2009 Standardization ConferenceSC18 Committee on Quality Standards
Westminster, ColoradoJune 25, 2009
API Monogram Program
Status Report
W. Don WhittakerManagerMonogram Program/[email protected]
Aaron DukeAudit Program ManagerMonogram Program/[email protected]
Laura LevandoskiAssociateMonogram Program/[email protected]
• Program Status• Fraud/Misuse Update• Additional Agreements• Workload Solutions / New
Developments
Monogram Program Status
Program Status
Organizational Structure
http://www.api.org/certifications/monogram
Program Growth Licensees/Licenses
Most Popular Licenses
Reaudits and Suspensions
Suspensions, Cancellations, and Withdrawals
• 178 Suspensions• 210 Withdrawals• 76 Cancellations
• Most Commonly Suspended Specs: 6D, 6A, 7-1• Most common reasons for Suspension: Audit Nonconformances,
No Renewal Agreement, Non-Payment
• Most Commonly Cancelled Specs: 5CT, 6D, 6A• Most common reasons for Cancellation: Audit Nonconformances,
Failure to Provide Responses to Audit Nonconformances by Specified Date, Facility Closure
• Most Commonly Withdrawn Specs: 6A, 6D, 7• Most common reasons for Withdrawal: Facility closed, Facility
request, Product(s) No Longer Covered by Specification
Average Days of Actions
Actions
July
Augus
t
Sept
embe
r
Octob
er
Novem
ber
Decem
ber
Janu
ary
Febr
uary
Mar
chApr
ilMay
0
200
400
600
800
1000
1200
Open Actions
Actions Received
Actions Processed
Revised Specs [Effective in 2009]• API Standard 600– Steel Gate Valves - Flanged and Butt-welding Ends, Bolted
Bonnets 9/1/2009
• API Spec 5LD – CRA Clad or Lined Steel Pipe 9/1/2009
• API Standard 608 – Metal Ball Valves--Flanged, Threaded and Butt-Welding
Ends 6/1/2009
• API Spec 11E – Specification for Pumping Units 5/1/2009
• API Spec 12B – Specification for Bolted Tanks for Storage of Production Liquids
3/31/2009
• API Spec 12D – Specification for Field Welded Tanks for Storage of Production
Liquids 3/31/2009
• API Spec 12K – Specification for Indirect Type Oilfield Heaters 3/31/2009
• API Spec 12F – Specification for Shop Welded Tanks for Storage of Production
Liquids 3/31/2009
• API Spec 12P – Specification for Fiberglass Reinforced Plastic Tanks 3/31/2009
• API Spec 12J - Specification for Oil and Gas Separators 3/31/2009
• API Spec 12L - Specification for Vertical and Horizontal Emulsion Treaters
3/31/2009
• API SPec17J - Specification for Unbonded Flexible Pipe 1/1/2009
Fraud/Misuse Update
Handling Fraudulent Activity
Minor Cases Nonconformance letter - inaccurate license claims,
misuse of monogram on documentation, sales, incomplete license numbers, websites
Taking action on Fraud Issue warnings Periodic Audits (result of product falsely
monogrammed) C&D letter Cancel current license & applications 2 year ban from the program Add to website list of nonlicensees Legal Investigation
Company ACase: Website displaying the API MonogramActions:• Sent email to remove the API Monogram within seven
days – 3/10/09• They responded to remove API Monogram – 3/12/09• API Monogram was removed – 4/09/09
Company BCase: Website displaying API Monogram without the license no.Actions: • Sent email to correct the website – 3/19/09• They responded to update website – 3/20/09• Website updated with the license no. – 3/31/09
Minor Cases
Company CCase: Received fake certificate from userActions:• Ask user if products were monogrammed• Check website if fake certificate was displayed• Discuss with OGC• Send C&D letter• Review their response to the C&D letter• Listed on the Non-Licensed Organization (API
Composite List)http://compositelist.api.org/
NoticeRegardingNonLicensedOrganizations.asp
Major Cases
Company DCase: Applicant website displaying fake certificateActions:• Check database for status• Discuss with OGC• Conduct investigation in China• C&D letter sent by Chinese lawyers• Review their response to the C&D letter• Fake certificate removed from website• Application withdrawn and given 2 years to re-apply• Listed on the Non-Licensed Organization (API Composite List)
http://compositelist.api.org/NoticeRegardingNonLicensedOrganizations.asp
Major Cases
Additional Agreements
Alternative Marking Agreement
Guest/Host Program Definitions
Host - a facility at which all manufacturing is performed
Guest - a facility that has requested another organization to perform the manufacturing of a product on their behalf
Guest/Host Program Requirements• Both Guest and Host must have an active
monogram license
• The Guest must conduct an annual on-site second party audit of the Host
• A documented acknowledgment shall be provided to the purchaser that the product was “Manufactured for (Guest) under Agreement with (Host) located in (Host Location)”
• The license number includes GH (XXX-xxxx-GH)
Program Implementation• New program requirements take effect November
1, 2009 • April 20, 2009 – Letter sent to all clients and
auditors involved in the Guest/Host program highlighting the main changes to the program
• April 22, 2009 – New Guest License issued to all active Guest Licensees with an October 31, 2009 expiration date
• New applicants will not be issued a Guest/Host license unless they meet new program requirements
Benefits
• Ensure all clients using the Monogram have an established quality management system and meet API Spec Q1 requirements
• Ensure the integrity of the API Monogram
• Ensure control over the API Monogram Mark
Workload Solutions & New Developments
Client Information Update
Sys
tem
AP
I Re
vie
we
rC
lien
t
End
Yes
No
No
Associate checks reason from list
and leaves comment if
needed 0.08
System generates email for client to check website to
make update0.00
Client Logs In
0.00
Item entered into approval queue
0.00
Change needed?
Reviewer Validates
Information0.03
Approved?
Client enters new information
0.00
System generates approval email
0.00
Item Require Approval?
Yes
NoDatabase
updated via SQL Data Connector
0.00
Yes
Start
1.1.1 API Official Response Workflow
Ass
ocia
te 1
Sta
nd
ard
s A
sso
cia
teM
ana
ge
rS
eni
or
Ass
oci
ate
Ass
oci
ate
2
Collaborate in Person
0.25
Agree w/ Associate 2?
Review, Processes, and signs off on AAR
2.00
Collaborate in Person
0.25
Collaborate in Person
0.25
Approve?
Collaborate in Person
0.25
Reviews, Processes &
Generates AAR response
3.00
Reviews comments
0.25
Decide
0.25
OK?
Reach Consensus?
Review
1.00
Reach Agreement?
Collaborate in Person
0.25
No
No
Click to Post
0.00
Yes
Yes
Click to Post
0.00
Yes
No
No
System automatically assigns specific AARs (per their ISO code) to Standards Queue and there is always
an option to “flag for standards”
Inserts a comment to the message
board0.25
Standards signs off on the AAR
0.25
Any Associate or Manager can flag an AAR for the answer to a technical
question at any time. When this occurs, the workflow moves to the Standards Associate for a comment
End
1. Unit Certification Process
Sys
tem
AP
IC
lient
Aud
itor
Auditor Conducts Audit
Audit information is loaded into SharePoint
AARs are generated on
client site
All AARs are resolved
AAR Resolution
Process
Certification is marked as
complete and Ops Database updated
End
1.1 AAR Resolution Process
Sys
tem
AP
IC
lien
t
Response required from
client?
Client provides response to AAR
on SharePoint siteYes
SharePoint sets AAR status to
closedNo
API Official Response Workflow
starts
Official response is posted to
discussion board
From Unit Certification
Process
End
Document stored in Alchemy
Current Process Future Process
Process Analysis
• Automating client information updates
• Providing clients with a clear view of their current
certifications
• Providing clients with a view into actions required of them
• Enabling Auditors to manage and view their audit schedules
• Allowing Auditors, Clients, and API to interact with each
other about open Non-Conformance repots quickly and
efficiently
• Creating and Managing Financial Invoices both from the
Auditor and to the Client
• Facilitate the letter approval and response process via
discussion boards
The system will assist in:
• Inputting information from documents and forms into client
databases
• Scanning documents for database storage
• Printing, collating and stapling documents for group review
and signoff
• Tracking and managing these tasks manually
• Mailing formal responses to clients via USPS or FedEx
($175K)
The system will remove non-value added work
Information Update
• Current time expenditure: 593 actions at 4774 hours/year
• New time expenditure: 593 actions at 148.25 hours/year
• Estimated time savings: 96% decrease in processing time
Panel Processes
• Current time expenditure: 2190 hours/year
• New time expenditure: 500 hours/year
• Estimated time savings: 77% decrease in processing time
Quality Manual Processing
• Current time expenditure: 890 actions at 2225 hours/year
• New time expenditure: 890 actions at 445 hours/year
• Estimated time savings: 80% decrease in processing time
Contact Information:Mailing Adress Billing Address500 E. 51st St. 720 5th AveHouston, TX 33221 New York, NY 10036
Phone Contact: 555-555-5555
Halliburton
Contact:Jane Doyle
v Hyperlink 1v Hyperlink 2
Current CertificationsClick a link to view that certification
v Hyperlink 1v Hyperlink 2
Certifications in ProgressRed boxes indicate a Certification needs your attention
Green boxes indicate the Certification is under API review
AARs waiting on your response: 20AARs waiting on APIs response: 5
AAR Status
Update
Client Main Page
Audit Summary Page
AAR Main Page
Internal “Panel” Page
Current Solutions• Internal SharePoint site
• Document Control• Standardization of Communication (letters)
• Responses are reviewed with the audit packages
• Web driven workplace activities• Web based data queries, providing better
tracking, more and useful metrics
Bottom line……..efficient, fast, responsive
New Developments
Client Site reported down or not operating
API status changed to “Inactive” for 6 months
During six month period – Renewal / Abbreviated audit
After six month period – License “Withdrawn” and full initial audit will be required
If, after 1 year for ISO site, a Stage 1 audit will be required
Client Status
Report Nonconforming Product
Report Nonconforming Product at “ncr.api.org”.
API strives to continually improve the value of the Monogram Program. As such, notify API of nonconforming Monogrammed products.
Description of Nonconforming Product(s)
Spec Pick list:Product Pick list:Manufacturer Pick list:
If the manufacturer is not listed in the pick list above, please enter the company name below.
_____________________________________Date of Purchase:Number of Products Purchased:Number of Products Nonconforming:Date Nonconformance Discovered:Description of Nonconformance:Your Contact InformationCompany NameContact NameE-mail AddressPhone NumberComments:
API Certification Programs
For more information:• API’s Composite List: http://compositelist.api.org • API Certifications Dept.: +1-202-962-4791• Don Whittaker: [email protected] • Aaron Duke: [email protected]• Laura Levandoski: [email protected]