Outline
NCHRP Program Cycle
FY2012 NCHRP Program Funding
NCHRP Bridge and Structure Projects
– Funded (FY2012)
– Awarded (FY2011)
– Completed/Published
– In progress
NCHRP Products Developed for AASHTO SCOBS
Submittal Evaluation Program
Formulation
Program Approval
Panel Formulation
Proposal Process
Agency Selection
Project Surveillance
NCHRP Program Cycle
Submittal & Evaluation
• NCHRP solicits problem statements from authorized sources: DOTs, AASHTO Committees/Subcommittees, and FHWA (July-September)
• FHWA and NCHRP evaluation panels and staff evaluate problem statements
• SCOR and RAC rate the candidates in a mail ballot to set priority for the SCOR meeting in March
• NCHRP sends a summary report to the SCOR
NCHRP Program Cycle
Formulation & Approval
• SCOR meets to formulate the NCHRP Program (late March)
• FHWA approves of conformance with Federal-aid requirements
• SCOR sends a report to the AASHTO Board of Directors requesting approval of the projects
• AASHTO refers program to the NAS for administration
• NAS reviews for acceptance
NCHRP Program Cycle
Execution
• NCHRP solicits panel nominations (May-June)
• NCHRP appoints panel members
• Panel prepares RFP (July-September)
• NCHRP solicits proposals
• Panel reviews the proposals and makes recommendation for award of contract
• NCHRP negotiates and executes a contract
• NCHRP administers the project
NCHRP Program Cycle
FY2012 NCHRP Program Funding
FY2012 NCHRP Program Funding
$31,470,000
Continuation
New
18 Projects
46 Projects
$11,390,000
$20,080,000
FY2012 NCHRP Program
Continuation Projects
Continuations
18 Projects
$11,390,000
12 Special projects
$9,550,000
(84%)
Research for AASHTO SCO: Planning, Highway, Public
Transportation, and Environment
Synthesis, Legal Studies, IDEA, Domestic and International
Scan, and NCHRP Program Implementation
Surface Transportation Security Research
Research for Administration of HW&T Agencies (CEOs)
6 Continuation projects
$1,840,000
(16%)
FY2012 NCHRP New Projects
New
46 projects
$20,080,000
Other areas
37
$15,280,000
(76%)
Bridges & Structures
9
$4,800,000
(24%)
FY2012 NCHRP Bridge and
Structure Funded Projects
FY2012 NCHRP Bridge and Structure
Funded Projects (HSCOBS)
Project Title Funds
12-91Strand Debonding Guidelines for
Pretensioned Girders$750k
14-26 Culvert and Storm Drain Inspection Manual $500k
14-27Guidelines for a Comprehensive Preventive
Maintenance Plan for Tunnel Owners and
Operators$450k
14-28Improved Corrosion Inspection Techniques
for Ducted Strands for Cable Stayed and
Post-Tensioned Concrete Bridges$750k
24-38Bridge Foundation Settlement Criteria for
Design $450k
FY2012 NCHRP Bridge and Structure
Funded Projects
Project Title Funds
12-90Guidelines for Design and Shielding of
Bridge Piers$500K
24-36Scour at the Base of Retaining Walls
and Other Longitudinal Structures$500K
24-37Combining Individual Scour
Components to Determine Total Scour$600K
25-42Bridge Runoff Treatment Analysis and
Treatment Options$300K
FY2012 NCHRP Bridge and Structure
Funded Projects (HSCOBS)
Project Title Funds
20-07/
Task 316
Establishment of Appropriate Guidelines
for Use of the Direct and Indirect Design
Methods for Reinforced Concrete Pipe.
$100K
FY2011 NCHRP Bridge and
Structure Awarded Projects
FY2011 NCHRP Bridge and Structure
Awarded Projects
Project Title Agency
12-87
Development of System Fracture
Analysis Methods for Fracture
Critical Steel Bridges
Virginia
Polytechnic
Institute
12-89Development of New AASHTO LRFD
Tunnel Design SpecificationsContract
pending
14-23
Quantify the Information Necessary
to Guide Bridge Preservation
Decisions
Selection
pending
18-16Self-Consolidating Concrete for Cast-
in-Place Bridge ComponentsContract
pending
Project Title Agency
Task
294
Continuation of Funding of 20-07 Task
245 - Update Bridge Temporary WorksWJE
Task
306
Revision of Strut-and-Tie Provisions in
the AASHTO LRFD Bridge Design
Specifications
Denis
Mitchell
Task
307
Updated Research for Collision
Damage and Repair of Prestessed
Concrete Beams
Contract
pending
FY2011 NCHRP Bridge and Structure
Awarded Projects(20-07)
NCHRP Bridge and Structure
Projects Completed/Published
NCHRP Bridge and Structure Projects
Published (2010)
Project Title Publication
12-72Blast-Resistant Highway Bridges:
Design and Detailing GuidelinesReport 645
15-29Design Specifications for Live Load
Distribution to Buried StructuresReport 647
24-31LRFD Design Specifications for
Shallow FoundationsReport 651
24-26Effects of Debris on Bridge Pier
ScourReport 653
NCHRP Bridge and Structure Projects
Published (2010)
Project Title Publication
18-14
Evaluation and Repair Procedures
for Precast/Prestressed Concrete
Girders with Longitudinal Cracking in
the Web
Report 654
10-73
Guide Specification for the Design of
Externally Bonded FRP Systems for
Repair and Strengthening of
Concrete Bridge Elements
Report 655
14-15
Developing a National Database
System for Maintenance Actions on
Highway Bridges
Report 668
NCHRP Bridge and Structure Projects
Completed/Published (2010/2011)
Project Title Publication
12-75
Design of FRP Systems for
Strengthening Concrete Girders in
Shear
Report 678
12-77Structural Design with High-
Strength ReinforcementReport 679
12-74Development of a Precast Bent Cap
System for Seismic RegionsReport 681
12-76
12-
76(01)
Protocols for Collecting and Using
Traffic Data in Bridge DesignReport 683
NCHRP Bridge and Structure Projects
Completed/Published (2011)
Project Title Publication
10-71Cast-in-Place Concrete Connections
for Precast Deck Systems
Web-Only
Document 173
10-70
Cost-Effective Connection Details for
Highway Sign, Luminaire, and Traffic
Signal Structures
To be available
as Web-Only
Document 176
12-88
Application of Accelerated Bridge
Construction Connections in
Moderate-to-High Seismic Regions
To be published
as Report 698
12-78A Comparison of AASHTO Bridge
Load Rating Methods
To be published
as Report 700
NCHRP Bridge and Structure Projects
Completed (2010)
Task Title
20-07/
Task 270
Application of AASHTO LRFD Specifications
to Design of Sound Barriers
20-07/
Task 276
Development of Guidelines for Rehabilitation
of Existing highway and Rail Transit Tunnels
20-
24(37)E
Measuring Performance Among State DOTs -
Bridge Conditions
NCHRP Bridge and Structure
Projects in Progress
NCHRP Bridge and Structure Projects in
Progress
Project Title
10-74Development of Fatigue Loading and Design
Methodology for High-Mast Lighting Poles (Nov. 2011)
10-80New Specifications for Structural Supports for Highway
Signs, Luminaires, and Traffic Signals (Nov. 2012)
12-79Guidelines for Analysis and Construction Engineering of
Curved and Skewed Steel Girder Bridges (Dec. 2011)
12-81Evaluation of Fatigue on the Serviceability of Highway
Bridges (Oct. 2011)
NCHRP Bridge and Structure Projects in
Progress
Project Title
12-82Developing Reliability-Based Bridge Inspection
Practices (Aug. 2011)
12-83Calibration of LRFD Concrete Bridge Design
Specifications for Serviceability (Apr. 2011)
12-84Guidelines for the Design and Rating of
Gusset Plate Connections (Dec. 2011)
12-85Roadway Bridges Fire Hazard Assessment
(Jun. 2012)
NCHRP Bridge and Structure Projects in
Progress
Project Title
12-86 Bridge System Reliability for Redundancy (Jul. 2012)
12-87Development of System Fracture Analysis Methods
for Fracture Critical Steel Bridges (Jan. 2014)
15-38 Design Requirements for Culvert Joints (Nov. 2011)
24-34Risk-Based Approach for Bridge Scour Prediction (Oct. 2012)
NCHRP 20-07 Bridge and Structure
Projects in Progress
Task Title
262Review and Update of the AASHTO Guide
Specifications for Seismic Isolation Design (Jun. 2011)
285Recalibration of the LRFR Load Factors in the
AASHTO Manual for Bridge Evaluation (Jun. 2011)
294Continuation of Funding of 20-07 Task 245 - Update
Bridge Temporary Works (Feb. 2012)
306 Revision of Strut-and-Tie Provisions in the AASHTO
LRFD Bridge Design Specifications (Oct. 2011)
Summary Status of NCHRP Bridge and
Structure Projects
0
2
4
6
8
10
12
14
16
18
In progress In publication In development Contract pending
NCHRP Products Developed for
AASHTO SCOBS
02468
101214161820222426
10Specifications, Procedures
and Practices
12Bridges
14 Maintenance of
Way and Structures
18 Concrete Materials
20-07 Research for
AASHTO SCO on Highways
24 Mechanics and
Foundations
Of Interest 2011 Agenda Item Action Required Adopted
NCHRP Products Developed for
AASHTO SCOBS (1978-2011)
Acknowledgements
• Members of AASHTO SCOBS and its Technical Committees
• FHWA
• NCHRP Panel Members
• Research Teams
Research Project Products
http://www.trb.org/NCHRP