Transcript of 2011 Fire Procurement Session May 5, 2011. Rate Guide & Region Provisions Review 2011 Equipment...
Incident Business Workshop
2011 Fire Procurement SessionMay 5, 2011
Rate Guide & Region Provisions Review 2011 Equipment Updates Payment Scenarios Fire Procurement Resources
◦ ITEAM Overview◦ Website Overview
Agenda
Forest Service phasing out ◦ Changing Focus to “Procurement Guide”◦ Established Rates not advised per OIG Audit◦ 90% Rates for VIPR resources
States will continue to utilize◦ Separate ODF Supplement
General Clauses & Provisions◦ Only Major Change:
Heavy Equipment that has one operator for the transport and the Heavy Equipment will be paid at 65% of the rate for the transport minimum daily guarantee.
Rate Guide - 2011
Engine/Tender◦ No major changes from 2010◦ Daily Rate
Engines (all Types): Includes 1 ENGB + 2 FFT2/FFT1 Add $300/day if extra FFT is requested Deduct $300/day if only 2 crew are ordered on Type 6
Tenders: R6 does Support Tender Only, no Tactical
Includes 1 Operator
Waterhandling
Heavy Equipment Heavy Equipment (Dozer/Excavator)
◦ Daily Rate for Heavy Equip◦ Mileage or Guarantee for transport◦ 1 E# for both◦ Same for Heavy w/Water
Transport – Stand Alone◦ Region 6 not awarding◦ EERA if needed
Fallers Two Types:
◦ Single Faller & Faller Module◦ Daily Rate
Includes saw, faller(s), vehicle◦ Fallers listed on roster on IBPA
Mechanic w/ Service Truck
Two Types◦ Type 1 – Heavy & Logging Equip◦ Type 2 - Light Automotive
Exhibit K – Incident Equipment Repair Order◦ Used to document repairs◦ Submit to Finance
Repairs (D.21.3)◦ $75/hour if Gov repairs any contractor’s equipment
Fuel Tender Three Types – based on gallons Required to provide diesel & gas Method of Payment
◦ “Rule” = Accept all major credit cards◦ “Exception” = OF-304 Fuel & Oil Issue
“Exception Fuel” – e.g., rental vehicles, light towers, etc.◦ Work with IMT to pay these
PROC, Buying Team, Local Unit
Weedwash Unit Two Types
◦ Recycling Water & Non-recycling Come with 2 operators Daily Rate
◦ No mileage, set up, take down, etc.
Trailers Helicopter Support Trailer
◦ One Type◦ Optional Internet & Satellite Phone
Clerical Support Trailer◦ One Type◦ Optional Internet
Communication Trailer◦ One Type◦ Optional Internet & Satellite Phones
GIS Unit◦ Three Types◦ Optional Internet
Vehicles w/ Driver
Region 5 piloting in VIPR Paid Daily + Mileage
Region 6 – same as last year
National Solicitation◦ Hosted at NIFC◦ Regional DPLs
Region 6◦ 5 Host Dispatch Centers
Paid Mileage or Guarantee
Crew Carrier Buses
Rental Vehicles Two Region 6 IBPAs
◦ Enterprise Oregon & Washington
Statewide Orders to POCs for each state
◦ Dollar One location in Spokane
Master List in ITEAM◦ EERAs each incident
Rates:◦ Day Rate◦ Service Rate◦ Mileage – all miles for delivery & service◦ Reset
Portable Toilets/Handwash
Transport Payments Daily/Weekly/Monthly Double Shift Calculation Hose Left at Incident Mechanic Services Calculation
Admin 101
Reference D.21.8.1 Rates of Payment
Dozer $1,000/day$800 Minimum Daily Guarantee$4.00/mile
Dozer ordered on May 3. Transport w/Dozer travels 250 miles to incident arriving May 3. Transport is retained until both released on May 7, does not move after it arrives. Travels 250 miles home on May 6.
How is this paid for the incident?
Heavy Equipment Payment with Retained Transport
Payment for Dozer w/Retained Transport
Dozer TransportMay 3 $1,000 $1,000May 4 $1,000 $ 800May 5 $1,000 $ 800May 6 $1,000 $1,000
Transport payment = 250 miles x $4.00/mile or $1,000 MDG, whichever is greater.
Heavy Equipment Payment with Retained Transport
Payment for Dozer w/Retained Transport
Dozer TransportMay 3 $1,000 $2,000May 4 $1,000 $ 0May 5 $1,000 $ 0May 6 $1,000 $2,000
Transport payment = 250 miles x $4.00/mile x 2 (roundtrip) or $8000 MDG, whichever is greater. Middle days nothing paid.
Heavy Equipment Payment with ReleasedTransport
PAYMENT WILL BE MADE AT THE RATE (DAILY, WEEKLY, MONTHLY) THAT IS MOST ADVANTAGEOUS TO THE GOVERNMENT. FOR PAYMENT PURPOSES, THE PAYMENT COMPUTATION WILL START OVER AFTER EACH 7 DAY PERIOD AND AFTER THE 30TH DAY FOR ANY PERIOD OF TIME UNDER HIRE.◦ Gov pays whatever is lowest!
How do we:◦ Record on the shift ticket?◦ Enter into ISUITE?◦ Calculate payment when released?
Daily/Weekly/Monthly
Shift Ticket◦ Record Daily, Every couple days as needed
ISUITE◦ Keep in mind the total might change based on
length of assignment◦ Recommend entering daily for COST purposes◦ Calculate final payment at demob◦ May have to revise ISUITE entries
Daily/Weekly/Monthly
Trailer Mounted Handwash Trailer
$1,000/day $5,000/week $15,000/month
Worked 6 days:◦ 6 days x $1,000 = $6,000◦ 1 week x$5,000 = $5,000
Worked 16 days:◦ 16 days x $1,000 = $16,000◦ 1 month x $15,000 = $15,000◦ 2 weeks x $5,000 + 2 day x $1,000 = $12,000
Worked 31 days◦ 31 days x $1,000 = $31,000◦ 4 weeks x $5,000 + 3 days x $1,000 = $23,000◦ 1 month x $15,000 + 1 day x $1,000 = $16,000
Daily/Weekly/Monthly Examples
Calculate Mechanic Services◦ Deduction for Kr◦ Use Exhibit K for mechanic services at incident◦ $75/Hour for work on Kr’s Equipment◦ Post as a deduction in ISUITE or invoice
Check Kr’s shift ticket◦ Should show time Equipment was down, being
serviced, etc.
Mechanic Services
Per D.21.8.3 Exceptions: a. No further payment will accrue during
any period that resource under hire is not in a safe or operable condition or it is not available for the assigned shift or portions of the assigned shift. Payment will be based on the hours the resource was operational during the assigned shift, as documented on the shift ticket versus the designated shift, as shown on the Incident Action Plan.
Equipment Breakdown Calculation
Shift According to IAP is 0600-1800 Dozer is paid $1,200/day Dozer starts work at 0600 and is broke down
from1200 – 1400.
Adjustment is calculated as:$1,200 (daily rate) / 12 hours (per IAP) = $100/hour.
Breakdown = 2 hours x $100 = $200
Payment = $1,200 (daily rate) - $200 = $1,000
Equipment Breakdown Calculation
DOUBLE SHIFT equipment is staffed with two operators or crews (one per shift). There will be no compensation for a double shift unless a separate operator is ordered in writing for the second shift. Agency personnel at the Section Chief level may, by resource order, authorize a second operator if needed during the assignment. Double shifts, when ordered, will be paid at 165% of the daily rate.
Double Shift Calculation
Key Points:1. Must have 2 crews or operators 2. Can be approved by Section Chief (recommend via General
Message).3. Must be documented on Resource Order4. Paid 165% of Single Shift
Additional Points:5. Double shift not defined for Resources with Minimum Daily
Guarantee (i.e. transport). 6. DS Rate of Schedule of Items is for the Heavy Equipment!7. Recommend 165% of MDG or negotiating for transport. 8. Single Operator – 65% of 165% rate… or MDG x 1.0725.
Double Shift Calculation
Transport MDG - $1,150
Double Shift Paid 165% of $1,150 = $1,897.50
Single Operator Paid 65% of $1,897.50 = $1,233.38
Double Shift Calculation - Single Operator
Reference D.7.1.3◦ Issue Form AD-107 Report of Transfer of Property◦ Form available on FACT web and ITEAM
If Reassigned: Kr uses to check out Gov Owned hose at the new incident
If Demob’d: Kr uses for reimbursement & amount is added to invoice
Hose Left at Incident
FACT will enter Vendor Info◦ Company ◦ Contact ◦ Rates
Dispatch Can search by Resource
Generate an unsigned EERA
CO needs to sign each one
Master List in ITEAM