – $1.4 miller the 2012‐

e costs of exct representsission netwoe  increase  intinues to woace of  subdtion in May 

illion greate012‐2016 PB

ter  main  renumber of c‐City Water2016 PBR for

n ‐ $2.4 millier the 2012‐

 main progr

hich includescts arising fr

evelopment

allations for

ams reflect growth  in Edes  in  contr

for  Other 

lion greater 

an on‐site sorecast  expeduled  from 

al to be und

ion greater t‐2016 PBR te

xtending EWs the reimbuork  to new n residentiaork with devdivisions bein2015. 

r than forecBR term).   

elocations  nconflicts witover  the  rerecast by $1

on greater t‐2016 PBR te

ams: 

s relocating rom City of E

ts or redeve

r new In‐City

several key dmonton’s practor  and  m

capital  proj

than foreca

odium hypocnditures  on2011‐2013  t

der target, d

than forecaserm).   

WSI’s distribuursement ofsubdivisionsl developmevelopers to idng  submitte

cast ($3.8 mi

eeded  to  ah existing tremainder of 1.3 million.  

than forecaserm).   

or modifyinEdmonton pr

elopments, a

y Water cust

factors, inclpopulation, material  co

jects  in  201

st ($2.1 mill

chlorite genn  this  projecto 2011‐201

depending o

st ($1.3 milli

ution and traf the costs is.   The  increent needed dentify theired  for desig

illion greate

ddress  the ransmission the current   

st ($4.9 milli

g existing wrojects;    

as well as re

tomers.   

uding the hian  increasests,  especia

14  and  for 

lion less for 

erator at thct  in  2014 14,  so  that e

May 2015

on weather 

ion greater 

ansmission ncurred by ease  in  the to address r upcoming n approval 

r for 2012‐

City’s  LRT mains will t PBR  term 

ion greater 

water mains 

eplacement 

igh volume d  focus on ally  meters 

2012‐2014 

2012‐2014 

e Rossdale are  timing experience 

Page 21: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

gained expects

• Rossda2014 a

This prpersonof  this million

o DisarcImpAlb

o Soirem

o Addaddres

• Proactiless ov

This  prwater water q2012‐2advancexpecte

• Plant R$6.3 m

This prplants. Develoreducinexpend

• All Othand $1

Rat3.4

In  2014,  tforecast  (sexpenditurrate base i

Services gress Report 

from  similas that, when

ale Laboratond $13.8 mi

oject includenel.  The scoproject,  nogreater tha

covery of hiheological  fpact  Assessmberta Culture

l conditions mediation wo

ditional  deladitional  stafulted in incr

ive Renewaer the 2012‐

roject  is  vermains  in oldquality, fire 2013 result  fced to 2012 ed to be clos

Residuals – illion less ov

rogram  cons EWSI has r

opment  (AESng alum  resditures on th

her Projects 0.7 million g

e Base an

he  total  syssee  Table  3res describeis projected 

ar work  at n completed

ory Building llion greater

es the constope of this pow  expectedn forecast.  

storical artiffieldwork  anments  Repoe. 

were muchork, which in

ays  as  EWSIfing movemreases in floo

l ‐ $1.3 millio‐2016 PBR te

ry  closely  tieder  areas wprotection, from  timing and 2013.  Tse to target.

$1.9 millionver the 2012

sists of  alumreviewed treSRD)  and  ididuals  impahis program 

‐ $3.3 milliogreater over 

nd Return

stem  net  ra3.4‐1).    EWed  in Sectionto exceed t

E.L.  Smith  c, the total co

‐ $11.7 milr for the 201

ruction of a project has cd  to  be  comDelays in pr

facts on thend  consultatort  could  be

h different  frncreased cos

  identified ments  resultor space and

on less thanerm). 

ed  to  Reactwhere waterand systemdifferencesTotal expend.  

n  less than t2‐2016 PBR t

m  sludge  treeatment optdentified  dicts on  the  rby $6.3 milli

on greater tthe 2012‐20

n on Equi

te  base waWSI’s  currenn 3.3 will ache PBR fore

18 of 59

could  be  levost of this pr

lion greater 12‐2016 PBR

new laboratchanged signmpleted  in  2oject comple

e site prior totion with  ine  completed

rom what hsts and furth

and  assesseing  from  thd correspond

 forecast ($0

tive  Renewa mains do n

m reliability. s; work origiditures on th

he PBR  foreterm).   

eatment  andtions with Alirect  filtratiriver.   The uion over the

han the PBR016 PBR term

ity 

s  $957.2 mt  projectionccelerate capecast by $40

veraged  to  rroject will be

 than forecaR term).   

tory buildingnificantly fro2015,  is  projetion and ch

o the planneterest  groud  and  Appr

had been exher delayed 

ed  options  fhe  corporateding increase

0.1 million le

al  and  includnot  conform Actual to finally  forecahis program 

ecast  ($1.0 m

d de‐chlorinlberta Enviroon  as  the use of directe 2012‐2016 

R forecast ($m).  

million, within  is  that  thpital spendi0.7 million (3

reduce  totae $1.3 millio

ast ($3.2 mi

g with officeom the forejected  to  behanges in sco

ed start of cps,  before  aroval  to  Con

pected, resuconstruction

for  construce  reorganizaes in project

ess for 2012

des  replacem  to  currentforecast variast  for 2014over the 20

million great

nation of waonment andmost  cost‐t  filtration hPBR term.  

$7.4 million 

n  $2.7 millihe  proposeng  in 2015 3.8%) at the 

l  expendituon less than f

llion greater

e space for scast and thee  $26.1 milope reflect: 

constructiona Historical nstruct  rece

ulting  in unan of the base

ction  to  accoation.    Thest costs.    

‐2014 and $

ments  or  ut design  staiances  in 20 and  future 012‐2016 PB

ter  for 2012

aste  streamsd Sustainable‐effective  sohas  reduced

greater for 

ion  (0.3%)  oed  increase and 2016, send of the 

May 2015

res.    EWSI forecast.   

r for 2012‐

ome water e total cost lion,  $13.8  

n, requiring Resources eived  from 

anticipated ement.  

ommodate se  changes 

$0.7 million 

pgrades  of ndards  for 014 and for years was 

BR term are 

2‐2014 and 

s  from  the e Resource olution  for d projected 

2012‐2014 

of  the  PBR in  capital 

so  that  the 2012‐2016 

Page 22: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  19 of 59  May 2015 2014 PBR Progress Report 

PBR  term.   Since  In‐City Water’s  share of  the 2016  rate base  is expected  to be  lower  than  forecast, because of relatively higher consumption growth for the regional water customers, the overall impact of the increase in capital spending on In‐City Water is not expected to be significant (see Section 5.1.1), amounting to a 1.2% increase in the 2016 rate base allocated to In‐City Water.    

Table 3.4‐1 Rate Base – Net of Contributions 

($ millions)      A  B  C  D 

Mid‐Year Rate Base  2014  2016 

 Actual 

PBR Forecast 

Current Projection 

PBR Forecast 

1  Property, Plant and Equipment, opening balance     1,214.7     1,232.7    1,402.6    1,371.1  2  Additions           92.1          74.4    76.0    83.0  3  Retirements/Transfers           (5.4)           (3.5)   (9.6)   (3.6) 4  Property, Plant and Equipment, closing balance     1,301.4     1,303.6    1,469.0    1,450.5             

5  Accumulated Depreciation, opening balance         311.0        313.5    348.1    358.1  6  Depreciation Expense                25.7         25.5    29.5    27.2  7  Retirements/Transfers        (5.2)           (3.5)   (9.6)   (3.5) 8  Accumulated Depreciation, closing balance         331.5       335.5    368.0    381.8             

9  Mid‐Year Property, Plant and Equipment     1,258.1     1,268.2    1,435.8    1,410.8  10  Mid‐Year Accumulated Depreciation      (321.3)  (324.5)   (358.1)   (370.0) 11  Mid‐Year Net Property         936.8        943.7    1,077.7    1,040.8  

           12  Add: Working Capital           18.0          14.4    18.9    15.6  13  Add:  Average Materials and Supplies             2.4            1.8   2.4  1.9 

           14  Total System ‐ Mid‐Year Rate Base         957.2        959.9    1,099.0    1,058.3  15  In‐City Water Share (%)  78.3% 79.9%  78.4% 80.5%16  In‐City Water Share ($)         749.4       766.7   862.1  852.3  Total returns on In‐City Water’s rate base are shown in Table 3.4‐2.  In 2014, the total return on In‐City Water’s  rate base was $4.0 million greater  than  in  the PBR  forecast.   This difference  reflects higher than forecast net income (see Section 3.2.1), partially offset by lower cost of debt (see Section 3.2.5).      

Page 23: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

  

1  Mid‐ye   

2  Capita3  Capita   

4  Cost o5  Cost o6  Weigh   7  Return8  Return9  Return

 

Wat3.5

In3.5.1

In‐City Wawith  the Elimited to over 2013.special  ratservice charate adjust

  

1  Curre2  Con3  Lab4  We5  Less6  Curre7  Prior y8  PBR In

Services gress Report 

ear Rate Base

l Structure ‐ Dl Structure ‐ E

f Debt f Equity ted Average 

n on Mid‐yearn on Mid‐yearn on Mid‐yea

ter Rates

n‐City Wat

ter rates coEPCOR Wateinflation plu.   This  increate  adjustmearge increasetments appli

nt year forecnsumer price our  ighted inflatios:  Efficiency fnt year forecyear forecast nflation Adju

Return on

Return o

e Allocated to

Debt (%) Equity (%) 

Cost of Capit

r Rate Base Fir Rate Base Fir Rate Base  

s and Bill 

er Rates 

nsist of coner  Services  aus special ratase  includesnt  for  the Aes were limiicable to fixe

Impact o

PBR Infla

cast inflation index  

on  factor cast inflation to actual inflstment for 20

n In‐City Wa

 

on Rate Base 

o In‐City Wate

al  

inanced by Dinanced by Eq

Compari

sumption chand Wastewte adjustmes the 2014 PAccelerated ted to the 2ed monthly s

of PBR Inflat  

ation  

 

lation adjustm014 

20 of 59

Table 3.4‐2ater Share of($ millions)

 

er 

ebt quity 

sons 

harges and fwater  Treatmnts.  In 2014PBR  inflationWater Main014 PBR inflservice charg

 Table 3.5.1ion on 2014

ment 

f Mid‐Year R

fixed monthment Bylaw,4, water conn adjustmenn Renewal plation adjustges in 2014.

4 In‐City Wat

We

63

Rate Base 

A

Actu749

5940

4.913.28.3

224062

hly service ch,  annual wansumption rat of 1.9% (sprogram of tment, since.   

ter Rates A  

eight   Ac 

65%    135%  3   2   0  2    (     1

A 2014 

ual  PB9.4 

 9.7% 0.3% 

 99% 28% 33% 

 2.3 0.1 2.4  

harges.  In aater  rate  incates increaseee Table 3.51.1%.    Fixe

e there were

B 2014

ctual  PBR 

1.80% 3.10 2.26 0.25 2.01 (.07) 1.94% 

May 2015

BR Forecast 766.7  

 60.0% 40.0% 

 5.46% 10.88% 7.63% 

 25.1  33.3  58.4  

accordance creases  are ed by 3.0% 5.1), plus a ed monthly e no special 

R Forecast  

  1.96% 3.56 2.52 0.25 2.27 ‐ 

  2.27% 

Page 24: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

W3.5.2

In‐City Wat • Reside

with  thconserv

• Multi‐Rrate strindividincreasAccord

• Commechargewide ra

W3.5.3

Water bill four  local fixed charg

3.5.3.1 RFigure  3.5consumpticonsumpti  

Services gress Report 

Water Rate

ter has three

ntial Customhree  consuvation and p

Residential ructure withual  multi‐reses.  As wellingly, a decl

ercial  Custod based on ange of aver

Water Bill C

comparisoncommunitieges, consum

Residential .3.1  provideon  of  16.2 on per custo

 Structure

e customer c

mer Class.  Rmption  blocprovide ince

Customer Ch three consesidential  c, there is a wining rate st

omer  Class. a declining

rage consum

Compariso

s for 2014 aes.   These biption charge

Water Billes  a  comparm3  per monomer in Edm

 

 by Custom

classes.  The

Residential ccks.    The  intives for re

Class.   Multisumption blocustomers  dwide range tructure best

  Similar  to g  rate  structmption volum

ns to Othe

are based onll comparisoes and any o

s rison  of  resnth.    This  lemonton over 

21 of 59

mer Class

ese classes a

ustomers arnclining  ratesidential cus

‐residential ocks.  EWSI declines  as of consumpt reflects the

multi‐resideture, but wimes within th

er Commu

n surveys ofons represenother applica

idential  houevel  of  consthe 2012‐20

and their rate

re charged bte  structurestomers to u

customers has found tthe  size  o

ption volumee cost chara

ential  custoth  five  conshis customer

nities  

f Calgary, Vant the total able surchar

usehold watsumption  is 014 period (

e structure i

based on an ie  is  intendeuse water ef

are chargedhat the costof  the  mules for multi‐cteristics of 

omers,  commsumption blr class. 

ancouver ancost to the ges. 

ter  bills  for equal  to  thsee Section 

include: 

inclining rateed  to  promfficiently.  

d based on at of providinlti‐residentia‐residential cthis custom

mercial  custlocks  to  rec

d Winnipeg,customer a

residential he  average 3.1).    

May 2015

e structure mote  water 

a declining ng water to al  building customers. 

mer class.     

tomers  are ognize  the 

, as well as and  include 

household Residential 

Page 25: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  22 of 59  May 2015 2014 PBR Progress Report 

Figure 3.5.3.1 Average Edmonton Monthly Residential Water Bill in 2014 

(16.2 m3/month) 

 Figure  3.5.3.1  shows  that  Edmonton’s  residential  water  bills  are  competitive  with  surrounding communities and other major cities in western Canada. Further: 

• Edmonton has the challenge of a poor raw water source compared to some other cities and must conduct additional treatment.   For example, Vancouver only disinfects water with chlorine which results in lower water treatment costs. 

• Different water rate structures also affect bill amounts.   For example, EWSI pays an 8% franchise fee to the City of Edmonton, whereas St. Albert has no franchise fees.   

3.5.3.2 Commercial Water Bills Table 3.5.3.2 provides a comparison of the water bills for typical commercial customers in each of In‐City  Water’s  five  consumption  blocks.    This  table  shows  that  water  bills  for  EWSI’s  commercial customers are competitive with those of surrounding communities and other major cities  in western Canada.   

    

$0

$5

$10

$15

$20

$25

$30

$35

$40

$45

$50

$/m

onth

Tax Levy

Page 26: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

 

1  Mont   

2  Avera3  Van4  Edm5  Win6  St. A7  Calg8  Stu9  She

10  Spr1 Reflects weig

PBR3.6

Water Systtracking ofPBR  regulabasis with achieved. applied if Emain  breameasures, Accordinglthe  actual worse than 

Services gress Report 

 

Commun

thly Consump

age Bill ‐ $ pencouver1 monton nnipeg Albert gary rgeon Countyerwood Park uce Grove ghted average of

R Operati

tem Service f these five iatory enviro100  base  p  Bonus  poinEWSI does naks,  a  lowesuch  as  thy, to provideoutcome w

n the standa

Comm

nity 

ption ‐ m3 

er month   

f seasonal water

ng Perfo

Quality  is mndices is int

onment.   Pepoints  availants  are  avainot meet ther‐than‐standhe  Planned e for greatewas  better  trd. 

 

Tmercial Mon

($

ConveSt

1

  2      

r rates 

rmance M

measured bytended to enrformance uable  if  the ilable  for  pee 100 base pdard  score Constructior clarity, actthan  the  sta

23 of 59

Table 3.5.3.2nthly Water$ per monthA enience tore 

RS

10   18  21  23  25  33  26  28  26  

Measures

y the resultsnsure that syunder each standards  foerformance point standarepresents n  Factor,  a ual outcomeandard  or  “B

2 r Bill Compah) B 

Retail Store  Re

50 

 60   76   80   89  

 102   106   117   128  

s of five  indiystem servicindex  is meor  all  five  pabove  stanrd.  For somperformanhigher  sco

es have beeBelow  Stand

rison 

staurant 

250   

280 350 367 409 365 636 569 638 

ices prescribce quality is easured  indeperformancedards  and  f

me performace  above  sre  indicatesn noted as “dard”,  if  the

Hotel 

2,000   

 2,191   2,489   2,741   3,209   2,116   4,923   4,496   5,100  

bed  in the Bmaintained ependently e measure  ifinancial  pence measurstandards.   s  better  per“Exceeded Se  actual  out

May 2015

Hospital 

10,000   

 9,211   9,511  

 13,221   16,009   10,086   23,323   22,016   25,500  

Bylaw.   The within the on a point indices  are nalties  are res, such as For  other rformance.  tandard” if tcome was 

Page 27: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Sy3.6.1

The Systemof the watmeasures i

PerformaMeasur

Water MainBreak Facto

Water MainBreak DuratFactor 

Planned ConstructioFactor 

Water PresFactor 

Water Loss Factor  

 2014 Highl

• Water resultebelow prografuture 

Services gress Report 

ystem Reli

m Reliability erworks systin this index

nce re n or 

The nubreaksreport

n tion 

The pebreaksfrom toff 

on The nucomplconstrprocedconstrpercenconstr

sure  The nuyear wis beloconsecWaterInfrastperforquantidistribfor thelosses 

lights 

Main Breaked in an overthe  PBR  sms.    These years. 

iability Ind

Index is a mtem.  In 201. 

PBR Measuumber of wates that occurredting period ercentage of ws repaired withthe time the wa

umber of timesies with requirruction notificadures and met ruction timelinntage of the toruction events umber of incidwhere the wateow 20 psi for twcutive 15‐minur loss is measurtructure Leak Irmance indicatifying how welbution system ie control of rea

k Factor.  Altrall increase standard,  hiprograms  a

dex 

measure of t14, In‐City W

System

ure r main d in the 

water main hin 24 hours ater is shut 

s that EWSI red ation 

es as a otal planned 

ents per er pressure wo or more ute periods red by the ndex,  a or l a water s managed al water 

though the hin water maighlighting are  expected

24 of 59

the confidenWater exceed

Table 3.6.1m Reliability

 

Standard 

574 

93.7% 

95% 

3.0 

M

high numberain breaks ovthe  effectivd  to  continu

nce that cusded standard

y Index 

ActualScore 

392 

91.2% 

96.4% 

1.27 

Index StanAvailable B

Maximum AvaiTotal ATotal Po

r of water mver 2013, waveness  of  Eue  to  reduc

stomers can ds for four o

Actual Outcome 

Exceeded standard 

Below standard 

Exceeded standard 

Exceeded standard 

Exceeded standard 

ndard Points Bonus Points  ilable Points Actual Points oints Earned 

main breaks iater main brEWSI’s  watece  the  numb

place in thef the five pe

AvailablePoints 

5.0 

5.0 

5.0 

5.0 

5.0 

25.0         3.5 

28.5   

in February reaks in 2014er  main  reber  of main

May 2015

e reliability erformance 

Actual Points 

6.6 

4.9 

5.1 

5.8 

7.9 

30.328.5

and March 4 were still eplacement n  breaks  in 

Page 28: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

• Plannetrackinfor this

• Water 3.0  stawithin unaccounders

 Areas for I

• Water 2014) toccurrewithin hours, suppor20 houdue to field stbreakswinter 

W3.6.2

The Waterexceed In‐the standaGuidelinesWater exce 

PerformanMeasur

Water QuaIndex 

 

Services gress Report 

ed  Construcg practices s factor.  The

Loss Factor.andard.    Thithe distribuounted  for tand trendin

mprovemen

Main Breakthat occurreences where24 hours, 2.EWSI providrt affected cuurs repair duthe potentitaff to suppo.  EWSI will weather eve

Water Qual

r Quality  IndCity Water’sards set out   for Waterweeded the st

nce e 

lity  The pewater qEWSI’sregulat

ction  Factorand proceduese efforts w

.  In 2014, EWs  result wastion systemwater  losseng data. 

nt 

k Duration ed during exte repair dura.5% lower thdes temporaustomers.  Euration to deal for the reort performcontinue toents.   

lity Index 

dex  is  calcus  internal win Alberta Eworks Systemtandard for t

PBR Measu

ercentage of Edquality tests ths internal standtory measures 

 

r.    Enhanceures continuwill be contin

WSI’s Infrasts  achieved  t.  EWSI will es  to  furth

Factor.   Thetreme cold wations exceehan the stanary water taEWSI also haetermine if aepair timelinance of exiso assess seas

lated  as  theater quality nvironmentms, and Schthis index. 

Wat

ure 

dmonton hat meet dards and 

25 of 59

ements  to ue to contribnued in 2015

tructure Leathrough  exccontinue to her  improve

e high numbweather in Feded 24 houndard of 93.7nks and delis a triage pradditional sune to exceedsting crews asonal staffin

e  percentagstandards. 

t and Sustainedule 3 of E

Table 3.6.2er Quality In

 

Standard 

99.6% 

M

planned  cobute to EWS5 for the con

ak Index wascellent man explore opte  its  Infrast

ber of wateFebruary anrs, resulting7%.  If mainivers water rocess for allupport is red 24 hours.  and  improveng  levels to 

ge  of water  At a minimnable ResouEWSI’s Appr

ndex 

Actual Score 

99.8% 

Index Stan

Available BMaximum Avai

Total ATotal Po

nstruction SI’s ability tonstruction pr

s 1.27, signifagement  antions to helptructure  Le

er main breand March, 20g in 91.2% ofn break repajugs to propl water mainquired for tIn 2015, EWe the timelymore effect

quality  testmum, these surce Developroval to Ope

Actual Outcome 

Exceeded standard 

ndard Points 

Bonus Points  ilable Points Actual Points oints Earned 

notification o exceed throjects unde

ficantly bettend  tracking p identify aneak  Index  a

aks  (147 of 014  resultedf main breakir duration eperties as nen breaks thahe affected WSI will hirey repair of wtively addres

t  results  thastandards arpment’s Stanerate.    In 20

Available Points 

25 

25.0 

0.5 25.5   

May 2015

and  time e standard ertaken. 

er than the of  leakage nd quantify and  better 

the 389  in d in eleven ks repaired exceeds 24 ecessary to t approach customers  additional water main ss extreme 

at meet  or re equal to ndards and 014,  In‐City 

Actual Points 

25.1 

25.125.1

Page 29: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

2014 Highl

In  2014, radiochemconductedand of thotests,  enhaimplementtraining.  T

Cu3.6.3

The CustomWater’s  ovperforman 

PerformaMeasur

Post ServiceAudit Facto

Response TFactor 

Home SniffFactor 

2014 Highl

• Homeimprovattribuin  parpotentstrateg

Services gress Report 

lights 

EWSI  met mical, chemic, only 91 didse, only threanced  trainted in 2014 Training is co

ustomer S

mer Serviceverall  level nce measure

nce re e or 

The pecustomserviceDispatstaff a“comp

Time  The avto cononce adispat

ing  The pecommfavourodour season

lights 

 Sniffing Facving  performuted to the erticular  addrtial precursogies accordin

Guidelines cal and physd not meet tee did not ming  for  samfor all waterontinuing in 2

ervice Ind

  Index  is a of  service. s in this Inde

PBR Measercentage of sumers who ratede experience wtch personnel as “very satisfiepletely satisfiedverage numberfirm a water ma call is receivech office ercentage of vounity memberrably assess drduring the sprn 

ctor.    In 201mance  fromeffective useressing  the ors of chloringly.  

for  all  Cansical paramethe requiremmeet Approvmpling  technr samplers.  2015 for all 

ex 

measure of  In  2014,  Iex. 

Custom

sure urveyed d their with Water and/or field ed” or d” r of minutes main break ed by the 

olunteer rs who inking water ring run‐off 

14, EWSI excm  94.8%  in e of carbon chlorinous nous odour

26 of 59

nadian  Drinketers.  Of  thments of EWal to Operatniques  and By the end new sample

f the  level on‐City Wate

Table 3.6.3mer Service 

Standard 

74.0% 

25 

93.8% 

Ma

ceeded the 2013  to  95dosing to imodours  notes on a daily

king  Water e 55,784 ap

WSI’s internate standardsselection  ofof the year ers. 

of  satisfactioer  exceeded

 Index ActualScore  O

73.6%  S

21  Es

95.7%  Es

Index StandaAvailable Bon

aximum AvailaTotal ActTotal Poin

standard fo5.7%  in  201mprove the ed  in  2013y basis and a

  Quality  hepplicable waal lab qualitys.  Followingf  appropriatover 120 sa

on  that  custd  standards 

Actual Outcome 

A

Below Standard 

Exceeded standard 

Exceeded standard 

ard Points nus Points  ble Points  tual Points nts Earned  

or this perfo14.    These  itaste and odthrough  anadjusting sp

ealth‐based ater quality y managemeg review of tte  sample  pamplers com

omers placefor  two  of 

AvailablePoints 

6.66 

6.67 

6.67 

20.0   3.0  23.0 

  

ormance meimprovemendour of trean  initiative  tring run‐off 

May 2015

limits  for tests EWSI ent system, hese failed points  was mpleted the 

e  in  In‐City the  three 

Actual Points 

6.62 

7.71 

6.81 

21.221.2

asure, also nts  can  be ated water, to monitor treatment 

Page 30: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Areas for I

• Post SemeasuexperiecompleenableimprovOperat

En3.6.4

The Envirocontribute2014, In‐Ci 

PerformanMeasur

Emergency Response Training 

Completeneand Timelinof ReportinEnvironmenIncident ManagemeWater ConservatioFactor 

Watershed Program Activity  

 

 

Services gress Report 

mprovemen

ervice Auditre.    EWSI ence  surveyetion of worresources t

vement.    Thtors are expe

nvironmen

onmental Inds to the Cityity Water me

nce e 

The nuexercisyear 

ess ness g 

The pereport

nt 

nt 

The nuprevenincide

on The 10water Edmonhouse# of de

nt  

t Factor.  In has  since y  timing  tork and by  imo be focusedhese  initiatiected to imp

nt Index 

dex measurey’s ten‐year set or exceed

PBR Measu

umber of practses undertaken

ercentage of ints completed 

umber of reporntable environnts 0 year average consumption nton residentiahold eliverables com

 

2014, EWSI implementeo  ensure  thmproving mod on the woves,  togethprove custom

es In‐City Wstrategic goaded all stand

Envir

re 

tice n in the 

ncident 

rtable and mental 

monthly in m3 per al 

mpleted

27 of 59

was margined  two  prohat  survey onitoring anrking groupsher  with  immer service i

Water’s effortal to “Preserards in this 

Table 3.6.4ronmental In

 Standard 

100% 

19.0 

Ma

nally below tocess  improproviders

nd analysis os that most 

mproved  traiin 2015. 

ts to  limit  itrve and Sustindex. 

ndex Actual Score 

5  Es

100.0%  s

5  Es

17.5  Es

7  Es

Index StandaAvailable Bonximum  Availa

Total ActTotal Point

the standardovements  byare  contacof negative need customining  and  f

ts  impact ontain Edmont

Actual Outcome 

Exceeded standard 

Met standard 

Exceeded standard 

Exceeded standard 

Exceeded standard 

ard Points nus Points  ble Points  tual Points ts Earned

d for this pey  adjusting ting  customcustomer  femer service efeedback  fo

n the environton’s Environ

Available Points 

3.75 (0.75 

available bonus points) 

3.75 

3.75 

1.5 

2.25 (0.75 

available bonus points) 15.0 1.5 16.5  

May 2015

erformance customer 

mers  upon eedback  to experience r  Dispatch 

nment and nment”.  In 

Actual Points 

4.50 

3.75 

3.75 

1.5 

3.00 

16.516.5

Page 31: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

2014 Highl

• EnvironEnvironincludeand  cotrainingcontinu

• Water on rolliforecas

• WatersincludetechnicEPCOR IndustrWater 

Sa3.6.5

The Safetyculture andactivity‐bainspectionsinjury sevein this inde 

PerformanMeasure

Safety Meetings Formal SafeWork Plans(SWP) 

First Aid Training 

Work Site InspectionsObservatio

Services gress Report 

lights 

nment  Incidnmental  Maed  introduciorrective  actg  to  furtheruing to impr

Conservatioing averagesst decline in 

shed Prograed financial scal committeis  also  en

rial  HeartlanProtection r

afety Index

y Index measd encouragised performs)  and  outcerity).  In 201ex, with only

nce e 

Numberconduct

e s 

NumberPlans eaidentify,communPercentemployea valid SCertifica

s / ons  

Number/ Observyear to faccident

dent  Manaanagement ng new protion, with  cer  reduce  theove incident

on Factor.   Ss to emphasResidential 

am Activity. support andees of the Nngaged  withnd Water Mrisks related 

sures In‐Cityng staff awa

mance measuome‐based 14, In‐City Wy the Lost Tim

PBR Measurr of safety meeted during the r of Formal Safach calendar ye, control and nicate hazardsage of permanees at year‐endStandard First Aate r of Work Site vations each cafind problems ts before othe

gement.   System  Cer

ocedures  forertification  ee already  lowt investigatio

Standard ansize long‐terconsumptio

 In 2014, EP representaorth Saskatch  Alberta  EManagementto spills and

y Water’s proareness and ures (safety performanc

Water exceedme Frequenc

S

re etings year fe Work ear to 

 nent d who hold Aid 

Inspections alendar and assess r losses 

28 of 59

In  2014,  EWrtification  for  legal  compexpected  inw number oon and corre

nd actual scom results.  Ton discussed 

PCOR maintation on the chewan WatEnvironmentt  frameworkd releases in 

ogress towaengagemenmeetings, sace measuresded standarcy Rate mea

Table 3.6.5Safety Index

 

Standard AS

36 

3,100  1

33%  5

800  1

WSI  workedor  the  watepliance, envi  2015.    EWof  reportablective action

ores for thisThe decreas in Section 3

ained strongboard of dirtershed Alliat  and  Sustak.    In  2015, the North S

ards its commnt in safety aafe work plas  (lost  time ds for six of asure below 

ActualScore 

AcOut

42  Excestan

14,059  Excestan

55.3%  Excestan

1,297  Excestan

d  towards er  treatmenironmental 

WSI  also  incrle environmn processes i

s performanse in 2014 re3.1. 

g watershedrectors, execance and othainable  Res,  EPCOR wilSaskatchewa

mitment of activities.  Thans, first aid   frequency,the seven pstandard. 

ctualcome 

A

eededndard 

eeded ndard 

eeded ndard 

eeded ndard 

achieving  Int  plants.   incident  inveased wate

mental  incidein 2015.   

ce measureeflects the h

d program acutive commher watershsource  Devell  be  assessan River. 

achieving a his index inctraining, and  injury  freqperformance

Available Points 

1.5 

3.75 

3.0 

3.0 

May 2015

ISO  14001 This  work 

vestigation, r  sampling ents and  is 

 are based higher than 

ctivity that mittees and hed groups. elopment’s ing  Source 

zero injury cludes both d work site uency  and e measures 

Actual Points 

1.5 

3.75 

3.0 

3.0 

Page 32: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  29 of 59  May 2015 2014 PBR Progress Report 

Performance Measure  PBR Measure  Standard 

ActualScore 

ActualOutcome 

Available Points 

Actual Points 

occur Lost Time Frequency Rate 

A measure of the effectiveness of a safety program – the frequency of injury rate per unit of exposure 

0.59  0.67  Below standard 

0.75 (0.375 available bonus points) 

0.66 

All Injury Frequency Rate 

A measure of the frequency of disabling injuries and medical aid injuries per unit of exposure 

2.40  1.57  Exceeded standard 

1.5 (0.562 available bonus points) 

2.06 

Injury Severity Rate 

A measure of the seriousness of injuries and illnesses – ratio number of disability days to the number of employee exposure hours in a calendar year 

8.92  5.17  Exceeded standard 

1.5 (0.562 available bonus points) 

2.06 

Index Standard Points 15.0 Available Bonus Points    1.5 

Maximum  Available Points   16.5 Total Actual Points   16.0

Total Points Earned    16.0 

2014 Highlights 

• In  2014,  EWSI  met  or  exceeded  the  standards  for  all  activity‐based  performance  measures including Safety Meetings, Formal Safe Work Plans, First Aid Training and Work Site Inspections & Observations, reflecting EWSI’s commitment to a zero injury culture.   

Area for Improvement 

• Lost  Time  Frequency  Rate.    Although  the  Injury  Frequency  Rate  and  Injury  Severity  Rate  both exceeded the PBR performance standard, the Lost Time Frequency Rate was below standard as a result of three  incidents.   These  incidents were reviewed and corrective actions taken to prevent similar incidents from occurring in the future. 

 

Page 33: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

4 201 Con4.1

Wastewateactual custare not tieand  total differences 

   

  

1  Annu2  Res3  Mu4  Com5  Tot   

6  Aver7  Res8  Mu9  Com

10  Tot   11  Mon12  Res13  Mu14  Com

Fina4.2

N4.2.1

Wastewatecost  savingconsumptirate base (return  on approved r 

Services gress Report 

4 PBR nsumptio

er  customertomer countd into the Cannual  cons caused by 

Cu

ual Consumptsidential ulti‐Residentiammercial tal 

age Monthlysidential ulti‐Residentiammercial tal 

thly Consumsidential ulti‐Residentiammercial 

ancial Per

et income

er earned ngs  and  lowon on  reven(see Section equity.    Foreturn on eq

Resultsn and Cu

r  counts andts between ICity’s drainagsumption  athe same fa

Custoand

 

ustomer Class

tion ‐ ML 

al 

 Customer Co

al 

ption per Cus

al 

rformanc

e and Retu

et  income oer  than  fornue.   Waste4.4), yielder  2012‐2014quity (see Ta

s - Wasstomer C

d  consumptIn‐City Watege system.  Are  also  simctors describ

omer Countd Monthly C

ount 

stomer ‐ m3 

ce  

rn on Equi

of $11.7 milrecast  intereewater’s higd a return o4, Wastewable 4.2.1). 

30 of 59

stewateCount  

ion are  simer and WasteAccordingly,

milar  to  thosbed in Sectio

Table 4.1, Total Annuonsumption

Actua

       42,       17,       25,       85,

      232         3       15      251

 4 1

ity 

lion  in 2014est  expenseher  than  foron equity of ater’s  return

er

ilar  to  thoseewater relat, average mse  of  In‐Cityon 3.1.   

ual Consumpn per Custom

2014 

al PB

Fore 

,773         45,704         16,126         25,603         87

  

2,086     231,522          3,573        15

1,181     251  

15.4 418.9   4134.5   1

4  ($27.2 mile  offset  therecast net  i10.6% in 20n  on  equity

e of  In‐City te to “wateronthly consy Water,  w

ption mer B 

BR ecast  A

 5,297         6,708        5,496        7,501         

  

1,996        3,465        5,671        1,132         

  

16.3  401.8  135.6  

llion  for 201e  impacts  ofncome and 014, 2.2% higwas  8.4%, 

Water. Diffr‐only” custoumption pe

with  actual  t

C 2012‐20

Actual  

126,042      51,747      75,834    253,623    

  

226,458        3,466      15,431     245,355    

  

 15.5   414.7   136.5  

12‐2014), asf  lower  thaa  lower  thagher than its2.3%  greate

May 2015

ferences  in omers who r customer to  forecast 

D 014 

PBR Forecast 

  134,835     50,254     75,549   260,638  

  

 228,027       3,439     15,478   246,944  

  

 16.4   405.9   135.6  

s operating an  forecast an  forecast s approved er  than  its 

Page 34: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

    

 N

1  Reven2  Opera3  Depre4  Intere5  Net In6  Equity7  Retur

Re4.2.2

In  2014, W(4.9%) millis primarilyActual and 

  

1  Consu2     Resi3     Mul4     Com5  Tota   

6  Fixed 7     Resi8     Mul9     Com

10  Tota   

11  Total 12  Other13  Total 

Services gress Report 

et Income an

nue ating costs eciation expeest  expense ncome y portion of Rrn on Equity (

evenue 

Wastewater’ion less for y attributabl PBR forecas

Revenue by

umption Revedential ti‐Residential

mmercial al Consumpti

Charge Revedential ti‐Residential

mmercial al Fixed Charg

Wastewater r revenue Revenue 

nd Return on 

nse 

Rate Base (%) 

s  revenues 2012‐2014. e to the longst revenue f

  

y Customer Cl

enue 

ion Revenue 

enue 

ge Revenue 

Treatment R

Net Income

Equity 

were  $3.5 This differeg‐term declior 2014 and

Revenue

lass 

Revenue 

31 of 59

Table 4.2.1e and Return($ millions)

Actua  72.6  (44.4    (9.5    (7.0  11.7109.9

     10.6

million  (4.6ence is conceine in per cud 2012‐2014

Table 4.2.2e by Custom($ millions)

A

Actua  

29.012.016.257.2

10.0  0.2  0.710.9 

     68.1       4.5     72.6

n on Equity

B2014 

al PB

Fore6    764)    (475)      (90)      (97      99  1186%       8

6%)  less  thaentrated in tustomer consare summa

mer Class 

B2014 

al PB

Fore

0  30  12  12  6

0  12   7   9  1

1      715       46     76

BR ecast  A6.1  27.4)  (19.8)    9.0)    9.9   8.8 8.4%     

an  in  the  PBthe Residentsumption dirized in Tabl

BR ecast  A

  31.7   11.7   16.7   60.1  1  

10.2   0.2   0.7   11.1   

1.2  14.9   6.1  2

C 2012‐20

Actual 200.1 124.9) (26.6) (21.4)  27.2 n/a   8.4% 

BR  forecasttial customescussed in Sle 4.2.2.   

C 2012‐20

Actual  

 79.3  32.4  45.1 156.8 

  

 27.3    0.4    1.8  29.5  

186.3  13.8 200.1 

May 2015

D 14 

PBR Forecast 210.4 (136.8)   (28.1)   (24.9)   20.6 n/a 

      6.1% 

and  $10.3 er class and Section 3.1.  

D 14 

PBR Forecast 

   87.5   32.6   46.0 166.1 

  

  27.9      0.4      1.9   30.2 

 196.3   14.1 210.4 

Page 35: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

O4.2.3

4.2.3.1 OTotal operActual and 

   

1  Salar2  Corp3  Custo4  Powe6  Cont7  Mate8  Othe9  Franc

10  Total Actual to P

• Salarie

In 2014incenticost  sacomple

• Corpor

As withcorpora

• Other ‐

In 2014cost  renumero

• Franch

Actual 

• Actual and Co2014 ($

Services gress Report 

Operating C

Operating Crating costs  forecast co

 Cost

ies and beneforate adminisomer billing er and other uractors and cerials and supr chise fees l Operating C

PBR forecast 

es and Benef

4,  incentive ve plan targavings  of  $eted in 2012

rate Adminis

h  In‐City Waate reorgani

‐ $0.3 million

4, $0.9 millioecoveries  frous small ite

ise Fee ‐ $0.

to PBR forec

to forecast dontractors an$1.7 million 

Costs  

Costs by Cfor 2014 arsts by cost c

t Category 

fits stration 

utilities onsultants pplies 

Costs 

differences 

fits ‐ $0.5 mi

plan costs wgets.  For 201$2.6  million  and the cor

stration ‐ $1

ater,  lower tization, desc

n less than f

on of the actom  non‐utiems, none of

.4 million (8%

cast variance

differences  nd consultanless for 2012

ost Categore $3.0 milliocategory are 

TOperating C

in operating

illion greate

were $0.5 m12‐2014, incfrom  the 

rresponding 

1.8 million le

than  forecascribed in Sec

orecast ($2.

tual to foreclity  operatiof which are i

%) less than 

es in franchi

in Power annts are not s2‐2014).    

32 of 59

ory on  less  thansummarized

Table 4.2.3.1Costs by Cos($ millions)

A

Actua17.4.4.4.4.2.1.5.

44.

g cost catego

r than foreca

million greatcreased incerestructurinheadcount 

ess than fore

st Corporatection 3.2.2.   

5 million les

ast varianceons.    The  rindividually 

forecast ($1

se fees resu

nd other utilisignificant, a

n  forecast  ($d in Table 4.

1 st Category

B2014 

al PB

Fore.6  1.0 .5 .6 .2 .5 .7 .3 .4  4

ories for 201

ast ($1.3 mi

ter than  forentive plan cng  of  Wastreductions. 

ecast ($5.1 m

e Administra   

ss for 2012‐2

e ($2.6 millioremainder  osignificant.  

1.2 million le

ult from lowe

ities, Materiamounting to

$11.9 millio.2.3.1.  

BR ecast 

A

17.1 5.8 4.5 5.4 3.7 3.2 2.0 5.7 

47.4 

14 and 2012

llion less for

ecast as Waosts of $1.3 tewater’s  te     

million less fo

ation costs a

2014)   

on for 2012‐2of  the  diffe  

ess for 2012‐

er than forec

ials and Supo $1.0 millio

n  less  for 2

C 2012‐20

Actual 

48.3 12.0 13.5 14.2 11.6 7.3 3.4 

14.6 124.9 

2‐2014 includ

r 2012‐2014)

stewater exmillion wer

echnical  ser

or 2012‐201

are attributa

2014) relateerence  is  m

‐2014).   

cast revenue

plies, Customon less than 

May 2015

012‐2014). 

D 14 PBR 

Forecast 49.6 17.1 13.1 15.2 11.1 9.0 5.9 

15.8 136.8 

de:    

).   

xceeded  its re offset by rvices  area 

4).   

able to the 

es to higher ade  up  of 

es.  

mer billing, forecast in 

Page 36: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  33 of 59  May 2015 2014 PBR Progress Report 

4.2.3.2 Operating Costs by Operational Function In  addition  to  analysis  of  operating  costs  by  cost  category, Wastewater  operating  costs  are  also analyzed  on  a  functional  basis.  Actual  and  forecast  operating  costs  by  operational  function  are summarized in Table 4.2.3.2.   

Table 4.2.3.2 Operating Costs by Operational Function 

($ millions) 

    A  B  C  D 

 Operational Function  2014  2012‐2014 

Actual PBR 

Forecast  Actual PBR 

Forecast 1  Wastewater Treatment Plant   18.9    20.9    55.1    59.7  2  Quality Assurance and Environment   3.1    2.8    8.3    8.2  3  Operations Support Services   3.9    4.3    10.0    12.9  4  Administrative Services   4.7    3.4    11.4    10.0  5  Customer billing   4.5    4.5    13.5    13.1  6  Corporate Administration   4.0    5.8    12.0    17.1  7  Franchise fees   5.3    5.7    14.6    15.8  8  Total Wastewater Operating Costs   44.4    47.4    124.9    136.8  

 Actual to PBR forecast differences by operational function for 2014 and 2012‐2014 include:   • Wastewater Treatment Plant ‐ $2.0 million less than forecast ($4.6 million less for 2012‐2014).   

Lower than forecast costs  include $0.9 million of cost recoveries from non‐utility operations ($2.6 million for 2012‐2014). The remainder of the actual to forecast difference includes: $0.7 million of savings ($1.0 million for 2012‐2014)  in digester operating costs; and $0.6 million ($1.0 million for 2012‐2014) of savings from lower than forecast chemical usage.  

• Operations Support Services ‐ $0.4 million less than forecast ($2.9 million less for 2012‐2014).  

In  2014,  $0.6 million  of  the  actual  to  forecast  variance  ($2.2 million  in  2012‐2014)  relates  to  a restructuring of  technical  services  in 2012 which  continues  to provide  substantial benefits.   The remainder of  the  variance  in  this  category  is  attributable  to  cost  savings  throughout operations support services, primarily related to reductions  in head count, and  in‐sourcing functions, such as project engineering, which had previously been performed by contract employees.   

• Administrative Services ‐ $1.3 million greater than forecast ($1.4 million greater for 2012‐2014) 

Higher than forecast Administrative services costs are attributable both to additional incentive plan costs of $0.5 million  in 2014 ($1.3 million for 2012‐2014), and additional charges for EWSI Shared Services related to the corporate reorganization.       

• Actual  to  forecast  differences  for  Quality  Assurance  and  Environment  are  not  significant, amounting  to  $0.3 million  greater  than  forecast  in  2014  ($0.1 million  greater  than  forecast  for 2012‐2014).    

Page 37: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

• Actual explain

D4.2.4

In  2014, Wmillion lessand  capitaTable 4.2.4 

 

1  Depre2  Less:  3  Net D

In4.2.5

In 2014, W2014).  Thiand  on  shcontribute 

 

Int

1  Interes2  Capital3  Interes4  Averag5  Averag8  Interes

Services gress Report 

to forecast ned in Sectio

epreciatio

Wastewater’s for 2012‐2al additions 4.  

Depreciat

eciation ExpeAmortization

Depreciation E

nterest Exp

Wastewater’ss differencehort‐term  dd to lower t

terest Expens

t expense ized interest t expense, nee Debt Balane Cost of Debst Expense  

differences on 4.2.3.1 ab

on Expense

s  net  depre014).  This v(see  Section

 

tion Expense 

nse n of ContributExpense 

pense and 

s interest ex is primarilydebt.    Lowehan forecast

 

se and Cost o

et of capitalizece bt 

in Franchisebove.  

eciation  expvariance is an 4.4).   Actu

Net Dep

 

tions 

Cost of De

xpense was $ attributableer  debt  bat interest co

Interest Exp

of Debt  

ed interest  

34 of 59

e fees, Custo

ense was  $ttributable tual  and  fore

Table 4.2.4preciation E($ millions)

Actual    10.4      (0.9)        9.5 

ebt 

$2.0 million e to lower thlances  resusts (see Tab

Table 4.2.5pense and C($ millions)

Actua8.(1.7.

 177.3.93

          7.

omer billing 

$0.3 millionto lower thaecast deprec

Expense 

B2014 

PBForec

       10)         (0            9

less than fohan forecastulting  from ble 4.2.5).  

Cost of Debt

B2014 

l PB

Fore5 5) 0 9    183%  40      

and Corpora

less  than  tan forecast ociation expe

R cast  A0.7      0.9)      9.8          

orecast ($3.5t interest ratdelays  in 

BR ecast  A9.6 (0.6) 9.0 

83.5  4.90%     9.0  

ate Adminis

he  PBR  foreopening asseense  is  sum

C 2012‐201

Actual 29.3   (2.7) 26.6     

5 million lesstes on new bcapital  spe

C 2012‐20

Actual 23.7 (2.3) 21.4 

    4.44%  21.4  

May 2015

tration are 

ecast  ($1.5 et balances marized  in 

D 14 

PBR Forecast    30.8       (2.7)      28.1  

s for 2012‐borrowings nding  also 

D 014 

PBR Forecast 

26.7 (1.8) 24.9 

    4.91% 24.9  

Page 38: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Cap4.3

WastewatePBR  term.transferredestimates that the coPBR  forecaforecast caBar facilityreplacemethan  forecreplacemethat Wasteexpenditurexpenditur5.1.1.   

   

Capital P

1  Digest2  Solids 3  Clover4  Base R5  Total 

 Wastewateforecast di • Digeste

$1.5 m

This caAlthougdigestetotal ex

• Solids $8.5 m

Services gress Report 

pital Expe

er provides t    The  capitd  from  the based on deost of many ast.    Accordapital expen.  The purponts needed cast  for  indnts were reewater’s totres  by  $47res on Wast

Program Cate

ter Reliability Handling Relr Bar ReliabilitReliability 

er’s  revised fferences by

er Reliabilityillion less ov

tegory inclugh the costser capacity hxpenditures 

Handling Reillion less ov

enditures 

the City wittal  plan  for City  in  2009etailed engiprojects in Wdingly,  EWSIditures in 20ose of this reto ensure pdividual  capequired thanal capital ex.9  million  (tewater’s  ra

egory A 

iability ty   

3

capital  proy category a

y – $2.8 miver the 2012

udes upgrades to upgradehave decreain this categ

eliability – $ver the 2012

 

h five year fwastewate9.  As  a  resuneering desWastewaterI  delayed  or012 and 201eview was toplant reliabilpital  projecn had been axpenditures o(see  Table te base,  ret

Capit

A 2014 

Actual  Fo 8.8 8.2  6.4 14.3 37.7 

gram  is  orgre as follows

llion  greate2‐2016 PBR t

es to the dige each digessed the numgory will be $

$3.0 million 2‐2016 PBR t

35 of 59

forecasts of r  was  deveult,  projectssigns.  In 201’s capital pror  deferred  c13, while it co assess asseity.   This revcts,  but  thaanticipated over the 2014.3‐1).    Thturn on equ

 Table 4.3‐1tal Expendit($ millions)B 

PBR orecast   6.0 11.1   0.3   5.3 22.7 

ganized  intos:  

r  than  forecerm).  

gesters and ster are highmber of dige$1.4 million 

less than  foerm).  

capital expeeloped  soons  identified 12, preliminaogram woulcapital  spenconducted a et condition view showeat  significanin the PBR 12‐2016 PBRhe  impacts uity and  futu

tures 

C 2012‐20

 Actual  F18.6 18.2   7.5 30.3 74.6 

o  four  broad

cast  ($3.5 m

gas room toher than foresters requirless than th

orecast  ($12

enditures at   after  the were  not  bary engineeld be significnding,  contrcomprehenand identifyed that not ontly  more  cforecast.   EWR term will eof  higher 

ure  rates ar

D 014 

PBR Forecast  P15.0 30.6   8.9 18.9 73.4 

d  reliability 

million  great

o improve crecast, EWSIring upgradehe 2012‐2016

2.4 million  le

the beginniGold  Bar  asased  on  dering analysiscantly greateributing  to  lnsive review y repairs, upgonly were cocapital  upgWSI currentexceed forecthan  forecae discussed 

E 2012‐2

Current Projection 

  20.6   43.1   17.8   78.1 159.6 

categories.

ter  for 2012

capacity andI’s efforts toes.   EWSI ex6 PBR foreca

ess  for 2012

May 2015

ing of each ssets  were tailed  cost s  indicated er than the ower  than of its Gold grades and osts higher rades  and tly projects cast capital ast  capital in Section 

F 2016 

PBR Forecast   22.0   51.7     8.9   29.1 111.7 

  Actual  to 

2‐2014  and 

d reliability.  o maximize xpects that ast.  

2‐2014 and 

Page 39: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

This  cahead‐wreviewto revistotal ex

• Clover $8.8 m

This prrecoveEdmonreleaseestimatEWSI e 

• Base Rmillion

This caor  impcosts  irepreseTable 4 

 

Ba

1  Bu2  St3  M4  El5  In6  Ge7  To

Rat4.4

In  2014,  emillion was2013.    ByWastewateof  the  inc

Services gress Report 

ategory  incluworks flow ced several dsed designs xpenditures 

Bar Reliabilillion greate

oject categor  phosphorton  Waste e  fertilizer.   tes and  the xpects that 

eliability – $greater ove

tegory consrove  reliabin  this  categent  the  cap4.3‐2 below: 

se Reliability

uildings and structural Mechanical ectrical strumentatioeneral plant aotal 

e Base an

even with  his still $19.6 y  2016,  thiser’s rate bascrease  in  c

udes  upgradontrol, and design optionand a highein this categ

lity – $6.1 mer over the o

ory includes us  and  nitrManagemenThe  cost  ostart of  thithe total cos

$9.1 million er the 2012‐2

ists primarilylity and  safegory  reflect ital  costs  ne

Capi

y Sub‐Categor

site 

on and controand process 

nd Return

igh  levels  omillion less ts  situation se by the enapital  expe

des  to  grit solids handlns for handler focus on pgory by $8.5

million greatever the 2012

the Ostara Nogen  from nt  Centre  anf  this  projes project wst of this pro

greater than2016 PBR te

y of life‐cyclety of plantthe  results

eeded  to  en

ital Expendit

A

ries Act 2 26. 1

ols  1. 

 14

n on Equi

f  capital  exthan the PBwill  be  revd of the curenditures,  b

36 of 59

removal  anling processing increaseprocess opti million ove

er than forec2‐2016 PBR 

Nutrient Recthe  Clover 

nd  transformect  in  the  Pas delayed  toject will be 

n forecast ($rm).  

e replacemet operationss  of  EWSI’s nsure plant 

Table 4.3‐tures ‐ Base($ million

A  B2014 

 tual 

PBRForeca

.0    1.5

.6   1.1.9    1.3.1    0.4.7    0.7‐      0.24.3   5.2

ity  

penditures, R forecast, bersed  as  prent PBR terecause  a  la

nd  screeninges.  EWSI haed solids to tmization, wr the 2012‐2

cast ($1.4 mterm).   

covery ProjeBar  biosolid

ms  these  nuPBR  forecastto allow EW$8.9 million

$11.4 million

ents and adds.   Higher  thcomprehenreliability.   

‐2 e Reliability Ps) 

C 201

R ast

 Actual

5    4.4 1   6.6 3   11.7 4    3.2 7   4.2 2   0.1    30.3 

Wastewatebecause of lorojects  are rm is expectarge  propo

g,  sludge  stas completethe plant.  Twhich EWSI e2016 PBR ter

million less th

ect, which utds  settling  ltrients  into t  was  basedWSI  to confirn greater tha

n greater for

ditional assehan  forecastnsive  asset These  resu

Projects 

D 12‐2014 

 PBR 

Forecast  6.7   3.1  4.5  1.2   3.4  0.5  18.9 

er’s mid‐yeaower capitacompleted

ted to be lesrtion  of  th

orage  and  ted detailed shese changeexpects will rm. 

han for 2012

tilizes a new agoons  locaan  eco‐fried  on  prelimrm costs anan forecast.  

r 2012‐2014

ets needed tt actual andcondition  rlts  are  sum

E 2012

Current Projection

14.7 14.5 28.4   6.6   6.7   7.2 78.1 

r  rate  base l spending in.    The  net ss than the fhe  increase 

May 2015

thickening, studies and es have led reduce the 

2‐2014 and 

process to ated  at  the ndly,  slow‐

minary  cost d benefits.    

4 and $49.0 

to maintain d projected review  and marized  in 

F 2‐2016 

n PBR 

Forecast9.6  5.3  7.2  2.1  4.9  0.6 29.1 

of  $269.7 n 2012 and effect  on ull amount in  capital 

Page 40: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  37 of 59  May 2015 2014 PBR Progress Report 

expenditures relates to life‐cycle replacements, so asset retirements are also expected to increase (see Table 4.4‐1).   

Table 4.4‐1 Rate Base – Net of Contributions 

($ millions)     A  B  C  D 

Mid‐Year Rate Base  2014  2016 

Actual PBR 

Forecast  Current 

Projection PBR 

Forecast 1  Property, Plant and Equipment, opening balance  356.1   383.0    431.2    440.8  2  Additions    28.9     28.8      49.2      19.7  3  Retirements/Transfers       (6.0)  ‐          (6.8)   ‐  4  Property, Plant and Equipment, closing balance   379.0   411.8    473.6    460.5             

5  Accumulated Depreciation, opening balance     96.1   103.2    106.5   123.5 6  Depreciation Expense            9.4        9.8      10.4     11.0 7  Retirements/Transfers        (5.8)  ‐         (6.8)   8  Accumulated Depreciation, closing balance     99.7   113.0   110.1  134.5            

9  Mid‐Year Property, Plant and Equipment  367.6   397.4    452.3    450.6  10  Mid‐Year Accumulated Depreciation    (97.9)  (108.1)   (108.2)   (128.9) 11  Mid‐Year Net Property  269.7   289.3    344.1    321.7  

           12  Add: Working Capital      5.6       5.4        7.1        5.1  13  Add:  Average Materials and Supplies      1.4        0.8        1.4        0.8  14  Mid‐Year Rate Base  276.7  295.5    352.6    327.6  

In 2014, the total return on Wastewater’s rate base was $0.2 million less than in the PBR forecast.  This result  reflects  lower  than  forecast debt costs  (see Section 4.2.5) and  significantly higher net  income (see Section 4.2.1).  These results are shown in Table 4.4‐2.                  

Page 41: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

 

1  M   

2  C3  C   

4  C5  C6  W   

7  R8  R9  R

Wa4.5

W4.5.1

Wastewateaccordanceadjustmenincludes th5.8%.  

W4.5.2

Wastewateseparate  rwater custstructure  ftreatment ResidentiaCommerciarecognize tIn additionfor  each wastewate Wastewate2012, 2013

Services gress Report 

Mid‐year Rate

Capital StructCapital Struct

Cost of Debt Cost of EquityWeighted Ave

Return on MidReturn on MidReturn on Mi

stewater

Wastewate

er  treatmene with the Bts.    In  2014he 2014 PBR

Wastewate

er has two crates  for muomers are sfor  residentare  very  sil customers al  customerthat there an, commercikilogram  ofer that excee

er  Treatmen3 and 2014 a

Return o

e Base Allocat

ture: Debt (%)ture: Equity (%

y erage Cost of

d‐year Rate Bd‐year Rate Bid‐year Rate B

r Treatme

r Treatme

nt  rates  consBylaw, annua4,  wastewa inflation ad

r Treatme

customer claulti‐residentubject to thetial  and  mumilar  for  reare based o

rs  are  basedre economieial customerf  certain  preds the conc

nt  Rates, Ovare shown in

Return on R

on Rate Base 

ted to In‐City

) %) 

f Capital 

Base FinancedBase FinancedBase 

ent Rates

nt Rates 

sist of  consal wastewatter  treatmedjustment of

nt Rate St

asses:  Resideial  customee same ratesulti‐residentiesidential  anon a flat ratd  on  a  deces of scale inrs are chargrescribed  mcentrations s

verstrength n Appendix D

38 of 59

Table 4.4‐2Rate Base ‐ W($ millions)

d by Debt d by Equity 

s and Bill 

umption  chater rate increent  rates  inf 1.9% (see S

ructure by

ential and Crs.    Insteads as residential  customend multi‐rese structure lining  rate  sn wastewateged overstrematerials  (“sshown in Sec

Surcharges D‐2. 

Wastewater

Compari

arges and  feases are limcreased  by Section 3.5.1

y Custome

ommercial.d,  customerstial wastewars  recognizesidential  cuswith a singlstructure  wer treatmentength and adsurchargeabction 4 of Sc

and  Additio

Actua   276.7

  60.3039.70

4.2010.656.76

    7.0      11.7      18.7

sons 

fixed monthmited to infl7.7%  from

1), plus spec

er Class  

Unlike In‐Cis who woulater customes  that  thestomers.    Acle consumptwith  three  cot for larger cdditional ovble  matter”)chedule 1 to 

onal Overst

2014 al  PBR7         2

%  5%  4 

% % %  

0  7     7      

ly  service  chlation plus s  2013.    Thiial rate adju

ty Water, thld  be multi‐ers.  The com  costs  of  wccordingly, tion block.   onsumptioncommercial cverstrength )  per  cubic the Bylaw.  

rength  Surc

May 2015

R Forecast 295.5  

 59.78% 40.22% 

 5.10% 8.35% 6.41% 

    9.0     9.9  18.9  

harges.    In special rate is  increase stments of 

here are no ‐residential mmon rate wastewater charges  to Charges to n  blocks  to customers. surcharges metre  of  

charges  for 

Page 42: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

W4.5.3

Unlike moWastewateand maintcompariso Wastewatefour local cfixed charg

4.5.3.1 RFigure 4.5.residentialresidentialcomparisoEWSI Wast Figure 4.5.Average Ed(15.5 m3/m 

$0

$5

$10

$15

$20

$25

$30

$35

$40

$45

$50

$/m

onth

Services gress Report 

Wastewate

ost  communer is only restenance  of  tns are based

er bill compacommunitiesges, consum

Residential 3.1 provides household’ customers n sample.   Etewater’s ch

.3.1    dmonton Mmonth)  

r Bill Comp

ities where sponsible fothe  collectiod on blended

arisons for 2s. These bill ption charge

Wastewats a compariss 2012‐2014have  lower Edmonton’s arge of $15.

onthly Resid

parisons to

drainage  aor wastewateon  system, d EWSI wast

2014 are bascomparisones, plus any 

ter Bills son of reside4 average wathan averagresidential .28 per mon

dential WasEPC

OR

Drainage

39 of 59

o Other Co

nd wastewaer treatmentare  providetewater trea

sed on survens are based surcharges.

ential houseastewater coge wastewawastewaterth and the C

tewater Bill

 

ommunitie

ater  treatmt.  Drainage ed  by  the  Catment and C

eys of Calgaron the tota

hold wastewonsumptionater bills comr bill  is baseCity’s draina

l  

Levy

es 

ent  services services, inity.    AccordCity drainage

ry, Vancouvel cost to the

water bills ba of 15.5 m3 pmpared to oed on a blenge charge of

s  are  combicluding the dingly, wastee rates.     

er, Winnipege customer a

ased on the per month.  other customnded rate cof $22.82 per

May 2015

ined,  EWSI operations ewater  bill 

g as well as and include 

Edmonton Edmonton 

mers  in the onsisting of r month.   

Levy

Page 43: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

4.5.3.2 CTable 4.5.2monthly ware compeis substantcomparisotreatment  

 

1  Mont   

2  Avera3  Van4  Edm5  Win6  St. A7  Calg8  Stu9  She

10  Spr

Wa4.6

WastewatePerformanavailable  ifavailable fthe 100 baoutcome wstandard. 

Sy4.6.1

The Systemof Wastew      

Services gress Report 

Commercia2.2 provides wastewater cetitive with stial variationns,  commeand City dra

Commu

thly Consump

age Bill ($ perncouver monton nnipeg Albert gary rgeon Countyerwood Park uce Grove 

stewater

er System Sence  under  ef  the  standaor performaase point stawas better th

ystem Reli

m Reliability water Treatm

l Wastewaa comparisoconsumptionurrounding n in monthlyrcial  wastewainage rates

Comme

 

nity 

ption ‐ m3 

r month) 

r PBR Per

ervice Qualiach  index  iards  for  all ance above andard.  Acthan the stan

iability Ind

Index is a mment Services

ater Bills on of the wan.  This tablecommunitiey wastewatewater  bill  c. 

Trcial Month

ConvS

formance

ty is measurs measuredfive performstandards aual outcomendard or “Be

dex

measure of ts.  In 2014, W

40 of 59

ater bills for e shows thates and with mer bills for cocomparisons

Table 4.5.3.2ly Wastewa

Avenience Store 

10 

 19   28   22   40   36   49   32   19  

e Measur

red by the rd  independemance measnd financiales have beeelow Standar

the confidenWastewater 

commercialt water billsmajor cities ommercial cs  are  based

2 ater Bill Com

BRetail Store  R

50 

   95     89   111   164     78   171     87     94  

res 

results of fivently  on  a  psure  indices penalties aen noted as rd”, if the ac

nce that cusexceeded th

l customers for EWSI’s cin western Customers.  Ad  on  blend

mparison 

C

Restaurant 

250   

 477   436   553   784   289   800   519   470  

ve indices prpoint  basis s  are  achievare applied  i“Exceeded Sctual outcom

stomers can he standard 

with differincommercial Canada.  OveAs with Resided  EWSI  w

Hotel 

2,000 

 3,812   3,556   4,420   6,205   2,138   6,179   2,822   3,762  

rescribed in with  100  bed.   Bonus f EWSI doesStandard” ifme was wors

place in thefor this inde

May 2015

ng levels of customers erall, there idential bill wastewater 

E

Hospital 

10,000 

 19,060   12,133   22,100   30,989   10,588   30,683   13,151   18,810  

the Bylaw.  base  points points  are s not meet f the actual se than the 

e reliability ex. 

Page 44: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

PerformaMeasu

Enhanced PTreatment 

  2014 Highl All  planneavailabilitystandard fo

W4.6.2

The Wasteplant’s  actWastewate 

PerformaMeasu

WastewateEffluent LimPerformancIndex (WEL

 2014 Highl

On‐going ethe standa

Services gress Report 

ance ure Primary (EPT) 

EPT in pefaciliweatinfluthe E

light 

d  EPT  faciliy  of  the  facor this perfo

Wastewate

ewater Qualtual  final  efer exceeded

ance ure 

r mit ce PI) 

The dischparawastfinal 

lights 

efforts  to  imrd for this p

PBR Measperformance, ercent, where tity operated duther events whent flow rate eEPT event thre

ity  maintenility  during ormance mea

r Quality I

ity Index  is affluent  qual the standar

PBR Meas

percentage of harge limit for meters in the tewater treatmeffluent 

mprove soliderformance

System

sure measured the EPT uring wet hen the exceeded shold 

ance  was  cwet weatheasure.  

ndex 

a measure olity  relative rd in this ind

Wastew

sure 

the five Gold Bar ment plant’s 

ds handling a measure.  

41 of 59

Table 4.6.1m Reliability

Standard AS

75.0%  8

InAv

Maxim

completed  der  periods, 

of the perceto  its  disc

dex. 

Table 4.6.2water Qualit

Standard 

46.0% 

InAv

Maxim

and nutrient

y Index ActualScore 

ActOutc

84.3%  Excestan

ndex Standard vailable Bonus mum Available 

Total Actual Total Points E

during  dry  wcontributing

entage of thharge  limits

ty Index ActualScore 

AcOut

22.9%  Excsta

ndex Standard vailable Bonus mum Available 

Total Actual Total Points E

t removal p

tualcome 

AvP

eeded ndard  (1.0 

bon

PointsPoints Points PointsEarned 

weather  peg  to  EWSI’s 

e Gold Bar ws  for  five  p

ctualtcome 

AvP

eeded ndard 

PointsPoints Points Points Earned 

processes all

vailable Points 

15.0 available us point) 

15.0   1.0 16.0   

riods,  maximability  to  e

wastewater parameters. 

vailable Points 

40.0 

40.0   4.0 44.0   

lowed EWSI 

May 2015

Actual Points 

16.9 

16.916.0

mizing  the exceed  the 

treatment   In  2014, 

Actual Points 

80.4 

80.444.0

  to exceed 

Page 45: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Cu4.6.3

The  CustoWastewateindex.  

PerformaMeasu

Customer Inquiries Responses  

 

2014 Highl

In  2014, attributed steps  to mclosed  to biogas flar

En4.6.4

The EnviroIn additionstrategic  gexceeded t 

PerformaMeasu

Emergency Response Training 

Completeneand TimelinReporting 

EnvironmenIncident 

Services gress Report 

ustomer S

omer  Servicer’s overall 

ance ure 

Percrespof re

lights 

Wastewaterto  the wast

minimize  releimprove  thee.   

nvironmen

onmental Indn, the Envirogoal  to  “Prethe standard

ance ure 

The Respwithcomeach

ess ness of 

Achirepoand subm

nt  The and 

ervice Ind

e  Index  is level of cus

PBR Measentage of custonded to witheceipt  

r  engaged tewater  treaease  of  odoe  effectiven

ntal Index 

dex measurenmental Indeserve  and ds for each o

PBR Meas

number of Emponse Training an environmeponent conduch calendar yearevement in meort submission complete repomissions number of reppreventable 

ex 

a  measuretomer  servi

Custom

sure omer issues in 24‐hours 

additional atment planours,  such  aess  of  the  o

es Wastewatdex contribuSustain  Edmof the perfor

Envir

ure 

ergency exercises ental cted in r eeting deadlines ort 

portable 

42 of 59

  of  the  levce.    In 2014

Table 4.6.3mer Service 

Standard 90.0%

InMaxim

managemennt.   Wastews  ensuring  todour  contr

ter’s activitites to the Cmonton’s  Enrmance mea

Table 4.6.4ronmental In

Standard 

1

100%

18

vel  of  satis4, Wastewat

 Index ActualScore 

AcOut

92.3% Excsta

ndex Standard mum Available 

Total Actual Total Points E

nt  staff  to water’s operathat  outsiderol  systems, 

es for limitinity’s measurnvironment”asures makin

ndex ActualScore 

AcOut

2 Excsta

100% Msta

6 Excsta

sfaction  thater exceede

ctualtcome 

AvP

eeded ndard 

PointsPoints PointsEarned 

respond  toations  teame  doors  in  o  and  optim

ng its impacre of progres”.    In  2014ng up this ind

ctualtcome 

AvP

ceeded ndard  (2.0 

bonu

Metndard 

ceeded ndard 

t  customered  the  stand

vailable Points 5.0 

5.0 5.0   

o  customerm also proacoperations  aizing  operat

ct on the envss towards i,  Wastewatdex. 

vailable Points 

6.66 available us points) 

6.67 

6.67 

May 2015

s  place  in dard  in  this 

Actual Points 5.1

5.15.0

r  concerns tively  took areas were tion  of  the 

vironment.  ts ten‐year ter  met  or 

Actual Points 

8.66

6.67

6.67

Page 46: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Manageme

 2014 Highl

• Compleprocessreports are  expsupport

• EnvironreceivedCertificainvestigenvironProtectienviron

Sa4.6.5

The  Safetyencouraginactivity‐baand observand injury   

Services gress Report 

nt  envir

lights 

eteness  and es  reducedsubmitted p

pected  to  det efforts to m

nment  Incidd  ISO  14001ation,  Wastgation,  and  cmental  inciion  and  Enmental com

afety Index

y  Index  meng  staff  awased performvations) andseverity).  In

ronmental inci

Timelinessreport  pre

prior to requecrease  sammeet this per

ent  Manag1  Environmewater  estacorrective  adents.    Durnhancement mpliance will 

easures  Wasareness  andmance measud outcome‐bn 2014, Wast

 

idents

  of  Reportieparation  anuired deadlimple  retestinrformance s

ement.    In ental Manaablished  proaction.    Thesring  2015,  GAct  Operabe required

stewater’s d  engagemeures (safety based perfotewater met

43 of 59

InAv

Maxim

ng.    Improvnd  compilatnes.   On‐gong  and  shortandard. 

early  2014gement  Sysocedures  fose  efforts  coGold  Bar  isating  Appro to maintain

progress  toent  in  safetymeetings, srmance meat or exceede

ndex Standard vailable Bonus mum Available 

Total Actual Total Points E

vements  in tion  time,  roing refinemrten  analysis

4  the  Gold stem  Certifior  legal  comontributed  ts  expected oval.    Contin the low nu

owards  achiy  activities. safe work pasures  (lost ed all standa

PointsPoints  Points  PointsEarned  

data  validaresulting  in ents  in the s  and  valida

Bar  wastewcation.    In mpliance,  ento  the  low to  receive inued  diligember of env

eving  a  zer  The  Safetylans, first aitime  freque

ards in this in

20.0   2.0  22.0 

  

tion  and w100%  comquality contation  times 

water  treatmorder  to  acnvironmentanumber  of a  new  Envience  and  avironmental 

ro  injury  cuy  Index  incld training,  iency,  injury ndex.  

May 2015

22.022.0

eb  posting mpletion  of trol system to  further 

ment  plant chieve  this al  incident reportable ironmental   focus  on incidents. 

ulture  and ludes  both nspections frequency 

Page 47: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  44 of 59  May 2015 2014 PBR Progress Report 

Table 4.6.5 Safety Index 

Performance Measure  PBR Measure  Standard 

ActualScore 

ActualOutcome 

Available Points 

ActualPoints 

Safety Meetings  Number of safety meetings conducted during the year  12  12  Met 

standard  2.0  2.0 

Formal Safe Work Plans (SWP) 

Number of Formal Safe Work Plans each calendar year to identify, control and communicate hazards 

1,100  8,758  Exceeded standard  5.0  5.0 

First Aid Certified 

Percentage of permanent employees at year‐end who hold a valid Standard First Aid Certificate 

33.0%  72.7%  Exceeded standard  4.0  4.0 

Work Site Inspections / Observations  

Number of Work Site Inspections / Observations each calendar year to find problems and assess accidents before other losses occur 

270  908  Exceeded standard  4.0  4.0 

Lost Time Frequency Rate 

A measure of the effectiveness of a safety program – the frequency of injury rate per unit of exposure 

0.81  0.00  Exceeded standard 

1.0 (0.6 available bonus points) 

1.6 

All Injury Frequency Rate 

A measure of the frequency of disabling injuries and medical aid injuries per unit of exposure 

2.42  0.00  Exceeded standard 

2.0 (1.2 available bonus points) 

3.2 

Injury Severity Rate 

A measure of the seriousness of injuries and illnesses – ratio number of disability days to the number of employee exposure hours in a calendar year 

8.88  0.00  Exceeded standard 

2.0 (1.2 available bonus points) 

3.2 

Index Standard Points 20.0 Available Bonus Points     3.0 

Maximum Available Points   23.0 Total Actual Points     23.0Total Points Earned     23.0

 2014 Highlights  In 2014, Gold Bar met or exceeded the standards for all performance measures in the Safety Index and, as in 2013, had no Lost Time or Medical Treatment Injuries.   

Page 48: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

5 Futu Fina5.1

H5.1.1

EWSI’s curthe 2012‐2Sections 3.almost $50In  order  taccelerate  Since projebeen compsignificant  Subsequenhigher  thainflation.   likely to beanticipateddetermine The  impacWater  as continuingimpacts aryears.     

N5.1.2

As noted  inon‐routin2014, City‐on In‐City Wfor  the  Soestimated non‐routinIn‐City WaAccordinglthese proje

Services gress Report 

ure Plaancial Ch

igher than

rrent project2016 PBR te.3 and 4.3, w0 million, is o  achieve  tspending in

ect costs arepleted, EWSimpacts on 

nt to 2016, dn  forecast aAs well,  sine additional d.   Since plad.     

ct of  additiofor  Wastew

g  to  quantifyre fully refle

on‐Routin

n Section 1ne  adjustme‐driven projeWater’s caputh East  LRcost of  thes

ne adjustmeater  to meety, EWSI  is nects.   

ans andallenges 

n Forecast 

tion  is that Irm will be mwhile over $needed to ahis  level  of  the remain

e not addedI does not exIn‐City Wate

depending oadditions  tonce much ofimpacts on danning  for  th

onal  capital water,  simpy  the  impaccted  in plan

ne Adjustm

.5, EWSI maents  from  thects, especiaital expenditT and otherse projects nt treatment or  exceednot  requesti

d Challeand Initia

Capital Ex

In‐City Watemore than $820 million oaddress the cspending  bder of 2015 

d to  In‐City Wxpect that iner and Wast

on the level  Wastewatef  the  additiodepreciationhe next PBR

spending  is ly  because cts  of  projecnning for the

ments for 2

ay request ahe  City.    Altally water mture programr water maito $21.2 mint, EWSI has  its  target  rng non‐rout

45 of 59

enges atives 

xpenditure

er and Wast86 million grf this increachallenges oby  the  end and into 20

Water and Wncreases in cewater’s ret

of capital sper’s  rate basonal  capital n expense frR  term  is sti

not  expectIn‐City  Watcted  in  cape remainder

2015 and F

adjustments though  no  nmain relocatim.  EWSI estn  relocationillion.   Altho been able treturn on  eqtine adjustm

es 

tewater’s coreater than ase is City‐drof aging infraof  the  20116.     

Wastewater’capital spendturn on equi

pending reqse  could  resrelates  to  l

rom assets bll on‐going, 

ted  to  be  aster  has  a  mital  expendir of the curr

uture Yea

to  In‐City Wnon‐routineions, are exptimates thatn projects  isough  this prto achieve oquity,  even ment  treatm

ombined capthe PBR forriven, the maastructure a2‐2016  PBR

’s rate baseding in 2015ity in the 201

uired in thesult  in  rate life‐cycle  rebeing retiredthese  impa

s  significantmuch  largeritures  and wrent PBR ter

rs 

Water and W  adjustmenpected to hat the total ins $11.2 milliroject could operating cowith  additi

ment  for  the 

pital expendrecast.  As dajority of that the Gold BR  term,  EWS

s until the p5 and 2016 w12‐2016 PBR

e 2017‐2021 increases  inplacements,d earlier thancts have no

  an  impact r  rate  basewill  ensure rm and for s

Wastewater’ts were  ideave significancrease in prion, bringingpotentially 

ost savings tonal  capitalcosts assoc

May 2015

itures over iscussed in e increase, Bar WWTP.  SI  plans  to 

project has would have R term.     

PBR term, n excess of ,  there  are n had been ot yet been 

for  In‐City .    EWSI  is that  these subsequent 

’s rates  for entified  for ant impacts roject costs g  the  total qualify  for hat enable l  spending.  ciated with 

Page 49: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

D5.1.3

As  noted downwardconsumptihave beencurrent PBactual  andresearchinidentified a 

Co5.1.4

EWSI, togeto  reflect developedEWSI  costrequiremeincorporaton  a  comphistorical  rservice mo

 15.0

 16.0

 17.0

 18.0

 19.0

 20.0

 21.0

m3 pe

r customer per m

onth

Services gress Report 

eclining Re

in  Section d  pressure on into the n greater  thaBR term.  Thd  forecast  cg  best  pracand impleme

ost of Serv

ether with thsystem  gro.   The new cs  allocated nts  for  thee “dual‐reguplaint  basis,regulatory dodel utilizes 

2005

esidential 

3.1,  declinon  EWSI’sPBR forecasan  anticipate greater thconsumptionctices  in  waented well in

Re

vice Study 

he regional wowth  and  ocost of servito  each  cu  next  PBR ulation”, res wholesale decisions.   Athe regulato

2006 20

Consumpt

ning  residens  revenues. sts for 2007‐ted  and  are han expectedn  per  resideter  forecastn advance o

esidential Co2

Update  

water customoperational ice model eustomer  groapplication

sulting from water  rates

As well,  simiory basis of a

007 2008

46 of 59

tion    

ntial  consum  Although

‐2011 and foexpected  tod decline is ential  customting,  so  thaf the next PB

Figure 5.1.3onsumption2005 to 2014

mers and thchanges  sinstablishes thup,  support.      The  revthe Albertas  charged  tolar  to  the oaccounting, 

2009

mption  perh  EWSI  inor 2012‐201o  challenge illustrated inmer  from  2at  forecastinBR term.    

3 per Custom4 

he City, havence  the  prehe methodoting  the  devvised  cost  oa Utilities Coo  the  regionold  cost of  swhich differ

2010 20

r  customer corporated 16, actual de EWSI over n Figure 5.12005  to  201ng  process  i

mer 

e revised theevious  cost ology for detvelopment of  service  mommission junal water  cservice modrs from the 

011 2012

is  placing declining 

eclines in cothe  remain

1.3 below wh14.    EWSI  isimprovemen

e cost of servof  service termining thof  rates  anmodel  is  deurisdiction toustomers  anel,  the  revisInternationa

2013

Actua

Forec

May 2015

significant residential nsumption nder of  the hich shows s  currently nts  can  be 

 

vice model study  was he share of nd  revenue esigned  to o regulate, nd  reflects sed cost of al Financial 

2014

al

cast

Page 50: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

Reporting separate  Irequireme

Con5.2

EPCOR’s cocustomer c • Partne

event pEPCORwater c

• Partnesuch asother p

• Continu

• Promotefficien

Env5.3

EWSI  strivfounding stakeholde EWSI  contResource based Albeand a  ten‐initiatives approval‐tostewardshpublic by J

Pro5.4

W5.4.1

Health CanEPCOR keeany changyears.  

Services gress Report 

Standards FRS  and  Rents.  

nservatio

onservation classes or gr

rship betwepromotes th’s participatconservation

ring with gos: The Way Wprograms;   

uing sponso

ting  conservncy informat

vironmen

es  to  ensurmember  ofer Integrated

tinues  to  mDevelopmenerta Environ‐year stewarEWSI  has  co‐operate  fip  commitmune 30.   

vincial an

Water 

nada continueps track of ges  to guidel

used  by  EWegulatory  fi

n Initiativ

platform fooups. Some 

en the City e use of wation in this en.   

overnment aWe Green Sp

rship of Albe

vation  and wtion and too

tal Initiat

re  that  it  suf  the  Northd Manageme

maintain  its nt’s  Envirovnment and Srdship agreecommitted  tfor  a  waterments.   Full d

nd Federa

uously revieguidelines uines  that w

WSI  for  all  oinancial  rec

ves  

cuses on ide2014 conse

of Edmontoter and enervent include

and businesspeaker Serie

erta RiverWa

water  efficiels on EPCOR

tives 

urpasses  curh  Saskatcheent Plan for 

Champion  sista  ProgramSustainable ement.  The to,  and  tharworks  systdetails will b

al Govern

ws and updnder reviewould materi

47 of 59

other  financords,  so  th

entifying andrvation initia

on, RONA anrgy efficiencyed sponsors

s to support s; World Wa

atch and the

ency  througR’s website to

rrent  and  prwan  Waterthe North Sa

status  undem.   ChampioResource Destewardshipt  go  above em.    EWSI be provided

nment In

ates the Guw and proposally  impact

cial  reportinhat  it  is  ab

d addressingatives includ

nd EPCOR toy products, hip and pro

 water efficater Day; Ca

e City’s River

gh  social meo help custo

roposed  envrshed  Allianaskatchewa

er  the  Alberon  status  inevelopmentp agreemen  and  beyonis  making 

d  in our 201

itiatives

idelines for sed review. the Water Q

ng.    Accordle  to  meet

g inefficient de:  

o host a Homgeneral edumotion of ra

iency and conada Water

r Clean Up p

edia  channeomers reduc

vironmentalnce  and  pan River Basin

rta  Environmnvolves  a  ne Approval‐tont outlines and  the  requgood  prog

14  EnviroVis

Canadian D At this timeQuality  inde

ingly,  EWSI t  regulatory

water use i

me$aver Ecoucation and aain barrels fo

onservation r Week and a

project; and

els,  includinge water was

l  standards.rticipates  inn.  

ment  and  Sew  ten‐yearo‐Operate  (6a set of enviuirements  ogress  on  fusta  report  to

Drinking Wate, EWSI is noex within  th

May 2015

maintains y  reporting 

n different 

o Sale. This awareness. or outdoor 

programs, a variety of 

g  updating stage.�

  EWSI  is  a n  a  multi‐

Sustainable r  outcome‐638‐03‐00) ironmental f  a  typical lfilling  the o be made 

ter Quality.  ot aware of e next  five 

Page 51: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water 2014 PBR Prog

 Alberta  Endrinking wMarch 201System  reghowever,  aAlberta  Enlicenses to

W5.4.2

EWSI  partManagemecommitteesurroundinAlberta’s  eexisting inda cumulatiGold Bar Aeffluent chHeartland   Environmecomply witneed to enCity`s  comaddition, t(other thanimpose new 

Services gress Report 

nvironment water  regulat15.    If  implegulatory  reqare not expnvironment  retain its hi

Wastewate

ticipates  in ent  Framewe.    One  of ng the use oeconomic  ddustry in theive effects aApproval  (20haracterizatiWater Mana

ent Canada ith the new nsure, howembined  sewehe new fedn the requirew regulation

and  Sustaintions  for Albmented  in  fquirements, pected  to  coand  Sustainstoric senior

r   

the  Albertwork  for  thethe  commi

of the North developmente region.  Thassessment o015‐2025) won and a poagement Fra

ssued new wregulations ver, that futer overflow eral regulated reportingns that woul

 

nable  Resouberta.   EWSfull, the reviincluding  th

ome  into  fornable  Resourity for with

ta  Environme  Industrial ittee’s  initiaSaskatchewt,  industriale Industrial of dischargewill  likely  incollution minamework ob

wastewater without theture changecontrol  straion does nog of such eved place rest

48 of 59

rce DevelopI  reviewed aisions will hhe Drinking rce until 20urce  Develodrawal from

ment  and  SHeartland  aatives  is  to wan River fro  projects  cHeartland Wes to the riveclude additionimization  stbjectives.  

systems effe requiremes to plant optegy do notot address wents).  Envirorictions on t

pment  has  pand commeave a signifWater Mon17.   EWSI hopment  to  am the North S

Sustainable and  Capital address  w

om Devon tourrently  unWater Manager and totalonal  requiretudy  that  lin

fluent regulant of additioperations tht  conflict wiwet weather onment Canthese overflo

proposed  a ented on  theicant  impacnitoring proghas  also  initamend  EWSSaskatchewa

Resource  DRegion  and

water  quantio Pakan, takndergoing  regement Fram  loadings mements  like ne up with 

ations in 201onal capital hat might beith  the newoverflows a

nada has notows. 

major  revise proposed t on Edmongram.   Thesiated discusSI’s  water  wan River.   

Developmend  sits  on  thity  and  quaking into conegulatory  remework is fo

managementin  stream mthe broader

12.  Gold Bainvestment

e required to  federal  regat the treatmt revealed an

May 2015

sion  to  the revision  in nton Water e changes, ssions with withdrawal 

nt’s  Water e  advisory ality  issues nsideration eview,  and ocussed on .   The next monitoring, r  Industrial 

r is able to t. EWSI will o meet the gulation.  In ment plant ny plans to 

Page 52: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  49 of 59  May 2015 2014 PBR Progress Report 

Appendix A: Historical Consumption Appendix A‐1:  Historical Consumption ‐ In‐City Water 

  A  B  C Consumption and Customer Counts ‐ Water  2012  2013  2014 

         1  Annual Consumption by Customer Class (ML)         2  Residential     43,317    43,622      44,876  3  Multi‐Residential     16,900    17,162      17,696  4  Commercial     28,768     28,662      28,572  5  Total     88,985    89,446      91,144           6  Average Monthly Customer Count         7  Residential    221,444   226,226     232,194  8  Multi‐Residential       3,407       3,470        3,522  9  Commercial     17,597     17,917      18,014  10  Total   242,448   247,613     253,730           

11  Average Monthly Consumption per Customer (m3)         12  Residential        16.3       16.1          16.1  13  Multi‐Residential       413.4     412.1        418.7  14  Commercial       136.2     133.3        132.2  

Appendix A‐2:  Historical Consumption ‐ Wastewater 

  A  B  C Consumption and Customer Counts ‐ Wastewater  2012  2013  2014 

         1  Annual Consumption by Customer Class (ML)         2  Residential  41,346  41,924  42,773 3  Multi‐Residential  16,936  17,107  17,704 4  Commercial  25,378  25,331  25,126 5  Total  83,660  84,362  85,603          6  Average Monthly Customer Count         7  Residential  221,170    226,118   232,086  8  Multi‐Residential      3,406         3,470    3,522  9  Commercial    15,231      15,488    15,573  10  Total  239,807    245,076    251,181           

11  Average Monthly Consumption per Customer (m3)         12  Residential       15.6           15.5    15.4  13  Multi‐Residential      414.4         410.8    418.9  14  Commercial      138.8         136.3    134.5  

Page 53: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  50 of 59  May 2015 2014 PBR Progress Report 

Appendix B: Historical Summary of Financial Performance Appendix B‐1:  Financial Performance – In‐City Water 

B‐1‐1:  Net Income and Return on Equity ‐ In‐City Water 

    A  B  C Net Income and Return on Equity ‐ Water  2012  2013  2014 

      ($ millions)   1  Net income   2  Revenue   150.4    161.7    172.8  3  Operating Costs   (90.3)   (87.2)   (90.4) 4  Depreciation   (17.2)   (19.0)   (20.0) 5  Interest Expense   (19.8)   (20.6)   (22.3) 6  Net Income   23.1    34.9    40.1 7  Rate Base and Return on Equity       8  Mid‐Year Rate Base   836.8    894.2    957.2  9  In‐City Share of Mid‐Year Rate Base         77.8%         77.9%         78.3% 

10  Rate Base (In‐City)   651.3    696.5    749.4  11  Equity Ratio       40.35%       39.59%        40.30% 12  In‐City Rate Base financed by Equity  262.8  275.8  302.0 13  Return on Equity ‐ %       8.8%    12.7%       13.3% 

         14  Capital Expenditures    84.1    85.9      99.3 

B‐1‐2:  Revenue ‐ In‐City Water 

  A B C Revenue - In-City Water 2012 2013 2014

    ($ millions)   1  Consumption Revenue   2     Residential   73.9    79.2    85.4  3     Multi‐Residential   22.4    24.3    26.1  4     Commercial   29.3    31.2    32.6  5  Total Consumption Revenue    125.6    134.7    144.1  6  Fixed Charge Revenue       7     Residential   17.7    19.1    20.1  8     Multi‐Residential   0.8    0.9    0.9  9     Commercial   2.6   2.8    2.9  

10  Total Fixed Charge Revenue   21.1    22.8    23.9  11  Total Consumption and Fixed Charge Revenue   146.7    157.5    168.0  

         12  Other revenue   3.7    4.2    4.8  13  Total Revenue      150.4   161.7    172.8  

  

Page 54: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  51 of 59  May 2015 2014 PBR Progress Report 

B‐1‐3:  Operating Costs ‐ In‐City Water 

    A  B  C Operating Costs ‐ In‐City Water  2012  2013  2014 

      ($ millions)   1  Operating Costs by Cost Category       2  Salaries and benefits   45.1    42.9    40.1  3  Corporate administration   20.3    14.0    13.1  4  EWSI Shared Services  ‐           2.7           9.5  5  Customer billing   9.1    8.8    8.8  6  Power   7.7    7.2    8.2  7  Chemicals  4.6    4.6    5.6  8  Contractors  5.8   6.1   6.1 9  Materials and supplies   3.0    2.7    3.0  

10  Vehicles   1.8    1.9    2.2  11  Other   0.2   1.3    (0.7) 12  Franchise fees   11.6    12.4    13.3  13  Total Operating Costs by Cost Category   109.2    105.6   109.2  

         14  Operating Costs by Operational Function         15  Water Treatment Plants   28.5    29.8    30.8  16  Distribution and Transmission   21.7    22.0    23.9  17  Quality Assurance and Environment   4.5    4.7    4.5  18  Operations Support Services   8.0    7.1    4.7  19  Administrative Services   5.4    3.7   0.6 20  EWSI Shared Services  ‐           2.7           9.5  21  Customer Billing   9.1    8.8   8.8  22  Corporate Administration Costs   20.4    14.4    13.1  23  Franchise Fees   11.6    12.4    13.3  24   Total Operating Costs by Operational Function   109.2    105.6    109.2           25  In‐City Water Share of Operating Costs ‐ %        82.8%        82.6%        82.8% 26  In‐City Water Share of Operating Costs ‐ $   90.3    87.2    90.4      

Page 55: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  52 of 59  May 2015 2014 PBR Progress Report 

Appendix B‐2:  Financial Performance ‐ Wastewater 

B‐2‐1:  Net Income and Return on Equity ‐ Wastewater 

    A  B  C Net Income and Return on Equity ‐ Wastewater  2012  2013  2014 

      ($ millions)   1  Net income   2  Revenue    61.1   66.5   72.6 3  Operating Costs    (40.2)  (40.2)  (44.4) 4  Depreciation      (8.5)    (8.7)    (9.5) 5  Interest Expense      (7.3)    (7.1)    (7.0) 6  Net Income      5.1   10.5   11.7      

7  Rate Base and Return on Equity       8  Mid‐Year Rate Base  263.2  266.3  276.7 9  Equity Ratio    40.46%    40.50%    39.70% 

10  Mid‐Year Rate Base financed by Equity  106.5   107.8   109.9  11  Return on Equity ‐ %  4.79% 9.74%  10.65%

         12  Capital Expenditures   11.8  25.1  37.7 

B‐2‐2:  Revenue ‐ Wastewater 

A B C Revenue - Wastewater 2012 2013 2014

    ($ millions)   1  Consumption Revenue   2     Residential   24.0    26.3    29.0  3     Multi‐Residential   9.8    10.6    12.0  4     Commercial   13.8    15.1    16.2  5  Total Consumption Revenue    47.6    52.0    57.2  6  Fixed Charge Revenue       7     Residential   8.1    9.2    10.0  8     Multi‐Residential   0.1    0.1    0.2  9     Commercial   0.6    0.5    0.7  

10  Total Fixed Charge Revenue   8.8    9.8    10.9  11  Total Consumption and Fixed Charge Revenue   56.4    61.8    68.1  

         12  Other revenue   4.7    4.6    4.5  13  Total Revenue   61.1    66.4    72.6       

Page 56: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  53 of 59  May 2015 2014 PBR Progress Report 

B‐2‐3:  Operating Costs ‐ Wastewater 

    A  B  C Operating Costs ‐ Wastewater  2012  2013  2014 

      ($ millions)   1  Operating Costs by Cost Category       2   Salaries and Benefits    15.2    15.5    17.6  3   Power Costs and Other Utilities    4.4    3.6    4.0  4   Franchise Fees    4.5    4.5    4.5  5   Customer Billing    4.8    4.8    4.6  6   Contractors and Consultants    3.7    3.7    4.2  7   Corporate Service Charges   2.3    2.5    2.5  8   Materials and Supplies (including chemicals)    1.0    0.7    1.7  9   Other    4.5    4.8    5.3  

10  Total Wastewater Operating Costs   40.4    40.1    44.4           

11  Operating Costs by Operational Function       12  Wastewater Treatment Plants   17.6    18.6    18.9  13  Quality Assurance and Environment   2.5    2.7    3.1  14  Operations Support Services   3.3    2.8    3.9  15  Administration Services   3.6    3.1    4.7  16  Customer Billing   4.5    4.5    4.5  17  Franchise Fees   4.4    3.6    4.0  18  Corporate Service Charges   4.5    4.8    5.3  19  Total Wastewater Operating Costs   40.4    40.1    44.4  

 

Page 57: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  54 of 59  May 2015 2014 PBR Progress Report 

Appendix C: Affiliate Transactions Appendix C‐1:  Affiliate Transactions Summary ‐ In‐City Water 

     A  B  C Affiliate Transactions ‐ Water     2012  2013  2014 

      ($ millions)   1  Transactions with EUI and its Subsidiaries   2  Interest expense (EUI)  23.9  25.8  27.8 3  Corporate administration (EUI)  23.9  18.0  13.1 4  Water shared services (EWSI)    ‐    2.6    9.5 5  Customer billing services (EEAI)    7.2    6.9    6.8 6  Meter reading services (EDTI)    4.5    4.5    4.6 7  Hydrovac charges and space rent (ETECH)    3.7    4.0    4.1 8  Soil/water dumping, locates & asset use charges (EDTI)    0.4    0.3    0.3 9  Technical training services (EDTI)    0.6    0.6    ‐ 

10  Water sales (Wastewater)    (0.3)    (0.3)    (0.3) 11  Meter reading services recoveries (Wastewater)    (1.7)    (1.7)    (1.8) 12  Water administration recoveries (non‐regulated operations)    (3.0)    (4.3)    ‐ 13  Corporate administration recoveries (non‐regulated 

operations)   (3.7)    (3.9)    ‐ 

14  Total  55.5  52.5  64.1          

15  Fees for Services Provided by Capital Power Corporation       16  Power charges    7.7  7.2  8.2 17  Total    7.7  7.2  8.2 

         18  Taxes and Fees for Services Provided by the City       19  Franchise fees  11.6  12.4  13.3 20  Property and business taxes    0.2    0.2    0.2 21  Paving & barricades    1.4    1.3    1.2 22  Customer services    2.0    2.3    3.0 23  Mobile equipment services    1.3    1.4    1.7 24  Interest expense*    1.5    1.3    1.2 25  Other services    ‐    0.3    0.1 26  Cost recoveries from City of Edmonton Transportation (MAP 

Services)   ‐    (1.3)    (0.3) 

27  Total  18.0  17.9  20.4          

28  Sales and Recoveries for Services Provided by EWSI to the City       29  Water sales for City of Edmonton parks and facilities    1.9    2.1    2.4 30  Miscellaneous sales    0.2    0.4    0.3 31  Meter reading services recoveries    1.7    1.7    1.8 32  Total    3.8    4.2    4.5 

* Includes 5 basis point administration fees.  

Page 58: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  55 of 59  May 2015 2014 PBR Progress Report 

Appendix C‐2:  Affiliate Transactions Summary ‐ Wastewater 

    A  B  C   Affiliate Transactions ‐ Wastewater  2012  2013  2014       ($ millions)  1  Transactions with EUI and its Subsidiaries       2  Corporate administration  (EUI)   4.4    3.6    4.0  3  Customer billing (EEAI)   2.6    2.5    2.5  4  Interest expense (EUI)   1.4    2.0    3.6  5  Meter reading services (Water)   1.7    1.7   1.8    6  Water purchases (Water)   0.3    0.3    0.3  7  Administrative services (Water)   0.7    1.4    2.6  8  Other    0.1   0.2    0.1    9  Total   11.2    11.7   14.9           

10  Fees for Services Provided by Capital Power Corporation       11  Power charges    ‐  1.0  4.0 12  Total  ‐  1.0  4.0 

         13  Taxes and Fees for Services Provided by the City of Edmonton       14  Franchise fees   4.4    4.8    5.3  15  Property and business taxes   0.5    0.4    0.5  16  Power charges (recoveries for Drainage Services)   4.1    3.2  ‐  17  Regulatory chargebacks from Drainage Services   0.9    0.9   0.9    18  Other   0.2    0.2   0.1   19  Interest expense*   4.9    4.6    4.3  20  Total   15.0    14.0    11.1  

         21  Sales and Recoveries for Services Provided by EWSI to the City of 

Edmonton      

22  Wastewater sales   0.5    0.7   0.8    23  Miscellaneous sales   0.2    0.2    0.2   24  Miscellaneous cost recoveries   0.2    0.1   0.1   25  Total  0.9  1.0  1.1 

* Includes 5 basis point administration fee.  

   

Page 59: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  56 of 59  May 2015 2014 PBR Progress Report 

Appendix D: Water and Wastewater Treatment Rates Appendix D‐1: Water Rates  

D‐1‐1:  Consumption Rates ‐ Water 

    A  B  C 

  Consumption Block   2012 Rate ($/m3) 

2013 Rate ($/m3) 

2014 Rate($/m3) 

1  Residential       2  0.0 m3 to 10.0 m3  1.6435  1.7469  1.7990 3  10.1 m3 to 35.0 m3  1.7955  1.9084  1.9653 4  Over 35.0 m3  2.2691  2.4117  2.4837 5  Multi‐Residential       6  0.0 m3 to 100.0 m3  1.5948  1.6951  1.7457 7  100.1 m3 to 1,000.0 m3  1.3343  1.4182  1.4605 8  Over 1,000.0 m3  1.1025  1.1718  1.2067 9  Commercial       10  0.0 m3 to 25.0 m3  1.2508  1.3296  1.3693 11  25.1 m3 to 100.0 m3  1.2508  1.3296  1.3693 13  100.1 m3 to 1,000.0 m3  1.1537  1.2263  1.2629 14  1,000.1 m3 to 5,000.0 m3  0.9131  0.9706  0.9995 15  Over 5,000.0 m3  0.7351  0.7813  0.8046 

D‐1‐2:  Fixed Monthly Service Charges ‐ Water 

    A  B  C    Meter Size  2012 Rate 

($) 2013 Rate 

($) 2014 Rate 

 ($) 1    15 mm  6.55        6.90   7.03 2    20 mm  8.99       9.46   9.64 3    25 mm  12.74     13.41  13.67 4    40 mm  22.26      23.43   23.88 5    50 mm  29.66      31.22   31.83 6    75 mm  58.88      61.98   63.18 7  100 mm  107.57    113.23  115.43 8  150 mm  201.32    211.93   216.04 9  200 mm  319.83    336.68   343.21 

10  250 mm  747.41    786.79  802.04 11  300 mm  747.41    786.79   802.04 12  400 mm  893.52    940.61   958.84 13  500 mm  962.18  1,012.88   1,032.52 

 

   

Page 60: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  57 of 59  May 2015 2014 PBR Progress Report 

Appendix D‐2: Wastewater Treatment Rates   

D‐2‐1 Consumption and Fixed Monthly Service Charges ‐ Wastewater  

    A  B  C 

Consumption and Fixed Monthly Service Charges  2012 Rate ($) 

2013 Rate ($) 

2014 Rate ($) 

1  Consumption Charge per m3       2  Residential1       3  All consumption  0.5955  0.6361  0.6855 4  Commercial       5  0.0 m3 to 10,000.0 m3  0.5955  0.6361  0.6855 6  10,000.1 m3 to 100,000.0 m3  0.4607  0.4921  0.5303 7  Over 100,000.0 m3  0.2403  0.2567  0.2767 8  Fixed Monthly Service Charge per Meter        9  All Customers  3.12   3.33  3.58 

D‐2‐2:  Overstrength and Additional Overstrength Surcharges 

    A  B  C 

Surchargeable Matter  2012 Rate ($/kg) 

2013 Rate ($/kg) 

2014 Rate ($/kg) 

1  Overstrength Surcharges       2  Biochemical Oxygen Demand (BOD)  > 300 mg/L  0.3730      0.3984   0.4294 3  Chemical Oxygen Demand (COD) > 600 mg/L *  0.3730      0.3984   0.4294 4  Oil and grease > 100 mg/L  0.3262      0.3484   0.3755 5  Phosphorous > 10 mg/L  3.1038      3.3152   3.5731 6  Suspended solids > 300 mg/L  0.3386      0.3617   0.3898 7  Total Kjeldahl nitrogen (TKN) > 50 mg/L  0.7922      0.8461   0.9119          8  Additional Overstrength Surcharges       29  Biochemical Oxygen Demand (BOD)  > 3,000 mg/L  0.3730      0.3984   0.4294 10  Chemical Oxygen Demand (COD) > 6,000 mg/L *  0.3730      0.3984   0.4294 11  Oil and grease > 400 mg/L  0.3262      0.3484   0.3755 12  Phosphorous > 75 mg/L  3.1038      3.3152   3.5731 13  Suspended solids > 3,000 mg/L  0.3386      0.3617   0.3898 14  Total Kjeldahl nitrogen (TKN) > 200 mg/L  0.7922      0.8461   0.9119  

 

Page 61: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  58 of 59  May 2015 2014 PBR Progress Report 

Appendix E: Operating Performance Measures Appendix E‐1:  Water System Service Quality Measures  

     A  B  C  D 

Index and Performance Measures ‐ Water  Performance Standard  2012  2013  2014 

           1  System Reliability Index      25.0  28.5  28.5  28.5 2  Water Main Break Factor  574  370       278    392 3  Water Main Break Repair Duration Factor  93.7%  94.6%     94.9%      91.2% 4  Planned Interruption Factor  95.0%  95.6%     95.6%      96.4% 5  Water Pressure Factor  5  1           0        1 6  Water Loss Factor  3.0  1.46      1.29  1.27            

8  Water Quality Index          25.0  25.1  25.1  25.1 9  Water Quality Index  99.6%  99.8%      99.8%      99.8%            

10  Customer Service Index         20.0  22.5  22.8  21.2 11  Post Service Audit Factor  74.0%  72.3%     77.8%      73.6% 12  Response Time Factor  25  16         16          21 13  Home Sniffing Factor  93.8%  97.0%      94.8%      95.7% 

           14  Environmental Index  15.0  16.2  15.8  16.5 15  Emergency Response Training  4  5  4  5 16  Completeness and Timeliness of Reporting  100%  92.1%  100.0%  100.0% 17  Environment Incident Management  7  5  4  5 18  Water Conservation Factor  19.0  18.2  17.8  17.5 19  Watershed Program Activity  5  7  7  7 

           20  Safety Index  15.0  14.1  14.6  16.0 21  Safety Meetings  36  36  36  42 22  Formal Safe Work Plans  3,100  12,863  12,417  14,059 23  First Aid Training  33%  66.6%  55.5%  55.3% 24  Work Site Inspections / Observations   800  1,127  998  1,297 25  Lost Time Frequency Rate  0.59  0.96  0.46  0.67 26  All Injury Frequency Rate  2.40  1.68  0.46  1.57 27  Injury Severity Rate  8.92  40.80  41.76  5.17 

           28  Aggregate Points Earned  100.0  106.4  106.8  107.2 29  Points Above / (Below) Performance Standard    6.4  6.8  7.2     

Page 62: 2014 progress report...progress report epCor water serviCes inC. 2012-2016 perFormanCe based regulation may 2015 EPCOR Water 2014 PBR Prog 1 EXECU 1.1 NET 1.2 CAPI 1.3 OPE 1.4 RATE

 

EPCOR Water Services  59 of 59  May 2015 2014 PBR Progress Report 

Appendix E‐2:  Wastewater Treatment Service Quality Measures  

      A  B  C  D 

Index and Performance Measures ‐ Wastewater  Performance Standard  2012  2013  2014 

           1  System Reliability Index  15.0  16.0  16.0  16.0 2  Enhanced Primary Treatment  75.0%  91.8%  89.2%  84.3%            

3  Wastewater Quality Index  40.0  44.0  44.0  44.0 4  Wastewater Effluent Limit Performance Index  46.0%  20.7%  20.7%  22.9%            

5  Customer Service Index  5.0  5.0  5.0  5.0 6  Customer Inquiries Response  90.0%  96.4%  96.3%  92.3%            

7  Environmental Index  20.0  21.3  19.3  22.0 8  Emergency Response Training  1  2  1  2 9  Completeness and Timeliness of Reporting  100%  88.9%  88.9%  100% 

10  Environment Incident Management  18  7  8  6            

11  Safety Index  20.0  23.0  23.0  23.0 12  Safety Meetings  12  12  12  12 13  Formal Safe Work Plans   1,100  7,283  8,283  8,758 14  First Aid Certified  33.0%  59.4%  71.5%  72.7% 15  Work Site Inspections / Observations  270  960  685  908 16  Lost Time Frequency Rate  0.81  0.00  0.00  0.00 17  All Injury Frequency Rate  2.42  0.94  0.00  0.00 18  Injury Severity Rate  8.88  0.00  0.00  0.00 

           19  Aggregate Points Earned  100.0  109.3  107.3  110.0 20  Points Above / (Below) Performance Standard    9.3  7.3  10.0