2. Achievements of this fiscal year · APAN Working Groups Point P oint 2005.8 : APAN-Taipei...

23
forces in motion MAURER || MAG 01 | 2019 MAURER MAGAZINE SAY HI TO THE MUNICH SKY New landmark for the Bavarian metropolis MAURER SIP ® -ADAPTIVE Newest-generation Sliding Isolation Pendulum MAURER LOCATION INDIA A daughter is growing up

Transcript of 2. Achievements of this fiscal year · APAN Working Groups Point P oint 2005.8 : APAN-Taipei...

Page 1: 2. Achievements of this fiscal year · APAN Working Groups Point P oint 2005.8 : APAN-Taipei Medical WG was formally approved. Application Technology Education WG, HDTV WG, Multimedia

2. Achievements of this fiscal year

-2-

2. Achievements of this fiscal year

Here is a list of major achievements in this fiscal year.

Medical Working Group was formally approved at APAN-Taipei in August 2006.

Page 2: 2. Achievements of this fiscal year · APAN Working Groups Point P oint 2005.8 : APAN-Taipei Medical WG was formally approved. Application Technology Education WG, HDTV WG, Multimedia

2. Achievements of this fiscal year

-3-

The first members of APAN Medical Working Group.

This summarizes the goals of APAN Medical Working Group.

Page 3: 2. Achievements of this fiscal year · APAN Working Groups Point P oint 2005.8 : APAN-Taipei Medical WG was formally approved. Application Technology Education WG, HDTV WG, Multimedia

2. Achievements of this fiscal year

-4-

This illustration shows the future style of medical telecommunication network.

Undergoing medical network in Asia-Pacific regions.

Page 4: 2. Achievements of this fiscal year · APAN Working Groups Point P oint 2005.8 : APAN-Taipei Medical WG was formally approved. Application Technology Education WG, HDTV WG, Multimedia

2. Achievements of this fiscal year

-5-

Increasing numbers of our activities.

The snap of 10-station connection for laparoscopic surgical teleconference.

Page 5: 2. Achievements of this fiscal year · APAN Working Groups Point P oint 2005.8 : APAN-Taipei Medical WG was formally approved. Application Technology Education WG, HDTV WG, Multimedia

2. Achievements of this fiscal year

-6-

The team flag for AQUA was designed by Torata in August 2005.

The homepage for AQUA became open in June 2005.