Arkansas State Highway and Transportation Department Statewide Transportation Improvement Program (STIP) Presented by the Arkansas State Highway Commission In compliance with Title 23-United States Code-Section 135 October 1, 2012 2013-2016 Federal Fiscal Years

Transcript of 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue...

Page 1: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

Arkansas State Highway and

Transportation Department

Statewide Transportation

Improvement Program (STIP)

Presented by the

Arkansas State Highway Commission

In compliance with Title 23-United States Code-Section 135

October 1, 2012

2013-2016 Federal Fiscal Years

Page 2: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 3: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

AHTD STIP

Arkansas State Highway and Transportation Department Statewide Transportation Improvement Program

2013-2016 Federal Fiscal Years

www.arkansashighways.com

Page 4: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 5: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

TABLE OF CONTENTS

Introduction ........................................................................................................ i

Financial Summary Report

Federal Highway Administration Funds ........................................... v

Federal Transit Administration Funds .............................................. vi

Glossary of Terms / Abbreviations / Acronyms ............................ vii

Information on Grouped Categories .................................................. viii

Projects

State Projects Sorted by Route ........................................................... 1

Local Projects

Areas > 200,000 Population

Central Arkansas Regional Transportation Study Area .............................. 26

West Memphis-Marion Area Transportation Study ................................... 30

Areas < 200,000 Population ................................................................... 32

Statewide Generic Projects

FFY 2013 ................................................................................................ 34

FFY 2014 ................................................................................................ 36

FFY 2015 ................................................................................................ 38

FFY 2016 ................................................................................................ 40

Transit Projects

FFY 2013 ................................................................................................ 42

FFY 2014 ................................................................................................ 50

FFY 2015 ................................................................................................ 57

FFY 2016 ................................................................................................ 64

Eastern Federal Lands Highway Division ...................................... 71

State and Local Projects Sorted by Job Number .......................... 72

State and Local Projects Sorted by County ................................... 99

Page 6: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 7: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

i

INTRODUCTION This Statewide Transportation Improvement Program (STIP) for Federal Fiscal Years (FFY) 2013 through 2016 has been prepared by the Arkansas State Highway Commission in response to 23 U.S.C. 135 - Statewide Planning, as amended by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users. Authorization for the listed projects may be requested for any phase of development (i.e., preliminary engineering, right of way, utilities, or construction) during FFY 2013-2016. Authorization for pre-construction phases may be requested in advance of the year a project is scheduled for construction to assure the project can be advertised and let to contract as scheduled in this STIP. With respect to urban areas greater than 50,000 in population, projects listed in the Transportation Improvement Programs (TIPs) that have been developed by the various Metropolitan Planning Organizations (MPOs) are hereby included as part of the overall Federal-aid highway construction program. For additional information on projects located within a TIP Area, consult the following TIPs or contact the appropriate MPO.

CARTS - Central Arkansas Regional Transportation Study (Pulaski, Saline, Faulkner, & Lonoke Counties)

Metroplan Mr. Jim McKenzie, Executive Director 501 West Markham, Suite B Little Rock, AR 72201 Telephone: 501-372-3300

Frontier - Frontier Transportation Study

(Crawford & Sebastian Counties) Frontier Metropolitan Planning Organization Mr. John Guthrie, Executive Director 1109 South 16th Street Fort Smith, AR 72901 Telephone: 479-785-2651

Page 8: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

ii

HSATS - Hot Springs Area Transportation Study (Garland & Hot Spring Counties)

Hot Springs Metropolitan Planning Organization Mr. David Watkins, City Manager City of Hot Springs 133 Convention Boulevard Hot Springs, AR 71901 Telephone: 501-321-4804

JATS - Jonesboro Area Transportation Study

(Craighead County)

Jonesboro Metropolitan Planning Organization The Honorable Harold Perrin Mayor of Jonesboro 515 West Washington Avenue Jonesboro, AR 72401 Telephone: 870-933-4623

NARTS - Northwest Arkansas Regional Transportation Study

(Washington & Benton Counties)

Northwest Arkansas Regional Planning Commission Mr. Jeff Hawkins, Executive Director 1311 Clayton Street Springdale, AR 72762 Telephone: 479-751-7125

PBATS - Pine Bluff Area Transportation Study

(Jefferson County)

Southeast Arkansas Regional Planning Commission Ms. Jerre George, Director 1300 Ohio Street Pine Bluff, AR 71601 Telephone: 870-534-4247

Page 9: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

iii

TUTS - Texarkana Urban Transportation Study

(Miller County)

Texarkana Metropolitan Planning Organization Mr. George Shackleford, City Manager City of Texarkana 220 Texas Boulevard Texarkana, TX 75501 Telephone: 903-798-3927

WMATS - West Memphis-Marion Area Transportation Study (Crittenden County)

West Memphis Metropolitan Planning Organization The Honorable William Johnson Mayor of West Memphis 205 South Redding Street West Memphis, AR 72301 Telephone: 870-732-7500

Projects (including Federal Transit Administration Projects) utilizing funds set aside for rural areas were selected in consultation with the appropriate local officials. This program includes both the Federal-aid portion and the 100% State funded portion of the State's overall highway construction program and is financially constrained in accordance with federal regulations set forth in 23 CFR Part 450. The following financial summary demonstrates current and estimated revenues to fund the STIP, while the system as a whole is being adequately operated and maintained. Additional information regarding this program may be obtained by contacting: Lorie H. Tudor Assistant Chief Engineer - Planning Arkansas State Highway and Transportation Department P. O. Box 2261 Little Rock, Arkansas 72203 Telephone: (501) 569-2241

Page 10: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

iv

NOTICE OF NONDISCRIMINATION

The Arkansas State Highway and Transportation Department (Department) complies with all civil rights provisions of federal statutes and related authorities that prohibited discrimination in programs and activities receiving federal financial assistance. Therefore, the Department does not discriminate on the basis of race, sex, color, age, national origin, religion or disability, in the admission, access to and treatment in Department’s programs and activities, as well as the Department’s hiring or employment practices. Complaints of alleged discrimination and inquiries regarding the Department’s nondiscrimination policies may be directed to EEO/DBE Section Head (ADA/504/Title VI Coordinator), P. O. Box 2261, Little Rock, AR 72203, (501) 569-2298, (Voice/TTY 711), or the following email address: EEO/[email protected]

Page 11: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

MOTOR FUEL & REGISTRATION FEES

4c DIESEL TAX - IRP

NATURAL GAS SEVERANCE TAX

REVENUES

EXPENDITURES (1)

STATE FUNDS REMAINING FOR

CONSTRUCTION

FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED

INTERSTATE MAINTENANCE 95.1 123.9 97.0 103.7 98.9 99.3 100.9 91.5 392.0 418.4

2011 INT REHAB BOND PROGRAM 225.0 222.2 200.0 193.7 150.0 132.7 0.0 26.4 575.0 575.0

NATIONAL HIGHWAY SYSTEM 108.6 96.9 110.8 105.7 113.0 124.3 115.3 113.1 447.7 440.0SURFACE TRANSPORTATION 186.3 153.8 189.5 181.6 192.8 163.9 196.1 152.8 764.7 652.1CONGESTION MITIGATION & AIR QUALITY 12.2 11.2 12.5 22.4 12.7 2.0 13.0 15.7 50.4 51.3HIGHWAY SAFETY 22.9 22.7 23.3 26.6 23.8 22.2 24.3 32.2 94.3 103.7

RAIL-HWY CROSSING 3.5 3.4 3.6 3.5 3.7 3.7 3.8 8.3 14.6 18.9

SAFE ROUTES TO SCHOOL 1.5 1.4 1.5 1.4 1.6 1.4 1.6 1.4 6.2 5.6

BRIDGE REPLACEMENT 78.0 87.8 79.5 75.7 81.1 76.9 82.7 77.5 321.4 317.9

RECREATIONAL TRAILS 1.4 0.8 1.4 0.8 1.5 0.8 1.5 0.8 5.7 3.2

SUB-TOTAL 734.6 724.0 719.2 715.2 679.1 627.2 539.1 519.7 2,672.0 2,586.0

EARMARKED FUNDS 56.2 56.2 12.4 12.4 57.3 57.3 4.0 4.0 129.9 129.9

FEDERAL LANDS HIGHWAY PROGRAM 0.0 0.0 0.1 0.1 0.25 0.25 0.0 0.0 0.3 0.3

STATE MATCH 88.5 88.5 94.5 94.5 100.8 100.8 105.0 105.0 388.8 388.8

IRP DEBT SERVICE 17.5 17.5 17.5 17.5 17.5 17.5 17.5 17.5 70.0 70.0

OTHER MATCH(2) 93.0 93.0 16.8 16.8 11.1 11.1 18.3 18.3 139.2 139.2

TOTAL 989.8 979.2 860.6 856.5 866.0 814.1 683.9 664.4 3,400.3 3,314.3

FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED

402-SAFETY 15.6 15.3 15.8 15.7 16.0 16.1 16.2 16.6 63.8 63.7

100% STATE 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 200.0 200.0

NATURAL GAS SEVERENCE TAX 25.0 25.0 30.0 30.0 30.0 30.0 30.0 30.0 115.0 115.0

TOTAL 90.6 90.3 95.8 95.7 96.0 96.1 96.2 96.6 378.8 378.7

GRAND TOTAL 1,080.4 1,069.6 956.4 952.2 962.0 910.2 780.1 761.0 3,779.1 3,693.0

NOTE: TOTAL MAY NOT BE ADDITIVE DUE TO ROUNDING

(1) INCLUDES FUNDS TO BE USED FOR MAINTENANCE AND OPERATIONS OF EXISTING SYSTEM

TOTAL2013

367.5

17.5

2015

376.5

17.5

385.0

17.5

2016

390.0

ESTIMATED STATE REVENUE ANALYSIS

2014

25.0

410.0

17.5

1,519.0

70.0

115.0

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

FINANCIAL SUMMARY REPORT FOR FEDERAL FISCAL YEARS 2013-2016(x $1 million)

30.0

OTHER AVAILABLE FUNDING ANALYSIS

432.5

122.3

FHWA FEDERAL FUNDING ANALYSIS

2013

(285.1)

424.0

30.0 30.0

124.9 125.3 125.6

(315.2)

(2) LOCAL, STATE AID, RAILROAD

20152014 2016

498.1

437.5

(298.7) (306.9) (1,205.9)

1,704.0

TOTAL

2013 2014 2015 2016 TOTAL

v

Page 12: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED

FTA 5307 - URBANIZED AREAS $10,701 $10,701 $10,701 $10,701 $10,701 $10,701 $10,701 $10,701 $42,804 $42,804

FTA 5308 - CLEAN FUELS $4,746 $4,746 $4,746 $4,746

FTA 5309 - BUS & BUS FACILITIES $6,328 $6,328 $6,328 $6,328

FTA 5310 - ELDERLY & DISABLED $1,514 $1,514 $1,514 $1,514 $1,514 $1,514 $1,514 $1,514 $6,056 $6,056

FTA 5311 - NONURBANIZED AREAS $10,933 $10,933 $10,933 $10,933 $10,933 $10,933 $10,933 $10,933 $43,732 $43,732

FTA 5316 - JOB ACCESS & REVERSE COMMUTE $1,814 $1,814 $1,814 $1,814 $1,814 $1,814 $1,814 $1,814 $7,256 $7,256

FTA 5317 - NEW FREEDOM $974 $974 $974 $974 $974 $974 $974 $974 $3,896 $3,896

EARMARKED FUNDS $238 $238 $238 $238

SUB-TOTAL $37,248 $37,248 $25,936 $25,936 $25,936 $25,936 $25,936 $25,936 $115,056 $115,056

STATE FUNDS $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $15,000 $15,000

LOCAL MATCH $27,738 $28,738 $25,861 $25,861 $25,861 $25,860 $25,861 $25,861 $105,322 $106,320

GRAND TOTAL $68,736 $69,736 $55,547 $55,547 $55,547 $55,546 $55,547 $55,547 $235,378 $236,376

vi

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

FINANCIAL SUMMARY FOR FEDERAL FISCAL YEARS 2013-2016(x $1 thousand)

FTA FEDERAL FUNDING ANALYSIS

FY 2013 FY 2014 FY 2015 FY 2016 TOTAL

Page 13: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS

vii

402402402402----SafetySafetySafetySafety Funds set aside for safety improvements due to the lack of a state open container law.

JETSJETSJETSJETS Jonesboro Economical Transit System

4444----RRRR Resurfacing, Restoration, Rehabilitation and Reconstruction LULULULUZAZAZAZA Local Urbanized Area

BRBRBRBR Bridge Replacement Funds MPOMPOMPOMPO Metropolitan Planning Organization

Bs. & Surf.Bs. & Surf.Bs. & Surf.Bs. & Surf. Base and Surfacing NARTSNARTSNARTSNARTS Northwest Arkansas Regional Transportation Study

CARTSCARTSCARTSCARTS Central Arkansas Regional Transportation Study NHSNHSNHSNHS National Highway System Funds

CATACATACATACATA Central Arkansas Transit Authority PBATSPBATSPBATSPBATS Pine Bluff Area Transportation Study

CMAQ AQCMAQ AQCMAQ AQCMAQ AQ Congestion Mitigation and Air Quality Funds – Air Quality Use P.E.P.E.P.E.P.E. Preliminary Engineering

CMAQ FLEXCMAQ FLEXCMAQ FLEXCMAQ FLEX Congestion Mitigation and Air Quality Funds – Flexible Use Rec TrailsRec TrailsRec TrailsRec Trails Recreational Trail Funds

CRCRCRCR County Road RRRRRRRR Railroad

CSCSCSCS City Street RRPRRPRRPRRP Railway-Highway Crossing Program Funds

EarmarkEarmarkEarmarkEarmark Various Earmarked Funds in Previous Highway Acts RUZARUZARUZARUZA Regional Urbanized Area

EFLHDEFLHDEFLHDEFLHD Eastern Federal Lands Highway Division of the Federal Highway Administration

SRTSSRTSSRTSSRTS Safe Routes to School Funds

Eng.Eng.Eng.Eng. Engineering STPSTPSTPSTP Surface Transportation Program Funds

ENHENHENHENH Enhancement Funds STP > 200,000STP > 200,000STP > 200,000STP > 200,000 Surface Transportation Program funds for areas greater than 200,000 population

FRONTIERFRONTIERFRONTIERFRONTIER Frontier Metropolitan Planning Organization STP < 200,000STP < 200,000STP < 200,000STP < 200,000 Surface Transportation Program funds for areas less than 200,000 population

FTAFTAFTAFTA Federal Transit Administration Funds Str. & Apprs.Str. & Apprs.Str. & Apprs.Str. & Apprs. Structure and Approaches

Gr. & Strs.Gr. & Strs.Gr. & Strs.Gr. & Strs. Grading and Structures TIPTIPTIPTIP Transportation Improvement Program

HSAHSAHSAHSA----MPOMPOMPOMPO Hot Springs Area Metropolitan Planning Organization TDOTTDOTTDOTTDOT Tennessee Department of Transportation

HSIPHSIPHSIPHSIP Highway Safety Improvement Program Funds TUTSTUTSTUTSTUTS Texarkana Urban Transportation Study

IMIMIMIM Interstate Maintenance Funds U of AU of AU of AU of A University of Arkansas

IRPIRPIRPIRP Interstate Rehabilitation Program WMATSWMATSWMATSWMATS West Memphis-Marion Area Transportation Study

JATSJATSJATSJATS Jonesboro Area Transportation Study

Page 14: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 15: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

viii

ARKANSAS’ STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FEDERAL FISCAL YEARS 2013-2016

INFORMATION ON GROUPED CATEGORIES

INTERSTATE MAINTENANCE

• VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of the Interstate System. The purpose of these improvements would be to improve the ride quality, to extend the life of pavements, or to improve traffic service on the Interstate System. Improvements could include interchange reconstruction and increasing lanes widths and/or shoulder widths to current standards, but do not include adding capacity.

• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

NATIONAL HIGHWAY SYSTEM

• VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of routes on the National Highway System. The purpose of these improvements would be to improve the ride quality or to extend the life of pavements on the National Highway System. Although projects may increase lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.

• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

SURFACE TRANSPORTATION PROGRAM

• VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of routes functionally classified above rural minor collector. The purpose of these improvements would be to improve the ride quality or to extend the life of pavements. Although projects may increase lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.

• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

• VARIOUS RESURFACING / RESTORATION / REHABITATION / RECONSTRUCTION / BRIDGE REPLACEMENT / BRIDGE REHABILITATION ON COUNTY ROADS– Eligible projects would include resurfacing, restoration, rehabilitation, reconstruction, signalization, increasing lanes widths and/or shoulder widths to current standards, intersection improvements such as the addition of turn lanes, pedestrian and bicycle improvements, bridge rehabilitation or replacement, and railroad crossing improvements. Projects to add capacity are not included in this category.

Page 16: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

ix

SURFACE TRANSPORTATION PROGRAM – URBAN PROJECTS IN AREAS > 200,000

• LUZA/RUZA NON-CAPACITY PROJECTS – Projects in this category include improvements to maintain the system of eligible routes in Transportation Management Areas. Eligible projects would include resurfacing, restoration, rehabilitation, reconstruction, signalization, increasing lanes widths and/or shoulder widths to current standards, intersection improvements such as the addition of turn lanes, pedestrian and bicycle improvements, bridge rehabilitation or replacement, and railroad crossing improvements. Projects to add capacity are not included in this category.

SURFACE TRANSPORTATION PROGRAM – URBAN PROJECTS IN AREAS < 200,000

• SIGNALIZATION / INTERSECTION IMPROVEMENTS – Projects in this category include signalization, signal upgrades, signal coordination, and the addition of turn lanes to improve the flow of traffic through intersections.

SURFACE TRANSPORTATION PROGRAM – ENHANCEMENT

• VARIOUS ENHANCEMENT TYPE PROJECTS – Projects in this category include those eligible under the Federal Transportation Enhancement Program as listed in 23 USC 101(a)(35). These include:

� Provision of facilities for pedestrians and bicycles. � Provision of safety and educational activities for pedestrians and bicyclists. � Acquisition of scenic easements and scenic or historic sites (including historic battlefields). � Scenic or historic highway programs (including the provision of tourist and welcome center

facilities). � Landscaping and other scenic beautification. � Historic preservation. � Rehabilitation and operation of historic transportation buildings, structures, or facilities

(including historic railroad facilities and canals). � Preservation of abandoned railway corridors (including the conversion and use of the

corridors for pedestrian or bicycle trails). � Inventory, control, and removal of outdoor advertising. � Archaeological planning and research. � Environmental mitigation--

(i) to address water pollution due to highway runoff; or (ii) reduce vehicle-caused wildlife mortality while maintaining habitat connectivity.

� Establishment of transportation museums.

• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

BRIDGE REPLACEMENT

• VARIOUS BRIDGE REHABILITATION / REPLACEMENT – Projects in this category include the replacement or rehabilitation of eligible bridges. While improvements may include increasing lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.

• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

Page 17: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

x

• BRIDGE PAINTING / GUARD RAIL / SCOUR CONTROL / INSPECTION – Projects in this category include the routine inspection of bridges, painting structural steel, adding or replacing guard rail at bridge ends, and improvements to columns to control scour.

• VARIOUS BRIDGE REHABILITATION / REPLACEMENT ON COUNTY ROADS – Projects in this category include the replacement or rehabilitation of eligible bridges. While improvements may include increasing lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.

HIGHWAY SAFETY IMPROVEMENT PROGRAM

• VARIOUS SAFETY TYPE IMPROVEMENTS – Highway safety improvement project means a project consistent with the State strategic highway safety plan (SHSP) that corrects or improves a hazardous road location or feature, or addresses a highway safety problem. Projects include, but are not limited to, the following:

� An intersection safety improvement. � Pavement and shoulder widening (including addition of a passing lane to remedy an unsafe

condition). � Installation of rumble strips or other warning devices, if the rumble strips or other warning

devices do not adversely affect the safety or mobility of bicyclists, pedestrians and persons with disabilities.

� Installation of a skid-resistant surface at an intersection or other location with a high frequency of crashes.

� An improvement for pedestrian or bicyclist safety or for the safety of persons with disabilities.

� Construction of any project for the elimination of hazards at a railway-highway crossing that is eligible for funding under 23 U.S.C. 130, including the separation or protection of grades at railway-highway crossings.

� Construction of a railway-highway crossing safety feature, including installation of highway-rail grade crossing protective devices.

� The conduct of an effective traffic enforcement activity at a railway-highway crossing. � Construction of a traffic calming feature. � Elimination of a roadside obstacle or roadside hazard. � Improvement of highway signage and pavement markings. � Installation of a priority control system for emergency vehicles at signalized intersections. � Installation of a traffic control or other warning device at a location with high crash potential. � Transportation safety planning. � Improvement in the collection and analysis of safety data. � Planning integrated interoperable emergency communications equipment, operational

activities, or traffic enforcement activities (including law enforcement assistance) relating to work zone safety.

� Installation of guardrails, barriers (including barriers between construction work zones and traffic lanes for the safety of road users and workers), and crash attenuators.

� The addition or retrofitting of structures or other measures to eliminate or reduce crashes involving vehicles and wildlife.

� Installation and maintenance of signs (including fluorescent yellow-green signs) at pedestrian-bicycle crossings and in school zones.

� Construction and operational improvements on high risk rural roads. � Conducting road safety audits.

Page 18: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

xi

.

• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

RAILWAY-HIGHWAY CROSSING

• RAILROAD CROSSING PROTECTIVE DEVICES / SURFACING / HAZARD ELIMINATION – Projects in this category include adding or upgrading flashing lights and gates, crossbucks or surfaces at railroad crossings, and the construction of railroad overpasses.

CONGESTION MITIGATION AND AIR QUALITY

• NON-ATTAINMENT PROJECT – Projects in this category have been selected by the Metropolitan Planning Organization in an area designated by the Environmental Protection Agency as a non-attainment area for the National Ambient Air Quality Standards and have been documented to decrease vehicular emissions.

RECREATIONAL TRAILS

• VARIOUS TRAIL PROJECTS – Projects in this category will be approved through the solicitation of applications. Eligible projects include motorized and non-motorized trails and trail facilities.

SAFE ROUTES TO SCHOOL

• VARIOUS SAFE ROUTES TO SCHOOL PROJECTS – Projects in this category will be approved through the solicitation of applications. Eligible projects include infrastructure and non-infrastructure projects, as well as administration of a Safe Routes to School Program that benefits elementary and middle school children in grades K-8. Infrastructure-related projects include the planning, design, and construction of projects within public right of way that will substantially improve the ability of students to walk and bicycle to school. These include:

� Sidewalk improvements, � Traffic calming and speed reduction improvements, � Pedestrian and bicycle crossing improvements, � On-street bicycle facilities, � Off-street bicycle and pedestrian facilities, � Secure bicycle parking facilities, and � Traffic diversion improvements in the vicinity of schools. � Non-infrastructure-related activities include activities that will encourage walking and

bicycling to school, including: � Public awareness campaigns and outreach, � Traffic education and enforcement in the vicinity of schools, � Student sessions on bicycle and pedestrian safety, health, and environment, and � Funding for training, volunteers, and managers of SRTS Programs.

NATIONAL SCENIC BYWAYS

• SCENIC BYWAYS PROJECTS – Eligible projects in this category include: � An activity related to the planning, design, or development of a State or Indian tribe scenic

byway program;

Page 19: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

xii

� Development and implementation of a byway corridor management plan; � Safety improvements to accommodate increased traffic; improvements that enhance

access; protection of resources adjacent to the byway; � Development and implementation of a marketing program; � Development and provision of tourist implementation; and construction of bicycle and

pedestrian facilities, interpretive facilities, overlooks and other enhancements for byway travelers.

Page 20: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 21: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

State Highway Projects Sorted by Route

Page 22: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 23: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

BB0301 Miller 030 Texas State Line-Hwy. 108 (S) Rehabilitation 7.10 2015State State TUTS5,852 - TOTAL

5,852 - Bond

BB0310 Miller 030 Hwy. 108-Hwy. 67 (S) Rehabilitation 4.40 2015State State7,253 - TOTAL

7,253 - Bond

BB0302 Miller 030 Hwy. 67-West of Red River (S) Rehabilitation 4.50 2016State State7,529 - TOTAL

7,529 - Bond

BB0303 Miller 030 Red River-East & West (F) Rehabilitation 1.80 2014State State17,745 - TOTAL

17,745 - Bond

BB0305 Hempstead 030 Hwy. 67-Sheppard (F) Rehabilitation 4.10 2016State State18,864 - TOTAL

18,864 - Bond

BB0306 Hempstead 030 Sheppard-Hwy. 278 (S) Rehabilitation 7.10 2014State State20,178 - TOTAL

20,178 - Bond

BB0702 Clark 030 Hwy. 26-Caddo River (F) Rehabilitation 8.30 2014State State6,577 - TOTAL

6,577 - Bond

BB0602 Saline 030 Hwy. 70-West (West Bound Lanes) (S) Rehabilitation 2.90 2015State State CARTS8,901 - TOTAL

8,901 - Bond

BB0403 Craw & Frank 040 Dyer-Cravens Creek (S) Rehabilitation 14.10 2013State State11,280 - TOTAL

11,280 - Bond

BB0804 Pope 040 Mill Creek-Hwy. 331(F) Rehabilitation 6.80 2013State State37,087

5,748 - IM

639 - State Match

- TOTAL

30,700 - Bond

BB1103 Frank & John 040 Ozark-Hwy. 164 (S) Rehabilitation 8.20 2014State State6,658 - TOTAL

6,658 - Bond

BB0803 John & Pope 040 Hwy. 64-Mill Creek (S) Rehabilitation 13.10 2015State State10,637 - TOTAL

10,637 - Bond

Page 1 of 125

An (F) or (S) following the termini indicates federal or state oversight.

INTERSTATE REHABILITATION PROJECTS

Page 24: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

BB0805 Pope 040 Hwy. 331-Atkins (S) Rehabilitation 10.80 2014State State9,263

444 - HSIP

49 - State Match

- TOTAL

Includes Safety Funds for Cable Median Barriers

8,770 - Bond

BB0806 Pope & Con 040 Atkins-Plumerville (S) Rehabilitation 18.60 2013State State18,826

2,118 - HSIP

235 - State Match

- TOTAL

Includes Safety Funds for Cable Median Barriers

16,473 - Bond

BB0604 Pulaski 040 I-30/I-40 Intchng.-Hwy. 67 (F) Rehabilitation 1.70 2016State State CARTS22,749

20,474 - IM

2,275 - State Match

- TOTAL �

BB0610 Prairie 040 White River Str. & Apprs. (F) Str. & Apprs. 0.50 2015State State53,572

36,515

10,400

- IM

- BR

6,657 - State Match

- TOTAL

Bridge funds are for widening the bridge - Bond funds cannot be used for widening the bridge

BB0101 Monroe 040 Cache River-Bayou DeView (F) Rehabilitation 4.10 2013State State18,040 - TOTAL

18,040 - Bond

BB0104 St. Francis 040 Goodwin-Forrest City (S) Rehabilitation 11.62 2014State State12,161

2,453 - HSIP

273 - State Match

- TOTAL

Includes Safety Funds for Cable Median Barriers

9,435 - Bond

BB0105 St. Francis 040 Forrest City-East (F) Rehabilitation 8.28 2013State State41,925

37,733 - IM

4,193 - State Match

- TOTAL �

Page 2 of 125

An (F) or (S) following the termini indicates federal or state oversight.

INTERSTATE REHABILITATION PROJECTS

Page 25: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

BB0106 St. Francis 040 Shearerville-West (S) Rehabilitation 16.50 2014State State82,607

2,453 - HSIP

273 - State Match

- TOTAL

Includes Safety Funds for Cable Median Barriers

79,881 - Bond

BB0107 Crittenden 040 Shearerville-Hwy. 77 (F) Rehabilitation 12.90 2015State State WMATS12,299 - TOTAL

12,299 - Bond

BB0108 Crittenden 040 Hwy. 77-I-55 (F) Rehabilitation 2.20 2013State State WMATS23,892 - TOTAL

23,892 - Bond

BB0109 Crittenden 055 I-40-Jericho (S) Rehabilitation 8.23 2013State State WMATS9,784 - TOTAL

9,784 - Bond

BB0110 Crittenden 055 Jericho-Lake David (S) Rehabilitation 8.00 2014State State6,496 - TOTAL

6,496 - Bond

BB1003 Mississippi 055 Hwy. 181-Hwy. 158 (F) Rehabilitation 7.90 2013State State31,600 - TOTAL

31,600 - Bond

BB1006 Mississippi 055 No. of Hwy. 18-Missouri St. Line (S) Rehabilitation 4.22 2015State State17,390 - TOTAL

17,390 - Bond

BB0611 Pulaski 440 I-30-Ark. River Bridge (F) Rehabilitation 3.00 2016State State CARTS25,042

22,538 - IM

2,504 - State Match

- TOTAL �

BB0613 Pulaski 530 I-30-Bingham Rd. (F) Rehabilitation 8.50 2014State State CARTS37,961 - TOTAL

37,961 - Bond

BB0614 Pulaski & Saline

530 Bingham Rd.-Grant Co. Line (S) Rehabilitation 7.50 2013State State CARTS9,111 - TOTAL

9,111 - Bond

BB0201 Jefferson 530 Jefferson-Hwy. 104 (S) Rehabilitation 6.10 2016State State PBATS6,284

5,656 - IM

628 - State Match

- TOTAL �

Page 3 of 125

An (F) or (S) following the termini indicates federal or state oversight.

INTERSTATE REHABILITATION PROJECTS

Page 26: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

BB0405 Sebastian 540 Hwy. 271-Hwy. 71 (S) Rehabilitation 2.15 2015State State FRONTIER3,898

3,190 - IM

709 - State Match

- TOTAL �

BB0407 Seb & Craw 540 Hwy. 22-I-40 (F) Rehabilitation 8.05 2013State State FRONTIER67,300 - TOTAL

67,300 - Bond

BB0409 Craw & Wash 540 I-540 Pavement Rehabilitation (Sel. Secs.) (S) Rehabilitation 2015State State FRONTIER / NARTS

25,756 - TOTAL

25,756 - Bond

BB0410 Washington 540 Hwy. 62 Intchng. Impvts. (F) Interchange 2015State State NARTS25,375 - TOTAL

25,375 - Bond

BB0411 Washington 540 Hwy. 16/112 Spur Intchng. Impvts. (S) Interchange 2015State State NARTS19,285 - TOTAL

19,285 - Bond

BB0414 Washington 540 Porter Rd.-Hwy. 112/71B Widening & Intchng. Impvts. (F) Major Widening & Interchange

2.50 2015State State NARTS54,977

33,119

7,400

- STP

- IM

9,102 - State Match

5,356 - Local

- TOTAL

Bond funds are for interchange modifications only - Bond funds cannot be used for widening the main lanes. City of Fayetteville transferred partnering commitment from Job 040489, Hwy. 112 Spur-North (Hwy. 112) to this project.

BB0412 Washington 540 Greathouse Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,500

1,350 - IM

150 - State Match

- TOTAL �

BB0413 Washington 540 Elm Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS4,000

3,600 - IM

400 - State Match

- TOTAL �

BB0901 Benton 540 Wagon Wheel Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,523

1,371 - IM

152 - State Match

- TOTAL �

Page 4 of 125

An (F) or (S) following the termini indicates federal or state oversight.

INTERSTATE REHABILITATION PROJECTS

Page 27: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

BB0902 Benton 540 Hwy. 264 Intchng. Impvts. (S) Interchange 2013State State NARTS4,000 - TOTAL

4,000 - Bond

BB0903 Benton 540 Hwy. 71B Intchng. Impvts. (F) Interchange 2015State State NARTS19,868

17,881 - IM

1,987 - State Match

- TOTAL �

235.75 825,045TOTAL

Page 5 of 125

An (F) or (S) following the termini indicates federal or state oversight.

INTERSTATE REHABILITATION PROJECTS

Page 28: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

020538 Arkansas 001 La Grue Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State2,700

2,160 - BR

540 - State Match

- TOTAL �

110217 Lee & Phillips 001 Walnut Corner-Cypress Corner (S) Major Widening 7.03 2015State State35,500

28,400 - NHS

7,100 - State Match

- TOTAL �

110502 Lee 001 Cypress Corner-North (S) Major Widening 5.40 2013State State18,040

14,080

220

- NHS

- Earmarks

3,740 - State Match

- TOTAL �

061134 Saline 005 Hurricane Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,220

976 - BR

244 - State Match

- TOTAL �

061335 Saline 005 Springhill Rd.-Hwy. 183 (Bryant) (S) Major Widening 1.10 2015State State CARTS12,000

9,600 - STP

2,400 - State Match

- TOTAL �

090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Strs. & Apprs. 2013State State5,200

4,160 - BR

1,040 - State Match

- TOTAL �

061309 Hot Spr & Garland

007 So. of Hot Spring/Garland Co. Ln.-Hwy. 290 (S) Widening 2016State State HSA-MPO10,000

9,000 - HSIP

1,000 - State Match

- TOTAL �

060432 Garland 007 Hwy. 290-Ouachita River Bridge (S) Major Widening 1.70 2015State State HSA-MPO6,000

4,800 - STP

1,200 - State Match

- TOTAL �

061329 Garland 007 Hot Springs-Hwy. 5 (Ph. I) (S) Improvements 6.20 2016State State HSA-MPO10,000

8,000 - STP

2,000 - State Match

- TOTAL �

Page 6 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 29: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

080439 Perry 007 Bear Creek & So. Fourche La Fave River Strs. & Apprs. (S) Strs. & Apprs. 2016State State5,150

4,120 - BR

1,030 - State Match

- TOTAL �

080441 Yell 007 Keeland Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000

800 - BR

200 - State Match

- TOTAL �

080385 Yell 007 Little Rock & Western RR Str. & Apprs. (S) Strs. & Apprs. 2013State State1,550

1,240 - BR

310 - State Match

- TOTAL �

080377 Yell 007 Centerville-Dardanelle (Passing Lane) (S) Passing Lane 1.20 2013State State2,000

1,600 - STP

400 - State Match

- TOTAL �

080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2014State State7,100

5,680 - STP

1,420 - State Match

- TOTAL �

080422 Pope 007 Dover-North (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL �

080392 Pope 007 Newton Co. Line-South (Passing Lane) (S) Passing Lanes 1.30 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL �

080464 Pope 007 Newton Co. Line-South (Passing Lane) (Ph. II) (S) Passing Lane 1.20 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL �

090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2014State State3,000

2,400 - STP

600 - State Match

- TOTAL �

Page 7 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 30: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Strs. & Apprs. 2014State State2,600

2,080 - BR

520 - State Match

- TOTAL �

070363 Clark 008 Hwy. 53-Hwy. 51 (Rehab.) (S) Rehabilitation 13.10 2013State State13,755

11,004 - STP

2,751 - State Match

- TOTAL �

050271 Fulton 009 Creek at L.M. 3.10 Str. & Apprs. (S) Strs. & Apprs. 2015State State750

600 - BR

150 - State Match

- TOTAL �

061331 Pulaski 010 Taylor Loop Rd.-Pleasant Valley Dr. (Ph. 1) (S) Major Widening 3.20 2016State State CARTS15,000

12,000 - STP

3,000 - State Match

- TOTAL �

061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (L.R.) (S) Major Widening 0.65 2013State State CARTS3,000

2,700 - HSIP

300 - Local

- TOTAL

Partnering Project – City responsible for the 10% match of Safety funds.

020539 Arkansas 011 Bayou Meto Str. & Apprs. (S) Strs. & Apprs. 2016State State3,500

2,800 - BR

700 - State Match

- TOTAL �

090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Major Widening 2.70 2013State State NARTS12,200

10,400 - Local

- TOTAL

1,800 - 100% State

Partnering Project – City to provide up to $10.4 million.

090342 Marion 014 Mill Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,400

1,120 - BR

280 - State Match

- TOTAL �

050272 Jackson 014 Cache River-Amagon Strs. & Apprs. (S) Strs. & Apprs. 2016State State8,250

6,600 - BR

1,650 - State Match

- TOTAL �

Page 8 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 31: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

090282 Benton 016 Illinois River Str. & Apprs. (S) Strs. & Apprs. 2016State State NARTS5,000

4,000 - BR

1,000 - State Match

- TOTAL �

040569 Washington 016 West Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2013State State NARTS6,900

5,520 - BR

1,380 - State Match

- TOTAL �

040641 Washington 016 Middle Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2016State State NARTS4,600

3,680 - BR

920 - State Match

- TOTAL �

050262 Cleb & White 016 Hwy. 25-Pangburn (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL �

100567 Craighead 018 North of Black Oak-Monette Bypass (S) Major Widening 1.40 2013State State6,000

4,800 - STP

1,200 - State Match

- TOTAL �

100651 Craighead 018 Monette Bypass (Gr. & Strs.) (S) New Location 3.60 2014State State19,500

15,600 - STP

3,900 - State Match

- TOTAL �

100653 Craig & Miss 018 Monette Bypass-Manila (S) Major Widening 6.90 2013State State26,500

21,200 - STP

5,300 - State Match

- TOTAL �

100654 Mississippi 018 Hwy. 18 Improvements (Manila) (S) Major Widening 4.30 2014State State21,000

16,800 - STP

4,200 - State Match

- TOTAL �

090343 Madison 023 Hwy. 74-Huntsville Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,000

4,000 - BR

1,000 - State Match

- TOTAL �

Page 9 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 32: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

080397 Faulkner 025 Hwy. 25 Relocation (I-40-North) (S) New Location 1.22 2014State State CARTS6,000

3,000 - STP

2,121 - Local

- STP > 200,000

- TOTAL

879

Partnering Project – City and County to provide 50% of project costs. Also shown in the CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA Section.

050261 Cleb & Indep 025 Hwy. 25 Spur-Locust Grove (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL �

080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Strs. & Apprs. 2014State State3,000

2,400 - BR

600 - State Match

- TOTAL �

080428 Yell 027 Danville-Dardanelle (Passing Lanes) (S) Passing Lanes 2.40 2014State State5,000

4,000 - STP

1,000 - State Match

- TOTAL �

110541 Woodruff 038 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2013State State2,400

1,920 - BR

480 - State Match

- TOTAL �

080411 Faulkner 040 Palarm Creek-West (Widening) (F) Major Widening 4.78 2013State State CARTS25,800

20,640 - STP

5,160 - State Match

- TOTAL �

012145 Faulk & Pulaski 040 Palarm Creek-Hwy. 365 (Widening) (F) Major Widening 4.31 2013State State CARTS18,200

4,560 - STP

3,640 - State Match

10,000 - CMAQ FLEX

- TOTAL

Funding Breakdown: District 6 - $17.0 M / District 8 - $1.2 M

Page 10 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 33: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

080395 Faulkner 040 Conway South Interchange-Hwy. 365 (Grading & Strs.) (F) New Location 0.84 2013Local State CARTS16,957

8,046

779

- NHS

- Earmarks

43 - State Match

6,918 - Local

- STP > 200,000

- TOTAL

1,171

Partnering Project – City to provide 50% of project costs. Also shown in the CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA Section.

080396 Faulkner 040 Conway South Interchange-Hwy. 365 (Base & Surf.) (S) New Location 0.84 2014Local State CARTS4,374

2,187 - NHS

2,187 - Local

- TOTAL

Partnering Project – City to provide 50% of project costs. Also shown in the CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA Section.

061317 Pulaski 040 Hwy. 365-I-430 (Widening) (Phase I) (F) Major Widening 5.63 2014State State CARTS23,000

8,400 - NHS

4,600 - State Match

10,000 - CMAQ FLEX

- TOTAL

This project will include modifications to the I-40/I-430 Interchange.

060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (S) Interchange 2013State/Local State CARTS7,062

1,600

3,822

- NHS

- Earmarks

400 - State Match

1,012 - Local

- STP > 200,000

- TOTAL

228

030415 Little River 041 Little River Str. & Apprs. (S) Strs. & Apprs. 2016State State10,600

8,480 - BR

2,120 - State Match

- TOTAL �

110567 Crittenden 042 Deer Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State WMATS1,100

880 - BR

220 - State Match

- TOTAL

Page 11 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 34: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

110575 Phillips 044 Bee Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

070364 Clark 051 Hwy. 26-Hwy. 8 (Rehab.) (S) Rehabilitation 4.80 2014State State4,000

3,200 - STP

800 - State Match

- TOTAL �

070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Strs. & Apprs. 2014State State7,800

6,240 - BR

1,560 - State Match

- TOTAL �

020419 Lincoln 054 Wells Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State1,300

1,040 - BR

260 - State Match

- TOTAL

040623 Crawford 059 Natural Dam-North Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750

3,800 - BR

950 - State Match

- TOTAL �

040521 Washington 062 Hwy. 62 Bypass (Bs. & Surf.) (Prairie Grove) (S) New Location 4.83 2013State State NARTS12,000

9,600 - STP

2,400 - State Match

- TOTAL �

090065 Benton 062 Avoca-North Garfield (S) Major Widening 6.43 2013State State NARTS29,300

23,440 - NHS

5,860 - State Match

- TOTAL �

090330 Carroll 062 East of Berryville-Hwy. 103 South (S) Major Widening 4.30 2015State State15,000

12,000 - STP

3,000 - State Match

- TOTAL �

090219 Carroll 062 Green Forest-Alpena (Phase I) (S) Major Widening 2.00 2015State State17,400

13,920 - STP

3,480 - State Match

- TOTAL �

Page 12 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 35: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

050230 Fulton 063 Hwy. 9-So. of Hwy. 342 (Mammoth Spring) (S) Major Widening 2014State State16,500

4,000

9,200

- NHS

- BR

3,300 - State Match

- TOTAL �

050274 Fulton 063 Gut Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State2,000

1,600 - BR

400 - State Match

- TOTAL �

050266 Sharp 063 Hardy-East (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - NHS

1,000 - State Match

- TOTAL �

050275 Sharp 063 Hardy-Ozark Acres Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750

3,800 - BR

950 - State Match

- TOTAL �

100686 Lawrence 063 Black Rock-Portia (S) Major Widening 1.55 2013State State10,200

8,160 - NHS

2,040 - State Match

- TOTAL �

100672 Craighead 063 Hwy. 63 Interchange Impvts. (Jonesboro) (S) Safety & Traf Eng 2013Local State JATS595

466 - Earmarks

129 - Local

- TOTAL �

080443 Pope 064 White Oak Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State1,700

1,360 - BR

340 - State Match

- TOTAL �

012155 Faulk & White 064 Vilonia Bypass-East (F) Major Widening 7.14 2015State State CARTS25,000

20,000 - NHS

5,000 - State Match

- TOTAL �

050263 White 064 Beebe-West (S) Major Widening 3.33 2016State State10,000

8,000 - NHS

2,000 - State Match

- TOTAL �

Page 13 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 36: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

050264 White 064 Hwy. 367-Woodruff Co. Line (Rehab.) (S) Rehabilitation 9.30 2016State State20,000

16,000 - STP

4,000 - State Match

- TOTAL �

080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Major Widening 1.41 2013State State11,000

8,800 - NHS

2,200 - State Match

- TOTAL �

080423 Van Buren 065 Bee Branch-North (S) Major Widening 8.07 2016State State20,000

16,000 - NHS

4,000 - State Match

- TOTAL �

080391 Van Buren 065 N. of Bee Branch-Co. Rd. 28 (S) Major Widening 3.60 2013State State12,900

10,320 - NHS

2,580 - State Match

- TOTAL �

050231 Stone 066 Mt. View-West (Passing Lane) (S) Passing Lane 1.20 2013State State3,000

2,400 - STP

600 - State Match

- TOTAL �

070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,300

4,240 - BR

1,060 - State Match

- TOTAL �

070376 Clark 067 De Roche Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State2,400

1,920 - BR

480 - State Match

- TOTAL �

061084 Hot Spring 067 UPRR & Pine St. Str. & Apprs. (Donaldson) (S) Strs. & Apprs. 2015State State HSA-MPO3,800

3,040 - BR

760 - State Match

- TOTAL �

061334 Pul & Lonoke 067 Jacksonville-Cabot (Ph. I) (F) Capacity Impvts. 11.80 2016State State CARTS15,000

3,000 - State Match

12,000 - CMAQ FLEX

- TOTAL �

Page 14 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 37: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

061276 Pulaski 067 Redmond Rd. & Main St. Strs. & Apprs. (Jacksonville) (F) Strs. & Apprs. 2013State State CARTS17,300

13,840 - BR

3,460 - State Match

- TOTAL �

050260 White 067 Hwy. 157-Hwy. 167 (Ph. II) (S) Rehabilitation 4.56 2013State State12,000

9,600 - NHS

2,400 - State Match

- TOTAL �

100404 Lawrence 067 Hwy. 230-Hwy. 63 (Bs. & Surf.) (S) New Location 9.78 2013State State36,000

28,800 - NHS

7,200 - State Match

- TOTAL �

100759 Randolph 067 Black River Str. & Apprs. (Pocahontas) (S) Strs. & Apprs. 2016State State8,500

6,800 - BR

1,700 - State Match

- TOTAL �

020462 Drew 069 Monticello Bypass (F) New Location 2015State State68,970

55,176 - Earmarks

13,794 - State Match

- TOTAL �

061330 Gar & Saline 070 Hot Springs-I-30 (Ph. I) (S) Major Widening 17.60 2015State State HSA-MPO/CARTS

20,000

16,000 - NHS

4,000 - State Match

- TOTAL �

061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Strs. & Apprs. 2014State State CARTS7,400

5,920 - BR

1,480 - State Match

- TOTAL �

061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Strs. & Apprs. 2013State State CARTS58,000

46,400 - BR

11,600 - State Match

- TOTAL �

110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Strs. & Apprs. 2014State State4,900

3,920 - BR

980 - State Match

- TOTAL �

Page 15 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 38: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

030313 Miller 071 LA Line-Doddridge (Bs. & Surf.) (S) New Location 4.46 2013State State15,900

10,000

2,700

- NHS

- Earmarks

3,200 - State Match

- TOTAL �

030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Strs. & Apprs. 2014State State TUTS7,750

6,200 - BR

1,550 - State Match

- TOTAL �

040376 Sebastian 071 Hwy. 71-Hwy. 22 (Base & Surf.) (S) New Location 6.04 2013State State FRONTIER23,000

12,101

6,299

- NHS

- Earmarks

4,600 - State Match

- TOTAL �

030X01 Sevier 071 DeQueen-East Strs. & Apprs. (S) Strs. & Apprs. 2016State State6,500

5,200 - BR

1,300 - State Match

- TOTAL �

090338 Benton 71B Dixieland Rd.-8th St. (Rogers) (S) Major Widening 1.00 2016Local State NARTS6,200

3,000 - STP

3,200 - Local

- TOTAL

Partnering Project – City to provide 50% of total project costs up to $5 million + additional $200,000 for 6' sidewalks. Amount shown - $6 M - is for construction only.

040024 Washington 074 White River Str. & Apprs. (Elkins) (S) Strs. & Apprs. 2015State State NARTS3,700

2,960 - BR

740 - State Match

- TOTAL

009831 Searcy VAR Gourd & Granney Creek Strs. & Apprs. (S) Strs. & Apprs. 2015State State750

600 - BR

150 - State Match

- TOTAL

Hwys. 74 and 377

100760 Mississippi VAR Left Hand Chute of Little River Strs. & Apprs. (S) Strs. & Apprs. 2015State State4,425

3,540 - BR

885 - State Match

- TOTAL

Hwys. 77 & 140

Page 16 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 39: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

070366 Col & Ouachita 079 Magnolia-Camden (Passing Lanes) (S) Passing Lanes 4.80 2015State State11,000

8,800 - STP

2,200 - State Match

- TOTAL �

110540 Monroe 079 White River Strs. Demo. & Removal (Clarendon) (S) Strs. & Apprs. 2015State State8,000

6,400 - BR

1,600 - State Match

- TOTAL �

030343 Lafayette 082 Hwy. 82 Improvements (Stamps) (S) Major Widening 1.94 2016State State6,000

4,800 - NHS

1,200 - State Match

- TOTAL �

070365 Columbia 082 Hwy. 79 No.-Hwy. 98 (Magnolia) (Ph. I) (S) Major Widening 13.00 2015State State20,000

16,000 - NHS

4,000 - State Match

- TOTAL �

070367 Union VAR Hwy. 82/82B/167B Improvements (El Dorado) (S) Major Widening 9.43 2016State State47,000

37,600 - STP

9,400 - State Match

- TOTAL

Hwys. 82, 82B and 167B

070377 Union 82B UPRR Str. & Apprs. (El Dorado) (S) Strs. & Apprs. 2016State State8,000

6,400 - BR

1,600 - State Match

- TOTAL

Coordinate with Job 070367

020534 Ashley 082 Co. Rd. 411-Hwy. 425 (East of Crossett) (S) Major Widening 6.10 2016State State23,000

18,400 - NHS

4,600 - State Match

- TOTAL �

020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Strs. & Apprs. 2014State State4,000

3,200 - BR

800 - State Match

- TOTAL �

Page 17 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 40: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

061214 Garland 088 Printers Place-Crawford St. (Higdon Ferry Rd.) (Hot Springs) (S) Major Widening 0.20 2013State State HSA-MPO3,800

1,216

1,824

- STP

- Earmarks

304 - State Match

456 - Local

- TOTAL

Partnering Project – City responsible for right of way acquisition and utility adjustments.

080457 Faulkner 089 UPRR Overpass & Realign. (Mayflower) (S) Strs. & Apprs. 2016State State CARTS15,000

8,000 - STP

2,500 - State Match

4,500 - RRP

- TOTAL

080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Rehabilitation 1.20 2013State State3,400

2,720 - STP

680 - State Match

- TOTAL �

080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts. (S) Rehabilitation 0.80 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL �

080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Major Widening 0.40 2013State State4,800

3,840 - STP

960 - State Match

- TOTAL �

080444 Johnson 123 Haw Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

080389 Pope 124 Hob Nob Rd.-Crow Mtn. Rd. (Russellville) (S) Major Widening 1.00 2013Local State6,000

3,000 - STP

3,000 - Local

- TOTAL

Partnering Project – City to provide up to $3 million. Hwys. 124 and 326.

080427 Pope 124 Crow Mtn. Rd.-Center Valley Rd. (S) Major Widening 2.15 2014State State7,000

5,600 - STP

1,400 - State Match

- TOTAL �

Page 18 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 41: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

080445 Van Buren 124 Cadron Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,900

1,520 - BR

380 - State Match

- TOTAL

110570 Lee 131 Ditch at L.M. 1.85 Str. & Apprs. (S) Strs. & Apprs. 2015State State2,125

1,700 - BR

425 - State Match

- TOTAL

020043 Chicot 144 Hwy. 144 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,100

1,680 - BR

420 - State Match

- TOTAL

110557 Crittenden 147 Hwy. 131-North (S) Rehabilitation 5.50 2015State State2,000

1,600 - STP

400 - State Match

- TOTAL

110571 Crittenden 149 Ditch at L.M. 2.30 Str. & Apprs. (S) Strs. & Apprs. 2016State State1,500

1,200 - BR

300 - State Match

- TOTAL

040456 Crawford 162 Hwy. 162 Improvements (Alma) (S) New Location 0.70 2014State State FRONTIER6,000

4,800 - STP

200 - State Match

1,000 - Local

- TOTAL

Partnering Project – City responsible for right of way acquisition, utility adjustments, $1 million toward cost of construction, and accepting responsibility for various highways upon completion of project.

020535 Chicot 165 Hwy. 208-Hwy. 65 (Rehab.) (Sel. Secs.) (S) Rehabilitation 4.36 2014State State3,000

2,400 - STP

600 - State Match

- TOTAL �

070280 Union 167 El Dorado-Hwy. 335 (S) Major Widening 5.04 2013State State18,500

13,437

1,363

- STP

- Earmarks

3,700 - State Match

- TOTAL �

Page 19 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 42: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

070281 Union 167 Hwy. 335-Ouachita River (S) Major Widening 2.97 2013State State10,600

8,480 - STP

2,120 - State Match

- TOTAL �

070282 Union & Calh 167 Ouachita River Str. & Apprs. (S) Major Widening 1.76 2014State State25,700

20,560 - NHS

5,140 - State Match

- TOTAL �

070283 Calhoun 167 Bangs Slough-Hwy. 172 (S) Major Widening 4.40 2016State State29,183

23,346 - NHS

5,837 - State Match

- TOTAL �

070284 Calhoun 167 Hwy. 172-Hampton (S) Major Widening 5.90 2016State State22,295

17,836 - NHS

4,459 - State Match

- TOTAL �

070289 Dallas & Cleve 167 Hwy. 273-Peters Rd. (CR 24) (F) Major Widening 5.30 2013State State26,600

21,280 - NHS

5,320 - State Match

- TOTAL �

050213 Independence 167 Hwy. 394-CR 80 (Antioch Road) (S) Major Widening 5.11 2014State State18,750

15,000 - NHS

3,750 - State Match

- TOTAL �

050214 Independence 167 CR 80 (Antioch Road)-South City Limits Cave City (F) Major Widening 4.57 2015State State17,500

14,000 - NHS

3,500 - State Match

- TOTAL �

040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Strs. & Apprs. 2015State State NARTS725

580 - BR

145 - State Match

- TOTAL

061349 Saline 183 Bauxite & Northern RR Spur Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,640

1,312 - BR

328 - State Match

- TOTAL �

Page 20 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 43: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

090319 Baxter 201 Hwy. 62-Hwy. 5 (Mountain Home) (S) Major Widening 1.51 2014State State8,000

6,000 - STP

2,000 - Local

- TOTAL

Partnering Project – City responsible for 20% of project costs (up to $2 million maximum) and accepting responsibility for various highways upon completion of project.

009814 Baxter 201 E. Pigeon Creek Strs. & Apprs. (S) Strs. & Apprs. 2016State State2,000

1,600 - BR

400 - State Match

- TOTAL

020542 Linc & Desha 212 Hwy. 212 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,500

2,000 - BR

500 - State Match

- TOTAL

100764 Poinsett 214 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2015State State1,250

1,000 - BR

250 - State Match

- TOTAL

080446 Perry 216 Coffee Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000

800 - BR

200 - State Match

- TOTAL

090346 Carroll 221 Town Branch Str. & Apprs. (S) Strs. & Apprs. 2016State State1,000

800 - BR

200 - State Match

- TOTAL

100643 Craighead 226 Cash Bypass (Gr. & Strs.) (S) Major Widening 2.92 2013State State10,500

8,400 - Earmarks

2,100 - State Match

- TOTAL �

100676 Craighead 226 Cash Bypass (Bs. & Surf.) (S) Major Widening 2.92 2014State State9,000

7,200 - Earmarks

1,800 - State Match

- TOTAL �

100X01 Craighead 226 Cash Bypass - Hwy. 49 (S) Major Widening 6.88 2014State State JATS55,000

44,000 - STP

11,000 - State Match

- TOTAL �

Page 21 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 44: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

110572 Phillips 242 Fletcher Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

110573 St. Francis 261 L'Anguille River Str. & Apprs. (S) Strs. & Apprs. 2015State State1,125

900 - BR

225 - State Match

- TOTAL

090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Major Widening 1.40 2013State State NARTS8,100

6,480 - STP

1,620 - State Match

- TOTAL �

090240 Benton 264 Hwy. 264 Impvts.(Lowell) (S) Capacity Impvts. 2016Local State/Local NARTS2,850

1,000 - STP

850 - Local

- STP < 200,000

- TOTAL

1,000

Partnering Project - City to provide $600,000 in local funds plus matching funds for STP<200,000 funds.

012153 Benton & Wash 265 Eastern North-South Corridor (Phase I) (S) Connectivity & Capacity Impvts.

1.00 2013State State NARTS5,000

4,000 - STP

1,000 - State Match

- TOTAL �

012153B Benton & Wash 265 Eastern North-South Corridor (Phase II) (S) Connectivity & Capacity Impvts.

3.80 2015State State NARTS20,000

16,000 - STP

4,000 - State Match

- TOTAL �

110147 Cross 284 Branch of Caney Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL �

080426 Faulkner 285 Bono-Hwy. 124 (Rehab.) (S) Rehabilitation 5.40 2014State State CARTS4,000

3,200 - STP

800 - State Match

- TOTAL

Page 22 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 45: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

020543 Grant 291 Moore's Slough Tributary Str. & Apprs. (S) Strs. & Apprs. 2015State State1,200

960 - BR

240 - State Match

- TOTAL

070368 Union 335 Hwy. 82-Hwy. 7 (Rehab.) (S) Rehabilitation 7.60 2016State State8,000

6,400 - STP

1,600 - State Match

- TOTAL

061348 Pulaski 365 UPRR/Parkway Dr. Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS6,000

4,800 - BR

1,200 - State Match

- TOTAL �

060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Strs. & Apprs. 2014State State CARTS6,400

5,120 - BR

1,280 - State Match

- TOTAL �

005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Strs. & Apprs. 2014State State22,600

18,080 - BR

4,520 - State Match

- TOTAL �

100708 Greene 412 Hwy. 412 West-Hwy. 49 (Gr. & Strs.) (S) New Location 5.23 2015State State10,600

8,480 - NHS

2,120 - State Match

- TOTAL �

100709 Greene 412 Hwy. 412 West-Hwy. 49 (Bs. & Surf.) (S) New Location 5.23 2016State State9,100

7,280 - NHS

1,820 - State Match

- TOTAL �

100711 Greene 412 Hwy. 49-Hwy. 412 East (Bs. & Surf.) (S) New Location 5.20 2014State State8,600

3,980

3,400

- NHS

- Earmarks

1,220 - State Match

- TOTAL �

061332 Pulaski 430 I-30/I-430 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS12,000

2,400 - State Match

9,600 - CMAQ FLEX

- TOTAL �

Page 23 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 46: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

061333 Pulaski 430 I-430/Hwy. 10 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS11,000

8,800 - NHS

2,200 - State Match

- TOTAL �

061--- Pulaski 440 Hwy. 67-I-40 West (North Belt Freeway Toll Feasibility Study) Planning 2013State State CARTS500

100 - State Match

- STP > 200,000

150 - CMAQ FLEX

- TOTAL

250

Partnering Project – Metroplan to provide 50% of project costs. Also shown in the LOCAL PROJECTS IN AREAS > 200,000 POPULATION Section.

040605 Washington 540 Hwy. 16-Porter Rd. (Widening) (S) Major Widening 1.35 2013State State NARTS9,400

7,520 - NHS

1,880 - State Match

- TOTAL �

090331 Benton 540 Wagon Wheel Rd.-Hwy. 264 (Widening) (S) Major Widening 2.56 2014State State NARTS15,700

12,560 - NHS

3,140 - State Match

- TOTAL �

090305 Benton 540 New Hope Rd.-Hwy. 62/102 Widening (Rogers) (F) Major Widening 2.66 2014State State NARTS16,000

12,800 - NHS

3,200 - State Match

- TOTAL �

090218 Benton 540 I-540/Hwy. 62/102 Intchng. & 8th Street Impvts. (Bentonville) (F) Interchange 2013Local Local NARTS53,000

4,000

28,812

- NHS

- Earmarks

20,188 - Local

- TOTAL

Partnering Project – AHTD to provide $5,597,323 (this includes $1,597,323 HPP plus State Match and $4 million in NHS funds that will require Local Match.)

050249 White NEW Hwy. 36-Hwy. 16 (Gr. & Strs.) (S) New Location 3.87 2016State State11,537

4,430 - STP

1,107 - State Match

6,000 - Local

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

Page 24 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 47: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:09:50 AM

APHN

050250 White NEW Hwy. 36-Hwy. 16 (Bs. & Surf.) (S) New Location 3.80 2016State State6,688

5,350 - STP

1,338 - State Match

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

050251 White NEW Hwy. 16-Hwy. 67 (S) New Location 4.04 2014State State12,787

10,230 - STP

2,557 - State Match

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

360.10 1,696,453TOTAL

Page 25 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 48: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 49: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

Local Projects in Areas > 200,000 Population Sorted by MPO Area and Job Number

Page 50: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 51: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:10:12 AM

APHN

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2014Local Local CARTS734

587 - Earmarks

147 - Local

- TOTAL

For Preliminary Engineering

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2015Local Local CARTS2,500

500 - Local

- STP > 200,000

- TOTAL

2,000

For Right-of-Way and Utility Relocation

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2016Local Local CARTS7,500

1,500 - Local

- STP > 200,000

- TOTAL

6,000

For Construction

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2015Local Local CARTS11,000

2,200 - Local

- STP > 200,000

- TOTAL

8,800

For Construction

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2014Local Local CARTS2,788

558 - Local

- STP > 200,000

- TOTAL

2,230

For Utility Relocation

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2013Local Local CARTS1,065

213 - Local

- STP > 200,000

- TOTAL

852

For Right-of-Way and Preliminary Engineering of Utility Relocation.

061294 Pulaski CS McCain Rail Grade Separation (NLR) (S) Grade Seperation 2013Local Local CARTS11,185

2,893 - Earmarks

2,237 - Local

- STP > 200,000

- TOTAL

6,055

061295 Pulaski CS Maryland Ave. Impvts. & Extension (Sherwood) Widening 2013Local Local CARTS405

81 - Local

- STP > 200,000

- TOTAL

324

Page 26 of 125

An (F) or (S) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 52: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:10:12 AM

APHN

080397 Faulkner 025 Hwy. 25 Relocation (I-40-North) (S) New Location 1.22 2014Local State CARTS6,000

3,000 - STP

2,121 - Local

- STP > 200,000

- TOTAL

879

Partnering Project – City and County to provide 50% of project costs. Also shown in the STATE PROJECTS SORTED BY ROUTE Section.

080395 Faulkner 040 Conway South Interchange-Hwy. 365 (Grading & Strs.) (F) New Location 0.84 2013Local State CARTS16,957

8,046

779

- NHS

- Earmarks

43 - State Match

6,918 - Local

- STP > 200,000

- TOTAL

1,171

Partnering Project – City to provide 50% of project costs. Also shown in the STATE PROJECTS SORTED BY ROUTE Section.

080396 Faulkner 040 Conway South Interchange-Hwy. 365 (Base & Surf.) (S) New Location 0.84 2014Local State CARTS4,374

2,187 - NHS

2,187 - Local

- TOTAL

Partnering Project – City to provide 50% of project costs. Also shown in the STATE PROJECTS SORTED BY ROUTE Section.

061--- Pulaski 440 Hwy. 67-I-40 West (North Belt Freeway Toll Feasibility Study) Planning 2013State State CARTS500

100 - State Match

- STP > 200,000

150 - CMAQ FLEX

- TOTAL

250

Partnering Project – Metroplan to provide 50% of project costs. Also shown in the STATE PROJECTS SORTED BY ROUTE Section.

080430 Faulkner Hwy. 365-Sturgis Rd (Gr. & Strs.) (S) New Location 2013Local Local CARTS6,140

6,140 - Local

- TOTAL

080431 Faulkner Hwy. 365-Sturgis Rd (Bs. & Surf.) (S) New Location 2014Local Local CARTS3,300

3,300 - Local

- TOTAL

060630 Various CARTS Planning Planning 2013Local Local CARTS225

45 - Local

- STP > 200,000

- TOTAL

180

060630 Various CARTS Planning Planning 2014Local Local CARTS250

50 - Local

- STP > 200,000

- TOTAL

200

Page 27 of 125

An (F) or (S) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 53: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:10:12 AM

APHN

060630 Various CARTS Planning Planning 2015Local Local CARTS250

50 - Local

- STP > 200,000

- TOTAL

200

060630 Various CARTS Planning Planning 2016Local Local CARTS250

50 - Local

- STP > 200,000

- TOTAL

200

012152 Various CARTS Metro 2040 Long-Range Plan Consultants Widening 2013Local Local CARTS350

70 - Local

- STP > 200,000

- TOTAL

280

012--- Various CARTS Regional Strategic Network (Optimization Improvements)

2013Local Local CARTS313

63 - Local

- STP > 200,000

- TOTAL

250

012--- Various CARTS Regional Strategic Network (Optimization Improvements)

2014Local Local CARTS8,125

1,625 - Local

- STP > 200,000

- TOTAL

6,500

012--- Various CARTS Regional Strategic Network (Optimization Improvements)

2015Local Local CARTS375

75 - Local

- STP > 200,000

- TOTAL

300

012--- Various CARTS Regional Strategic Network (Optimization Improvements)

2016Local Local CARTS3,875

775 - Local

- STP > 200,000

- TOTAL

3,100

012--- Various Ozone Action Days 2013Local Local CARTS60

12 - Local

48 - CMAQ FLEX

- TOTAL

Page 28 of 125

An (F) or (S) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 54: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:10:12 AM

APHN

012--- Various Ozone Action Days 2014Local Local CARTS60

12 - Local

48 - CMAQ FLEX

- TOTAL

012--- Various Ozone Action Days 2015Local Local CARTS60

12 - Local

48 - CMAQ FLEX

- TOTAL

012--- Various Ozone Action Days 2016Local Local CARTS60

12 - Local

48 - CMAQ FLEX

- TOTAL

2.90 88,701TOTAL

Page 29 of 125

An (F) or (S) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 55: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:10:12 AM

APHN

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2013Local Local WMATS250

250 - Earmarks

- TOTAL

For Environmental Assessment

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2014Local Local WMATS450

450 - Earmarks

- TOTAL

For Preliminary Engineering

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2015Local Local WMATS1,400

1,337 - Earmarks

63 - Local

- TOTAL

For ROW and Utility

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2016Local Local WMATS7,900

3,169 - Earmarks

3,111 - Local

1,620 - CMAQ - AQ

- TOTAL

For Construction

110583 Crittenden CS Ingram Blvd.-East (Southland Dr.) (West Memphis) (S) Reconstruction 2013Local Local WMATS2,738

547 - Local

- STP > 200,000

- TOTAL

2,191

110XX1 Crittenden CS Ingram Blvd.-West (Southland Dr.) (West Memphis) (S) New Location 2014Local Local WMATS3,084

616 - Local

- STP > 200,000

- TOTAL

2,468

110XX2 Crittenden CS Harahan Bikeway Connector (West Memphis - Mississippi River) New Location 2014Local Local WMATS850

850 - CMAQ - AQ

- TOTAL

XX2014-16 Crittenden CMAQ Non-Attainment Project Improve Air Quality 2014Local Local WMATS955

191 - Local

764 - CMAQ - AQ

- TOTAL

XX2015-16 Crittenden CMAQ Non-Attainment Project Improve Air Quality 2015Local Local WMATS994

199 - Local

795 - CMAQ - AQ

- TOTAL

Page 30 of 125

An (F) or (S) following the termini indicates federal or state oversight.

WEST MEMPHIS-MARION AREA TRANSPORTATION STUDY

Page 56: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:10:12 AM

APHN

XX2016-16 Crittenden CMAQ Non-Attainment Project Improve Air Quality 2016Local Local WMATS1,031

206 - Local

825 - CMAQ - AQ

- TOTAL

XX2013-22 Crittenden WMATS Planning Planning 2013Local Local WMATS285

57 - Local

- STP > 200,000

138 - CMAQ FLEX

- TOTAL

90

XX2014-22 Crittenden WMATS Planning Planning 2014Local Local WMATS288

58 - Local

- STP > 200,000

138 - CMAQ FLEX

- TOTAL

92

XX2015-22 Crittenden WMATS Planning Planning 2015Local Local WMATS290

58 - Local

- STP > 200,000

138 - CMAQ FLEX

- TOTAL

94

XX2016-22 Crittenden WMATS Planning Planning 2016Local Local WMATS293

58 - Local

- STP > 200,000

138 - CMAQ FLEX

- TOTAL

96

20,808TOTAL

Page 31 of 125

An (F) or (S) following the termini indicates federal or state oversight.

WEST MEMPHIS-MARION AREA TRANSPORTATION STUDY

Page 57: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

Local Projects in Areas < 200,000 Population

Sorted by Job Number

Page 58: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 59: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:10:47 AM

APHN

040272 Washington CS Johnson Road Reconst. (Springdale) Widening 3.24 2013Local Local NARTS10,409

7,327 - Earmarks

2,082 - Local

- STP < 200,000

- TOTAL

1,000

040581 Washington 112 Hwy. 180-Leroy Pond Dr. (Hwy. 112) (Fayetteville) (S) Major Widening 0.35 2013Local State NARTS1,250

250 - Local

- STP < 200,000

- TOTAL

1,000

040471 Sebastian CS Jenny Lind Rd. & Ingersoll Ave. Widening (Fort Smith) (S) Major Widening 3.00 2013Local Local FRONTIER8,980

7,184 - Earmarks

1,796 - Local

- TOTAL

040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2013Local State1,935

935 - Local

- STP < 200,000

- TOTAL

1,000

040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2013Local Local NARTS26,951

26,951 - Local

- TOTAL �

040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Safety & Traf Eng 2013Local Local NARTS6,452

5,162 - Earmarks

1,290 - Local

- TOTAL

040618 Washington CS Maple St. & Lafayette St. Bridge Rehab. (Fayetteville) (S) Str. & Apprs. 2013Local State NARTS1,000

800 - BR

200 - Local

- TOTAL

040X02 Sebastian CS Western & Eastern Rail Trolley Ext (PE) (Ft. Smith) (S) PE 2013Local Local FRONTIER238

238 - Earmarks

- TOTAL

040X03 Crawford Van Buren Port Facility Miscellaneous 2013Local Local FRONTIER51

41 - Earmarks

10 - Local

- TOTAL

061312 Garland CS Hot Springs & Stokes Creeks Strs. & Apprs. (Hot Springs) (S) Str. & Apprs. 2013Local State HSA-MPO650

520 - BR

130 - Local

- TOTAL

Page 32 of 125

An (F) or (S) following the termini indicates federal or state oversight.

LOCAL PROJECTS AREAS < 200,000 POPULATION

Page 60: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:10:47 AM

APHN

080157 Pope Intermodal Complex (Russellville) (S) Miscellaneous 2013Local Local2,908

2,326 - Earmarks

582 - Local

- TOTAL

080437 Johnson CS Hwy. 64-East (Massengale Rd.) (Clarksville) (S) Reconstruction 2014Local State973

195 - Local

- STP < 200,000

- TOTAL

778

090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2013Local Local NARTS35,000

10,668 - Earmarks

24,332 - Local

- TOTAL

090269 Benton CS Cherry St.-Mt. Olive St. (Kenwood St.) (Siloam Springs) (S) Reconstruction 0.50 2014Local State NARTS1,100

220 - Local

- STP < 200,000

- TOTAL

880

XX2013-17 Various Various Signals and Intersection Improvements Safety & Traf Eng 2013State/Local State *All - See Note2,500

500 - State or Local

- STP < 200,000

- TOTAL

2,000

*Includes all MPOs with the exception inside the urbanized areas of WMATS & CARTS

XX2014-17 Various Various Signals and Intersection Improvements Safety & Traf Eng 2014State/Local State *All - See Note2,500

500 - State or Local

- STP < 200,000

- TOTAL

2,000

*Includes all MPOs with the exception inside the urbanized areas of WMATS & CARTS

XX2015-17 Various Various Signals and Intersection Improvements Safety & Traf Eng 2015State/Local State *All - See Note2,500

500 - State or Local

- STP < 200,000

- TOTAL

2,000

*Includes all MPOs with the exception inside the urbanized areas of WMATS & CARTS

XX2016-17 Various Various Signals and Intersection Improvements Safety & Traf Eng 2016State/Local State *All - See Note2,500

500 - State or Local

- STP < 200,000

- TOTAL

2,000

*Includes all MPOs with the exception inside the urbanized areas of WMATS & CARTS

7.99 107,897TOTAL

Page 33 of 125

An (F) or (S) following the termini indicates federal or state oversight.

LOCAL PROJECTS AREAS < 200,000 POPULATION

Page 61: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

Statewide Generic Projects

Page 62: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 63: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:09 AM

APHN

XX2013-01 Statewide IRP Debt Service Various 2013State State All MPOs59,437

59,437 - IM

- TOTAL

XX2013-02 Statewide Various Resurf / Restoration / Rehab / Reconstruction 4-R 2013State State All MPOs5,200

1,600

1,600

1,000

- NHS

- STP

- IM

1,000 - State Match

- TOTAL

XX2013-03 Statewide Various Bridge Rehab / Replacement Str. & Apprs. 2013State/Local State/Local All MPOs2,000

1,600 - BR

400 - State or Local

- TOTAL

XX2013-04 Statewide Bridge Guard Rail / Scour Control / Inspection Miscellaneous 2013State/Local State All MPOs1,000

800 - BR

200 - State or Local

- TOTAL

XX2013-06 Statewide RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2013State/RR State/RR All MPOs3,310

331 - State Match

2,979 - RRP

- TOTAL

XX2013-07 Statewide Various Enhancement Type Projects Enhancement 2013State/Local State/Local All MPOs10,000

2,000 - State or Local

- TOTAL

8,000 - ENH

XX2013-08 Statewide Various Safe Routes to School Projects Enhancement 2013N/A State/Local All MPOs1,400 - TOTAL

1,400 - SRTS

XX2013-09 Statewide Scenic Byways Projects Miscellaneous 2013State/Local State/Local All except CARTS &

TUTS

1,000

800 - Earmarks

200 - State or Local

- TOTAL

XX2013-10 Statewide Various Trail Projects Enhancement 2013Local Local All MPOs1,000

200 - Local

800 - Rec Trails

- TOTAL

Page 34 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2013

Page 64: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:09 AM

APHN

XX2013-11 Statewide Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads

4-R / Strs. & Apprs. 2013State State All MPOs7,459

5,967 - STP

1,492 - Local

- TOTAL

XX2013-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2013State State All MPOs4,625

3,700 - BR

925 - Local

- TOTAL

XX2013-13 Statewide Right-of-Way / Utilities / CENG Various 2013State/Local State All MPOs80,364

15,825

22,872

20,000

4,860

2,347

- NHS

- STP

- IM

- BR

- HSIP

402 - RRP

11,664 - State or Local

1,023 - CMAQ FLEX

- TOTAL

1,371 - 402-Safety

XX2013-14 Statewide Bridge Painting Miscellaneous 2013State State All MPOs3,000

2,400 - BR

600 - State Match

- TOTAL

XX2013-18 Statewide Motor Fuel Tracking System Miscellaneous 2013State State All MPOs300

300 - STP

- TOTAL

XX2013-19 Statewide VAR Various Statewide Safety Improvements 2013State State All MPOs31,455

15,500 - HSIP

2,007 - State Match

- TOTAL

13,948 - 402-Safety

211,550TOTAL

Page 35 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2013

Page 65: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:09 AM

APHN

XX2014-01 Statewide IRP Debt Service Various 2014State State All MPOs77,974

77,974 - IM

- TOTAL

XX2014-02 Statewide Various Resurf / Restoration / Rehab / Reconstruction 4-R 2014State State All MPOs5,200

1,600

1,600

1,000

- NHS

- STP

- IM

1,000 - State Match

- TOTAL

XX2014-03 Statewide Various Bridge Rehab / Replacement Str. & Apprs. 2014State/Local State/Local All MPOs2,000

1,600 - BR

400 - State or Local

- TOTAL

XX2014-04 Statewide Bridge Guard Rail / Scour Control / Inspection Miscellaneous 2014State/Local State All MPOs1,000

800 - BR

200 - State or Local

- TOTAL

XX2014-06 Statewide RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2014State/RR State/RR All MPOs3,471

347 - State Match

3,124 - RRP

- TOTAL

XX2014-07 Statewide Various Enhancement Type Projects Enhancement 2014State/Local State/Local All MPOs10,000

2,000 - State or Local

- TOTAL

8,000 - ENH

XX2014-08 Statewide Various Safe Routes to School Projects Enhancement 2014N/A State/Local All MPOs1,400 - TOTAL

1,400 - SRTS

XX2014-09 Statewide Scenic Byways Projects Miscellaneous 2014State/Local State/Local All except CARTS &

TUTS

1,000

800 - Earmarks

200 - State or Local

- TOTAL

XX2014-10 Statewide Various Trail Projects Enhancement 2014Local Local All MPOs1,000

200 - Local

800 - Rec Trails

- TOTAL

Page 36 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2014

Page 66: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:09 AM

APHN

XX2014-11 Statewide Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads

4-R / Strs. & Apprs. 2014State State All MPOs7,459

5,967 - STP

1,492 - Local

- TOTAL

XX2014-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2014State State All MPOs4,625

3,700 - BR

925 - Local

- TOTAL

XX2014-13 Statewide Right-of-Way / Utilities / CENG Various 2014State/Local State All MPOs78,754

15,825

22,872

18,390

4,860

2,347

- NHS

- STP

- IM

- BR

- HSIP

402 - RRP

11,664 - State or Local

1,023 - CMAQ FLEX

- TOTAL

1,371 - 402-Safety

XX2014-14 Statewide Bridge Painting Miscellaneous 2014State State All MPOs3,000

2,400 - BR

600 - State Match

- TOTAL

XX2014-18 Statewide Motor Fuel Tracking System Miscellaneous 2014State State All MPOs300

300 - STP

- TOTAL

XX2014-19 Statewide VAR Various Statewide Safety Improvements 2014State State All MPOs35,397

18,947 - HSIP

2,105 - State Match

- TOTAL

14,345 - 402-Safety

232,580TOTAL

Page 37 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2014

Page 67: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:09 AM

APHN

XX2015-01 Statewide IRP Debt Service Various 2015State State All MPOs22,311

22,311 - IM

- TOTAL

XX2015-02 Statewide Various Resurf / Restoration / Rehab / Reconstruction 4-R 2015State State All MPOs5,200

1,600

1,600

1,000

- NHS

- STP

- IM

1,000 - State Match

- TOTAL

XX2015-03 Statewide Various Bridge Rehab / Replacement Str. & Apprs. 2015State/Local State/Local All MPOs2,000

1,600 - BR

400 - State or Local

- TOTAL

XX2015-04 Statewide Bridge Guard Rail / Scour Control / Inspection Miscellaneous 2015State/Local State All MPOs1,000

800 - BR

200 - State or Local

- TOTAL

XX2015-06 Statewide RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2015State/RR State/RR All MPOs3,639

364 - State Match

3,275 - RRP

- TOTAL

XX2015-07 Statewide Various Enhancement Type Projects Enhancement 2015State/Local State/Local All MPOs10,000

2,000 - State or Local

- TOTAL

8,000 - ENH

XX2015-08 Statewide Various Safe Routes to School Projects Enhancement 2015N/A State/Local All MPOs1,400 - TOTAL

1,400 - SRTS

XX2015-09 Statewide Scenic Byways Projects Miscellaneous 2015State/Local State/Local All except CARTS &

TUTS

1,000

800 - Earmarks

200 - State or Local

- TOTAL

XX2015-10 Statewide Various Trail Projects Enhancement 2015Local Local All MPOs1,000

200 - Local

800 - Rec Trails

- TOTAL

Page 38 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2015

Page 68: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:09 AM

APHN

XX2015-11 Statewide Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads

4-R / Strs. & Apprs. 2015State State All MPOs7,459

5,967 - STP

1,492 - Local

- TOTAL

XX2015-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2015State State All MPOs4,625

3,700 - BR

925 - Local

- TOTAL

XX2015-13 Statewide Right-of-Way / Utilities / CENG Various 2015State/Local State All MPOs71,364

15,825

22,872

11,000

4,860

2,347

- NHS

- STP

- IM

- BR

- HSIP

402 - RRP

11,664 - State or Local

1,023 - CMAQ FLEX

- TOTAL

1,371 - 402-Safety

XX2015-14 Statewide Bridge Painting Miscellaneous 2015State State All MPOs3,000

2,400 - BR

600 - State Match

- TOTAL

XX2015-18 Statewide Motor Fuel Tracking System Miscellaneous 2015State State All MPOs300

300 - STP

- TOTAL

XX2015-19 Statewide VAR Various Statewide Safety Improvements 2015State State All MPOs36,827

19,863 - HSIP

2,207 - State Match

- TOTAL

14,757 - 402-Safety

171,125TOTAL

Page 39 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2015

Page 69: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:09 AM

APHN

XX2016-01 Statewide IRP Debt Service Various 2016State State All MPOs39,411

39,411 - IM

- TOTAL

XX2016-02 Statewide Various Resurf / Restoration / Rehab / Reconstruction 4-R 2016State State All MPOs5,200

1,600

1,600

1,000

- NHS

- STP

- IM

1,000 - State Match

- TOTAL

XX2016-03 Statewide Various Bridge Rehab / Replacement Str. & Apprs. 2016State/Local State/Local All MPOs2,000

1,600 - BR

400 - State or Local

- TOTAL

XX2016-04 Statewide Bridge Guard Rail / Scour Control / Inspection Miscellaneous 2016State/Local State All MPOs1,000

800 - BR

200 - State or Local

- TOTAL

XX2016-06 Statewide RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2016State/RR State/RR All MPOs3,814

382 - State Match

3,432 - RRP

- TOTAL

XX2016-07 Statewide Various Enhancement Type Projects Enhancement 2016State/Local State/Local All MPOs10,000

2,000 - State or Local

- TOTAL

8,000 - ENH

XX2016-08 Statewide Various Safe Routes to School Projects Enhancement 2016N/A State/Local All MPOs1,400 - TOTAL

1,400 - SRTS

XX2016-09 Statewide Scenic Byways Projects Miscellaneous 2016State/Local State/Local All except CARTS &

TUTS

1,000

800 - Earmarks

200 - State or Local

- TOTAL

XX2016-10 Statewide Various Trail Projects Enhancement 2016Local Local All MPOs1,000

200 - Local

800 - Rec Trails

- TOTAL

Page 40 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2016

Page 70: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:09 AM

APHN

XX2016-11 Statewide Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads

4-R / Strs. & Apprs. 2016State State All MPOs7,459

5,967 - STP

1,492 - Local

- TOTAL

XX2016-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2016State State All MPOs4,625

3,700 - BR

925 - Local

- TOTAL

XX2016-13 Statewide Right-of-Way / Utilities / CENG Various 2016State/Local State All MPOs62,739

15,825

22,872

2,375

4,860

2,347

- NHS

- STP

- IM

- BR

- HSIP

402 - RRP

11,664 - State or Local

1,023 - CMAQ FLEX

- TOTAL

1,371 - 402-Safety

XX2016-14 Statewide Bridge Painting Miscellaneous 2016State State All MPOs3,000

2,400 - BR

600 - State Match

- TOTAL

XX2016-18 Statewide Motor Fuel Tracking System Miscellaneous 2016State State All MPOs300

300 - STP

- TOTAL

XX2016-19 Statewide VAR Various Statewide Safety Improvements 2016State State All MPOs38,313

20,815 - HSIP

2,313 - State Match

- TOTAL

15,185 - 402-Safety

181,261TOTAL

Page 41 of 125

An (F) or (S) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2016

Page 71: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

Transit Projects

Page 72: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 73: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

031FTA Miller Operating Assistance Transit 2013Local Local TUTS256

128 - Local

128 - FTA-5307

FFY Transit 2013

- TOTAL

032FTA Miller Capital - Preventive Maintenance Transit 2013Local Local TUTS74

15 - Local

59 - FTA-5307

FFY Transit 2013

- TOTAL

033FTA Miller Capital - Paratransit Transit 2013Local Local TUTS35

7 - Local

28 - FTA-5307

FFY Transit 2013

- TOTAL

034FTA Miller Planning Transit 2013Local Local TUTS91

18 - Local

73 - FTA-5307

FFY Transit 2013

- TOTAL

110FTA Statewide Elderly Persons and Persons with Disabilities Transit 2013Local Local All MPOs1,893

378 - Local

1,514 - FTA-5310

FFY Transit 2012

- TOTAL

111FTA Statewide Non-Urbanized Transit 2013Local Local All MPOs18,222

7,289 - Local

10,933 - FTA-5311

FFY Transit 2012

- TOTAL

116FTA Statewide Job Access Reverse Commute Transit 2013Local Local All MPOs3,023

1,209 - Local

1,814 - FTA-5316

FFY Transit 2012

- TOTAL

Page 42 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 74: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

117FTA Statewide New Freedom Transit 2013Local Local All MPOs1,623

649 - Local

974 - FTA-5317

FFY Transit 2012

- TOTAL

109FTA Statewide Bus and Bus Facilities Transit 2013Local Local All MPOs3,750

750 - Local

3,000 - FTA-5309

FFY Transit 2012

- TOTAL

200PTF Statewide Public Transit Trust Fund Transit 2013Local Local All MPOs3,750

FFY Transit 2013

- TOTAL

3,750 - 100% State

201TLS Statewide Translease Transit 2013Local Local All MPOs775

775 - Local

FFY Transit 2013

- TOTAL

CATA01 Pulaski Rolling Stock Transit 2013Local Local CARTS1,355

271 - Local

1,084 - FTA-5307

FFY Transit 2013

- TOTAL

CATA02 Pulaski Bus Support Equipment/Facilities Transit 2013Local Local CARTS368

74 - Local

294 - FTA-5307

FFY Transit 2013

- TOTAL

CATA03 Pulaski Rail Support Equipment/Facilities Transit 2013Local Local CARTS71

14 - Local

57 - FTA-5307

FFY Transit 2013

- TOTAL

CATA04 Pulaski Transit Enhancement (Bus) Transit 2013Local Local CARTS75

15 - Local

60 - FTA-5307

FFY Transit 2013

- TOTAL

Page 43 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 75: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

CATA05 Pulaski Other Capital Items (Bus) - Prev Maint Transit 2013Local Local CARTS1,790

358 - Local

1,432 - FTA-5307

FFY Transit 2013

- TOTAL

CATA06 Pulaski Metropolitan Planning Transit 2013Local Local CARTS333

67 - Local

266 - FTA-5307

FFY Transit 2013

- TOTAL

CATA07 Pulaski Training Transit 2013Local Local CARTS19

4 - Local

15 - FTA-5307

FFY Transit 2013

- TOTAL

CATA08 Pulaski Signal & Communications (Bus) Transit 2013Local Local CARTS20

4 - Local

16 - FTA-5307

FFY Transit 2013

- TOTAL

CATA09 Pulaski Operating Assistance Transit 2013Local Local CARTS1,093

546 - Local

546 - FTA-5307

FFY Transit 2013

- TOTAL

CATA10 Pulaski Transit Operations Transit 2013Local Local CARTS8,500

8,500 - Local

FFY Transit 2013

- TOTAL

CATA11 Pulaski State of Good Repair - Training Room Equipment Transit 2013Local Local CARTS227

45 - Local

182 - FTA-5309

FFY Transit 2013

- TOTAL

CATA12 Pulaski Bus Livability - CNG Bus Purchase (8) Transit 2013Local Local CARTS3,790

644 - Local

3,146 - FTA-5309

FFY Transit 2013

- TOTAL

Page 44 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 76: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

CATA13 Pulaski Clean Fuels - CNG Bus Purchase (8) Transit 2013Local Local CARTS3,790

644 - Local

FFY Transit 2013

- TOTAL

3,146 - FTA-5308

CATA14 Pulaski CNG Fueling Station Transit 2013Local Local CARTS2,000

400 - Local

FFY Transit 2013

- TOTAL

1,600 - FTA-5308

CATA15 Pulaski Other Capital Items (Bus) - Paratransit Serv Transit 2013Local Local CARTS414

83 - Local

331 - FTA-5307

FFY Transit 2013

- TOTAL

FTS001 Sebastian Operating Assistance Transit 2013Local Local FRONTIER1,824

912 - Local

912 - FTA-5307

FFY Transit 2012

- TOTAL

FTS002 Sebastian Capital - Preventive Maintenance Transit 2013Local Local FRONTIER362

72 - Local

290 - FTA-5307

FFY Transit 2012

- TOTAL

FTS003 Sebastian Capital - Paratransit Service Transit 2013Local Local FRONTIER189

38 - Local

151 - FTA-5307

FFY Transit 2012

- TOTAL

FTS004 Sebastian Capital - Rolling Stock/Support Equipment Transit 2013Local Local FRONTIER206

41 - Local

165 - FTA-5307

FFY Transit 2012

- TOTAL

FTS005 Sebastian Fort Smith Trolley Extension - Design, Engineering Transit 2013Local Local Frontier238

238 - FTA-5309

FFY Transit 2009

- TOTAL

Page 45 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 77: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

HSIT01 Garland Operating Assistance Transit 2013Local Local HSA-MPO730

365 - Local

365 - FTA-5307

FFY Transit 2013

- TOTAL

HSIT02 Garland Capital - Preventive Maintenance Transit 2013Local Local HSA-MPO243

48 - Local

194 - FTA-5307

FFY Transit 2013

- TOTAL

HSIT03 Garland Capital - Paratransit Service Transit 2013Local Local HSA-MPO76

15 - Local

61 - FTA-5307

FFY Transit 2013

- TOTAL

JETS01 Craighead Operating Assistance Transit 2013Local Local JATS616

308 - Local

308 - FTA-5307

FFY Transit 2012

- TOTAL

JETS02 Craighead Capital - Preventive Maintenance Transit 2013Local Local JATS154

31 - Local

123 - FTA-5307

FFY Transit 2012

- TOTAL

JETS03 Craighead Capital - Paratransit Service Transit 2013Local Local JATS78

16 - Local

62 - FTA-5307

FFY Transit 2012

- TOTAL

JETS04 Craighead Capital - Rolling Stock/Support Equipment Transit 2013Local Local JATS154

31 - Local

123 - FTA-5307

FFY Transit 2012

- TOTAL

Page 46 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 78: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

NARTS01 Wash & Benton Operating Assistance Transit 2013Local-ORT Local-ORT NARTS1,110

555 - Local

555 - FTA-5307

FFY Transit 2012

- TOTAL

NARTS02 Wash & Benton Capital - Preventive Maintenance Transit 2013Local-ORT Local-ORT NARTS576

115 - Local

461 - FTA-5307

FFY Transit 2012

- TOTAL

NARTS03 Wash & Benton Capital - Paratransit Service Transit 2013Local-ORT Local-ORT NARTS146

29 - Local

117 - FTA-5307

FFY Transit 2012

- TOTAL

NARTS04 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2013Local-ORT Local-ORT NARTS41

8 - Local

33 - FTA-5307

FFY Transit 2012

- TOTAL

NARTS05 Wash & Benton Transit Operations (Urban) Transit 2013Local-ORT Local-ORT NARTS427

427 - Local

FFY Transit 2012

- TOTAL

NARTS06 Wash & Benton Operating Assistance Transit 2013Local-UofA Local-UofA NARTS1,190

595 - Local

595 - FTA-5307

FFY Transit 2012

- TOTAL

NARTS07 Wash & Benton Capital - Preventive Maintenance Transit 2013Local-UofA Local-UofA NARTS344

69 - Local

275 - FTA-5307

FFY Transit 2012

- TOTAL

NARTS08 Wash & Benton Capital - Paratransit Service Transit 2013Local-UofA Local-UofA NARTS94

19 - Local

75 - FTA-5307

FFY Transit 2012

- TOTAL

Page 47 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 79: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

NARTS09 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2013Local-UofA Local-UofA NARTS11

2 - Local

9 - FTA-5307

FFY Transit 2012

- TOTAL

NARTS10 Wash & Benton Transit Operations Transit 2013Local-UofA Local-UofA NARTS676

676 - Local

FFY Transit 2012

- TOTAL

NARTS11 Wash & Benton Capital - Planning Transit 2013Local-MPO Local-MPO NARTS125

25 - Local

100 - FTA-5307

FFY Transit 2013

- TOTAL

PBT001 Jefferson Operating Assistance Transit 2013Local Local PBATS688

344 - Local

344 - FTA-5307

FFY Transit 2012

- TOTAL

PBT002 Jefferson Capital - Preventive Maintenance Transit 2013Local Local PBATS344

69 - Local

275 - FTA-5307

FFY Transit 2012

- TOTAL

PBT003 Jefferson Capital - Paratransit Service Transit 2013Local Local PBATS98

20 - Local

78 - FTA-5307

FFY Transit 2012

- TOTAL

PBT004 Jefferson Capital - Rolling Stock/Support Equipment Transit 2013Local Local PBATS75

15 - Local

60 - FTA-5307

FFY Transit 2012

- TOTAL

PBT005 Jefferson Capital - Planning Transit 2013Local Local PBATS30

6 - Local

24 - FTA-5307

FFY Transit 2012

- TOTAL

Page 48 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 80: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

68,180TOTAL

Page 49 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 81: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

031FTA Miller Operating Assistance Transit 2014Local Local TUTS256

128 - Local

128 - FTA-5307

FFY Transit 2014

- TOTAL

032FTA Miller Capital - Preventive Maintenance Transit 2014Local Local TUTS74

15 - Local

59 - FTA-5307

FFY Transit 2014

- TOTAL

033FTA Miller Capital - Paratransit Transit 2014Local Local TUTS35

7 - Local

28 - FTA-5307

FFY Transit 2014

- TOTAL

034FTA Miller Planning Transit 2014Local Local TUTS91

18 - Local

73 - FTA-5307

FFY Transit 2014

- TOTAL

110FTA Statewide Elderly Persons and Persons with Disabilities Transit 2014Local Local All MPOs1,893

378 - Local

1,514 - FTA-5310

FFY Transit 2013

- TOTAL

111FTA Statewide Non-Urbanized Transit 2014Local Local All MPOs18,222

7,289 - Local

10,933 - FTA-5311

FFY Transit 2013

- TOTAL

116FTA Statewide Job Access Reverse Commute Transit 2014Local Local All MPOs3,023

1,209 - Local

1,814 - FTA-5316

FFY Transit 2013

- TOTAL

Page 50 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2014

Page 82: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

117FTA Statewide New Freedom Transit 2014Local Local All MPOs1,623

649 - Local

974 - FTA-5317

FFY Transit 2013

- TOTAL

200PTF Statewide Public Transit Trust Fund Transit 2014Local Local All MPOs3,750

FFY Transit 2013

- TOTAL

3,750 - 100% State

201TLS Statewide Translease Transit 2014Local Local All MPOs775

775 - Local

FFY Transit 2013

- TOTAL

CATA01 Pulaski Rolling Stock Transit 2014Local Local CARTS1,355

271 - Local

1,084 - FTA-5307

FFY Transit 2014

- TOTAL

CATA02 Pulaski Bus Support Equipment/Facilities Transit 2014Local Local CARTS368

74 - Local

294 - FTA-5307

FFY Transit 2014

- TOTAL

CATA03 Pulaski Rail Support Equipment/Facilities Transit 2014Local Local CARTS71

14 - Local

57 - FTA-5307

FFY Transit 2014

- TOTAL

CATA04 Pulaski Transit Enhancement (Bus) Transit 2014Local Local CARTS75

15 - Local

60 - FTA-5307

FFY Transit 2014

- TOTAL

CATA05 Pulaski Other Capital Items (Bus) - Prev Maint Transit 2014Local Local CARTS1,790

358 - Local

1,432 - FTA-5307

FFY Transit 2014

- TOTAL

Page 51 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2014

Page 83: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

CATA06 Pulaski Metropolitan Planning Transit 2014Local Local CARTS333

67 - Local

266 - FTA-5307

FFY Transit 2014

- TOTAL

CATA07 Pulaski Training Transit 2014Local Local CARTS19

4 - Local

15 - FTA-5307

FFY Transit 2014

- TOTAL

CATA08 Pulaski Signal & Communications (Bus) Transit 2014Local Local CARTS20

4 - Local

16 - FTA-5307

FFY Transit 2014

- TOTAL

CATA09 Pulaski Operating Assistance Transit 2014Local Local CARTS1,093

546 - Local

546 - FTA-5307

FFY Transit 2014

- TOTAL

CATA10 Pulaski Transit Operations Transit 2014Local Local CARTS8,500

8,500 - Local

FFY Transit 2014

- TOTAL

CATA15 Pulaski Other Capital Items (Bus) - Paratransit Serv Transit 2014Local Local CARTS414

83 - Local

331 - FTA-5307

FFY Transit 2014

- TOTAL

FTS001 Sebastian Operating Assistance Transit 2014Local Local FRONTIER1,824

912 - Local

912 - FTA-5307

FFY Transit 2013

- TOTAL

FTS002 Sebastian Capital - Preventive Maintenance Transit 2014Local Local FRONTIER362

72 - Local

290 - FTA-5307

FFY Transit 2013

- TOTAL

Page 52 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2014

Page 84: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

FTS003 Sebastian Capital - Paratransit Service Transit 2014Local Local FRONTIER189

38 - Local

151 - FTA-5307

FFY Transit 2013

- TOTAL

FTS004 Sebastian Capital - Rolling Stock/Support Equipment Transit 2014Local Local FRONTIER206

41 - Local

165 - FTA-5307

FFY Transit 2013

- TOTAL

HSIT01 Garland Operating Assistance Transit 2014Local Local HSA-MPO730

365 - Local

365 - FTA-5307

FFY Transit 2014

- TOTAL

HSIT02 Garland Capital - Preventive Maintenance Transit 2014Local Local HSA-MPO243

48 - Local

194 - FTA-5307

FFY Transit 2014

- TOTAL

HSIT03 Garland Capital - Paratransit Service Transit 2014Local Local HSA-MPO76

15 - Local

61 - FTA-5307

FFY Transit 2014

- TOTAL

JETS01 Craighead Operating Assistance Transit 2014Local Local JATS616

308 - Local

308 - FTA-5307

FFY Transit 2013

- TOTAL

JETS02 Craighead Capital - Preventive Maintenance Transit 2014Local Local JATS154

31 - Local

123 - FTA-5307

FFY Transit 2013

- TOTAL

Page 53 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2014

Page 85: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

JETS03 Craighead Capital - Paratransit Service Transit 2014Local Local JATS78

16 - Local

62 - FTA-5307

FFY Transit 2013

- TOTAL

JETS04 Craighead Capital - Rolling Stock/Support Equipment Transit 2014Local Local JATS154

31 - Local

123 - FTA-5307

FFY Transit 2013

- TOTAL

NARTS01 Wash & Benton Operating Assistance Transit 2014Local-ORT Local-ORT NARTS1,200

600 - Local

600 - FTA-5307

FFY Transit 2013

- TOTAL

NARTS02 Wash & Benton Capital - Preventive Maintenance Transit 2014Local-ORT Local-ORT NARTS701

140 - Local

561 - FTA-5307

FFY Transit 2013

- TOTAL

NARTS03 Wash & Benton Capital - Paratransit Service Transit 2014Local-ORT Local-ORT NARTS204

41 - Local

163 - FTA-5307

FFY Transit 2013

- TOTAL

NARTS04 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2014Local-ORT Local-ORT NARTS313

63 - Local

250 - FTA-5307

FFY Transit 2013

- TOTAL

NARTS05 Wash & Benton Transit Operations Transit 2014Local-ORT Local-ORT NARTS767

767 - Local

FFY Transit 2013

- TOTAL

NARTS06 Wash & Benton Operating Assistance Transit 2014Local-UofA Local-UofA NARTS1,264

632 - Local

632 - FTA-5307

FFY Transit 2013

- TOTAL

Page 54 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2014

Page 86: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

NARTS07 Wash & Benton Capital - Preventive Maintenance Transit 2014Local-UofA Local-UofA NARTS375

75 - Local

300 - FTA-5307

FFY Transit 2013

- TOTAL

NARTS08 Wash & Benton Capital - Paratransit Service Transit 2014Local-UofA Local-UofA NARTS167

34 - Local

133 - FTA-5307

FFY Transit 2013

- TOTAL

NARTS09 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2014Local-UofA Local-UofA NARTS279

56 - Local

223 - FTA-5307

FFY Transit 2013

- TOTAL

NARTS10 Wash & Benton Transit Operations Transit 2014Local-UofA Local-UofA NARTS693

693 - Local

FFY Transit 2013

- TOTAL

NARTS11 Wash & Benton Capital - Planning Transit 2014Local-MPO Local-MPO NARTS125

25 - Local

100 - FTA-5307

FFY Transit 2014

- TOTAL

PBT001 Jefferson Operating Assistance Transit 2014Local Local PBATS688

344 - Local

344 - FTA-5307

FFY Transit 2013

- TOTAL

PBT002 Jefferson Capital - Preventive Maintenance Transit 2014Local Local PBATS344

69 - Local

275 - FTA-5307

FFY Transit 2013

- TOTAL

PBT003 Jefferson Capital - Paratransit Service Transit 2014Local Local PBATS98

20 - Local

78 - FTA-5307

FFY Transit 2013

- TOTAL

Page 55 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2014

Page 87: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

PBT004 Jefferson Capital - Rolling Stock/Support Equipment Transit 2014Local Local PBATS75

15 - Local

60 - FTA-5307

FFY Transit 2013

- TOTAL

PBT005 Jefferson Capital - Planning Transit 2014Local Local PBATS30

6 - Local

24 - FTA-5307

FFY Transit 2013

- TOTAL

55,733TOTAL

Page 56 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2014

Page 88: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

031FTA Miller Operating Assistance Transit 2015Local Local TUTS256

128 - Local

128 - FTA-5307

FFY Transit 2015

- TOTAL

032FTA Miller Capital - Preventive Maintenance Transit 2015Local Local TUTS74

15 - Local

59 - FTA-5307

FFY Transit 2015

- TOTAL

033FTA Miller Capital - Paratransit Transit 2015Local Local TUTS35

7 - Local

28 - FTA-5307

FFY Transit 2015

- TOTAL

034FTA Miller Planning Transit 2015Local Local TUTS91

18 - Local

73 - FTA-5307

FFY Transit 2015

- TOTAL

110FTA Statewide Elderly Persons and Persons with Disabilities Transit 2015Local Local All MPOs1,893

378 - Local

1,514 - FTA-5310

FFY Transit 2014

- TOTAL

111FTA Statewide Non-Urbanized Transit 2015Local Local All MPOs18,222

7,289 - Local

10,933 - FTA-5311

FFY Transit 2014

- TOTAL

116FTA Statewide Job Access Reverse Commute Transit 2015Local Local All MPOs3,023

1,209 - Local

1,814 - FTA-5316

FFY Transit 2014

- TOTAL

Page 57 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2015

Page 89: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

117FTA Statewide New Freedom Transit 2015Local Local All MPOs1,623

649 - Local

974 - FTA-5317

FFY Transit 2014

- TOTAL

200PTF Statewide Public Transit Trust Fund Transit 2015Local Local All MPOs3,750

FFY Transit 2014

- TOTAL

3,750 - 100% State

201TLS Statewide Translease Transit 2015Local Local All MPOs775

775 - Local

FFY Transit 2014

- TOTAL

CATA01 Pulaski Rolling Stock Transit 2015Local Local CARTS1,355

271 - Local

1,084 - FTA-5307

FFY Transit 2015

- TOTAL

CATA02 Pulaski Bus Support Equipment/Facilities Transit 2015Local Local CARTS368

74 - Local

294 - FTA-5307

FFY Transit 2015

- TOTAL

CATA03 Pulaski Rail Support Equipment/Facilities Transit 2015Local Local CARTS71

14 - Local

57 - FTA-5307

FFY Transit 2015

- TOTAL

CATA04 Pulaski Transit Enhancement (Bus) Transit 2015Local Local CARTS75

15 - Local

60 - FTA-5307

FFY Transit 2015

- TOTAL

CATA05 Pulaski Other Capital Items (Bus) - Prev Maint Transit 2015Local Local CARTS1,790

358 - Local

1,432 - FTA-5307

FFY Transit 2015

- TOTAL

Page 58 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2015

Page 90: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

CATA06 Pulaski Metropolitan Planning Transit 2015Local Local CARTS333

67 - Local

266 - FTA-5307

FFY Transit 2015

- TOTAL

CATA07 Pulaski Training Transit 2015Local Local CARTS19

4 - Local

15 - FTA-5307

FFY Transit 2015

- TOTAL

CATA08 Pulaski Signal & Communications (Bus) Transit 2015Local Local CARTS20

4 - Local

16 - FTA-5307

FFY Transit 2015

- TOTAL

CATA09 Pulaski Operating Assistance Transit 2015Local Local CARTS1,093

546 - Local

546 - FTA-5307

FFY Transit 2015

- TOTAL

CATA10 Pulaski Transit Operations Transit 2015Local Local CARTS8,500

8,500 - Local

FFY Transit 2015

- TOTAL

CATA15 Pulaski Other Capital Items (Bus) - Paratransit Serv Transit 2015Local Local CARTS414

83 - Local

331 - FTA-5307

FFY Transit 2015

- TOTAL

FTS001 Sebastian Operating Assistance Transit 2015Local Local FRONTIER1,824

912 - Local

912 - FTA-5307

FFY Transit 2014

- TOTAL

FTS002 Sebastian Capital - Preventive Maintenance Transit 2015Local Local FRONTIER362

72 - Local

290 - FTA-5307

FFY Transit 2014

- TOTAL

Page 59 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2015

Page 91: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

FTS003 Sebastian Capital - Paratransit Service Transit 2015Local Local FRONTIER189

38 - Local

151 - FTA-5307

FFY Transit 2014

- TOTAL

FTS004 Sebastian Capital - Rolling Stock/Support Equipment Transit 2015Local Local FRONTIER206

41 - Local

165 - FTA-5307

FFY Transit 2014

- TOTAL

HSIT01 Garland Operating Assistance Transit 2015Local Local HSA-MPO730

365 - Local

365 - FTA-5307

FFY Transit 2015

- TOTAL

HSIT02 Garland Capital - Preventive Maintenance Transit 2015Local Local HSA-MPO243

48 - Local

194 - FTA-5307

FFY Transit 2015

- TOTAL

HSIT03 Garland Capital - Paratransit Service Transit 2015Local Local HSA-MPO76

15 - Local

61 - FTA-5307

FFY Transit 2015

- TOTAL

JETS01 Craighead Operating Assistance Transit 2015Local Local JATS616

308 - Local

308 - FTA-5307

FFY Transit 2014

- TOTAL

JETS02 Craighead Capital - Preventive Maintenance Transit 2015Local Local JATS154

31 - Local

123 - FTA-5307

FFY Transit 2014

- TOTAL

Page 60 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2015

Page 92: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

JETS03 Craighead Capital - Paratransit Service Transit 2015Local Local JATS78

16 - Local

62 - FTA-5307

FFY Transit 2014

- TOTAL

JETS04 Craighead Capital - Rolling Stock/Support Equipment Transit 2015Local Local JATS154

31 - Local

123 - FTA-5307

FFY Transit 2014

- TOTAL

NARTS01 Wash & Benton Operating Assistance Transit 2015Local-ORT Local-ORT NARTS1,200

600 - Local

600 - FTA-5307

FFY Transit 2014

- TOTAL

NARTS02 Wash & Benton Capital - Preventive Maintenance Transit 2015Local-ORT Local-ORT NARTS701

140 - Local

561 - FTA-5307

FFY Transit 2014

- TOTAL

NARTS03 Wash & Benton Capital - Paratransit Service Transit 2015Local-ORT Local-ORT NARTS204

41 - Local

163 - FTA-5307

FFY Transit 2014

- TOTAL

NARTS04 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2015Local-ORT Local-ORT NARTS313

63 - Local

250 - FTA-5307

FFY Transit 2014

- TOTAL

NARTS05 Wash & Benton Transit Operations Transit 2015Local-ORT Local-ORT NARTS767

767 - Local

FFY Transit 2014

- TOTAL

NARTS06 Wash & Benton Operating Assistance Transit 2015Local-UofA Local-UofA NARTS1,264

632 - Local

632 - FTA-5307

FFY Transit 2014

- TOTAL

Page 61 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2015

Page 93: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

NARTS07 Wash & Benton Capital - Preventive Maintenance Transit 2015Local-UofA Local-UofA NARTS375

75 - Local

300 - FTA-5307

FFY Transit 2014

- TOTAL

NARTS08 Wash & Benton Capital - Paratransit Service Transit 2015Local-UofA Local-UofA NARTS167

34 - Local

133 - FTA-5307

FFY Transit 2014

- TOTAL

NARTS09 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2015Local-UofA Local-UofA NARTS279

56 - Local

223 - FTA-5307

FFY Transit 2014

- TOTAL

NARTS10 Wash & Benton Transit Operations Transit 2015Local-UofA Local-UofA NARTS693

693 - Local

FFY Transit 2014

- TOTAL

NARTS11 Wash & Benton Capital - Planning Transit 2015Local-MPO Local-MPO NARTS125

25 - Local

100 - FTA-5307

FFY Transit 2015

- TOTAL

PBT001 Jefferson Operating Assistance Transit 2015Local Local PBATS688

344 - Local

344 - FTA-5307

FFY Transit 2014

- TOTAL

PBT002 Jefferson Capital - Preventive Maintenance Transit 2015Local Local PBATS344

69 - Local

275 - FTA-5307

FFY Transit 2014

- TOTAL

PBT003 Jefferson Capital - Paratransit Service Transit 2015Local Local PBATS98

20 - Local

78 - FTA-5307

FFY Transit 2014

- TOTAL

Page 62 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2015

Page 94: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

PBT004 Jefferson Capital - Rolling Stock/Support Equipment Transit 2015Local Local PBATS75

15 - Local

60 - FTA-5307

FFY Transit 2014

- TOTAL

PBT005 Jefferson Capital - Planning Transit 2015Local Local PBATS30

6 - Local

24 - FTA-5307

FFY Transit 2014

- TOTAL

55,733TOTAL

Page 63 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2015

Page 95: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

031FTA Miller Operating Assistance Transit 2016Local Local TUTS256

128 - Local

128 - FTA-5307

FFY Transit 2016

- TOTAL

032FTA Miller Capital - Preventive Maintenance Transit 2016Local Local TUTS74

15 - Local

59 - FTA-5307

FFY Transit 2016

- TOTAL

033FTA Miller Capital - Paratransit Transit 2016Local Local TUTS35

7 - Local

28 - FTA-5307

FFY Transit 2016

- TOTAL

034FTA Miller Planning Transit 2016Local Local TUTS91

18 - Local

73 - FTA-5307

FFY Transit 2016

- TOTAL

110FTA Statewide Elderly Persons and Persons with Disabilities Transit 2016Local Local All MPOs1,893

378 - Local

1,514 - FTA-5310

FFY Transit 2015

- TOTAL

111FTA Statewide Non-Urbanized Transit 2016Local Local All MPOs18,222

7,289 - Local

10,933 - FTA-5311

FFY Transit 2015

- TOTAL

116FTA Statewide Job Access Reverse Commute Transit 2016Local Local All MPOs3,023

1,209 - Local

1,814 - FTA-5316

FFY Transit 2015

- TOTAL

Page 64 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2016

Page 96: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

117FTA Statewide New Freedom Transit 2016Local Local All MPOs1,623

649 - Local

974 - FTA-5317

FFY Transit 2015

- TOTAL

200PTF Statewide Public Transit Trust Fund Transit 2016Local Local All MPOs3,750

FFY Transit 2015

- TOTAL

3,750 - 100% State

201TLS Statewide Translease Transit 2016Local Local All MPOs775

775 - Local

FFY Transit 2015

- TOTAL

CATA01 Pulaski Rolling Stock Transit 2016Local Local CARTS1,355

271 - Local

1,084 - FTA-5307

FFY Transit 2016

- TOTAL

CATA02 Pulaski Bus Support Equipment/Facilities Transit 2016Local Local CARTS368

74 - Local

294 - FTA-5307

FFY Transit 2016

- TOTAL

CATA03 Pulaski Rail Support Equipment/Facilities Transit 2016Local Local CARTS71

14 - Local

57 - FTA-5307

FFY Transit 2016

- TOTAL

CATA04 Pulaski Transit Enhancement (Bus) Transit 2016Local Local CARTS75

15 - Local

60 - FTA-5307

FFY Transit 2016

- TOTAL

CATA05 Pulaski Other Capital Items (Bus) - Prev Maint Transit 2016Local Local CARTS1,790

358 - Local

1,432 - FTA-5307

FFY Transit 2016

- TOTAL

Page 65 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2016

Page 97: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

CATA06 Pulaski Metropolitan Planning Transit 2016Local Local CARTS333

67 - Local

266 - FTA-5307

FFY Transit 2016

- TOTAL

CATA07 Pulaski Training Transit 2016Local Local CARTS19

4 - Local

15 - FTA-5307

FFY Transit 2016

- TOTAL

CATA08 Pulaski Signal & Communications (Bus) Transit 2016Local Local CARTS20

4 - Local

16 - FTA-5307

FFY Transit 2016

- TOTAL

CATA09 Pulaski Operating Assistance Transit 2016Local Local CARTS1,093

546 - Local

546 - FTA-5307

FFY Transit 2016

- TOTAL

CATA10 Pulaski Transit Operations Transit 2016Local Local CARTS8,500

8,500 - Local

FFY Transit 2016

- TOTAL

CATA15 Pulaski Other Capital Items (Bus) - Paratransit Serv Transit 2016Local Local CARTS414

83 - Local

331 - FTA-5307

FFY Transit 2016

- TOTAL

FTS001 Sebastian Operating Assistance Transit 2016Local Local FRONTIER1,824

912 - Local

912 - FTA-5307

FFY Transit 2015

- TOTAL

FTS002 Sebastian Capital - Preventive Maintenance Transit 2016Local Local FRONTIER362

72 - Local

290 - FTA-5307

FFY Transit 2015

- TOTAL

Page 66 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2016

Page 98: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

FTS003 Sebastian Capital - Paratransit Service Transit 2016Local Local FRONTIER189

38 - Local

151 - FTA-5307

FFY Transit 2015

- TOTAL

FTS004 Sebastian Capital - Rolling Stock/Support Equipment Transit 2016Local Local FRONTIER206

41 - Local

165 - FTA-5307

FFY Transit 2015

- TOTAL

HSIT01 Garland Operating Assistance Transit 2016Local Local HSA-MPO730

365 - Local

365 - FTA-5307

FFY Transit 2016

- TOTAL

HSIT02 Garland Capital - Preventive Maintenance Transit 2016Local Local HSA-MPO243

48 - Local

194 - FTA-5307

FFY Transit 2016

- TOTAL

HSIT03 Garland Capital - Paratransit Service Transit 2016Local Local HSA-MPO76

15 - Local

61 - FTA-5307

FFY Transit 2016

- TOTAL

JETS01 Craighead Operating Assistance Transit 2016Local Local JATS616

308 - Local

308 - FTA-5307

FFY Transit 2015

- TOTAL

JETS02 Craighead Capital - Preventive Maintenance Transit 2016Local Local JATS154

31 - Local

123 - FTA-5307

FFY Transit 2015

- TOTAL

Page 67 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2016

Page 99: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

JETS03 Craighead Capital - Paratransit Service Transit 2016Local Local JATS78

16 - Local

62 - FTA-5307

FFY Transit 2015

- TOTAL

JETS04 Craighead Capital - Rolling Stock/Support Equipment Transit 2016Local Local JATS154

31 - Local

123 - FTA-5307

FFY Transit 2015

- TOTAL

NARTS01 Wash & Benton Operating Assistance Transit 2016Local-ORT Local-ORT NARTS1,200

600 - Local

600 - FTA-5307

FFY Transit 2015

- TOTAL

NARTS02 Wash & Benton Capital - Preventive Maintenance Transit 2016Local-ORT Local-ORT NARTS701

140 - Local

561 - FTA-5307

FFY Transit 2015

- TOTAL

NARTS03 Wash & Benton Capital - Paratransit Service Transit 2016Local-ORT Local-ORT NARTS204

41 - Local

163 - FTA-5307

FFY Transit 2015

- TOTAL

NARTS04 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2016Local-ORT Local-ORT NARTS313

63 - Local

250 - FTA-5307

FFY Transit 2015

- TOTAL

NARTS05 Wash & Benton Transit Operations Transit 2016Local-ORT Local-ORT NARTS767

767 - Local

FFY Transit 2015

- TOTAL

NARTS06 Wash & Benton Operating Assistance Transit 2016Local-UofA Local-UofA NARTS1,264

632 - Local

632 - FTA-5307

FFY Transit 2015

- TOTAL

Page 68 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2016

Page 100: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

NARTS07 Wash & Benton Capital - Preventive Maintenance Transit 2016Local-UofA Local-UofA NARTS375

75 - Local

300 - FTA-5307

FFY Transit 2015

- TOTAL

NARTS08 Wash & Benton Capital - Paratransit Service Transit 2016Local-UofA Local-UofA NARTS167

34 - Local

133 - FTA-5307

FFY Transit 2015

- TOTAL

NARTS09 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2016Local-UofA Local-UofA NARTS279

56 - Local

223 - FTA-5307

FFY Transit 2015

- TOTAL

NARTS10 Wash & Benton Transit Operations Transit 2016Local-UofA Local-UofA NARTS693

693 - Local

FFY Transit 2015

- TOTAL

NARTS11 Wash & Benton Capital - Planning Transit 2016Local-MPO Local-MPO NARTS125

25 - Local

100 - FTA-5307

FFY Transit 2016

- TOTAL

PBT001 Jefferson Operating Assistance Transit 2016Local Local PBATS688

344 - Local

344 - FTA-5307

FFY Transit 2015

- TOTAL

PBT002 Jefferson Capital - Preventive Maintenance Transit 2016Local Local PBATS344

69 - Local

275 - FTA-5307

FFY Transit 2015

- TOTAL

PBT003 Jefferson Capital - Paratransit Service Transit 2016Local Local PBATS98

20 - Local

78 - FTA-5307

FFY Transit 2015

- TOTAL

Page 69 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2016

Page 101: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:36 AM

APHN

PBT004 Jefferson Capital - Rolling Stock/Support Equipment Transit 2016Local Local PBATS75

15 - Local

60 - FTA-5307

FFY Transit 2015

- TOTAL

PBT005 Jefferson Capital - Planning Transit 2016Local Local PBATS30

6 - Local

24 - FTA-5307

FFY Transit 2015

- TOTAL

55,733TOTAL

Page 70 of 125

An (F) or (S) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2016

Page 102: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 103: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

Eastern Federal Land Highway Division

Page 104: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 105: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:11:57 AM

APHN

EFLHD10 Various Repairs to structures and roadways damaged by flooding and storms (AR2008-1-FS)

3R 2012EFLHD EFLHD1,400 - TOTAL

EFLHD11 White Rehabilitate Norton Road 3R 2015EFLHD EFLHD54 - TOTAL

EFLHD12 Searcy Woolum Road Landslide Repair 3R 2012EFLHD EFLHD400 - TOTAL

EFLHD13 Sebastian Resurface of Frisco station parking lot (50 visitor spaces and four handicap accessible spaces) and access road (concrete).

3R 2012EFLHD EFLHD FRONTIER200 - TOTAL

EFLHD14 Cleburne Rehab Parking lot, Rte 900 (SAMMS WO# 2006429705) 3R 2014EFLHD EFLHD45 - TOTAL

EFLHD15 Cleburne Rehab Entrance Parking Lot Rte 010 (SAMMS WO# 2006429698)

3R 2014EFLHD EFLHD45 - TOTAL

EFLHD3 Ashley Rehabilitate Hdqtr/VC Turn Lane off Hwy 82 3R 2015EFLHD EFLHD200 - TOTAL

EFLHD5 Howard & Polk Phase 1 - (Bridge and Grading) Realignment of 1.4 miles of County Road 64 near Shady Lake. New alignment for beginning of Route 159. Ties to existing Route 159 at RIP MP 2.75

New Construction 2012EFLHD EFLHD2,650 - TOTAL

EFLHD6 Garland Repair/Rehabilitate West Mountain Drive and West Mountain Summit Drive

3R 2012EFLHD EFLHD HSA-MPO1,500 - TOTAL

EFLHD8 Various Rehabilitate Howell Unit Access Road (SAMMS WO# 20099544650)

3R 2012EFLHD EFLHD38 - TOTAL

6,532TOTAL

Page 71 of 125

An (F) or (S) following the termini indicates federal or state oversight.

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Page 106: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 107: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

State and Local Projects Sorted by Job Number

Page 108: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 109: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

110147 Cross 284 Branch of Caney Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

110217 Lee & Phillips 001 Walnut Corner-Cypress Corner (S) Major Widening 7.03 2015State State35,500

28,400 - NHS

7,100 - State Match

- TOTAL

110502 Lee 001 Cypress Corner-North (S) Major Widening 5.40 2013State State18,040

14,080

220

- NHS

- Earmarks

3,740 - State Match

- TOTAL

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2013Local Local WMATS250

250 - Earmarks

- TOTAL

For Environmental Assessment.

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2014Local Local WMATS450

450 - Earmarks

- TOTAL

For Preliminary Engineering.

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2015Local Local WMATS1,400

1,337 - Earmarks

63 - Local

- TOTAL

For Right-of-Way and Utility Relocation.

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2016Local Local WMATS7,900

3,169 - Earmarks

3,111 - Local

1,620 - CMAQ - AQ

- TOTAL

For Construction.

110540 Monroe 079 White River Strs. Demo. & Removal (Clarendon) (S) Strs. & Apprs. 2015State State8,000

6,400 - BR

1,600 - State Match

- TOTAL

Page 72 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 110: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

110541 Woodruff 038 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2013State State2,400

1,920 - BR

480 - State Match

- TOTAL

110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Strs. & Apprs. 2014State State4,900

3,920 - BR

980 - State Match

- TOTAL

110557 Crittenden 147 Hwy. 131-North (S) Rehabilitation 5.50 2015State State2,000

1,600 - STP

400 - State Match

- TOTAL

110567 Crittenden 042 Deer Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State WMATS1,100

880 - BR

220 - State Match

- TOTAL

110570 Lee 131 Ditch at L.M. 1.85 Str. & Apprs. (S) Strs. & Apprs. 2015State State2,125

1,700 - BR

425 - State Match

- TOTAL

110571 Crittenden 149 Ditch at L.M. 2.30 Str. & Apprs. (S) Strs. & Apprs. 2016State State1,500

1,200 - BR

300 - State Match

- TOTAL

110572 Phillips 242 Fletcher Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

110573 St. Francis 261 L'Anguille River Str. & Apprs. (S) Strs. & Apprs. 2015State State1,125

900 - BR

225 - State Match

- TOTAL

110575 Phillips 044 Bee Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

Page 73 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 111: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

110583 Crittenden CS Ingram Blvd.-East (Southland Dr.) (West Memphis) (S) Reconstruction 2013Local Local WMATS2,738

547 - Local

- STP > 200,000

- TOTAL

2,191

110XX1 Crittenden CS Ingram Blvd.-West (Southland Dr.) (West Memphis) (S) New Location 2014Local Local WMATS3,084

616 - Local

- STP > 200,000

- TOTAL

2,468

110XX2 Crittenden CS Harahan Bikeway Connector (West Memphis - Mississippi River)

New Location 2014Local Local WMATS850

850 - CMAQ - AQ

- TOTAL

BB0101 Monroe 040 Cache River-Bayou DeView (F) Rehabilitation 4.10 2013State State

18,040

18,040

- Bond

- TOTAL

BB0104 St. Francis 040 Goodwin-Forrest City (S) Rehabilitation 11.62 2014State State

9,435

12,161

- Bond

2,453 - HSIP

273 - State Match

- TOTAL

Includes Safety Funds for Cable Median Barriers.

BB0105 St. Francis 040 Forrest City-East (F) Rehabilitation 8.28 2013State State41,925

37,733 - IM

4,193 - State Match

- TOTAL

BB0106 St. Francis 040 Shearerville-West (S) Rehabilitation 16.50 2014State State

79,881

82,607

- Bond

2,453 - HSIP

273 - State Match

- TOTAL

Includes Safety Funds for Cable Median Barriers.

BB0107 Crittenden 040 Shearerville-Hwy. 77 (F) Rehabilitation 12.90 2015State State WMATS

12,299

12,299

- Bond

- TOTAL

BB0108 Crittenden 040 Hwy. 77-I-55 (F) Rehabilitation 2.20 2013State State WMATS

23,892

23,892

- Bond

- TOTAL

Page 74 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 112: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

BB0109 Crittenden 055 I-40-Jericho (S) Rehabilitation 8.23 2013State State WMATS

9,784

9,784

- Bond

- TOTAL

BB0110 Crittenden 055 Jericho-Lake David (S) Rehabilitation 8.00 2014State State

6,496

6,496

- Bond

- TOTAL

020043 Chicot 144 Hwy. 144 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,100

1,680 - BR

420 - State Match

- TOTAL

020419 Lincoln 054 Wells Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State1,300

1,040 - BR

260 - State Match

- TOTAL

020462 Drew 069 Monticello Bypass (F) New Location 2015State State68,970

55,176 - Earmarks

13,794 - State Match

- TOTAL

020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Strs. & Apprs. 2014State State4,000

3,200 - BR

800 - State Match

- TOTAL

020534 Ashley 082 Co. Rd. 411-Hwy. 425 (East of Crossett) (S) Major Widening 6.10 2016State State23,000

18,400 - NHS

4,600 - State Match

- TOTAL

020535 Chicot 165 Hwy. 208-Hwy. 65 (Rehab.) (Sel. Secs.) (S) Rehabilitation 4.36 2014State State3,000

2,400 - STP

600 - State Match

- TOTAL

020538 Arkansas 001 La Grue Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State2,700

2,160 - BR

540 - State Match

- TOTAL

020539 Arkansas 011 Bayou Meto Str. & Apprs. (S) Strs. & Apprs. 2016State State3,500

2,800 - BR

700 - State Match

- TOTAL

Page 75 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 113: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

020542 Linc & Desha 212 Hwy. 212 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,500

2,000 - BR

500 - State Match

- TOTAL

020543 Grant 291 Moore's Slough Tributary Str. & Apprs. (S) Strs. & Apprs. 2015State State1,200

960 - BR

240 - State Match

- TOTAL

BB0201 Jefferson 530 Jefferson-Hwy. 104 (S) Rehabilitation 6.10 2016State State PBATS6,284

5,656 - IM

628 - State Match

- TOTAL

030313 Miller 071 LA Line-Doddridge (Bs. & Surf.) (S) New Location 4.46 2013State State15,900

10,000

2,700

- NHS

- Earmarks

3,200 - State Match

- TOTAL

030343 Lafayette 082 Hwy. 82 Improvements (Stamps) (S) Major Widening 1.94 2016State State6,000

4,800 - NHS

1,200 - State Match

- TOTAL

030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Strs. & Apprs. 2014State State TUTS7,750

6,200 - BR

1,550 - State Match

- TOTAL

030415 Little River 041 Little River Str. & Apprs. (S) Strs. & Apprs. 2016State State10,600

8,480 - BR

2,120 - State Match

- TOTAL

030X01 Sevier 071 DeQueen-East Strs. & Apprs. (S) Strs. & Apprs. 2016State State6,500

5,200 - BR

1,300 - State Match

- TOTAL

BB0301 Miller 030 Texas State Line-Hwy. 108 (S) Rehabilitation 7.10 2015State State TUTS

5,852

5,852

- Bond

- TOTAL

BB0302 Miller 030 Hwy. 67-West of Red River (S) Rehabilitation 4.50 2016State State

7,529

7,529

- Bond

- TOTAL

Page 76 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 114: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

BB0303 Miller 030 Red River-East & West (F) Rehabilitation 1.80 2014State State

17,745

17,745

- Bond

- TOTAL

BB0305 Hempstead 030 Hwy. 67-Sheppard (F) Rehabilitation 4.10 2016State State

18,864

18,864

- Bond

- TOTAL

BB0306 Hempstead 030 Sheppard-Hwy. 278 (S) Rehabilitation 7.10 2014State State

20,178

20,178

- Bond

- TOTAL

BB0310 Miller 030 Hwy. 108-Hwy. 67 (S) Rehabilitation 4.40 2015State State

7,253

7,253

- Bond

- TOTAL

040024 Washington 074 White River Str. & Apprs. (Elkins) (S) Strs. & Apprs. 2015State State NARTS3,700

2,960 - BR

740 - State Match

- TOTAL

040272 Washington CS Johnson Road Reconst. (Springdale) Widening 3.24 2013Local Local NARTS10,409

7,327 - Earmarks

2,082 - Local

- STP < 200,000

- TOTAL

1,000

040376 Sebastian 071 Hwy. 71-Hwy. 22 (Base & Surf.) (S) New Location 6.04 2013State State FRONTIER23,000

12,101

6,299

- NHS

- Earmarks

4,600 - State Match

- TOTAL

040456 Crawford 162 Hwy. 162 Improvements (Alma) (S) New Location 0.70 2014State State FRONTIER6,000

4,800 - STP

200 - State Match

1,000 - Local

- TOTAL

Partnering Project – City responsible for right of way acquisition, utility adjustments, $1 million toward cost of construction, and accepting responsibility for various highways upon completion of project.

040471 Sebastian CS Jenny Lind Rd. & Ingersoll Ave. Widening (Fort Smith) (S) Major Widening 3.00 2013Local Local FRONTIER8,980

7,184 - Earmarks

1,796 - Local

- TOTAL

Page 77 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 115: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2013Local State1,935

935 - Local

- STP < 200,000

- TOTAL

1,000

040521 Washington 062 Hwy. 62 Bypass (Bs. & Surf.) (Prairie Grove) (S) New Location 4.83 2013State State NARTS12,000

9,600 - STP

2,400 - State Match

- TOTAL

040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2013Local Local NARTS26,951

26,951 - Local

- TOTAL

040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Safety & Traf Eng 2013Local Local NARTS6,452

5,162 - Earmarks

1,290 - Local

- TOTAL

040569 Washington 016 West Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2013State State NARTS6,900

5,520 - BR

1,380 - State Match

- TOTAL

040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Strs. & Apprs. 2015State State NARTS725

580 - BR

145 - State Match

- TOTAL

040581 Washington 112 Hwy. 180-Leroy Pond Dr. (Hwy. 112) (Fayetteville) (S) Major Widening 0.35 2013Local State NARTS1,250

250 - Local

- STP < 200,000

- TOTAL

1,000

040605 Washington 540 Hwy. 16-Porter Rd. (Widening) (S) Major Widening 1.35 2013State State NARTS9,400

7,520 - NHS

1,880 - State Match

- TOTAL

040618 Washington CS Maple St. & Lafayette St. Bridge Rehab. (Fayetteville) (S) Str. & Apprs. 2013Local State NARTS1,000

800 - BR

200 - Local

- TOTAL

040623 Crawford 059 Natural Dam-North Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750

3,800 - BR

950 - State Match

- TOTAL

Page 78 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 116: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

040641 Washington 016 Middle Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2016State State NARTS4,600

3,680 - BR

920 - State Match

- TOTAL

040X02 Sebastian CS Western & Eastern Rail Trolley Ext (PE) (Ft. Smith) (S) PE 2013Local Local FRONTIER238

238 - Earmarks

- TOTAL

040X03 Crawford Van Buren Port Facility Miscellaneous 2013Local Local FRONTIER51

41 - Earmarks

10 - Local

- TOTAL

BB0403 Craw & Frank 040 Dyer-Cravens Creek (S) Rehabilitation 14.10 2013State State

11,280

11,280

- Bond

- TOTAL

BB0405 Sebastian 540 Hwy. 271-Hwy. 71 (S) Rehabilitation 2.15 2015State State FRONTIER3,898

3,190 - IM

709 - State Match

- TOTAL

BB0407 Seb & Craw 540 Hwy. 22-I-40 (F) Rehabilitation 8.05 2013State State FRONTIER

67,300

67,300

- Bond

- TOTAL

BB0409 Craw & Wash 540 I-540 Pavement Rehabilitation (Sel. Secs.) (S) Rehabilitation 2015State State FRONTIER / NARTS

25,756

25,756

- Bond

- TOTAL

BB0410 Washington 540 Hwy. 62 Intchng. Impvts. (F) Interchange 2015State State NARTS

25,375

25,375

- Bond

- TOTAL

BB0411 Washington 540 Hwy. 16/112 Spur Intchng. Impvts. (S) Interchange 2015State State NARTS

19,285

19,285

- Bond

- TOTAL

BB0412 Washington 540 Greathouse Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,500

1,350 - IM

150 - State Match

- TOTAL

BB0413 Washington 540 Elm Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS4,000

3,600 - IM

400 - State Match

- TOTAL

Page 79 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 117: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

BB0414 Washington 540 Porter Rd.-Hwy. 112/71B Widening & Intchng. Impvts. (F) Major Widening & Interchange

2.50 2015State State NARTS54,977

33,119

7,400

- STP

- IM

9,102 - State Match

5,356 - Local

- TOTAL

Bond funds are for interchange modifications only - Bond funds cannot be used for widening the main lanes. City of Fayetteville transferred partnering commitment from Job 040489, Hwy. 112 Spur-North (Hwy. 112) to this project.

005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Strs. & Apprs. 2014State State22,600

18,080 - BR

4,520 - State Match

- TOTAL

050213 Independence 167 Hwy. 394-CR 80 (Antioch Road) (S) Major Widening 5.11 2014State State18,750

15,000 - NHS

3,750 - State Match

- TOTAL

050214 Independence 167 CR 80 (Antioch Road)-South City Limits Cave City (F) Major Widening 4.57 2015State State17,500

14,000 - NHS

3,500 - State Match

- TOTAL

050230 Fulton 063 Hwy. 9-So. of Hwy. 342 (Mammoth Spring) (S) Major Widening 2014State State16,500

4,000

9,200

- NHS

- BR

3,300 - State Match

- TOTAL

050231 Stone 066 Mt. View-West (Passing Lane) (S) Passing Lane 1.20 2013State State3,000

2,400 - STP

600 - State Match

- TOTAL

050249 White NEW Hwy. 36-Hwy. 16 (Gr. & Strs.) (S) New Location 3.87 2016State State11,537

4,430 - STP

1,107 - State Match

6,000 - Local

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

Page 80 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 118: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

050250 White NEW Hwy. 36-Hwy. 16 (Bs. & Surf.) (S) New Location 3.80 2016State State6,688

5,350 - STP

1,338 - State Match

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

050251 White NEW Hwy. 16-Hwy. 67 (S) New Location 4.04 2014State State12,787

10,230 - STP

2,557 - State Match

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

050260 White 067 Hwy. 157-Hwy. 167 (Ph. II) (S) Rehabilitation 4.56 2013State State12,000

9,600 - NHS

2,400 - State Match

- TOTAL

050261 Cleb & Indep 025 Hwy. 25 Spur-Locust Grove (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

050262 Cleb & White 016 Hwy. 25-Pangburn (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

050263 White 064 Beebe-West (S) Major Widening 3.33 2016State State10,000

8,000 - NHS

2,000 - State Match

- TOTAL

050264 White 064 Hwy. 367-Woodruff Co. Line (Rehab.) (S) Rehabilitation 9.30 2016State State20,000

16,000 - STP

4,000 - State Match

- TOTAL

050266 Sharp 063 Hardy-East (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - NHS

1,000 - State Match

- TOTAL

050271 Fulton 009 Creek at L.M. 3.10 Str. & Apprs. (S) Strs. & Apprs. 2015State State750

600 - BR

150 - State Match

- TOTAL

Page 81 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 119: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

050272 Jackson 014 Cache River-Amagon Strs. & Apprs. (S) Strs. & Apprs. 2016State State8,250

6,600 - BR

1,650 - State Match

- TOTAL

050274 Fulton 063 Gut Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State2,000

1,600 - BR

400 - State Match

- TOTAL

050275 Sharp 063 Hardy-Ozark Acres Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750

3,800 - BR

950 - State Match

- TOTAL

060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Strs. & Apprs. 2014State State CARTS6,400

5,120 - BR

1,280 - State Match

- TOTAL

060432 Garland 007 Hwy. 290-Ouachita River Bridge (S) Major Widening 1.70 2015State State HSA-MPO6,000

4,800 - STP

1,200 - State Match

- TOTAL

060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (S) Interchange 2013State/Local State CARTS7,062

1,600

3,822

- NHS

- Earmarks

400 - State Match

1,012 - Local

- STP > 200,000

- TOTAL

228

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2014Local Local CARTS734

587 - Earmarks

147 - Local

- TOTAL

For Preliminary Engineering.

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2015Local Local CARTS2,500

500 - Local

- STP > 200,000

- TOTAL

2,000

For Right-of-Way and Utility Relocation.

Page 82 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 120: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2016Local Local CARTS7,500

1,500 - Local

- STP > 200,000

- TOTAL

6,000

For Construction.

061084 Hot Spring 067 UPRR & Pine St. Str. & Apprs. (Donaldson) (S) Strs. & Apprs. 2015State State HSA-MPO3,800

3,040 - BR

760 - State Match

- TOTAL

061134 Saline 005 Hurricane Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,220

976 - BR

244 - State Match

- TOTAL

061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (L.R.) (S) Major Widening 0.65 2013State State CARTS3,000

2,700 - HSIP

300 - Local

- TOTAL

Partnering Project – City responsible for the 10% match of Safety funds.

061214 Garland 088 Printers Place-Crawford St. (Higdon Ferry Rd.) (Hot Springs) (S)

Major Widening 0.20 2013State State HSA-MPO3,800

1,216

1,824

- STP

- Earmarks

304 - State Match

456 - Local

- TOTAL

Partnering Project – City responsible for right of way acquisition and utility adjustments.

061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Strs. & Apprs. 2013State State CARTS58,000

46,400 - BR

11,600 - State Match

- TOTAL

061276 Pulaski 067 Redmond Rd. & Main St. Strs. & Apprs. (Jacksonville) (F) Strs. & Apprs. 2013State State CARTS17,300

13,840 - BR

3,460 - State Match

- TOTAL

061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Strs. & Apprs. 2014State State CARTS7,400

5,920 - BR

1,480 - State Match

- TOTAL

Page 83 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 121: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

061294 Pulaski CS McCain Rail Grade Separation (NLR) (S) Grade Seperation 2013Local Local CARTS11,185

2,893 - Earmarks

2,237 - Local

- STP > 200,000

- TOTAL

6,055

061295 Pulaski CS Maryland Ave. Impvts. & Extension (Sherwood) Widening 2013Local Local CARTS405

81 - Local

- STP > 200,000

- TOTAL

324

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2013Local Local CARTS1,065

213 - Local

- STP > 200,000

- TOTAL

852

For Right-of-Way and Preliminary Engineering of Utility Relocation.

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2014Local Local CARTS2,788

558 - Local

- STP > 200,000

- TOTAL

2,230

For Utility Relocation

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2015Local Local CARTS11,000

2,200 - Local

- STP > 200,000

- TOTAL

8,800

For Construction

061309 Hot Spr & Garland

007 So. of Hot Spring/Garland Co. Ln.-Hwy. 290 (S) Widening 2016State State HSA-MPO10,000

9,000 - HSIP

1,000 - State Match

- TOTAL

061312 Garland CS Hot Springs & Stokes Creeks Strs. & Apprs. (Hot Springs) (S) Str. & Apprs. 2013Local State HSA-MPO650

520 - BR

130 - Local

- TOTAL

Page 84 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 122: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

061317 Pulaski 040 Hwy. 365-I-430 (Widening) (Phase I) (F) Major Widening 5.63 2014State State CARTS23,000

8,400 - NHS

4,600 - State Match

10,000 - CMAQ FLEX

- TOTAL

This project will include modifications to the I-40/I-430 Interchange.

061329 Garland 007 Hot Springs-Hwy. 5 (Ph. I) (S) Improvements 6.20 2016State State HSA-MPO10,000

8,000 - STP

2,000 - State Match

- TOTAL

061330 Gar & Saline 070 Hot Springs-I-30 (Ph. I) (S) Major Widening 17.60 2015State State HSA-MPO/CARTS

20,000

16,000 - NHS

4,000 - State Match

- TOTAL

061331 Pulaski 010 Taylor Loop Rd.-Pleasant Valley Dr. (Ph. 1) (S) Major Widening 3.20 2016State State CARTS15,000

12,000 - STP

3,000 - State Match

- TOTAL

061332 Pulaski 430 I-30/I-430 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS12,000

2,400 - State Match

9,600 - CMAQ FLEX

- TOTAL

061333 Pulaski 430 I-430/Hwy. 10 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS11,000

8,800 - NHS

2,200 - State Match

- TOTAL

061334 Pul & Lonoke 067 Jacksonville-Cabot (Ph. I) (F) Capacity Impvts. 11.80 2016State State CARTS15,000

3,000 - State Match

12,000 - CMAQ FLEX

- TOTAL

061335 Saline 005 Springhill Rd.-Hwy. 183 (Bryant) (S) Major Widening 1.10 2015State State CARTS12,000

9,600 - STP

2,400 - State Match

- TOTAL

061348 Pulaski 365 UPRR/Parkway Dr. Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS6,000

4,800 - BR

1,200 - State Match

- TOTAL

Page 85 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 123: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

061349 Saline 183 Bauxite & Northern RR Spur Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,640

1,312 - BR

328 - State Match

- TOTAL

BB0602 Saline 030 Hwy. 70-West (West Bound Lanes) (S) Rehabilitation 2.90 2015State State CARTS

8,901

8,901

- Bond

- TOTAL

BB0604 Pulaski 040 I-30/I-40 Intchng.-Hwy. 67 (F) Rehabilitation 1.70 2016State State CARTS22,749

20,474 - IM

2,275 - State Match

- TOTAL

BB0610 Prairie 040 White River Str. & Apprs. (F) Str. & Apprs. 0.50 2015State State53,572

36,515

10,400

- IM

- BR

6,657 - State Match

- TOTAL

Bridge funds are for widening the bridge - Bond funds cannot be used for widening the bridge.

BB0611 Pulaski 440 I-30-Ark. River Bridge (F) Rehabilitation 3.00 2016State State CARTS25,042

22,538 - IM

2,504 - State Match

- TOTAL

BB0613 Pulaski 530 I-30-Bingham Rd. (F) Rehabilitation 8.50 2014State State CARTS

37,961

37,961

- Bond

- TOTAL

BB0614 Pulaski & Saline 530 Bingham Rd.-Grant Co. Line (S) Rehabilitation 7.50 2013State State CARTS

9,111

9,111

- Bond

- TOTAL

070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Strs. & Apprs. 2014State State7,800

6,240 - BR

1,560 - State Match

- TOTAL

070280 Union 167 El Dorado-Hwy. 335 (S) Major Widening 5.04 2013State State18,500

13,437

1,363

- STP

- Earmarks

3,700 - State Match

- TOTAL

Page 86 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 124: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

070281 Union 167 Hwy. 335-Ouachita River (S) Major Widening 2.97 2013State State10,600

8,480 - STP

2,120 - State Match

- TOTAL

070282 Union & Calh 167 Ouachita River Str. & Apprs. (S) Major Widening 1.76 2014State State25,700

20,560 - NHS

5,140 - State Match

- TOTAL

070283 Calhoun 167 Bangs Slough-Hwy. 172 (S) Major Widening 4.40 2016State State29,183

23,346 - NHS

5,837 - State Match

- TOTAL

070284 Calhoun 167 Hwy. 172-Hampton (S) Major Widening 5.90 2016State State22,295

17,836 - NHS

4,459 - State Match

- TOTAL

070289 Dallas & Cleve 167 Hwy. 273-Peters Rd. (CR 24) (F) Major Widening 5.30 2013State State26,600

21,280 - NHS

5,320 - State Match

- TOTAL

070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,300

4,240 - BR

1,060 - State Match

- TOTAL

070363 Clark 008 Hwy. 53-Hwy. 51 (Rehab.) (S) Rehabilitation 13.10 2013State State13,755

11,004 - STP

2,751 - State Match

- TOTAL

070364 Clark 051 Hwy. 26-Hwy. 8 (Rehab.) (S) Rehabilitation 4.80 2014State State4,000

3,200 - STP

800 - State Match

- TOTAL

070365 Columbia 082 Hwy. 79 No.-Hwy. 98 (Magnolia) (Ph. I) (S) Major Widening 13.00 2015State State20,000

16,000 - NHS

4,000 - State Match

- TOTAL

Page 87 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 125: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

070366 Col & Ouachita 079 Magnolia-Camden (Passing Lanes) (S) Passing Lanes 4.80 2015State State11,000

8,800 - STP

2,200 - State Match

- TOTAL

070367 Union VAR Hwy. 82/82B/167B Improvements (El Dorado) (S) Major Widening 9.43 2016State State47,000

37,600 - STP

9,400 - State Match

- TOTAL

Hwys. 82, 82B and 167B

070368 Union 335 Hwy. 82-Hwy. 7 (Rehab.) (S) Rehabilitation 7.60 2016State State8,000

6,400 - STP

1,600 - State Match

- TOTAL

070376 Clark 067 De Roche Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State2,400

1,920 - BR

480 - State Match

- TOTAL

070377 Union 82B UPRR Str. & Apprs. (El Dorado) (S) Strs. & Apprs. 2016State State8,000

6,400 - BR

1,600 - State Match

- TOTAL

Coordinate with Job 070367.

BB0702 Clark 030 Hwy. 26-Caddo River (F) Rehabilitation 8.30 2014State State

6,577

6,577

- Bond

- TOTAL

080157 Pope Intermodal Complex (Russellville) (S) Miscellaneous 2013Local Local2,908

2,326 - Earmarks

582 - Local

- TOTAL

080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2014State State7,100

5,680 - STP

1,420 - State Match

- TOTAL

080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Major Widening 0.40 2013State State4,800

3,840 - STP

960 - State Match

- TOTAL

Page 88 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 126: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

080377 Yell 007 Centerville-Dardanelle (Passing Lane) (S) Passing Lane 1.20 2013State State2,000

1,600 - STP

400 - State Match

- TOTAL

080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Strs. & Apprs. 2014State State3,000

2,400 - BR

600 - State Match

- TOTAL

080385 Yell 007 Little Rock & Western RR Str. & Apprs. (S) Strs. & Apprs. 2013State State1,550

1,240 - BR

310 - State Match

- TOTAL

080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts. (S)

Rehabilitation 0.80 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL

080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Rehabilitation 1.20 2013State State3,400

2,720 - STP

680 - State Match

- TOTAL

080389 Pope 124 Hob Nob Rd.-Crow Mtn. Rd. (Russellville) (S) Major Widening 1.00 2013Local State6,000

3,000 - STP

3,000 - Local

- TOTAL

Partnering Project – City to provide up to $3 million. Hwys. 124 and 326.

080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Major Widening 1.41 2013State State11,000

8,800 - NHS

2,200 - State Match

- TOTAL

080391 Van Buren 065 N. of Bee Branch-Co. Rd. 28 (S) Major Widening 3.60 2013State State12,900

10,320 - NHS

2,580 - State Match

- TOTAL

080392 Pope 007 Newton Co. Line-South (Passing Lane) (S) Passing Lanes 1.30 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL

Page 89 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 127: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

080395 Faulkner 040 Conway South Interchange-Hwy. 365 (Grading & Strs.) (F) New Location 0.84 2013Local State CARTS16,957

8,046

779

- NHS

- Earmarks

43 - State Match

6,918 - Local

- STP > 200,000

- TOTAL

1,171

Partnering Project – City to provide 50% of project costs.

080396 Faulkner 040 Conway South Interchange-Hwy. 365 (Base & Surf.) (S) New Location 0.84 2014Local State CARTS4,374

2,187 - NHS

2,187 - Local

- TOTAL

Partnering Project – City to provide 50% of project costs.

080397 Faulkner 025 Hwy. 25 Relocation (I-40-North) (S) New Location 1.22 2014State State CARTS6,000

3,000 - STP

2,121 - Local

- STP > 200,000

- TOTAL

879

Partnering Project – City and County to provide 50% of project costs.

080411 Faulkner 040 Palarm Creek-West (Widening) (F) Major Widening 4.78 2013State State CARTS25,800

20,640 - STP

5,160 - State Match

- TOTAL

080422 Pope 007 Dover-North (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

080423 Van Buren 065 Bee Branch-North (S) Major Widening 8.07 2016State State20,000

16,000 - NHS

4,000 - State Match

- TOTAL

080426 Faulkner 285 Bono-Hwy. 124 (Rehab.) (S) Rehabilitation 5.40 2014State State CARTS4,000

3,200 - STP

800 - State Match

- TOTAL

080427 Pope 124 Crow Mtn. Rd.-Center Valley Rd. (S) Major Widening 2.15 2014State State7,000

5,600 - STP

1,400 - State Match

- TOTAL

Page 90 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 128: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

080428 Yell 027 Danville-Dardanelle (Passing Lanes) (S) Passing Lanes 2.40 2014State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

080430 Faulkner Hwy. 365-Sturgis Rd (Gr. & Strs.) (S) New Location 2013Local Local CARTS6,140

6,140 - Local

- TOTAL

080431 Faulkner Hwy. 365-Sturgis Rd (Bs. & Surf.) (S) New Location 2014Local Local CARTS3,300

3,300 - Local

- TOTAL

080437 Johnson CS Hwy. 64-East (Massengale Rd.) (Clarksville) (S) Reconstruction 2014Local State973

195 - Local

- STP < 200,000

- TOTAL

778

080439 Perry 007 Bear Creek & So. Fourche La Fave River Strs. & Apprs. (S) Strs. & Apprs. 2016State State5,150

4,120 - BR

1,030 - State Match

- TOTAL

080441 Yell 007 Keeland Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000

800 - BR

200 - State Match

- TOTAL

080443 Pope 064 White Oak Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State1,700

1,360 - BR

340 - State Match

- TOTAL

080444 Johnson 123 Haw Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

080445 Van Buren 124 Cadron Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,900

1,520 - BR

380 - State Match

- TOTAL

080446 Perry 216 Coffee Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000

800 - BR

200 - State Match

- TOTAL

Page 91 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 129: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

080457 Faulkner 089 UPRR Overpass & Realign. (Mayflower) (S) Strs. & Apprs. 2016State State CARTS15,000

8,000 - STP

2,500 - State Match

4,500 - RRP

- TOTAL

080464 Pope 007 Newton Co. Line-South (Passing Lane) (Ph. II) (S) Passing Lane 1.20 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL

BB0803 John & Pope 040 Hwy. 64-Mill Creek (S) Rehabilitation 13.10 2015State State

10,637

10,637

- Bond

- TOTAL

BB0804 Pope 040 Mill Creek-Hwy. 331(F) Rehabilitation 6.80 2013State State

30,700

37,087

- Bond

5,748 - IM

639 - State Match

- TOTAL

BB0805 Pope 040 Hwy. 331-Atkins (S) Rehabilitation 10.80 2014State State

8,770

9,263

- Bond

444 - HSIP

49 - State Match

- TOTAL

Includes Safety Funds for Cable Median Barriers.

BB0806 Pope & Con 040 Atkins-Plumerville (S) Rehabilitation 18.60 2013State State

16,473

18,826

- Bond

2,118 - HSIP

235 - State Match

- TOTAL

Includes Safety Funds for Cable Median Barriers.

009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Strs. & Apprs. 2014State State2,600

2,080 - BR

520 - State Match

- TOTAL

009814 Baxter 201 E. Pigeon Creek Strs. & Apprs. (S) Strs. & Apprs. 2016State State2,000

1,600 - BR

400 - State Match

- TOTAL

Page 92 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 130: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

009831 Searcy VAR Gourd & Granney Creek Strs. & Apprs. (S) Strs. & Apprs. 2015State State750

600 - BR

150 - State Match

- TOTAL

Hwys. 74 and 377

090065 Benton 062 Avoca-North Garfield (S) Major Widening 6.43 2013State State NARTS29,300

23,440 - NHS

5,860 - State Match

- TOTAL

090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2013Local Local NARTS35,000

10,668 - Earmarks

24,332 - Local

- TOTAL

090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2014State State3,000

2,400 - STP

600 - State Match

- TOTAL

090218 Benton 540 I-540/Hwy. 62/102 Intchng. & 8th Street Impvts. (Bentonville) (F)

Interchange 2013Local Local NARTS53,000

4,000

28,812

- NHS

- Earmarks

20,188 - Local

- TOTAL

Partnering Project – AHTD to provide $5,597,323 (this includes $1,597,323 HPP plus State Match and $4 million in NHS funds that will require Local Match.)

090219 Carroll 062 Green Forest-Alpena (Phase I) (S) Major Widening 2.00 2015State State17,400

13,920 - STP

3,480 - State Match

- TOTAL

090240 Benton 264 Hwy. 264 Impvts.(Lowell) (S) Capacity Impvts. 2016Local State/Local NARTS2,850

1,000 - STP

850 - Local

- STP < 200,000

- TOTAL

1,000

Partnering Project - City to provide $600,000 in local funds plus matching funds for STP<200,000 funds.

Page 93 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 131: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Major Widening 2.70 2013State State NARTS12,200

10,400 - Local

- TOTAL

1,800 - 100% State

Partnering Project – City to provide up to $10.4 million.

090269 Benton CS Cherry St.-Mt. Olive St. (Kenwood St.) (Siloam Springs) (S) Reconstruction 0.50 2014Local State NARTS1,100

220 - Local

- STP < 200,000

- TOTAL

880

090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Strs. & Apprs. 2013State State5,200

4,160 - BR

1,040 - State Match

- TOTAL

090282 Benton 016 Illinois River Str. & Apprs. (S) Strs. & Apprs. 2016State State NARTS5,000

4,000 - BR

1,000 - State Match

- TOTAL

090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Major Widening 1.40 2013State State NARTS8,100

6,480 - STP

1,620 - State Match

- TOTAL

090305 Benton 540 New Hope Rd.-Hwy. 62/102 Widening (Rogers) (F) Major Widening 2.66 2014State State NARTS16,000

12,800 - NHS

3,200 - State Match

- TOTAL

090319 Baxter 201 Hwy. 62-Hwy. 5 (Mountain Home) (S) Major Widening 1.51 2014State State8,000

6,000 - STP

2,000 - Local

- TOTAL

Partnering Project – City responsible for 20% of project costs (up to $2 million maximum) and accepting responsibility for various highways upon completion of project.

090330 Carroll 062 East of Berryville-Hwy. 103 South (S) Major Widening 4.30 2015State State15,000

12,000 - STP

3,000 - State Match

- TOTAL

090331 Benton 540 Wagon Wheel Rd.-Hwy. 264 (Widening) (S) Major Widening 2.56 2014State State NARTS15,700

12,560 - NHS

3,140 - State Match

- TOTAL

Page 94 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 132: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

090338 Benton 71B Dixieland Rd.-8th St. (Rogers) (S) Major Widening 1.00 2016Local State NARTS6,200

3,000 - STP

3,200 - Local

- TOTAL

Partnering Project – City to provide 50% of total project costs up to $5 million + additional $200,000 for 6' sidewalks. Amount shown - $6 M - is for construction only.

090342 Marion 014 Mill Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,400

1,120 - BR

280 - State Match

- TOTAL

090343 Madison 023 Hwy. 74-Huntsville Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,000

4,000 - BR

1,000 - State Match

- TOTAL

090346 Carroll 221 Town Branch Str. & Apprs. (S) Strs. & Apprs. 2016State State1,000

800 - BR

200 - State Match

- TOTAL

BB0901 Benton 540 Wagon Wheel Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,523

1,371 - IM

152 - State Match

- TOTAL

BB0902 Benton 540 Hwy. 264 Intchng. Impvts. (S) Interchange 2013State State NARTS

4,000

4,000

- Bond

- TOTAL

BB0903 Benton 540 Hwy. 71B Intchng. Impvts. (F) Interchange 2015State State NARTS19,868

17,881 - IM

1,987 - State Match

- TOTAL

100404 Lawrence 067 Hwy. 230-Hwy. 63 (Bs. & Surf.) (S) New Location 9.78 2013State State36,000

28,800 - NHS

7,200 - State Match

- TOTAL

100567 Craighead 018 North of Black Oak-Monette Bypass (S) Major Widening 1.40 2013State State6,000

4,800 - STP

1,200 - State Match

- TOTAL

Page 95 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 133: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

100643 Craighead 226 Cash Bypass (Gr. & Strs.) (S) Major Widening 2.92 2013State State10,500

8,400 - Earmarks

2,100 - State Match

- TOTAL

100651 Craighead 018 Monette Bypass (Gr. & Strs.) (S) New Location 3.60 2014State State19,500

15,600 - STP

3,900 - State Match

- TOTAL

100653 Craig & Miss 018 Monette Bypass-Manila (S) Major Widening 6.90 2013State State26,500

21,200 - STP

5,300 - State Match

- TOTAL

100654 Mississippi 018 Hwy. 18 Improvements (Manila) (S) Major Widening 4.30 2014State State21,000

16,800 - STP

4,200 - State Match

- TOTAL

100672 Craighead 063 Hwy. 63 Interchange Impvts. (Jonesboro) (S) Safety & Traf Eng 2013Local State JATS595

466 - Earmarks

129 - Local

- TOTAL

100676 Craighead 226 Cash Bypass (Bs. & Surf.) (S) Major Widening 2.92 2014State State9,000

7,200 - Earmarks

1,800 - State Match

- TOTAL

100686 Lawrence 063 Black Rock-Portia (S) Major Widening 1.55 2013State State10,200

8,160 - NHS

2,040 - State Match

- TOTAL

100708 Greene 412 Hwy. 412 West-Hwy. 49 (Gr. & Strs.) (S) New Location 5.23 2015State State10,600

8,480 - NHS

2,120 - State Match

- TOTAL

100709 Greene 412 Hwy. 412 West-Hwy. 49 (Bs. & Surf.) (S) New Location 5.23 2016State State9,100

7,280 - NHS

1,820 - State Match

- TOTAL

Page 96 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 134: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

100711 Greene 412 Hwy. 49-Hwy. 412 East (Bs. & Surf.) (S) New Location 5.20 2014State State8,600

3,980

3,400

- NHS

- Earmarks

1,220 - State Match

- TOTAL

100759 Randolph 067 Black River Str. & Apprs. (Pocahontas) (S) Strs. & Apprs. 2016State State8,500

6,800 - BR

1,700 - State Match

- TOTAL

100760 Mississippi VAR Left Hand Chute of Little River Strs. & Apprs. (S) Strs. & Apprs. 2015State State4,425

3,540 - BR

885 - State Match

- TOTAL

Hwys. 77 & 140

100764 Poinsett 214 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2015State State1,250

1,000 - BR

250 - State Match

- TOTAL

100X01 Craighead 226 Cash Bypass - Hwy. 49 (S) Major Widening 6.88 2014State State JATS55,000

44,000 - STP

11,000 - State Match

- TOTAL

BB1003 Mississippi 055 Hwy. 181-Hwy. 158 (F) Rehabilitation 7.90 2013State State

31,600

31,600

- Bond

- TOTAL

BB1006 Mississippi 055 No. of Hwy. 18-Missouri St. Line (S) Rehabilitation 4.22 2015State State

17,390

17,390

- Bond

- TOTAL

012145 Faulk & Pulaski 040 Palarm Creek-Hwy. 365 (Widening) (F) Major Widening 4.31 2013State State CARTS18,200

4,560 - STP

3,640 - State Match

10,000 - CMAQ FLEX

- TOTAL

Funding Breakdown: District 6 - $17.0 M / District 8 - $1.2 M.

012153 Benton & Wash 265 Eastern North-South Corridor (Phase I) (S) Connectivity & Capacity Impvts.

1.00 2013State State NARTS5,000

4,000 - STP

1,000 - State Match

- TOTAL

Page 97 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 135: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:21 AM

012153B Benton & Wash 265 Eastern North-South Corridor (Phase II) (S) Connectivity & Capacity Impvts.

3.80 2015State State NARTS20,000

16,000 - STP

4,000 - State Match

- TOTAL

012155 Faulk & White 064 Vilonia Bypass-East (F) Major Widening 7.14 2015State State CARTS25,000

20,000 - NHS

5,000 - State Match

- TOTAL

061--- Pulaski 440 Hwy. 67-I-40 West (North Belt Freeway Toll Feasibility Study) Planning 2013State State CARTS500

100 - State Match

- STP > 200,000

150 - CMAQ FLEX

- TOTAL

250

Partnering Project – Metroplan to provide 50% of project costs.

BB1103 Frank & John 040 Ozark-Hwy. 164 (S) Rehabilitation 8.20 2014State State

6,658

6,658

- Bond

- TOTAL

Page 98 of 125

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 136: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 137: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

State and Local Projects Sorted by County

Page 138: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement
Page 139: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:42 AM

020538 Arkansas 001 La Grue Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State2,700

2,160 - BR

540 - State Match

- TOTAL

020539 Arkansas 011 Bayou Meto Str. & Apprs. (S) Strs. & Apprs. 2016State State3,500

2,800 - BR

700 - State Match

- TOTAL

020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Strs. & Apprs. 2014State State4,000

3,200 - BR

800 - State Match

- TOTAL

020534 Ashley 082 Co. Rd. 411-Hwy. 425 (East of Crossett) (S) Major Widening 6.10 2016State State23,000

18,400 - NHS

4,600 - State Match

- TOTAL

009814 Baxter 201 E. Pigeon Creek Strs. & Apprs. (S) Strs. & Apprs. 2016State State2,000

1,600 - BR

400 - State Match

- TOTAL

090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Strs. & Apprs. 2013State State5,200

4,160 - BR

1,040 - State Match

- TOTAL

090319 Baxter 201 Hwy. 62-Hwy. 5 (Mountain Home) (S) Major Widening 1.51 2014State State8,000

6,000 - STP

2,000 - Local

- TOTAL

Partnering Project – City responsible for 20% of project costs (up to $2 million maximum) and accepting responsibility for various highways upon completion of project.

090065 Benton 062 Avoca-North Garfield (S) Major Widening 6.43 2013State State NARTS29,300

23,440 - NHS

5,860 - State Match

- TOTAL

090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2013Local Local NARTS35,000

10,668 - Earmarks

24,332 - Local

- TOTAL

Page 99 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 140: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

090218 Benton 540 I-540/Hwy. 62/102 Intchng. & 8th Street Impvts. (Bentonville) (F)

Interchange 2013Local Local NARTS53,000

4,000

28,812

- NHS

- Earmarks

20,188 - Local

- TOTAL

Partnering Project – AHTD to provide $5,597,323 (this includes $1,597,323 HPP plus State Match and $4 million in NHS funds that will require Local Match.)

090240 Benton 264 Hwy. 264 Impvts.(Lowell) (S) Capacity Impvts. 2016Local State/Local NARTS2,850

1,000 - STP

850 - Local

- STP < 200,000

- TOTAL

1,000

Partnering Project - City to provide $600,000 in local funds plus matching funds for STP<200,000 funds.

090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Major Widening 2.70 2013State State NARTS12,200

10,400 - Local

- TOTAL

1,800 - 100% State

Partnering Project – City to provide up to $10.4 million.

090269 Benton CS Cherry St.-Mt. Olive St. (Kenwood St.) (Siloam Springs) (S) Reconstruction 0.50 2014Local State NARTS1,100

220 - Local

- STP < 200,000

- TOTAL

880

090282 Benton 016 Illinois River Str. & Apprs. (S) Strs. & Apprs. 2016State State NARTS5,000

4,000 - BR

1,000 - State Match

- TOTAL

090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Major Widening 1.40 2013State State NARTS8,100

6,480 - STP

1,620 - State Match

- TOTAL

090305 Benton 540 New Hope Rd.-Hwy. 62/102 Widening (Rogers) (F) Major Widening 2.66 2014State State NARTS16,000

12,800 - NHS

3,200 - State Match

- TOTAL

090331 Benton 540 Wagon Wheel Rd.-Hwy. 264 (Widening) (S) Major Widening 2.56 2014State State NARTS15,700

12,560 - NHS

3,140 - State Match

- TOTAL

Page 100 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 141: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

090338 Benton 71B Dixieland Rd.-8th St. (Rogers) (S) Major Widening 1.00 2016Local State NARTS6,200

3,000 - STP

3,200 - Local

- TOTAL

Partnering Project – City to provide 50% of total project costs up to $5 million + additional $200,000 for 6' sidewalks. Amount shown - $6 M - is for construction only.

BB0901 Benton 540 Wagon Wheel Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,523

1,371 - IM

152 - State Match

- TOTAL

BB0902 Benton 540 Hwy. 264 Intchng. Impvts. (S) Interchange 2013State State NARTS

4,000

4,000- Bond

- TOTAL

BB0903 Benton 540 Hwy. 71B Intchng. Impvts. (F) Interchange 2015State State NARTS19,868

17,881 - IM

1,987 - State Match

- TOTAL

012153 Benton & Wash 265 Eastern North-South Corridor (Phase I) (S) Connectivity & Capacity Impvts.

1.00 2013State State NARTS5,000

4,000 - STP

1,000 - State Match

- TOTAL

012153B Benton & Wash 265 Eastern North-South Corridor (Phase II) (S) Connectivity & Capacity Impvts.

3.80 2015State State NARTS20,000

16,000 - STP

4,000 - State Match

- TOTAL

070283 Calhoun 167 Bangs Slough-Hwy. 172 (S) Major Widening 4.40 2016State State29,183

23,346 - NHS

5,837 - State Match

- TOTAL

070284 Calhoun 167 Hwy. 172-Hampton (S) Major Widening 5.90 2016State State22,295

17,836 - NHS

4,459 - State Match

- TOTAL

090219 Carroll 062 Green Forest-Alpena (Phase I) (S) Major Widening 2.00 2015State State17,400

13,920 - STP

3,480 - State Match

- TOTAL

Page 101 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 142: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

090330 Carroll 062 East of Berryville-Hwy. 103 South (S) Major Widening 4.30 2015State State15,000

12,000 - STP

3,000 - State Match

- TOTAL

090346 Carroll 221 Town Branch Str. & Apprs. (S) Strs. & Apprs. 2016State State1,000

800 - BR

200 - State Match

- TOTAL

020043 Chicot 144 Hwy. 144 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,100

1,680 - BR

420 - State Match

- TOTAL

020535 Chicot 165 Hwy. 208-Hwy. 65 (Rehab.) (Sel. Secs.) (S) Rehabilitation 4.36 2014State State3,000

2,400 - STP

600 - State Match

- TOTAL

070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Strs. & Apprs. 2014State State7,800

6,240 - BR

1,560 - State Match

- TOTAL

070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,300

4,240 - BR

1,060 - State Match

- TOTAL

070363 Clark 008 Hwy. 53-Hwy. 51 (Rehab.) (S) Rehabilitation 13.10 2013State State13,755

11,004 - STP

2,751 - State Match

- TOTAL

070364 Clark 051 Hwy. 26-Hwy. 8 (Rehab.) (S) Rehabilitation 4.80 2014State State4,000

3,200 - STP

800 - State Match

- TOTAL

070376 Clark 067 De Roche Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State2,400

1,920 - BR

480 - State Match

- TOTAL

BB0702 Clark 030 Hwy. 26-Caddo River (F) Rehabilitation 8.30 2014State State

6,577

6,577- Bond

- TOTAL

Page 102 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 143: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

050261 Cleb & Indep 025 Hwy. 25 Spur-Locust Grove (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

050262 Cleb & White 016 Hwy. 25-Pangburn (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

070366 Col & Ouachita 079 Magnolia-Camden (Passing Lanes) (S) Passing Lanes 4.80 2015State State11,000

8,800 - STP

2,200 - State Match

- TOTAL

070365 Columbia 082 Hwy. 79 No.-Hwy. 98 (Magnolia) (Ph. I) (S) Major Widening 13.00 2015State State20,000

16,000 - NHS

4,000 - State Match

- TOTAL

080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts. (S)

Rehabilitation 0.80 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL

080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Rehabilitation 1.20 2013State State3,400

2,720 - STP

680 - State Match

- TOTAL

100653 Craig & Miss 018 Monette Bypass-Manila (S) Major Widening 6.90 2013State State26,500

21,200 - STP

5,300 - State Match

- TOTAL

100567 Craighead 018 North of Black Oak-Monette Bypass (S) Major Widening 1.40 2013State State6,000

4,800 - STP

1,200 - State Match

- TOTAL

100643 Craighead 226 Cash Bypass (Gr. & Strs.) (S) Major Widening 2.92 2013State State10,500

8,400 - Earmarks

2,100 - State Match

- TOTAL

Page 103 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 144: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

100651 Craighead 018 Monette Bypass (Gr. & Strs.) (S) New Location 3.60 2014State State19,500

15,600 - STP

3,900 - State Match

- TOTAL

100672 Craighead 063 Hwy. 63 Interchange Impvts. (Jonesboro) (S) Safety & Traf Eng 2013Local State JATS595

466 - Earmarks

129 - Local

- TOTAL

100676 Craighead 226 Cash Bypass (Bs. & Surf.) (S) Major Widening 2.92 2014State State9,000

7,200 - Earmarks

1,800 - State Match

- TOTAL

100X01 Craighead 226 Cash Bypass - Hwy. 49 (S) Major Widening 6.88 2014State State JATS55,000

44,000 - STP

11,000 - State Match

- TOTAL

BB0403 Craw & Frank 040 Dyer-Cravens Creek (S) Rehabilitation 14.10 2013State State

11,280

11,280- Bond

- TOTAL

BB0409 Craw & Wash 540 I-540 Pavement Rehabilitation (Sel. Secs.) (S) Rehabilitation 2015State State FRONTIER / NARTS

25,756

25,756

- Bond

- TOTAL

040456 Crawford 162 Hwy. 162 Improvements (Alma) (S) New Location 0.70 2014State State FRONTIER6,000

4,800 - STP

200 - State Match

1,000 - Local

- TOTAL

Partnering Project – City responsible for right of way acquisition, utility adjustments, $1 million toward cost of construction, and accepting responsibility for various highways upon completion of project.

040623 Crawford 059 Natural Dam-North Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750

3,800 - BR

950 - State Match

- TOTAL

040X03 Crawford Van Buren Port Facility Miscellaneous 2013Local Local FRONTIER51

41 - Earmarks

10 - Local

- TOTAL

Page 104 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 145: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2013Local Local WMATS250

250 - Earmarks

- TOTAL

For Environmental Assessment.

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2014Local Local WMATS450

450 - Earmarks

- TOTAL

For Preliminary Engineering.

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2015Local Local WMATS1,400

1,337 - Earmarks

63 - Local

- TOTAL

For Right-of-Way and Utility Relocation.

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2016Local Local WMATS7,900

3,169 - Earmarks

3,111 - Local

1,620 - CMAQ - AQ

- TOTAL

For Construction.

110557 Crittenden 147 Hwy. 131-North (S) Rehabilitation 5.50 2015State State2,000

1,600 - STP

400 - State Match

- TOTAL

110567 Crittenden 042 Deer Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State WMATS1,100

880 - BR

220 - State Match

- TOTAL

110571 Crittenden 149 Ditch at L.M. 2.30 Str. & Apprs. (S) Strs. & Apprs. 2016State State1,500

1,200 - BR

300 - State Match

- TOTAL

110583 Crittenden CS Ingram Blvd.-East (Southland Dr.) (West Memphis) (S) Reconstruction 2013Local Local WMATS2,738

547 - Local

- STP > 200,000

- TOTAL

2,191

110XX1 Crittenden CS Ingram Blvd.-West (Southland Dr.) (West Memphis) (S) New Location 2014Local Local WMATS3,084

616 - Local

- STP > 200,000

- TOTAL

2,468

Page 105 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 146: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

110XX2 Crittenden CS Harahan Bikeway Connector (West Memphis - Mississippi River)

New Location 2014Local Local WMATS850

850 - CMAQ - AQ

- TOTAL

BB0107 Crittenden 040 Shearerville-Hwy. 77 (F) Rehabilitation 12.90 2015State State WMATS

12,299

12,299- Bond

- TOTAL

BB0108 Crittenden 040 Hwy. 77-I-55 (F) Rehabilitation 2.20 2013State State WMATS

23,892

23,892- Bond

- TOTAL

BB0109 Crittenden 055 I-40-Jericho (S) Rehabilitation 8.23 2013State State WMATS

9,784

9,784- Bond

- TOTAL

BB0110 Crittenden 055 Jericho-Lake David (S) Rehabilitation 8.00 2014State State

6,496

6,496- Bond

- TOTAL

110147 Cross 284 Branch of Caney Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

070289 Dallas & Cleve 167 Hwy. 273-Peters Rd. (CR 24) (F) Major Widening 5.30 2013State State26,600

21,280 - NHS

5,320 - State Match

- TOTAL

020462 Drew 069 Monticello Bypass (F) New Location 2015State State68,970

55,176 - Earmarks

13,794 - State Match

- TOTAL

012145 Faulk & Pulaski 040 Palarm Creek-Hwy. 365 (Widening) (F) Major Widening 4.31 2013State State CARTS18,200

4,560 - STP

3,640 - State Match

10,000 - CMAQ FLEX

- TOTAL

Funding Breakdown: District 6 - $17.0 M / District 8 - $1.2 M.

012155 Faulk & White 064 Vilonia Bypass-East (F) Major Widening 7.14 2015State State CARTS25,000

20,000 - NHS

5,000 - State Match

- TOTAL

Page 106 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 147: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

080395 Faulkner 040 Conway South Interchange-Hwy. 365 (Grading & Strs.) (F) New Location 0.84 2013Local State CARTS16,957

8,046

779

- NHS

- Earmarks

43 - State Match

6,918 - Local

- STP > 200,000

- TOTAL

1,171

Partnering Project – City to provide 50% of project costs.

080396 Faulkner 040 Conway South Interchange-Hwy. 365 (Base & Surf.) (S) New Location 0.84 2014Local State CARTS4,374

2,187 - NHS

2,187 - Local

- TOTAL

Partnering Project – City to provide 50% of project costs.

080397 Faulkner 025 Hwy. 25 Relocation (I-40-North) (S) New Location 1.22 2014State State CARTS6,000

3,000 - STP

2,121 - Local

- STP > 200,000

- TOTAL

879

Partnering Project – City and County to provide 50% of project costs.

080411 Faulkner 040 Palarm Creek-West (Widening) (F) Major Widening 4.78 2013State State CARTS25,800

20,640 - STP

5,160 - State Match

- TOTAL

080426 Faulkner 285 Bono-Hwy. 124 (Rehab.) (S) Rehabilitation 5.40 2014State State CARTS4,000

3,200 - STP

800 - State Match

- TOTAL

080430 Faulkner Hwy. 365-Sturgis Rd (Gr. & Strs.) (S) New Location 2013Local Local CARTS6,140

6,140 - Local

- TOTAL

080431 Faulkner Hwy. 365-Sturgis Rd (Bs. & Surf.) (S) New Location 2014Local Local CARTS3,300

3,300 - Local

- TOTAL

080457 Faulkner 089 UPRR Overpass & Realign. (Mayflower) (S) Strs. & Apprs. 2016State State CARTS15,000

8,000 - STP

2,500 - State Match

4,500 - RRP

- TOTAL

Page 107 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 148: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

BB1103 Frank & John 040 Ozark-Hwy. 164 (S) Rehabilitation 8.20 2014State State

6,658

6,658- Bond

- TOTAL

040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2013Local State1,935

935 - Local

- STP < 200,000

- TOTAL

1,000

050230 Fulton 063 Hwy. 9-So. of Hwy. 342 (Mammoth Spring) (S) Major Widening 2014State State16,500

4,000

9,200

- NHS

- BR

3,300 - State Match

- TOTAL

050271 Fulton 009 Creek at L.M. 3.10 Str. & Apprs. (S) Strs. & Apprs. 2015State State750

600 - BR

150 - State Match

- TOTAL

050274 Fulton 063 Gut Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State2,000

1,600 - BR

400 - State Match

- TOTAL

061330 Gar & Saline 070 Hot Springs-I-30 (Ph. I) (S) Major Widening 17.60 2015State State HSA-MPO/CARTS

20,000

16,000 - NHS

4,000 - State Match

- TOTAL

060432 Garland 007 Hwy. 290-Ouachita River Bridge (S) Major Widening 1.70 2015State State HSA-MPO6,000

4,800 - STP

1,200 - State Match

- TOTAL

061214 Garland 088 Printers Place-Crawford St. (Higdon Ferry Rd.) (Hot Springs) (S)

Major Widening 0.20 2013State State HSA-MPO3,800

1,216

1,824

- STP

- Earmarks

304 - State Match

456 - Local

- TOTAL

Partnering Project – City responsible for right of way acquisition and utility adjustments.

Page 108 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 149: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

061312 Garland CS Hot Springs & Stokes Creeks Strs. & Apprs. (Hot Springs) (S) Str. & Apprs. 2013Local State HSA-MPO650

520 - BR

130 - Local

- TOTAL

061329 Garland 007 Hot Springs-Hwy. 5 (Ph. I) (S) Improvements 6.20 2016State State HSA-MPO10,000

8,000 - STP

2,000 - State Match

- TOTAL

020543 Grant 291 Moore's Slough Tributary Str. & Apprs. (S) Strs. & Apprs. 2015State State1,200

960 - BR

240 - State Match

- TOTAL

100708 Greene 412 Hwy. 412 West-Hwy. 49 (Gr. & Strs.) (S) New Location 5.23 2015State State10,600

8,480 - NHS

2,120 - State Match

- TOTAL

100709 Greene 412 Hwy. 412 West-Hwy. 49 (Bs. & Surf.) (S) New Location 5.23 2016State State9,100

7,280 - NHS

1,820 - State Match

- TOTAL

100711 Greene 412 Hwy. 49-Hwy. 412 East (Bs. & Surf.) (S) New Location 5.20 2014State State8,600

3,980

3,400

- NHS

- Earmarks

1,220 - State Match

- TOTAL

BB0305 Hempstead 030 Hwy. 67-Sheppard (F) Rehabilitation 4.10 2016State State

18,864

18,864- Bond

- TOTAL

BB0306 Hempstead 030 Sheppard-Hwy. 278 (S) Rehabilitation 7.10 2014State State

20,178

20,178- Bond

- TOTAL

061309 Hot Spr & Garland

007 So. of Hot Spring/Garland Co. Ln.-Hwy. 290 (S) Widening 2016State State HSA-MPO10,000

1,000 - State Match

- TOTAL

9,000 - HSIP

Page 109 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 150: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

061084 Hot Spring 067 UPRR & Pine St. Str. & Apprs. (Donaldson) (S) Strs. & Apprs. 2015State State HSA-MPO3,800

3,040 - BR

760 - State Match

- TOTAL

050213 Independence 167 Hwy. 394-CR 80 (Antioch Road) (S) Major Widening 5.11 2014State State18,750

15,000 - NHS

3,750 - State Match

- TOTAL

050214 Independence 167 CR 80 (Antioch Road)-South City Limits Cave City (F) Major Widening 4.57 2015State State17,500

14,000 - NHS

3,500 - State Match

- TOTAL

005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Strs. & Apprs. 2014State State22,600

18,080 - BR

4,520 - State Match

- TOTAL

050272 Jackson 014 Cache River-Amagon Strs. & Apprs. (S) Strs. & Apprs. 2016State State8,250

6,600 - BR

1,650 - State Match

- TOTAL

BB0201 Jefferson 530 Jefferson-Hwy. 104 (S) Rehabilitation 6.10 2016State State PBATS6,284

5,656 - IM

628 - State Match

- TOTAL

BB0803 John & Pope 040 Hwy. 64-Mill Creek (S) Rehabilitation 13.10 2015State State

10,637

10,637- Bond

- TOTAL

080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Major Widening 0.40 2013State State4,800

3,840 - STP

960 - State Match

- TOTAL

080437 Johnson CS Hwy. 64-East (Massengale Rd.) (Clarksville) (S) Reconstruction 2014Local State973

195 - Local

- STP < 200,000

- TOTAL

778

080444 Johnson 123 Haw Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

Page 110 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 151: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

030343 Lafayette 082 Hwy. 82 Improvements (Stamps) (S) Major Widening 1.94 2016State State6,000

4,800 - NHS

1,200 - State Match

- TOTAL

100404 Lawrence 067 Hwy. 230-Hwy. 63 (Bs. & Surf.) (S) New Location 9.78 2013State State36,000

28,800 - NHS

7,200 - State Match

- TOTAL

100686 Lawrence 063 Black Rock-Portia (S) Major Widening 1.55 2013State State10,200

8,160 - NHS

2,040 - State Match

- TOTAL

110502 Lee 001 Cypress Corner-North (S) Major Widening 5.40 2013State State18,040

14,080

220

- NHS

- Earmarks

3,740 - State Match

- TOTAL

110570 Lee 131 Ditch at L.M. 1.85 Str. & Apprs. (S) Strs. & Apprs. 2015State State2,125

1,700 - BR

425 - State Match

- TOTAL

110217 Lee & Phillips 001 Walnut Corner-Cypress Corner (S) Major Widening 7.03 2015State State35,500

28,400 - NHS

7,100 - State Match

- TOTAL

020542 Linc & Desha 212 Hwy. 212 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,500

2,000 - BR

500 - State Match

- TOTAL

020419 Lincoln 054 Wells Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State1,300

1,040 - BR

260 - State Match

- TOTAL

030415 Little River 041 Little River Str. & Apprs. (S) Strs. & Apprs. 2016State State10,600

8,480 - BR

2,120 - State Match

- TOTAL

Page 111 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 152: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (S) Interchange 2013State/Local State CARTS7,062

1,600

3,822

- NHS

- Earmarks

400 - State Match

1,012 - Local

- STP > 200,000

- TOTAL

228

090343 Madison 023 Hwy. 74-Huntsville Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,000

4,000 - BR

1,000 - State Match

- TOTAL

090342 Marion 014 Mill Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,400

1,120 - BR

280 - State Match

- TOTAL

030313 Miller 071 LA Line-Doddridge (Bs. & Surf.) (S) New Location 4.46 2013State State15,900

10,000

2,700

- NHS

- Earmarks

3,200 - State Match

- TOTAL

030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Strs. & Apprs. 2014State State TUTS7,750

6,200 - BR

1,550 - State Match

- TOTAL

BB0301 Miller 030 Texas State Line-Hwy. 108 (S) Rehabilitation 7.10 2015State State TUTS

5,852

5,852- Bond

- TOTAL

BB0302 Miller 030 Hwy. 67-West of Red River (S) Rehabilitation 4.50 2016State State

7,529

7,529- Bond

- TOTAL

BB0303 Miller 030 Red River-East & West (F) Rehabilitation 1.80 2014State State

17,745

17,745- Bond

- TOTAL

BB0310 Miller 030 Hwy. 108-Hwy. 67 (S) Rehabilitation 4.40 2015State State

7,253

7,253- Bond

- TOTAL

Page 112 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 153: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

100654 Mississippi 018 Hwy. 18 Improvements (Manila) (S) Major Widening 4.30 2014State State21,000

16,800 - STP

4,200 - State Match

- TOTAL

100760 Mississippi VAR Left Hand Chute of Little River Strs. & Apprs. (S) Strs. & Apprs. 2015State State4,425

3,540 - BR

885 - State Match

- TOTAL

Hwys. 77 & 140

BB1003 Mississippi 055 Hwy. 181-Hwy. 158 (F) Rehabilitation 7.90 2013State State

31,600

31,600- Bond

- TOTAL

BB1006 Mississippi 055 No. of Hwy. 18-Missouri St. Line (S) Rehabilitation 4.22 2015State State

17,390

17,390- Bond

- TOTAL

110540 Monroe 079 White River Strs. Demo. & Removal (Clarendon) (S) Strs. & Apprs. 2015State State8,000

6,400 - BR

1,600 - State Match

- TOTAL

110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Strs. & Apprs. 2014State State4,900

3,920 - BR

980 - State Match

- TOTAL

BB0101 Monroe 040 Cache River-Bayou DeView (F) Rehabilitation 4.10 2013State State

18,040

18,040- Bond

- TOTAL

080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Strs. & Apprs. 2014State State3,000

2,400 - BR

600 - State Match

- TOTAL

009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Strs. & Apprs. 2014State State2,600

2,080 - BR

520 - State Match

- TOTAL

090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2014State State3,000

2,400 - STP

600 - State Match

- TOTAL

Page 113 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 154: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

080439 Perry 007 Bear Creek & So. Fourche La Fave River Strs. & Apprs. (S) Strs. & Apprs. 2016State State5,150

4,120 - BR

1,030 - State Match

- TOTAL

080446 Perry 216 Coffee Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000

800 - BR

200 - State Match

- TOTAL

110572 Phillips 242 Fletcher Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

110575 Phillips 044 Bee Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100

880 - BR

220 - State Match

- TOTAL

100764 Poinsett 214 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2015State State1,250

1,000 - BR

250 - State Match

- TOTAL

080157 Pope Intermodal Complex (Russellville) (S) Miscellaneous 2013Local Local2,908

2,326 - Earmarks

582 - Local

- TOTAL

080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2014State State7,100

5,680 - STP

1,420 - State Match

- TOTAL

080389 Pope 124 Hob Nob Rd.-Crow Mtn. Rd. (Russellville) (S) Major Widening 1.00 2013Local State6,000

3,000 - STP

3,000 - Local

- TOTAL

Partnering Project – City to provide up to $3 million. Hwys. 124 and 326.

080392 Pope 007 Newton Co. Line-South (Passing Lane) (S) Passing Lanes 1.30 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL

Page 114 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 155: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

080422 Pope 007 Dover-North (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

080427 Pope 124 Crow Mtn. Rd.-Center Valley Rd. (S) Major Widening 2.15 2014State State7,000

5,600 - STP

1,400 - State Match

- TOTAL

080443 Pope 064 White Oak Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State1,700

1,360 - BR

340 - State Match

- TOTAL

080464 Pope 007 Newton Co. Line-South (Passing Lane) (Ph. II) (S) Passing Lane 1.20 2013State State2,200

1,760 - STP

440 - State Match

- TOTAL

BB0804 Pope 040 Mill Creek-Hwy. 331(F) Rehabilitation 6.80 2013State State

30,700

37,087- Bond

5,748 - IM

639 - State Match

- TOTAL

BB0805 Pope 040 Hwy. 331-Atkins (S) Rehabilitation 10.80 2014State State

8,770

9,263- Bond

49 - State Match

- TOTAL

444 - HSIP

Includes Safety Funds for Cable Median Barriers.

BB0806 Pope & Con 040 Atkins-Plumerville (S) Rehabilitation 18.60 2013State State

16,473

18,826- Bond

235 - State Match

- TOTAL

2,118 - HSIP

Includes Safety Funds for Cable Median Barriers.

BB0610 Prairie 040 White River Str. & Apprs. (F) Str. & Apprs. 0.50 2015State State53,572

36,515

10,400

- IM

- BR

6,657 - State Match

- TOTAL

Bridge funds are for widening the bridge - Bond funds cannot be used for widening the bridge.

Page 115 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 156: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

061334 Pul & Lonoke 067 Jacksonville-Cabot (Ph. I) (F) Capacity Impvts. 11.80 2016State State CARTS15,000

3,000 - State Match

12,000 - CMAQ FLEX

- TOTAL

060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Strs. & Apprs. 2014State State CARTS6,400

5,120 - BR

1,280 - State Match

- TOTAL

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2014Local Local CARTS734

587 - Earmarks

147 - Local

- TOTAL

For Preliminary Engineering.

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2015Local Local CARTS2,500

500 - Local

- STP > 200,000

- TOTAL

2,000

For Right-of-Way and Utility Relocation.

060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2016Local Local CARTS7,500

1,500 - Local

- STP > 200,000

- TOTAL

6,000

For Construction.

061--- Pulaski 440 Hwy. 67-I-40 West (North Belt Freeway Toll Feasibility Study) Planning 2013State State CARTS500

100 - State Match

- STP > 200,000

150 - CMAQ FLEX

- TOTAL

250

Partnering Project – Metroplan to provide 50% of project costs.

061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (L.R.) (S) Major Widening 0.65 2013State State CARTS3,000

300 - Local

- TOTAL

2,700 - HSIP

Partnering Project – City responsible for the 10% match of Safety funds.

061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Strs. & Apprs. 2013State State CARTS58,000

46,400 - BR

11,600 - State Match

- TOTAL

Page 116 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 157: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

061276 Pulaski 067 Redmond Rd. & Main St. Strs. & Apprs. (Jacksonville) (F) Strs. & Apprs. 2013State State CARTS17,300

13,840 - BR

3,460 - State Match

- TOTAL

061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Strs. & Apprs. 2014State State CARTS7,400

5,920 - BR

1,480 - State Match

- TOTAL

061294 Pulaski CS McCain Rail Grade Separation (NLR) (S) Grade Seperation 2013Local Local CARTS11,185

2,893 - Earmarks

2,237 - Local

- STP > 200,000

- TOTAL

6,055

061295 Pulaski CS Maryland Ave. Impvts. & Extension (Sherwood) Widening 2013Local Local CARTS405

81 - Local

- STP > 200,000

- TOTAL

324

061317 Pulaski 040 Hwy. 365-I-430 (Widening) (Phase I) (F) Major Widening 5.63 2014State State CARTS23,000

8,400 - NHS

4,600 - State Match

10,000 - CMAQ FLEX

- TOTAL

This project will include modifications to the I-40/I-430 Interchange.

061331 Pulaski 010 Taylor Loop Rd.-Pleasant Valley Dr. (Ph. 1) (S) Major Widening 3.20 2016State State CARTS15,000

12,000 - STP

3,000 - State Match

- TOTAL

061332 Pulaski 430 I-30/I-430 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS12,000

2,400 - State Match

9,600 - CMAQ FLEX

- TOTAL

061333 Pulaski 430 I-430/Hwy. 10 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS11,000

8,800 - NHS

2,200 - State Match

- TOTAL

061348 Pulaski 365 UPRR/Parkway Dr. Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS6,000

4,800 - BR

1,200 - State Match

- TOTAL

Page 117 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 158: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

BB0604 Pulaski 040 I-30/I-40 Intchng.-Hwy. 67 (F) Rehabilitation 1.70 2016State State CARTS22,749

20,474 - IM

2,275 - State Match

- TOTAL

BB0611 Pulaski 440 I-30-Ark. River Bridge (F) Rehabilitation 3.00 2016State State CARTS25,042

22,538 - IM

2,504 - State Match

- TOTAL

BB0613 Pulaski 530 I-30-Bingham Rd. (F) Rehabilitation 8.50 2014State State CARTS

37,961

37,961- Bond

- TOTAL

BB0614 Pulaski & Saline 530 Bingham Rd.-Grant Co. Line (S) Rehabilitation 7.50 2013State State CARTS

9,111

9,111- Bond

- TOTAL

100759 Randolph 067 Black River Str. & Apprs. (Pocahontas) (S) Strs. & Apprs. 2016State State8,500

6,800 - BR

1,700 - State Match

- TOTAL

061134 Saline 005 Hurricane Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,220

976 - BR

244 - State Match

- TOTAL

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2013Local Local CARTS1,065

213 - Local

- STP > 200,000

- TOTAL

852

For Right-of-Way and Preliminary Engineering of Utility Relocation.

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2014Local Local CARTS2,788

558 - Local

- STP > 200,000

- TOTAL

2,230

For Utility Relocation

061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2015Local Local CARTS11,000

2,200 - Local

- STP > 200,000

- TOTAL

8,800

For Construction

Page 118 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 159: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

061335 Saline 005 Springhill Rd.-Hwy. 183 (Bryant) (S) Major Widening 1.10 2015State State CARTS12,000

9,600 - STP

2,400 - State Match

- TOTAL

061349 Saline 183 Bauxite & Northern RR Spur Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,640

1,312 - BR

328 - State Match

- TOTAL

BB0602 Saline 030 Hwy. 70-West (West Bound Lanes) (S) Rehabilitation 2.90 2015State State CARTS

8,901

8,901- Bond

- TOTAL

009831 Searcy VAR Gourd & Granney Creek Strs. & Apprs. (S) Strs. & Apprs. 2015State State750

600 - BR

150 - State Match

- TOTAL

Hwys. 74 and 377

BB0407 Seb & Craw 540 Hwy. 22-I-40 (F) Rehabilitation 8.05 2013State State FRONTIER

67,300

67,300- Bond

- TOTAL

040376 Sebastian 071 Hwy. 71-Hwy. 22 (Base & Surf.) (S) New Location 6.04 2013State State FRONTIER23,000

12,101

6,299

- NHS

- Earmarks

4,600 - State Match

- TOTAL

040471 Sebastian CS Jenny Lind Rd. & Ingersoll Ave. Widening (Fort Smith) (S) Major Widening 3.00 2013Local Local FRONTIER8,980

7,184 - Earmarks

1,796 - Local

- TOTAL

040X02 Sebastian CS Western & Eastern Rail Trolley Ext (PE) (Ft. Smith) (S) PE 2013Local Local FRONTIER238

238 - Earmarks

- TOTAL

BB0405 Sebastian 540 Hwy. 271-Hwy. 71 (S) Rehabilitation 2.15 2015State State FRONTIER3,898

3,190 - IM

709 - State Match

- TOTAL

030X01 Sevier 071 DeQueen-East Strs. & Apprs. (S) Strs. & Apprs. 2016State State6,500

5,200 - BR

1,300 - State Match

- TOTAL

Page 119 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 160: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

050266 Sharp 063 Hardy-East (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000

4,000 - NHS

1,000 - State Match

- TOTAL

050275 Sharp 063 Hardy-Ozark Acres Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750

3,800 - BR

950 - State Match

- TOTAL

110573 St. Francis 261 L'Anguille River Str. & Apprs. (S) Strs. & Apprs. 2015State State1,125

900 - BR

225 - State Match

- TOTAL

BB0104 St. Francis 040 Goodwin-Forrest City (S) Rehabilitation 11.62 2014State State

9,435

12,161- Bond

273 - State Match

- TOTAL

2,453 - HSIP

Includes Safety Funds for Cable Median Barriers.

BB0105 St. Francis 040 Forrest City-East (F) Rehabilitation 8.28 2013State State41,925

37,733 - IM

4,193 - State Match

- TOTAL

BB0106 St. Francis 040 Shearerville-West (S) Rehabilitation 16.50 2014State State

79,881

82,607- Bond

273 - State Match

- TOTAL

2,453 - HSIP

Includes Safety Funds for Cable Median Barriers.

050231 Stone 066 Mt. View-West (Passing Lane) (S) Passing Lane 1.20 2013State State3,000

2,400 - STP

600 - State Match

- TOTAL

070280 Union 167 El Dorado-Hwy. 335 (S) Major Widening 5.04 2013State State18,500

13,437

1,363

- STP

- Earmarks

3,700 - State Match

- TOTAL

Page 120 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 161: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

070281 Union 167 Hwy. 335-Ouachita River (S) Major Widening 2.97 2013State State10,600

8,480 - STP

2,120 - State Match

- TOTAL

070367 Union VAR Hwy. 82/82B/167B Improvements (El Dorado) (S) Major Widening 9.43 2016State State47,000

37,600 - STP

9,400 - State Match

- TOTAL

Hwys. 82, 82B and 167B

070368 Union 335 Hwy. 82-Hwy. 7 (Rehab.) (S) Rehabilitation 7.60 2016State State8,000

6,400 - STP

1,600 - State Match

- TOTAL

070377 Union 82B UPRR Str. & Apprs. (El Dorado) (S) Strs. & Apprs. 2016State State8,000

6,400 - BR

1,600 - State Match

- TOTAL

Coordinate with Job 070367.

070282 Union & Calh 167 Ouachita River Str. & Apprs. (S) Major Widening 1.76 2014State State25,700

20,560 - NHS

5,140 - State Match

- TOTAL

080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Major Widening 1.41 2013State State11,000

8,800 - NHS

2,200 - State Match

- TOTAL

080391 Van Buren 065 N. of Bee Branch-Co. Rd. 28 (S) Major Widening 3.60 2013State State12,900

10,320 - NHS

2,580 - State Match

- TOTAL

080423 Van Buren 065 Bee Branch-North (S) Major Widening 8.07 2016State State20,000

16,000 - NHS

4,000 - State Match

- TOTAL

080445 Van Buren 124 Cadron Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,900

1,520 - BR

380 - State Match

- TOTAL

Page 121 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 162: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

040024 Washington 074 White River Str. & Apprs. (Elkins) (S) Strs. & Apprs. 2015State State NARTS3,700

2,960 - BR

740 - State Match

- TOTAL

040272 Washington CS Johnson Road Reconst. (Springdale) Widening 3.24 2013Local Local NARTS10,409

7,327 - Earmarks

2,082 - Local

- STP < 200,000

- TOTAL

1,000

040521 Washington 062 Hwy. 62 Bypass (Bs. & Surf.) (Prairie Grove) (S) New Location 4.83 2013State State NARTS12,000

9,600 - STP

2,400 - State Match

- TOTAL

040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2013Local Local NARTS26,951

26,951 - Local

- TOTAL

040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Safety & Traf Eng 2013Local Local NARTS6,452

5,162 - Earmarks

1,290 - Local

- TOTAL

040569 Washington 016 West Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2013State State NARTS6,900

5,520 - BR

1,380 - State Match

- TOTAL

040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Strs. & Apprs. 2015State State NARTS725

580 - BR

145 - State Match

- TOTAL

040581 Washington 112 Hwy. 180-Leroy Pond Dr. (Hwy. 112) (Fayetteville) (S) Major Widening 0.35 2013Local State NARTS1,250

250 - Local

- STP < 200,000

- TOTAL

1,000

040605 Washington 540 Hwy. 16-Porter Rd. (Widening) (S) Major Widening 1.35 2013State State NARTS9,400

7,520 - NHS

1,880 - State Match

- TOTAL

Page 122 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 163: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

040618 Washington CS Maple St. & Lafayette St. Bridge Rehab. (Fayetteville) (S) Str. & Apprs. 2013Local State NARTS1,000

800 - BR

200 - Local

- TOTAL

040641 Washington 016 Middle Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2016State State NARTS4,600

3,680 - BR

920 - State Match

- TOTAL

BB0410 Washington 540 Hwy. 62 Intchng. Impvts. (F) Interchange 2015State State NARTS

25,375

25,375- Bond

- TOTAL

BB0411 Washington 540 Hwy. 16/112 Spur Intchng. Impvts. (S) Interchange 2015State State NARTS

19,285

19,285- Bond

- TOTAL

BB0412 Washington 540 Greathouse Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,500

1,350 - IM

150 - State Match

- TOTAL

BB0413 Washington 540 Elm Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS4,000

3,600 - IM

400 - State Match

- TOTAL

BB0414 Washington 540 Porter Rd.-Hwy. 112/71B Widening & Intchng. Impvts. (F) Major Widening & Interchange

2.50 2015State State NARTS54,977

33,119

7,400

- STP

- IM

9,102 - State Match

5,356 - Local

- TOTAL

Bond funds are for interchange modifications only - Bond funds cannot be used for widening the main lanes. City of Fayetteville transferred partnering commitment from Job 040489, Hwy. 112 Spur-North (Hwy. 112) to this project.

050249 White NEW Hwy. 36-Hwy. 16 (Gr. & Strs.) (S) New Location 3.87 2016State State11,537

4,430 - STP

1,107 - State Match

6,000 - Local

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

Page 123 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 164: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

050250 White NEW Hwy. 36-Hwy. 16 (Bs. & Surf.) (S) New Location 3.80 2016State State6,688

5,350 - STP

1,338 - State Match

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

050251 White NEW Hwy. 16-Hwy. 67 (S) New Location 4.04 2014State State12,787

10,230 - STP

2,557 - State Match

- TOTAL

Partnering project – City and County to provide $6,000,000 of project costs.

050260 White 067 Hwy. 157-Hwy. 167 (Ph. II) (S) Rehabilitation 4.56 2013State State12,000

9,600 - NHS

2,400 - State Match

- TOTAL

050263 White 064 Beebe-West (S) Major Widening 3.33 2016State State10,000

8,000 - NHS

2,000 - State Match

- TOTAL

050264 White 064 Hwy. 367-Woodruff Co. Line (Rehab.) (S) Rehabilitation 9.30 2016State State20,000

16,000 - STP

4,000 - State Match

- TOTAL

110541 Woodruff 038 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2013State State2,400

1,920 - BR

480 - State Match

- TOTAL

080377 Yell 007 Centerville-Dardanelle (Passing Lane) (S) Passing Lane 1.20 2013State State2,000

1,600 - STP

400 - State Match

- TOTAL

080385 Yell 007 Little Rock & Western RR Str. & Apprs. (S) Strs. & Apprs. 2013State State1,550

1,240 - BR

310 - State Match

- TOTAL

080428 Yell 027 Danville-Dardanelle (Passing Lanes) (S) Passing Lanes 2.40 2014State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

Page 124 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 165: 2013-2016 - ArDOT2013 total 367.5 17.5 2015 376.5 17.5 385.0 17.5 2016 390.0 estimated state revenue analysis 2014 25.0 410.0 17.5 1,519.0 70.0 115.0 statewide transportation improvement

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

10/3/2012 9:12:43 AM

080441 Yell 007 Keeland Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000

800 - BR

200 - State Match

- TOTAL

Page 125 of 125

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.