2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS,...

15
2008 Solar Annual Review Meeting Session: PDIL/CIGS platform Company or Organization: NREL Funding Opportunity: EE&RE Miguel Contreras 1617 Colde Blvd., MS 3219 Golden, CO 80401 Phone: 303 384 6478 Fax 303 384 7600 [email protected] Design Team Miguel Contreras (leader), Rommel Noufi, Brent Nelson, Steve Robbins Glenn Teeter, Tim Gessert Input/support from: Dean Levi, Brian Keyes, Sally Asher, Craig Perkins, Aaron Ptak, Kannan Ramanathan, David Young, Fallah Hasoon, Jehad Abushama, Ingrid Repins NREL/PR-520-43202 Presented at the Solar Energy Technologies Program (SETP) Annual Program Review Meeting held April 22-24, 2008 in Austin, Texas

Transcript of 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS,...

Page 1: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

2008 Solar Annual Review Meeting

Session: PDIL/CIGS platform Company or Organization: NRELFunding Opportunity: EE&RE

Miguel Contreras

1617 Colde Blvd., MS 3219Golden, CO 80401Phone: 303 384 6478Fax 303 384 [email protected]

Design Team

Miguel Contreras (leader), Rommel Noufi,

Brent Nelson, Steve Robbins

Glenn Teeter, Tim Gessert

Input/support from:

Dean Levi, Brian Keyes, Sally Asher, Craig Perkins, Aaron Ptak,

Kannan Ramanathan, David Young, Fallah Hasoon, Jehad Abushama, Ingrid Repins

NREL/PR-520-43202Presented at the Solar Energy Technologies Program (SETP) Annual Program Review Meeting held April 22-24, 2008 in Austin, Texas

Page 2: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

1

The CIGS cell and its processing

ZnO, ITO2500 Å

CdS700 Å

Mo0.5-1 µm

Glass,Metal Foil,

Plastics

CIGS1-2.5 µm

CIGS

• layer 1: DC sputtering for back contacts

• layer 2: UHV CIGS evaporation

• layer 3: RF sputtering for “window” layers (CdS, ZnS, others)

• layer 4 : RF sputtering for TCO’s

• metallization or top contacts + AR coatings

Page 3: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

2

The CIGS Cluster Tool 1

Back Contacts by DC sputtering

3 targets

(Mo, Cr, Na precursors, other)

Page 4: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

3

The CIGS Cluster Tool 2

CIGS (and other) compounds

UHV evaporation

Page 5: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

4

The CIGS Cluster Tool 3

*CdS and other “window” materials (ZnS, InS, others) *RF sputtering (3 targets)

Page 6: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

5

The CIGS Cluster Tool 4

• TCO’s (i-ZnO; n-ZnO; ITO, others)

• RF sputtering (3 targets)

Page 7: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

6

The CIGS Cluster Tool 5

• Analytical Tool

• AES and others

Page 8: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

7

The CIGS Cluster Tool 6

• Load-lock w/10 platten cassette

• Optional port for pod

Page 9: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

8

The CIGS Cluster Tool 7

• Expansion ports (2) for industry support and/or wet station for CdS? Pod? Bridge to second robot?

Page 10: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

9

Design Concepts

#1 Allows for state-of-the-art CIGS solar cell fabrication in an integrated fashion and enables new fundamental studies

#2 Allows all process steps to manufacture a CIGS coupon of 6” x 6” (PDIL std) adding new capabilities aimed at addressing relevant issues to industrial processes. Tool must also interface with other tools

#3 Supports commercialization efforts by US industry working in CIGS PV technology by addressing highly specific industrial issues

#4 Allows for future expansion (new processes, new compound semiconductor materials, etc.)

Page 11: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

10

Cluster Tool costs/ordering

PO # 187426

1.64 M$ Jan 08

PO # 185120

715 k$

Dec 06 PO# 186893493 k$ Oct 07

Page 12: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

11

The CIGS chamber

Page 13: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

12

The CIGS Cluster Tool Timetable

Dec 06 Jul 07 Dec 07 Jul 08 Dec 08 Jul 09 Dec 09

Page 14: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

13

Obstacle Discussion

Barriers encountered or anticipated that may inhibit success of programs

The standard size of substrates (6”x6”) will require the use of larger amounts of materials than we currently use: increase of operational costs to run the tool (true for all conversion technologies tools) => need for increased funding/supportThe demand for steel (including that used in the fabrication of vacuum chambers) continues to increase to record levels worldwide. There is a possibility the construction of the sputtering modules (last items purchased to build the CIGS tool) may be delayed due to this current market situation in the steel industry.

Page 15: 2008 Solar Annual Review Meetingevaporation •layer 3: RF sputtering for “window” layers (CdS, ZnS, others) •layer 4 : RF sputtering for TCO’s •metallization or top contacts

14

CdTe Platform

Tim Gessert

PlatformThin Si

Wafer Rep.

CIGS

CdTe

Atm. Proc.

M&C Ind.

M&C Cluster

PV Technology Road Maps

Waf

er S

i

Film

Si

CPV

CdT

e

CIG

S

OPV

DSP

V