Project Station A 400/230 kV for ABB REL 670 customer Approved Resp. dept. Title Rev ind Max Degerfalt Prepared MD ABB PTSX MB Date Setting of Line protection relay REL 670 2005-11-02 for 400 kV OHL Line Station A - Station C Document No. C Sheet 1 Cont 1MRK 506 267-WEN 42 Setting of Line protection terminal REL670 v1.1 1. Terminal identification StationName: Station A StationNumber: ObjectName: Object Number: UnitName: 1 400 OHL1 1 REL670 UnitNumber: Relay serial No Frequency Aux voltage 1 A1234 50 Hz 110.000 V Line to : Frequency: Station C 50 Hz Line data: R1´ + R0´ RM´ + + jX1´ = jX0´ jXM´ = = 1.400 + 16.000 9.000 + + Line length CT ratio 2000 / CVT ratio Maximum load on line: 400 / 1448 100.0 km 1 A 0.110 kV A ==> 159 ohm/ph = Voltage: 400 kV j30.000 ohm j90.000 ohm j50.000 ohm 88 ohm/ph" Export Maximum load export gives angles between sources: A ==> 159 ohm/ph = 88 ohm/ph" Import 22 deg 2. Setting of fault locator values (LFL) Line length unit: Length km 100.0 km X1 R1 X0 R0 j30.00 ohm 1.40 ohm j90.00 ohm 16.00 ohm X1SA R1SA X1SB R1SB XM0 RM0 j19.80 ohm j0.90 ohm j32.80 ohm j5.10 ohm j50.000 ohm j9.000 ohm Printout 2007-05-23 We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ©ABB PTSX C B A Rev No Adjusted to version 1.1 of REL 670 Adjusted MD MD First issue Description Appd 2007-05-23 2006-07-05 2005-11-02 Date

description

From ABB setting of line protection, Enjoy!

Transcript of 1MRK506267-WEN C en REL670 Setting Example 1

Page 1: 1MRK506267-WEN C en REL670 Setting Example 1

Setting summary for REL670Station:Data:

Station AVoltage 400

Picture:

length 100km

ParameterGeneral settingsStation Name:Frequency

Description

Station No:Object Name:Object No:Unit Name:Unit No:

VoltageLength

System voltageLine length

X1R1X0R0

Line Positive Sequence ReactanceLine Positive Sequence ResistanceLine Zero Sequence ReactanceLine Zero Sequence Resistance

Xm0Rm0X1SAR1SA

Line mutual reactanceLine mutual resistanceSource A reactanceSource A resistance

X1SBR1SBVTprim/VTsecCTPrim/sec

Source B reactance (remote source)Source B resistance (remote source)Voltage Transformer VoltageCurrent Transformer Primary Current

CT Earth

Phase SelectionX1

Direction of CT earthing

Ph l ti R ti h

BEGIN TESTOBJECT

Name REL670SUBSTATIONSUBSTATION-Address

Station A1

BAYBAY-ADDRESSDEVICE-ADDRESSVNOM

400 OHL111

110VVPRIM-LLINOMIMAXIPRIM

4001

2.52000

FNOMBEGIN DISTANCELINE LENGTHLINE ANGLE

50

10087.34

CTSTARPOINTZone 1

TripTimeZone 2

LINE

0.00 0.00

TripTimeZone 3

TripTimeZone 4

0.30 0.30

0.60 0.60

TripTimeZone 5

TripTime

0.90 0.90

1.50 1.50

REL670Station A

1400 OHL1

11

110400000

12.5

200050

10087.34

LINE

00

0.30.30.60.60.90.91.51.5

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

1Cont

1MRK 506 267-WEN 42

Setting of Line protection terminal REL670 v1.1

1. Terminal identification

StationName: Station AStationNumber:ObjectName:Object Number:UnitName:

1400 OHL11REL670

UnitNumber:Relay serial NoFrequencyAux voltage

1A123450 Hz110.000 V

Line to :

Frequency:

Station C

50 Hz

Line data: R1´ +R0´RM´

++

jX1´ =jX0´jXM´

==

1.400 +16.000

9.000++

Line length

CT ratio 2000 /

CVT ratio

Maximum load on line:

400 /

1448

100.0 km

1 A

0.110 kV

A ==> 159 ohm/ph =

Voltage: 400 kV

j30.000 ohmj90.000 ohmj50.000 ohm

88 ohm/ph" Export

Maximum load export gives angles between sources:

A ==> 159 ohm/ph = 88 ohm/ph" Import

22 deg

2. Setting of fault locator values (LFL)Line length unit:Length

km100.0 km

X1R1X0R0

j30.00 ohm1.40 ohmj90.00 ohm16.00 ohm

X1SAR1SAX1SBR1SBXM0RM0

j19.80 ohmj0.90 ohmj32.80 ohmj5.10 ohmj50.000 ohmj9.000 ohm

Prin

tout

200

7-05

-23

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

X

CBA

Rev No

Adjusted to version 1.1 of REL 670Adjusted

MDMD

First issueDescription Appd

2007-05-232006-07-052005-11-02Date

Page 2: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

2Cont

1MRK 506 267-WEN 42

Set analogue voltage channels.

Name: =Ch U1UL1

Ch U2UL2

Ch U3UL3

Ch U4UL2BUS1

VTprimnVTsecn

==

400.000110.000 V

400.000110.000 V

400.000110.000 V

400.000110.000 V

Ch U5UL2BUS2

Ch U6UL2L2

400.000110.000 V

400.000110.000 V

Setting of analogue and digital channels.Configure analogue inputs:Set analogue current channels

Name:CTprimCTsec

===

Ch I1IL1-CB1

Ch I2IL2-CB1

2000.0001.0 A

2000.0001.0 A

Ch I3IL3-CB1

Ch I4IL1-CB2

2000.0001.0 A

2000.0001.0 A

Ch I5IL2-CB2

Ch I6IL3-CB2

2000.0001.0 A

2000.0001.0 A

CTStarPoint = Out Indicates the earthing towards object (Out) or towards busbar (In).

Set Digital IO boards

I/O Module 1 =OperationOn

OscBlock40

OscRelease30 Pos Slot3

I/O Module 2I/O Module 3I/O Module 4I/O Module 5

====

OnOn

4040

OnOn

4040

3030

Pos Slot3Pos Slot3

3030

Pos Slot3Pos Slot3

Note: OscBlock and OcscRel defines the filtering time at activationLow frequency gives slow responce for digital input.

General settings for Distance protection zones (Note! Set under Direction)Set the Base values for the Distance protection zones in primary Ampere resp kV.

Setting of minimum sensitivity for Distance zones. Note! Ref for zones settings

Ibase =Ubase= =

2000 A 400.0 kV

Set the Directional angle Distance protection zones

Set the Negartive restraint angle for Distance protection zone

Setting of Distance protection ZonesThe zones are set directly in primary ohms R´, X´. The primary ohms R´, X´ are recalculated to

IMinOp =

ArgDir =

20% *Ibase

15 deg

ArgNegRes = 115 deg

secondary ohms with the current and voltage transformer ratios.The secondary values are presented as information for zone testing.

Setting of the analogue preprocessing function blocks SMAI (General settings/Power system)Set ref for DFT filter adjustment:Set the measured minimum value:

DFTReferencenMinValFreqMeasn

==

InternalRef10%

set voltage L1 as ref

Set the connection typeSet negation of the function blockSet the base voltageFor first function block in each task time (1,13,25) also

ConnectionnNegationn

UBasen

==

Ph-NOff

= 400.00 kV

SYNCH output reference DFTRefExtOut = InternalRef set voltage L1 as refWe

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 3: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

3Cont

1MRK 506 267-WEN 42

Setting of the fault resistive coverThe resistive reach is set to cover a maximum expected fault resistance of(The fault resistance for phase faults includes the arc resistance only whereas the resistance for earth faultsincludes the arc resistance and tower foot resistance. Note that setting of fault resistance is the loop valuewhereas reactance setting is phase value for phase faults. Remote end infeed will limit the possibility for each endto detect high ohmic faults so highest reasonable setting should be used.Set the resistive reach for phase faults to:

30.0 ohm

The secondary setting will thus be

Set the resistive reach for earth faults to

RFPPZ1' =

RFPPZ1 =

The secondary setting will thus beRFPEZ1´ =

RFPEZ1 =

72.0 ohm

39.60 ohm

120.0 ohm

66.00 ohm

Note! In Ohms/loop

Set the Base current for the Distance protection zones in primary Ampere.

Setting of minimum sensitivity for zone Phase-Phase elements. Measures IL-IL for each loop.IBase =

Setting of minimum operating current for Phase faults. Measures ILx

Setting of minimum Neutral current required for earth faults. (Controls Load Compensation algoritm)

IMinOpPP =

MinOpPE =

2000 A

20% *Ibase

20% *Ibase

IMinOpIN = 10% *Ibase

Activation of Zone 1 operation (ZM1)OperationDir

Operation PP==

Setting of zone 1 Phase fault reachZone 1 phase fault reach is set to

Operation PE =

X1Z1' =

ForwardOnOn

24.00 ohm80.0% of the total line reactance

Note! Zone will send carrier signalThe secondary setting will thus be

Set the positive sequence resistance for phase faults to (this gives the characteristic angle)X1Z1 =

R1Z1' =The secondary setting will thus be

Setting of zone earth fault zero sequence valuesSet the zero sequence values for the zone giving the earth fault reach (1+KN)X1 where KN=(Z0-Z1)/3Z1.

R1Z1 =

13.20 ohm

1.12 ohm

0.62 ohm

The secondary setting will thus be

Set the zero sequence resistance for earth faults to

X0Z1' =

X0Z1 =

The secondary setting will thus beR0Z1' =

R0Z1 =

72.0 ohm

39.60 ohm

80.0% of the total line reactance

12.80 ohm

7.04 ohm

gives KN= 0.67

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 4: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

4Cont

1MRK 506 267-WEN 42

Setting of the fault resistive coverThe resistive reach is set to cover a maximum expected fault resistance ofThe faults on remote lines will have infeed of fault current through the fault resistance from other remote feederswhich will make an apparent increase of the value. The setting is selected to cover as much reistance as possi-ble.Set the resistive reach for phase faults to:

30.0 ohm

The secondary setting will thus be

Set the resistive reach for earth faults to

RFPPZ2' =

RFPPZ2 =

The secondary setting will thus beRFPEZ2´ =

RFPEZ2 =

108.0 ohm

59.40 ohm

180.0 ohm

99.00 ohm

Note! In Ohms/loop

Set the Base current for the Distance protection zones in primary Ampere.

Setting of minimum sensitivity for zone Phase-Phase elements. Measures IL-IL for each loop.IBase =

Setting of minimum operating current for Phase faults. Measures ILxIMinOpPP =

MinOpPE =

2000 A

20% *Ibase

20% *Ibase

Activation of Zone 2 operation (ZM2)OperationDir

Operation PP==

Setting of zone 2 Phase fault reachZone 1 phase fault reach is set to

Operation PE =

X1Z2' =

ForwardOnOn

36.00 ohm120.0% of the total line reactance

Zone is accelerated at reciept of Carrier signal.The secondary setting will thus be

Set the positive sequence resistance for phase faults to (this setting gives the characteristic angle)X1Z2 =

R1Z2' =The secondary setting will thus be

Setting of zone earth fault zero sequence valuesSet the zero sequence values for the zone giving the earth fault reach (1+KN)X1 where KN=(Z0-Z1)/3Z1.

R1Z2 =

19.80 ohm

1.68 ohm

0.92 ohm

The secondary setting will thus be

Set the zero sequence resistance for earth faults to

X0Z2' =

X0Z2 =

The secondary setting will thus beR0Z2' =

R0Z2 =

108.0 ohm

59.40 ohm

120.0% of the total line reactance

19.20 ohm

10.56 ohm

gives KN= 0.67

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 5: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

5Cont

1MRK 506 267-WEN 42

Setting of the fault resistive coverThe resistive reach is set to cover a maximum expected fault resistance ofThe faults on remote lines will have infeed of fault current through the fault resistance from other remote feederswhich will make an apparent increase of the value. The setting is selected to cover as much reistance as possible.Set the resistive reach for phase faults to:

30.0 ohm

The secondary setting will thus be

Set the resistive reach for earth faults to

RFPPZ3' =

RFPPZ3 =

The secondary setting will thus beRFPEZ3´ =

RFPEZ3 =

180.0 ohm

99.00 ohm

300.0 ohm

165.00 ohm

Note! In Ohms/loop

Set the Base current for the Distance protection zones in primary Ampere.

Setting of minimum sensitivity for zone Phase-Phase elements. Measures IL-IL for each loop.IBase =

Setting of minimum operating current for Phase faults. Measures ILxIMinOpPP =

MinOpPE =

2000 A

20% *Ibase

20% *Ibase

Activation of Zone 3 operation (ZM3)OperationDir

Operation PP==

Setting of zone 3 Phase fault reachZone 1 phase fault reach is set to

Operation PE =

X1Z3' =

ForwardOnOn

60.00 ohm200.0% of the total line reactance

The secondary setting will thus be

Set the positive sequence resistance for phase faults to (this setting gives the characteristic angle)X1Z3 =

R1Z3' =The secondary setting will thus be

Setting of zone earth fault reach zero sequence valuesSet the zero sequence values for the zone giving the earth fault reach (1+KN)X1 where KN=(Z0-Z1)/3Z1.

R1Z3 =

33.00 ohm

2.80 ohm

1.54 ohm

The secondary setting will thus be

Set the zero sequence resistance for earth faults to

X0Z3' =

X0Z3 =

The secondary setting will thus beR0Z3' =

R0Z3 =

180.0 ohm

99.00 ohm

200.0% of the total line reactance

32.00 ohm

17.60 ohm

gives KN= 0.67

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 6: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

6Cont

1MRK 506 267-WEN 42

Setting of the fault resistive coverThe resistive reach is set to cover a maximum expected fault resistance ofThe faults on remote lines will have infeed of fault current through the fault resistance from other remote feederswhich will make an apparent increase of the value. The setting is selected to cover as much reistance as possi-ble.Set the resistive reach for phase faults to:

30.0 ohm

The secondary setting will thus be

Set the resistive reach for earth faults to

RFPPZ4' =

RFPPZ4 =

The secondary setting will thus beRFPEZ4´ =

RFPEZ4 =

180.0 ohm

99.00 ohm

300.0 ohm

165.00 ohm

Note! In Ohms/loop

Set the Base current for the Distance protection zones in primary Ampere.

Setting of minimum sensitivity for zone Phase-Phase elements. Measures IL-IL for each loop.IBase =

Setting of minimum operating current for Phase faults. Measures ILxIMinOpPP =

MinOpPE =

2000 A

20% *Ibase

20% *Ibase

Activation of Zone 4 operation (ZM4)OperationDir

Operation PP==

Setting of zone 4 Phase fault reachZone 1 phase fault reach is set to

Operation PE =

X1Z4' =

ForwardOffOff

60.00 ohm200.0% of the total line reactance

The secondary setting will thus be

Set the positive sequence resistance for phase faults to (this setting gives the characteristic angle)X1Z4 =

R1Z4' =The secondary setting will thus be

Setting of zone earth fault reach zero sequence valuesSet the zero sequence values for the zone giving the earth fault reach (1+KN)X1 where KN=(Z0-Z1)/3Z1.

R1Z4 =

33.00 ohm

2.80 ohm

1.54 ohm

The secondary setting will thus be

Set the zero sequence resistance for earth faults to

X0Z4' =

X0Z4 =

The secondary setting will thus beR0Z4' =

R0Z4 =

180.0 ohm

99.00 ohm

200.0% of the total line reactance

32.00 ohm

17.60 ohm

gives KN= 0.67

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 7: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

7Cont

1MRK 506 267-WEN 42

Setting of the fault resistive coverThe resistive reach is set to cover a maximum expected fault resistance ofThe faults on remote lines will have infeed of fault current through the fault resistance from other remote feeders whwill make an apparent increase of the value. The setting is selected to cover as much reistance as possible.Set the resistive reach for phase faults to:

30.0 ohm

The secondary setting will thus be

Set the resistive reach for earth faults to

RFPPZ5' =

RFPPZ5 =

The secondary setting will thus beRFPEZ5´ =

RFPEZ5 =

108.0 ohm

59.40 ohm

180.0 ohm

99.00 ohm

Note! In Ohms/loop

Set the Base current for the Distance protection zones in primary Ampere.

Setting of minimum sensitivity for zone Phase-Phase elements. Measures IL-IL for each loop.IBase =

Setting of minimum operating current for Phase faults. Measures ILxIMinOpPP =

MinOpPE =

2000 A

20% *Ibase

10% *Ibase

Activation of Zone 5 operation (ZM5)OperationDir

Operation PP==

Setting of zone 5 Phase fault reachZone 1 phase fault reach is set to

Operation PE =

X1Z5' =

ReverseOnOn

36.00 ohm120.0% of the total line reactance

The secondary setting will thus be

Set the positive sequence resistance for phase faults to (this setting gives the characteristic angle)X1Z5 =

R1Z5' =The secondary setting will thus be

Setting of zone 1 earth fault reactive reachSet the zero sequence values for the zone giving the earth fault reach (1+KN)X1 where KN=(Z0-Z1)/3Z1.

R1Z5 =

19.80 ohm

1.68 ohm

0.92 ohm

The secondary setting will thus be

Set the zero sequence resistance for earth faults to

X0Z5' =

X0Z5 =

The secondary setting will thus beR0Z5' =

R0Z5 =

108.0 ohm

59.40 ohm

120.0% of the total line reactance

19.20 ohm

10.56 ohm

gives KN= 0.67

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 8: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

8Cont

1MRK 506 267-WEN 42

Setting of Phase Selection with Load Enchroachment (PPHS)

Phase selector phase fault reach is set to 144.0% of the total line valuePositive sequence reactance as set for the reach of phase selectors in reactive direction

The secondary setting will thus beX1 =

X1" =

43.20 ohm

23.8 ohm

earth fault reach zero sequence component is set to Zero sequence reactance as set for the reach of phase selectors in reactive direction at phase-to-earth faults

X0 =The secondary setting will thus be

Reach of the phase selector in resistive direction at ph-to-ph faults (Note! In ohms per loop)

X0" =

129.60 ohm

144.0% of the total line zero sequence value

71.3 ohm

The secondary setting will thus beRFFwPP =

RFFwPP" =

Reach of the phase selector in resistive direction at phase-to-earth faults

The secondary setting will thus beRFFwPE =

RFFwPE" =

118.80 ohm

65.3 ohm

216.00 ohm

118.8 ohm

Set the Base current for the Phase selection function in primary Ampere.IBase =

Setting of Neutral release current (shall be set below minimum neutral current expected at earth faults)

Setting of phase-phase blocking current element for other phases at a earth fault

INReleasePE =

2000 A

20% *Ibase

RFRvPP =

RFRvPP" =

118.80 ohm

65.3 ohm

RFRvPE =

RFRvPE" =

216.00 ohm

118.8 ohm

Set the load limitation reach to <Zload*0,8 giving Zload Note! In Ohm/phase

IBlockPP =

RLdFw' =The secondary setting will thus be

Set the load limitation in the reverse (import) directionRLdFw =

RLdRv' =

40% *Ibase

119.6 ohm Note: Set in Ohms/phase

65.79 ohm

119.6 ohm

Compare with min load impedance on sh 1When Power Swing blocking is used this shall be allowed outside this setting.

The secondary setting will thus be

Set the angle of the load limitation lineRLdRv =

ARGLd =

65.79 ohm

20 deg

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 9: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

9Cont

1MRK 506 267-WEN 42

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3Setting of the Broken conductor function (BRC)Enable the operation of the function

Operation = OnSet the Base current for the function on which the current levels are based

Set the operating current for BRC function at which the measurement starts. Unsymmetry for trip is 20% Imax-minIbase =

IP> =

2000 A

20% *IrSet the unsymmetry level. Note! One current must also be below 50% of IP.

Setting of the time delay for the alarm or trip of functionIub> =

tTrip =

50% *Ir

20.00 s

Setting of the Loss of voltage function (LOV)Enable the operation of the function

Operation = OnSet the Base current for the function on which the current levels are based

Set the operating current for BRC function at which the measurement starts. Unsymmetry for trip is 20% Imax-minUBase =

UPE< =

400.0 kV

10% *IrSetting of the time delay for the alarm or trip of function

tTrip = 7.00 s

Page 10: 1MRK506267-WEN C en REL670 Setting Example 1

Zone 1 setting of timers.

Setting of Zone timer activation for phase-phase and earth faults

Setting of Zone timers:

tPP1tPE1

==

tPP1 =

OnOn

0.00 stPE1 = 0.00 s

Zone 2 setting of timers.

Setting of Zone timer activation for phase-phase and earth faults

Setting of Zone timers:

tPP2tPE2

==

tPP2 =

OnOn

0.30 stPE2 = 0.30 s

Zone 3 setting of timers.

Setting of Zone timer activation for phase-phase and earth faults

Setting of Zone timers:

tPP3tPE3

==

tPP3 =

OnOn

0.60 stPE3 = 0.60 s

Zone 4 setting of timers.

Setting of Zone timer activation for phase-phase and earth faults

Setting of Zone timers:

tPP4tPE4

==

tPP4 =

OffOff

0.90 stPE4 = 0.90 s

Zone 5 setting of timers.

Setting of Zone timer activation for phase-phase and earth faults

Setting of Zone timers:

tPP5tPE5

==

tPP5 =

OnOn

1.50 stPE5 = 1.50 s

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

10Cont

1MRK 506 267-WEN 42

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 11: 1MRK506267-WEN C en REL670 Setting Example 1

Zone1Fw

Zone2Fw

Forward On

Forward On

On0,0,-1519.8,-5.31,90,,,,,,19.8,0,87.3320.42,13.2,180-6.16,13.2,-65

On0,0,-1529.7,-7.96,90,,,,,,

Zone3Fw Forward On

29.7,0,87.3330.62,19.8,180

On-9.23,19.8,-65

0,0,-1549.5,-13.26,90,,,,

Zone4Fw Off

,,49.5,0,87.3351.04,33,180-15.39,33,-65

Off0,0,-150,0,90,,

Z 5F R O

,,,,0,0,87.330,0,180

O0,0,-65

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

11Cont

1MRK 506 267-WEN 42

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60

R" ohm/ph

-45

-40

-35

-30

-25

-20

-15

-10

-5

0

5

10

15

20

25

30

35

40

X" o

hm/p

h

Characteristic for phase faults

Note: x Indicates the line impedanceO : Phase Selection

Note! o Angle will be 90 deg at 3ph faults

Line to: Station C Voltage: 400 kVLine data: 0.77

8.80++

j16.50 ohmj49.50 ohm

R1"+jX1"R0"+jX0"

Line length:Note: All values are given as secondary impedance as a reference for testing.

4.95 + j27.50 ohm100.00

Rm"+jXm"km

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 12: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

12Cont

1MRK 506 267-WEN 42

REF!REF!REF!

REF!REF!REF!

REF!REF!REF!REF!

REF!REF!REF!

REFREFREFREF

REFREF

REFREF

REFREF

REFREF

REFREF

REF! REF! REFREF

-150 -100 -50 0 50 100 150 200

R" ohm/loop

-35

-30

-25

-20

-15

-10

-5

0

5

10

15

20

25

30

35

40

45

50

55

X" o

hm/lo

op

Characteristic for earth faults

Note: X Indicates the line impedanceO : Phase Selection

Line to: Station C Voltage: 400 kVLine data: 0.77

8.80++

j16.50 ohmj49.50 ohm

R1"+jX1"R0"+jX0"

Line length:Note: All values are given as secondary impedance as a reference for testing.

4.95 + j27.50 ohm100.00

Rm"+jXm"km

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 13: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

13Cont

1MRK 506 267-WEN 42

Setting of the tripping logic (TRP01)Operation = On

Set the trip pulse length

Set the latching of the trip signal

Program =

tTripMin =

1/3ph

0.150 s

Set the internal activation of Lock-out output, else only activation of Lock-out input will create Lock-outTripLockout =

AutoLock =

Off

Off

Setting of the tripping logic (TRP02)Operation = On

Set the trip pulse length

Set the latching of the trip signal

Program =

tTripMin =

1/3ph

0.150 s

Set the internal activation of Lock-out output, else only activation of Lock-out input will create Lock-outTripLockout =

AutoLock =

Off

Off

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Setting of the tripping matrix (TR01)(TR02)(TR03)(TR05)(TR06)Operation = On

Set the pulse length

Set th on delayPulseTime1 =

OnDelayTime1 =

0.000 s

0.000 s

PulseTime2

OnDelayTime2

= 0.000 s

= 0.000 s

PulseTime2 =

OnDelayTime2 =

0.000 s

0.000 sSet the off delay

OffDelayTime1 = 0.000 s OffDelayTime2 = 0.000 s OffDelayTime2 = 0.000 s

Setting of the Switch OnTo Fault (SOTF) function.Setting of the zone to be activated during switch onto fault.

Set the Base current for the SOTF function in primary Ampere.

OperationNon directional operation Zone

==

Ibase =

OnZone2

2000 A

The used zone is selected in CAP config.

Setting of the Base voltage level on which the Dead line voltage is based

Built-in Dead line detection which will activate SOTF after tDLDActivation of the Dead line detection function

UBase =

Set the Operation Mode for the function

Set the SOTF to be initiated automatic, off gives activation by BC input.

Operation =

Mode =

400.0 kV

On

Impedance

Setting of the U< voltage

Setting of under current

AutoInit =

UP< =

Set the required duration of low UI check to achieve operation

Set the time during which the fault is considered being a Switch Onto Fault case.

IP< =

tDuration =

On

60% *UBase

20% *Ibase

0.020 s

Set the required time for all currents and all voltages to be low to Auto Initiate the SOTF function.tSOTF =

tDLD =

1.000 s

0.150 s

Page 14: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

14Cont

1MRK 506 267-WEN 42

Scheme communication logic for Distance protection (ZCOM)Setting of the Communication operation

Setting of the Communication scheme

Setting of the coordination timer

Operation =

Scheme Type =

On

PermUR

Setting of the carrier send minimum time

Setting of the unblocking logic

tCoord =

tSendmin =

Setting of the unblocking security timeUnblock =

tSecurity =

0.000 s

0.100 s

Off

0.035 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3Setting of the Power Swing Detection (PSD) function

Setting of the positive sequence reactance for PSB function to operate in Forward directionOperation =

X1InFw =

On

63.0 ohm gives X1InFw"= 34.65 ohmSetting of the line resistance for the characteristic angle of the characteristic

Setting of the resistance for PSB function to operate in Forward directionR1LIn =

R1FInFw =Setting of the positive sequence reactance for PSB function to operate in reverse direction

Setting of the resistance for PSB function to operate in reverse directionX1InRv =

R1FInRv =

2.8 ohm gives R1LIn"=

189.0 ohm gives R1FInFw"=

1.54 ohm

103.95 ohm

63.0 ohm gives X1InRv"=

189.0 ohm gives R1FInRv"=

34.65 ohm

103.95 ohmSetting of the Power Swing Detection, Load enchroachment factor ON-OFF

Setting of the Outer Load resistance in forward direction for the Load enchroachment function, when utilizedOperationLdCh =

RLdOutFw' =Setting of the Outer Load resistance in Reverse direction for the Load enchroachment function, when utilized

Set the angle of the load limitation lineRLdOutRv =

ArgLd =

On

132.9 ohm gives RLdOutFw"= 73.10 ohm

132.9 ohm gives RLdOutRv"=

16°

73.10 ohm

Set of the constant giving the margin between outer and inner graph defined at R-axis.The impedance margin between outer and inner lines will be calculated all over the characteristic with same valuesor in forward directionor in reverse direction

kLdRFw=kLdRRv=

==

Setting of the PSD timersInitial PSD timer tP1 =Fast PSD timer tP2

old timer for initof Fast PSD timer tW==

0.900.90

*RLdFw*RLdRv

0.045 s0.015 s0.250 s

Hold timer for PSD detected tHtimer overriding 1-ph Reclosing tEF

==

r to delay block by the IN current tR1r Blocking output at slow swings tR2

==

Note! Blocking of trip from PSB is decided by programming of blocking input and the configuration in CAP.Set the Base current for the Power Swing detection in primary Ampere.

Setting of the minimum operating current in phases required for operationIbase =

0.500 s2.000 s0.300 s2.000 s

2000 A

IminOpPE = 20% *Ibase

Page 15: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

15Cont

1MRK 506 267-WEN 42

Setting of the Weak End Infeed (WEI) logic (used in overreaching schemes)Activation of the current reversal logic

Setting of the U< voltageWEI =

UPP<UPN<

==

Off

70%70%

*UBase*UBase

Setting of the delay timer

Setting of the Base voltage level on which the WEI voltage is basedtPickUpWEI =

UBase =

0.100 s

400.0 kV

Setting of the current reversal logic for distance protection(used in overreaching schemes) (ZCAL) (REV)Activation of the current reversal logic

Setting of the pick-up timer

Setting of the delay timer

CurrRev =

tPickUpRev =

Off

0.020 s

tDelayRev = 0.100 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Setting of Stub protection function (STUB)Setting of operation mode

Select wheather the function shall operate continuous or only at release from release input.

Set the Base current for the function on which the current levels are based

Operation =

ReleaseMode =

On

Release

Setting of operation current level

Set the possible time delay at operation, normally function is instantanous

Ibase =

I> =

t =

2000 A

100% *Ibase

0.00 s

Set the analogue channels in the Disturbance recorder used for Fault locator calculations.Current ch for IL1Current ch for IL2

12

Voltage ch for UL1Voltage ch for UL1

78

Current ch for IL3Current channel for INCurrent ch for INP

345

Voltage ch for UL1 9

Setting of the local acceleration logic (ZCLC)Setting of the AR extension mode

Setting of the Loss of load acceleration mode

Extension =

Loss Of Load =

Off

Off

Page 16: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

16Cont

1MRK 506 267-WEN 42

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3Setting of Fuse Failure supervision function based on U0-I0, U2-I2 and dU-dI (FSD)Setting of the operation for the Fuse failure supervision

Setting of the operating mode for the Fuse failure supervisionOperation =

OpMode =

On

UZsIZsSetting of the Base voltage level on which the voltage setting is based

Set the Base current for the function on which the current levels are basedUBase =

Ibase =Setting of the 3U0 (UZs) voltage required to give operation

Setting of the 3I0 (IZs) current which will block the fuse failure function3U0> =

3I0< =

400.0 kV

2000 A

20% *UBase

10% *IbaseSetting of the U2 (UNs) voltage required to give operation

Setting of the I2 (INs) current which will block the fuse failure function3U2> =

3I2< =Setting of the operation for the DU> and DI< measuring function

Setting of the DU> voltage required to give operationOperation DUDI =

DU> =

20% *UBase

10% *Ibase

Off

20% *UBaseSetting of the DI< current which will block the fuse failure function

Setting of the operate voltage for phase voltagesIPH> =

UPH> =Setting of the operate value for phase currents

Setting of the seal-in function On-Off giving seal-in of alarm until voltages are symmetrical and highDI< =

SEALIN =

10% *Ibase

70% *UBase

10% *Ibase

OnSet the voltage level for the seal-in of the function

Note! At operation symmetrical voltages (reset of DLD) is required to reset the FUSE function.Setting of the U< voltage

USealIn< =

Setting of under currentUDLD< =

IDLD< =

60% *UBase

60% *UBase

20% *Ibase

Instantaneous overcurrent protection (IOC)The function is used with a reach less than 80% of the line at minimum source impedance.Setting of operation

Set the Base current for the function on which the current levels are basedOperation =

Ibase =

On

2000 A Setting of operation mode

Operating level of the instantaneous O/C protectionOpMode =

IP>> =Set a multiplier at inrush used when the binary input is activated

StValMult =

1 out of 3

500% *Ibase Set to limit the maximum reach with the object i

2.00min source plus the object impedance

Page 17: 1MRK506267-WEN C en REL670 Setting Example 1

Setting of four step Earth fault overcurrent function (TEF)Activation of the earth fault function

Operation =Set the Base current for the function on which the current levels are based

Setting of the Base voltage level on which the directional polarizing voltage is basedIbase =

UBase= =

On

2000 A

400.0 kVSetting of parameters for first stageSetting of the operating direction for the stage or switch it off

Setting of the operating characteristicDirMode1 =

Setting of the operating current level in primary valuesCharacteristic1 =

IN1>'IN1>

==

Forward

IEC NI

200 A 10% *Ibase

set to detect xxx ohm fault resistance

Set the current multiplier for IN1 valid at activation of input ENMULT

Set the definite time delay, when definite time characteristic has been selectedIN1Mult =

t1 =Set the back-up trip time delay multiplier for inverse characteristic

Set the Minimum operating time for inverse characteristick1 =

t1Min =

2.00

0.30 s

0.30

0.30 sSelect the reset curve type for the inverse delay

Set the Reset time delay for definite time delayed functionResetTypeCrv1 =

tReset1 =Set the release of Harmonic restraint blocking for the stage

Setting of parameters for second stageSetting of the operating direction for the stage or switch it off

HarmRestrain1 =

Instantaneous

0.02 s

On

Setting of the operating characteristic

Setting of the operating current level in primary values

DirMode2 =

Characteristic2 =

Set the current multiplier for IN2 valid at activation of input ENMULT

IN2>'IN2>

==

IN2Mult =

Off

IEC NI

600 A 30% *Ibase

2.00Set the definite time delay, when definite time characteristic has been selected

Set the back-up trip time delay multiplier for inverse characteristict2 =

k2 =Set the Minimum operating time for inverse characteristic

Select the reset curve type for the inverse delayt2Min =

ResetTypeCrv2 =

0.30 s

0.20

0.30 s

InstantaneousSet the Reset time delay for definite time delayed function

Set the release of Harmonic restraint blocking for the stagetReset2 =

HarmRestrain2 =

0.02 s

On

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

X

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

17Cont

1MRK 506 267-WEN 42Prin

tout

200

7-05

-23

Page 18: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

18Cont

1MRK 506 267-WEN 42

Setting of parameters for third stageSetting of the operating direction for the stage or switch it off

DirMode3 = OffSetting of the operating characteristic

Setting of the operating current level in primary valuesCharacteristic3 =

IN3> =

IEC NI

1200 A

Set the current multiplier for IN3 valid at activation of input ENMULT

Set the definite time delay, when definite time characteristic has been selected

IN3> =

IN3Mult =

Set the back-up trip time delay multiplier for inverse characteristic

Set the Minimum operating time for inverse characteristic

t3 =

k3 =

60% *Ibase

2.00

0.30 s

0.20

Select the reset curve type for the inverse delay

Set the Reset time delay for definite time delayed function

t3Min =

ResetTypeCrv3 =

Set the release of Harmonic restraint blocking for the stage

Setting of parameters for fourth stage

tReset3 =

HarmRestrain3 =

0.30 s

Instantaneous

0.02 s

On

Setting of the operating direction for the stage or switch it off

Setting of the operating characteristicDirMode4 =

Characteristic4 =Setting of the operating current level in primary values

Set the current multiplier for IN4 valid at activation of input ENMULT

IN4> =IN4> =

Off

IEC NI

6000 A 300% *Ibase

Set the definite time delay, when definite time characteristic has been selected

Set the back-up trip time delay multiplier for inverse characteristic

IN4Mult =

t4 =

Set the Minimum operating time for inverse characteristic

Select the reset curve type for the inverse delay

k4 =

t4Min =

2.00

0.30 s

0.20

0.30 s

Set the Reset time delay for definite time delayed function

Set the release of Harmonic restraint blocking for the stage

ResetTypeCrv4 =

tReset4 =

Set of Direction, Harmonic blocking and SOTF functionalitySetting of the minimum neutral point polarizing voltage level for the directional funtion

HarmRestrain4 =

UPolMin =

Instantaneous

0.02 s

On

1.00 %*UbaseSet the relay characteristic angle, i.e. the angle between the neutral point voltage and current

Setting of the operating current level for the directional release. Note! Sensitivity at RCAAngleRCA =

IN>DirCmp =

65 deg Normal zero sequence source angle at direct earthing

10% *Ibase Note! Used for POR

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 19: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

19Cont

1MRK 506 267-WEN 42

Earth Fault function communication (EFC and EFCA)Setting of the operating characteristics of communication scheme for earth faultActivation of the earth fault overcurrent function

Set the coordination time for trip acceleration

OperationSchemeType

==

tCoord =

OnPermissive OR

0.060 sSetting of the carrier send minimum time

Set the Current reversal and WEI functionsActivation of the current reversal logic

tSendmin =

Set the current reversal pick-up timer

Set the current reversal delay timer

CurrRev =

tPickUpRev =

0.100 s

On

0.120 s

Setting of weak end infeed logic. Trip=Echo and WEITrip.

Setting of the Base voltage level on which the directional polarizing voltage is based

tDelayRev =

WEI =

Setting of the operating neutral point voltage level for Weak end infeed functionUBase= =

3U0> =

0.100 s

Off

400.0 kV

25% *UBase

Set the method of directional polarizing to be used

Setting of the minimum enutral current required for direction polarizingPolMethod = Voltage

Setting of the zero sequence source resistance generating the polarizing current in primary ohm

Setting of the zero sequence source resistance generating the polarizing current in primary ohm

IPolMin =

RNPol =

5.00 %*IBase

5.00 ohm

Enable the harmonic restraint measuring function

Setting of the harmonic content in IN current blocking level

XNPol =

HarmRestrain =

Set the harmonic seal-in blocking at parallel transformers on if problems are expected due to sympatetic inrush.

Set the current level to be blocked to seal-in the Harmonic blocking on this level if sympatetic inrush is expected.

2ndHarmStab =

BlockParTransf =

40.00 ohm

On

25% of I

Off

Set the SOTF function operating mode

Select the input signal which shall activate the SOTF function

UseStartVal =

SOTF =

Select the input signal which shall activate the undertime function

Set the time after closing or position change during which the SOTF function is active

ActivationSOTF =

ActUndertime =

IN4>

Off

CloseCommand

CBCommand

Set the time delay for the SOTF trip

Set the time delay for the undertime trip i.e acclerated trip from the selected stage at closing

t4U =

tSOTF =

Enable Harmonic restraint function in SOTFtUndertime =

HarmResSOTF =

1.00 s

0.30 s

0.30 s

Disabled

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 20: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

20Cont

1MRK 506 267-WEN 42

Setting of MultiPurpose current and voltage measuring function GF 1 to 3. The function can be used for many applications, refer to the selected application for OC1 below.Activation of the function

Set the Base current for the function on which the current levels are based

Setting of the Base voltage level on which the directional polarizing voltage is based

Operation =

Ibase =

On

2000 A

Set the Current signal to be measured e.g. phase current, sequence components etc.

Set the Voltage signal to be measured e.g. phase current, sequence components etc.

UBase= =

CurrentInput =

Setting of the relay characteristic angle RCA ( plus is a lagging current)

Set the relay operating angle area (angle from RCA)

VoltageInput =

RCA_Dir =

400.0 kV

3ZeroSeq

Phase1 resp 2,3

30

Set the min operating voltage below which the action decided at low voltages take over

Set the action for directional function (when used) at voltages below LowVoltVM

ROA_Dir =

LowVolt_VM =

Enable the harmonic restraint measuring function

Setting of the harmonic content in current blocking level

ROA_Dir =

OperHarmRestr =

45

5.0%

Block

Off

Current level above which the 2nd harmonic blocking is inhibited (to avoid problem with CT saturation)

Enable the current restraint for overcurrent functions

I_2nd/I_fund =

BlkLev2nd =

Select the restraint current parameter

Give the current restraint coefficient (slope)

EnRestrCurr =

RestCurrInput =

20% of I

1000.0%

Off

PosSeq

Setting of parameters for GF Overcurrent 1 function OC1 for functions GF1 to GF3The function is used for Phase selection at high resistive earth faults in combination with EF4 function and EFCActivation of the OC1 function

RestCurrCoeff =

Setting of the operating direction for the stage

Setting of the operating priciple for the direction function

Operation_OC1 =

DirMode_OC1 =

0.00

On

Forward

Setting of the operating characteristic

Setting of the operating current level in primary values

DirPrinc_OC1 =

CurveType_OC1 =

Set the definite time delay, when definite time characteristic has been selected

OC1>StartCurr_OC1

==

tDefOC1 =

IcosFandU

Def

200 A 10% *Ibase

0.00 s

set to detect 300 ohm fault resistance

Set the back-up trip time delay multiplier for inverse characteristic

Set the Minimum operating time for inverse characteristick_OC1 =

t1Min_OC1 =Select the reset curve type for the inverse delay

ResetCrvType_OC1 =

0.30

0.30 s

Instantaneous

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 21: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

21Cont

1MRK 506 267-WEN 42

Set the Reset time delay for definite time delayed function

Set the release of Harmonic restraint blocking for the stagetResetDef_OC1 = 0.03 s

Set the Voltage Control mode for OC1 function

Set the Voltage Dependent mode for OC1 function

HarmRestr_OC1 =

VoltCntrMode_OC1 =

Off

Off

Set the Voltage Dependent factor for OC1 when function is voltage dependent function

Set the Voltage Low limit

VoltDepMode_OC1 =

VoltDepFactor_OC1 =

Set the VoltageHigh limit

Action for directional OC1 at voltage lower than set level above

ULowLimit_OC1 =

UHighLimit_OC1 =

Slope

1.00

50.0

100.0

Setting of parameters for GF Overcurrent 2 function OC2Activation of the OC2 function

ActLowVolt1_VM =

Operation_OC2 =Setting of the operating direction for the stage

Setting of the operating priciple for the direction functionDirMode_OC2 =

DirPrinc_OC2 =

Block

Off

Forward

IcosFandUSetting of the operating characteristic

Setting of the operating current level in primary valuesCurveType_OC2 =

OC2> =

Set the definite time delay, when definite time characteristic has been selected

Set the back-up trip time delay multiplier for inverse characteristic

StartCurr_OC2 =

tDef_OC2 =

IEC NI

150 A 8% *Ibase

0.30 s

Set the Minimum operating time for inverse characteristic

Select the reset curve type for the inverse delay

k_OC2 =

t1Min_OC2 =

Set the Reset time delay for definite time delayed function

Set the release of Harmonic restraint blocking for the stage

ResetCrvType_OC2 =

tResetDef_OC2 =

0.20

0.30 s

Instantaneous

0.02 s

Set the Voltage Control mode for OC1 function

Set the Voltage Dependent mode for OC1 function

HarmRestr_OC2 =

VoltCntrMode_OC2 =

Set the Voltage Dependent factor for OC1 when function is voltage dependent function

Set the Voltage Low limit

VoltDepMode_OC2 =

VoltFactor_OC2 =

On

Off

Slope

1.00

Set the VoltageHigh limit

Action for directional OC1 at voltage lower than set level above

ULowLimjt_OC2 =

UHighLimit_OC2 =

ActLowVolt2_VM =

50.0

100.0

Memory

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 22: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

22Cont

1MRK 506 267-WEN 42

Setting of parameters for GF Undercurrent 1 function UC1Activation of the UC1function

Operation_UC1 =Activate the internal low current level blocking of the function

Setting of the undercurrent level below which the operation is blockedEnBlLowI_UC1 =

BlkLowCurr_UC1 =

Off

Forward

20% *IbaseSetting of the operating current level in primary values

Set the definite time delay

UC1< =StartCurr_UC1 =

Set the Reset time delay for definite time delayed function

Setting of the operating priciple for the direction function

tDef_UC1 =

tResetDef_UC1 =

150 A 8% *Ibase

0.30 s

0.02 s

DirPrinc_UC1 = IcosΦandU

Setting of parameters for GF Undercurrent 2 function UC2Activation of the UC2 function

Operation_UC2 =Activate the internal low current level blocking of the function

Setting of the undercurrent level below which the operation is blockedEnBlLowI_UC2 =

BlkLowCurr_UC2 =

Off

Forward

20% *IbaseSetting of the operating current level in primary values

Set the definite time delay

UC2< =StartCurr_UC2 =

Set the Reset time delay for definite time delayed function

Setting of the operating priciple for the direction function

tDef_UC2 =

tResetDef_UC2 =

150 A 8% *Ibase

0.30 s

0.02 s

DirPrinc_UC2 = IcosΦandU

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 23: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

23Cont

1MRK 506 267-WEN 42

Setting of parameters for GF Overvoltage 1 function OV1Activation of the OV1 function

Operation_OV1 =Setting of the operating characteristic

Setting of the curve saturation point for the inverse curve in percentCurveType_OV1 =

CurveSat_OV1 =

Off

Inverse curve A

145% *UBaseSetting of the operating voltage level in primary values

Set the definite time delay

OV1> =StartVolt_OV1 =

Set the Minimum operating time for inverse characteristic

Set the Reset time delay for definite time delayed function

tDef_OV1 =

t1Min_OV1 =

440.0 kV110% *UBase

0.30 s

0.30 s

Select the reset curve type for the inverse delay

Set the Reset time delay for IDMT time delayed function

tResetDef_OV1 =

ResetCrvType_OV1 =

tResetIDMT_OV1 =

0.02 s

Instantaneous

0.00 s

Setting of parameters for GF Overvoltage 2 function OV2Activation of the OV2 function

Operation_OV2 =Setting of the operating characteristic

Setting of the curve saturation point for the inverse curve in percentCurveType_OV2 =

CurveSat_OV2 =

Off

Inverse curve A

145% *UBaseSetting of the operating voltage level in primary values

Set the definite time delay

OV2> =StartVolt_OV2 =

Set the Minimum operating time for inverse characteristic

Set the Reset time delay for definite time delayed function

tDef_OV2 =

t1Min_OV2 =

440.0 kV110% *UBase

0.30 s

0.30 s

Select the reset curve type for the inverse delay

Set the Reset time delay for IDMT time delayed function

tResetDef_OV2 =

ResetCrvType_OV2 =

tResetIDMT_OV2 =

0.02 s

Instantaneous

0.00 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 24: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

24Cont

1MRK 506 267-WEN 42

Setting of parameters for GF Undervoltage 1 function UV1Activation of the UV1 function

Operation_UV1 =Setting of the operating characteristic

Setting of the curve saturation point for the inverse curve in percentCurveType_UV1 =

CurveSat_UV1 =

Off

Inverse curve A

145%Setting of the undervoltage level for operation

Setting of the operating voltage level in primary valuesBlockLowVolt_UV1 =

UV1< =

Set the definite time delay

Set the Minimum operating time for inverse characteristic

StartVolt_UV1 =

tDef_UV1 =

20% *UBase

360.0 kV90% *UBase

0.30 s

Set the Reset time delay for definite time delayed function

Select the reset curve type for the inverse delay

t1Min_UV1 =

tResetDef_UV1 =

Enable low voltage block level for the UV1 function

Set the Reset time delay for IDMT time delayed function

ResetCrvType_UV1 =

EnBlkLowV_UV1 =

0.30 s

0.02 s

Instantaneous

On

tResetIDMT_UV1 = 0.00 s

Setting of parameters for GF Undervoltage 2 function UV2Activation of the UV2 function

Operation_UV2 =Setting of the operating characteristic

Setting of the curve saturation point for the inverse curve in percentCurveType_UV2 =

CurveSat_UV2 =

Off

Inverse curve A

145%Setting of the undervoltage level for operation

Setting of the operating voltage level in primary valuesBlockLowVolt_UV2 =

UV2< =

Set the definite time delay

Set the Minimum operating time for inverse characteristic

StartVolt_UV2 =

tDef_UV2 =

20% *UBase

200.0 kV50% *UBase

0.30 s

Set the Reset time delay for definite time delayed function

Select the reset curve type for the inverse delay

t1Min_UV2 =

tResetDef_UV2 =

Enable low voltage block level for the UV2 function

Set the Reset time delay for IDMT time delayed function

ResetCrvType_UV2 =

EnBlkLowV_UV2 =

0.30 s

0.02 s

Instantaneous

On

tResetIDMT_UV2 = 0.00 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 25: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

25Cont

1MRK 506 267-WEN 42

Setting of single and/or three phase Auto reclose device (AR1)Setting of the operating mode

Operation =Setting of the number of Auto reclose shots

Setting of the Auto reclose first shot types allowedNoOfShots =

FirstShot =

ExternalCtrl

1

1/2/3phSet if you want the AR to be started from CB Open instead of from Start inputs.

Select the type of contact used for the CB Position input.StartByCBOpen =

CBAuxContType =Extended t1S and t1 at PLC failure activated or not

Set the 3Ph shot 1 timer extension when the PLC is not operative and connected to input PLCFAILExtended t1 =

tExtended t1 =

Off

NO

On

0.50 sShot 1, Single phase reclosure dead-time

Shot 1, Two phase reclosure dead-timet1 1Ph =

t1 2Ph =Shot 1, Three phase reclosure dead-time

Shot 1, Three phase reclosure dead-time for High speed shot without Synchrocheck. Note! Start by StartHS it13Ph =

t13PhHS =

1.00 s

2.40 s

0.40 s

0.40 sShot 2, Three phase reclosure dead-time

Shot 3, Three phase reclosure dead-timet2 3Ph =

t3 3Ph =Shot 4, Three phase reclosure dead-time

Shot 5, Three phase reclosure dead-timet4 3Ph =

t5 3Ph =

60.00 s

60.00 s

60.00 s

60.00 sSelect if you want the multi-shot cycle to advance to next shot at a new fault if CB has been closed during dea

Maximum time for Synchro check condition to be fulfilledFollow CB =

tSync =Reclose pulse duration

Setting of the operating modetPulse =

CutPulse =

Off

15.00 s

0.20 s

OffSet the reclaim time

Set the inhibit reset timetReclaim =

tInhibit =Setting of the type of CB Ready condition

Max duration of trip or start signalCBReadyType =

tTrip =

180.00 s

5.00 s

CO

0.20 sSetting of the Priority between AR terminals in multi breaker schemes.

Setting of the maximum wait time for Master to be readyPriority =

tWaitMaster =Setting of the time CB shall be closed before a fault to get an AR Attempt.

tCBClosedMin =

High

15.00 s

5.00 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 26: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

26Cont

1MRK 506 267-WEN 42

Pole Discrepancy protection (PD) for CB1Setting of operation mode

Setting of the time delay

Operation =

tDelayTrip =

On

0.20 sSetting of contact type activating the function

Setting of Current supervision activating the functionContSel =

CurrSel =Setting of the unsymmetry level for operation

Setting of the unbalance current level for operationCurrUnsymmLevel =

CurrRelLevel =

PD Pos from CB

Off

80% *Ibase

10% *IbaseSet the Base current for the function on which the current levels are based

Ibase = 2000 A

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3Setting of the operating mode for next AR attempt (continue if CB does not close)

AutoCont =Blocking of the Auto reclose program at unsuccessful auto reclosing

Wait time after reclose attempt before proceeding to next shots (for multi-shots only)BlockByUnsucCl =

tAutoCondWait =

Off

Off

4.00 sSetting of the signal mode at Unsuccessful reclosing

CB check time before unsuccessful alarmUnsucClBYCBChk =

tUnsucCl =

No CB check

20.00 s

Page 27: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

27Cont

1MRK 506 267-WEN 42

Setting of single and/or three phase Auto reclose device (AR2)Setting of the operating mode

Operation =Setting of the number of Auto reclose shots

Setting of the Auto reclose first shot types allowedNoOfReclosing =

FirstShot =

ExternalCtrl

1

1/2/3phSet if you want the AR to be started from CB Open instead of from Start inputs.

Select the type of contact used for the CB Position input.StartByCBOpen =

CBAuxContType =Extended t1S and t1

Set the 3Ph shot 1 timer extension when the PLC is not operative and connected to input PLCFAILExtend t1 =

tExtended t1 =

Off

NO

On

0.50 sShot 1, Single phase reclosure dead-time

Shot 1, Two phase reclosure dead-timet1 1Ph =

t1 2Ph =Shot 1, Three phase reclosure dead-time

Shot 1, Three phase reclosure dead-time for High speed shot without Synchrocheck. Note! Start by StartHS it13Ph =

t13PhHS =

1.00 s

2.40 s

0.40 s

0.40 sShot 2, Three phase reclosure dead-time

Shot 3, Three phase reclosure dead-timet2 3Ph =

t3 3Ph =Shot 4, Three phase reclosure dead-time

Shot 5, Three phase reclosure dead-timet4 3Ph =

t5 3Ph =

60.00 s

60.00 s

60.00 s

60.00 sSelect if you want the multi-shot cycle to advance to next shot at a new fault if CB has been closed during dea

Maximum time for Synchro check condition to be fulfilledFollowCB =

tSync =Reclose pulse duration

Setting of the operating modetPulse =

CutPulse =

Off

15.00 s

0.20 s

OffSet the reclaim time

Set the inhibit reset timetReclaim =

tInhibit =Setting of the type of CB Ready condition

Max duration of trip or start signalCBReady =

tTrip =

180.00 s

5.00 s

CO

0.20 sSetting of the Priority between AR terminals in multi breaker schemes.

Setting of the maximum wait time for Master to be readyPriority =

tWaitMaster =Setting of the time CB shall be closed before a fault to get an AR Attempt.

tCBClosedMin =

Low

15.00 s

5.00 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 28: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

28Cont

1MRK 506 267-WEN 42

Pole Discrepancy protection (PD2) for CB2Setting of operation mode

Setting of the time delay

Setting of contact type activating the function

Operation =

tDelayTrip =

On

0.20 s

Setting of Current supervision activating the function

Setting of the unsymmetry level for operation

ContSel =

CurrSel =

Setting of the unbalance current level for operation

Set the Base current for the function on which the current levels are based

CurrUnsymmLevel =

CurrRelLevel =

PD Pos from CB

Off

80% *Ibase

10% *Ibase

Ibase = 2000 A

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3Setting of the operating mode for next AR attempt (continue if CB does not close)

AutoCont =Blocking of the Auto reclose program at unsuccessful auto reclosing

Wait time after reclose attempt before proceeding to next shots (for multi-shots only)BlockByUnsucCl =

tAutoCondWait =

Off

Off

4.00 sSetting of the signal mode at Unsuccessful reclosing

CB check time before unsuccessful alarmUnsucClBYCBChk =

tUnsucCl =

No CB check

20.00 s

Page 29: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

29Cont

1MRK 506 267-WEN 42

Setting of Synchrocheck function (SYN1)

Setting of the operating mode for the functionOperation = On

Setting of the input phase for Bus 1 voltage reference

Setting of the phase or line 1 voltage measurementSelPhaseBus1 =

SelPhaseLine1 =

L2

L2Setting of the input phase for bus 2 voltage reference (used in multi breaker schemes only)

Setting of the phase or line 2 voltage measurement (used in multi-breaker schemes only)SelPhaseBus2 =

SelPhaseLine2 =

L2

L2Setting of the Base voltage level on which the voltage settings are based

Setting of the phase shift for phases involved in checkingUBase= =

Phase shift =Setting of the voltage ratio between Line VT and Bus VT (Line/Bus)

Setting of the busbar arrangement for Bus VT selectionUratio =

CBConfig =

400.0 kV

1.00

1 1/2 Bus CBSet the values for the Energizing checkSetting of the maximum live voltage level at which energizing is allowed

Set the operating level for the Bus high voltage at Line energizingUMaxEnerg =

Setting of the operating voltage level for the low line voltage level at line energizing

Set the operating level for the Line high voltage at Bus energizing

UHighBusEnerg =

ULowLineEnerg =

115%

80% *UBase

40% *UBase

Setting of the operating voltage level for the low Bus voltage level at Bus energizing

Setting of the energizing check directions to be activated.

UHighLineEnerg =

ULowBusEnerg =

Set the time delay for the Auto Energizing

Setting of the manual Dead line/bus and Dead/Dead switching conditions to be allowed

AutoEnergi =

tAutoEnerg =

80% *UBase

40% *UBase

DLLB

0.10 s

Set the time delay for the Manual Energizing

ManEnergManEnergDLDB

==

tManEnerg =Set general settings for the Synchronism check functionSetting of the operating mode for the synchonism check (paralleling) function

Setting of the allowed voltage difference for Manual and Auto synchronism checkOperationSync =

BothOff

0.10 s

On

Set the operating level for the Bus high voltage at Line synchronism check

Set the operating level for the Line high voltage at Line synchronism check

UDiff =

UHighBusSync =

UHighLineSync =

10%

80% *UBase

80% *UBase

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 30: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

30Cont

1MRK 506 267-WEN 42

Set the values for the Manual Synchronism (paralleling) checkSetting of the frequency difference for Manual synchronism check

FreqDiffM = 0.010 HzSetting of the phase angle difference for Manual synchronism check

Setting of the time delay for Manual synchronism checkPhaseDiffM =

tSyncM =

45 °

0.10 s

Set the values for the Auto Synchronism (paralleling) checkSetting of the frequency difference for Auto synchronism check

FreqDiffA =Setting of the phase angle difference for Auto synchronism check

Setting of the time delay for Auto synchronism checkPhaseDiffA =

tSyncA =

0.010 Hz

45 °

0.10 s

Setting of the operating mode for the Synchronising function.

Setting of the min frequency difference required to perform synchronising.Operation =

Shall be set same as Synchrocheck value FreqDiffA/M.

Setting of the frequency difference required to perform synchronisingFreqDiffMin =

FreqDiffMax =

Off

0.010 Hz

0.220 HzSet the operating level for the Bus high voltage at Line synchronism check

Set the operating level for the Line high voltage at Line synchronism checkUHighBusSynch =

UHighLineSynch =Setting of the allowed voltage difference for Manual and Auto synchronism check

Setting of the time delay for energizingUDiffSynch =

tClosePulse =

80% *UBase

80% *UBase

10%

0.300 sSetting of the breaker operating time at closing (including possible auxiliary relays)

Setting of the minimum time for Synchronizing. Before this time no pulse will be giventBreaker =

tMinSynch =Setting of the maximum time for Synchronizing. After this time the function will be reset.

tMaxSynch =

0.08 s

0.25 s

300.00 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 31: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

31Cont

1MRK 506 267-WEN 42

Setting of Synchrocheck function (SYN2)

Setting of the operating mode for the functionOperation = On

Setting of the input phase for Bus 1 voltage reference

Setting of the phase or line 1 voltage measurementSelPhaseBus1 =

SelPhaseLine1 =

L2

L2Setting of the input phase for bus 2 voltage reference (used in multi breaker schemes only)

Setting of the phase or line 2 voltage measurement (used in multi-breaker schemes only)SelPhaseBus2 =

SelPhaseLine2 =

L2

L2Setting of the Base voltage level on which the voltage settings are based

Setting of the phase shift for phases involved in checkingUBase= =

Phase shift =Setting of the voltage ratio between Line VT and Bus VT (Line/Bus)

Setting of the busbar arrangement for Bus VT selectionUratio =

CBConfig =

400.0 kV

1.00

Tie CBSet the values for the Energizing checkSetting of the maximum live voltage level at which energizing is allowed

Set the operating level for the Bus high voltage at Line energizingUMaxEnerg =

Setting of the operating voltage level for the low line voltage level at line energizing

Set the operating level for the Line high voltage at Bus energizing

UHighBusEnerg =

ULowLineEnerg =

115%

80% *UBase

40% *UBase

Setting of the operating voltage level for the low Bus voltage level at Bus energizing

Setting of the energizing check directions to be activated.

UHighLineEnerg =

ULowBusEnerg =

Set the time delay for the Auto Energizing

Setting of the manual Dead line/bus and Dead/Dead switching conditions to be allowed

AutoEnergi =

tAutoEnerg =

80% *UBase

40% *UBase

DLLB

0.10 s

Set the time delay for the Manual Energizing

ManEnergManEnergDLDB

==

tManEnerg =Set general settings for the Synchronism check functionSetting of the operating mode for the synchonism check (paralleling) function

Setting of the allowed voltage difference for Manual and Auto synchronism checkOperationSync =

BothOff

0.10 s

On

Set the operating level for the Bus high voltage at Line synchronism check

Set the operating level for the Line high voltage at Line synchronism check

UDiff =

UHighBusSync =

UHighLineSync =

10%

80% *UBase

80% *UBase

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 32: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

32Cont

1MRK 506 267-WEN 42

Set the values for the Manual Synchronism (paralleling) checkSetting of the frequency difference for Manual synchronism check

FreqDiffM = 0.010 HzSetting of the phase angle difference for Manual synchronism check

Setting of the time delay for Manual synchronism checkPhaseDiffM =

tSyncM =

45 °

0.10 s

Set the values for the Auto Synchronism (paralleling) checkSetting of the frequency difference for Auto synchronism check

FreqDiffA =Setting of the phase angle difference for Auto synchronism check

Setting of the time delay for Autosynchronism checkPhaseDiffA =

tSyncA =

0.010 Hz

45 °

0.10 s

Setting of the operating mode for the synchronising function.

Setting of the min frequency difference required to perform synchronising.Operation =

Shall be set same as Synchrocheck value FreqDiffA/M.

Setting of the frequency difference required to perform synchronisingFreqDiffMin =

FreqDiffMax =

Off

0.010 Hz

0.220 HzSet the operating level for the Bus high voltage at Line synchronism check

Set the operating level for the Line high voltage at Line synchronism checkUHighBusSynch =

UHighLineSynch =Setting of the allowed voltage difference for Manual and Auto synchronism check

Setting of the time delay for energizingUDiffSynch =

tClosePulse =

80% *UBase

80% *UBase

10%

0.300 sSetting of the breaker operating time at closing (including possible auxiliary relays)

Setting of the minimum time for Synchronizing. Before this time no pulse will be giventBreaker =

tMinSynch =Setting of the maximum time for Synchronizing. After this time the function will be reset.

tMaxSynch =

0.08 s

0.25 s

300.00 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 33: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

33Cont

1MRK 506 267-WEN 42

Setting of two step Overvoltage protection function (TOV)

Activation of the Overvoltage function

Setting of the Base voltage level on which the voltage settings are basedOperation = Off

Setting of the parameters for stage 1Setting of the U> voltage

UBase= =

Setting of the Overvoltage function measuring mode for involved voltages

U1>'=U1> =

OpMode1 =

400.0 kV

254.0 kV64% *UBase

1 out of 3Setting of the characteristic for the time delay, inverse or definite time

Setting of the definite time delay, when selectedCharacterist1 =

t1 =Setting of the definite time reset time

Set the time delay multiplier for inverse characteristic, when selectedt1Reset =

k1 =

Definite

5.000 s

0.025 s

0.05Setting of the definite minimum operating time for the inverse characteristic

Set the reset time curve for inverse characteristict1Min =

ResetTypeCrv1 =Set the reset ratio (hystereses) for the function

Setting of the parameters for stage 2Setting of the U>> voltage

HystAbs1 =

1.000 s

Instantaneous

0.995

Setting of the Overvoltage function measuring mode for involved voltages

U2>>'=U2> =

OpMode2 =Setting of the characteristic for the time delay, inverse or definite time

Setting of the definite time delay, when selectedCharacterist2 =

t2 =

415.7 kV104% *UBase

1 out of 3

Definite

5.000 sSetting of the definite time reset time

Set the time delay multiplier for inverse characteristic, when selectedt2Reset =

k2 =Setting of the definite minimum operating time for the inverse characteristic

Set the reset time curve for inverse characteristict2Min =

ResetTypeCrv2 =

0.025 s

0.05

1.000 s

InstantaneousSet the reset ratio (hystereses) for the function

HystAbs2 = 0.995

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 34: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

34Cont

1MRK 506 267-WEN 42

Setting of two step Undervoltage protection function (TUV)

Activation of the Overvoltage function

Setting of the Base voltage level on which the voltage settings are basedOperation = Off

Setting of the parameters for stage 1Setting of the U< voltage

UBase= =

Setting of the Undervoltage function measuring mode for involved voltages

U<'=U1< =

OpMode1 =

400.0 kV

184.8 kV46% *UBase

1 out of 3Setting of the characteristic for the time delay, inverse or definite time

Setting of the definite time delay, when selectedCharacterist1 =

t1 =Setting of the definite time reset time

Set the time delay multiplier for inverse characteristic, when selectedt1Reset =

lk1 =

Definite

5.000 s

0.025 s

0.05Setting of the definite minimum operating time for the inverse characteristic

Set the reset time curve for inverse characteristict1Min =

ResetTypeCrv1 =Set the reset ratio (hystereses) for the function

Setting of the parameters for stage 2Setting of the U<< voltage

HystAbs1 =

1.000 s

Instantaneous

1.005

Setting of the Overvoltage function measuring mode for involved voltages

U<<'=U2< =

OpMode2 =Setting of the characteristic for the time delay, inverse or definite time

Setting of the definite time delay, when selectedCharacterist2 =

t2 =

92.4 kV23% *UBase

1 out of 3

Definite

5.000 sSetting of the definite time reset time

Set the time delay multiplier for inverse characteristic, when selectedt2Reset =

k2 =Setting of the definite minimum operating time for the inverse characteristic

Set the reset time curve for inverse characteristict2Min =

ResetTypeCrv2 =

0.025 s

0.05

1.000 s

InstantaneousSet the reset ratio (hystereses) for the function

HystAbs2 = 1.005

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 35: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

35Cont

1MRK 506 267-WEN 42

Setting of Breaker failure function (BFP1)Activation of the Breaker failure function

Operation =Setting of the operating mode for retrip of own breaker

Set the used principle for current checkRetripMode =

BUTripMode =

On

I> Check

1 out of 3Set the used principle forback-up tripping, with or without contact resp current checks

Set the Base current for the function on which the current levels are basedFunctionMode =

Ibase =Setting of the operating current level

Setting of the operating current level for Neutral currentIP> =

IN> =

Current

2000 A

10% *Ibase

10% *IbaseSet the retrip time delay

Set the back-up trip time delayt1 =

t2 =Set the back-up trip time delay for Multi-phase start

Set an additional time delay for a second back-up trip step if used. Will be added to t2 B-u trip time without checks.t2MPh =

t3 =

0.050 s

0.120 s

0.120 s

0.030 sSet the length of the trip pulse

Set the current level above which the contact base operation (if selected) is blockedtPulse =

I>BlkCont =Set the time to alarm for CB faults if input is used

tCBAlarm =

0.200 s

20% *Ibase

5.000 s

Setting of the System Overload function (THL)Operation =

Set the Base current for the function on which the current levels are based

Set the hystereses for start temperatureIbase =

HystTemp =

Off

2000 A

10Setting of the reference current level above which continuous operation gives trip

Setting of the end temperature of the line when loaded continuously with IRefIRef =

TRef =Setting of the trip temperature of the line

Setting of the end temperature at which the alarm shall be givenTripTemp =

tAlarm =

102% *Ibase

90 deg C

90 deg C

80 deg CSetting temperature at which the reclosing is allowed

Set the line heating time constant in minutestRecl =

Tau =

80 deg C

8 min

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 36: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

36Cont

1MRK 506 267-WEN 42

Setting of Breaker failure function (BFP2)Activation of the Breaker failure function

Operation =Setting of the operating mode for retrip of own breaker

Set the used principle for current checkRetripMode =

BUTripMode =

On

I> Check

1 out of 3Set the used principle forback-up tripping, with or without contact resp current checks

Set the Base current for the function on which the current levels are basedFunctionMode =

Ibase =Setting of the operating current level

Setting of the operating current level for Neutral currentIP> =

IN> =

Current

2000 A

10% *Ibase

10% *IbaseSet the retrip time delay

Set the back-up trip time delayt1 =

t2 =Set the back-up trip time delay for Multi-phase start

Set an additional time delay for a second back-up trip step if used. Will be added to t2 B-u trip time without checks.t2MPh =

t3 =

0.050 s

0.120 s

0.120 s

0.030 sSet the length of the trip pulse

Set the current level above which the contact base operation (if selected) is blockedtPulse =

I>BlkCont =Set the time to alarm for CB faults if input is used

tCBAlarm =

0.200 s

20% *Ibase

5.000 s

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Setting of HMI controlled GatesGate No 1

Operation =Gate No 5

Gate No 17Operation =

Operation =

Off

Off

OffGate No x

Gate No 11Operation =

Operation =Gate No 2

Gate No 21Operation =

Operation =

Off

Off

Off

OnGate No 12

Gate No 3Operation =

Operation =Gate No 22

Operation =

Off

Off

Off

Application in CAP531SOTF activation from BC input

AR at EFC Trip

EFC Trip is not single phase when activated.

Futiure use

External AR is used. Bus CB

Permit 1ph trip is used. (ext AR) Bus CB

Trip coil supervision activated. Bus CB

External AR is used Tie CB

Permit 1 pH trip is used (ext AR) Tie CB

Trip coil supervision is activated TIe CB

Page 37: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

37Cont

1MRK 506 267-WEN 42

Setting of Measuring values SRVSet under General settings/Monitoring:Set for each of the measuring functions S,P, Q,PF,U,I, FrSet the reporting typeSet deaband in % resp Set the supervision limits for high and low alarm and the hystereses for the limits in VA

SRepTypeSdb

==

SHHlimit =

Note! Measures the line values!

Deadband1%

1200000000

Set the maximum and minimum value for the measuring in VA

SHlimitSLlimit

==

SLLlimit =

Set active and reactive powerSet the reporting type

S maxS min

==

PRepType =

1000000000200000005000000

1500000000100000

DeadbandSet deadband in % respSet the supervision limits for high and low alarm and the hystereses for the limits in W

P db =

PHHlimitPHlimit

==

Set the maximum and minimum value for the measuring in W

PLlimitPLLlimit

==

P max =

2%

12000000001000000000200000005000000

1500000000

Set the Power Factor PF valuesSet the reporting type

P min =

PFRepType =Set deaband in % resp Set the supervision limits for high and low alarm and the hystereses for the limits in units

PFdb =

PFHHlimitPFHlimit

==

100000

Deadband1%

11

Q dbType = DeadbandQ db =

QHHlimitQHlimit

==

1%

3000000010000000

QLlimitQLLlimit

==

Q max =

2000000100000

1500000000Q min = 100000

Set the maximum and minimum value for the measuring in units

PFLlimitPfLLlimit

==

PF max =

Set the Voltage and Current valuesSet the reporting typeSet deaband in % resp

PF min =

URepTypeUdb

==

0.80.7

10

Deadband2%

Set the supervision limits for high and low alarm and the hystereses for the limits in VUHHlimit =

UHlimitULlimit

==

Set the maximum and minimum value for the measuring in VULLlimit =

U maxU min

==

450000000400000000360000000320000000

6000000001000

I dbTypeIdb

==

Deadband1%

IHHlimit =IHlimitILlimit

==

36003200300

ILLlimit =

I maxI min

==

100

60001

Set the reporting typeSet deaband in % resp Set the supervision limits for high and low alarm and the hystereses for the limits in Hz

f dbTypef Fdb

==

fHHlimit =

Note! Connect alarm to measuring expander block to use them in Application configuration

fHlimitfLlimit

==

fLLlimit =

Deadband1%

56534744

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 38: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

38Cont

1MRK 506 267-WEN 42

Set under Setting group/MonitoringOperation

Mode==

Setting of the Base voltage level on which the voltage settings are based

Set the Base current for the function on which the current levels are basedUBase= =

Ibase =

OnL1, L2, L3

400.0 kV

2000 A Set the minimum values for which the power is calculated

Set S amplitude factor and angle compensationIMin =

Ampl =

1% *Ibase

1.000

UMin =

Angle =

1% *UBase

0.0 deg

Setting of Current Phasors values CMMXUSet under General settings/Monitoring:

Operation =Set for phase L1 currentSet the reporting typeSet deaband in % resp secSet the deadband at zero

IL1RepType =IL1 db

IL1 Zero db=

Note! Measures the line values!

On

Deadband1%0.2%

Set the supervision limits for high and low alarm and the hystereses for the limits in AIL1 HHlimit =

IL1 HlimitIL1 Llimit

==

Set the maximum and minimum value for the measuring in AIL1 LLlimit =

IL1 maxIL1 min

==

36003200300100

60001

Set for phase L3 currentSet the reporting typeSet deaband in % resp secSet the deadband at zero

IL13RepType =IL3 db

IL3 Zero db=

Set the supervision limits for high and low alarm and the hystereses for the limits in AIL3 HHlimit =

IL3 HlimitIL3 Llimit

==

Deadband1%0.2%

36003200300

Set the maximum and minimum value for the measuring in AIL3 LLlimit =

IL3 maxIL3 min

==

Set for I0 currentSet the reporting typeSet deaband in % resp secSet the deadband at zero

I0RepType =I0= db

I0 Zero db=

100

60001

Deadband1%0.2%

Set for phase L2 currentIL2RepType =

IL2 dbIL2 Zero db

=Deadband1%0.2%

IL2 HHlimit =IL2 HlimitIL2 Llimit

==

36003200300

IL2 LLlimit =

IL2 maxIL2 min

==

100

60001

Set for neutral IN current3I0RepType =

3I0 db3I0 Zero db

=Deadband1%0.2%

3I0 HHlimit =3I0 Hlimit3I0 Llimit

==

36003200300

3I0 LLlimit =

3I0 max3I0 min

==

100

60001

Set for negative sequence I2 currentI2RepType =

I2 dbI2 Zero db

=Deadband1%0.2%

Set the supervision limits for high and low alarm and the hystereses for the limits in AI0 HHlimit =

I0 HlimitI0 Llimit

==

Set the maximum and minimum value for the measuring in AI0 LLlimit =

I0 maxI0 min

==

36003200300100

60001

Note! Connect alarm to measuring expander block to use them in Application configuration

I2 HHlimit =I2 HlimitI2 Llimit

==

36003200300

I2 LLlimit =

I2 maxI2 min

==

100

60001

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 39: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

39Cont

1MRK 506 267-WEN 42

Setting of Voltage Phasors values VMMXUSet under General settings/Monitoring:

Operation =Set for phase L1VoltageSet the reporting typeSet deadband in % resp secSet the deadband at zero

UL1 dbType =UL1 db

UL1 Zero db=

Note! Measures the line values!

On

Deadband1%0.2%

Set the supervision limits for high and low alarm and the hystereses for the limits in VUL1 HHlimit =

UL1 HlimitUL1 Llimit

==

Set the maximum and minimum value for the measuring in VUL1 LLlimit =

UL1 maxUL1 min

==

440000420000360000320000

6000001

Set for phase L3 VoltageSet the reporting typeSet deadband in % resp secSet the deadband at zero

U13 dbType =UL3 db

U3 Zero db=

Set the supervision limits for high and low alarm and the hystereses for the limits in VU3 HHlimit =UL3 Hlimit

U3 Llimit==

Deadband1%0.2%

440000420000360000

Set the maximum and minimum value for the measuring in VU3 LLlimit =

UL3 maxUL3 min

==

Set for U0 volageSet the reporting typeSet deaband in % resp secSet the deadband at zero

U0RepType =U0= db

U0 Zero db=

320000

6000001

Deadband1%0.2%

Set for phase L2 VoltageUL2RepType =

UL2 dbUL2 Zero db

=Deadband1%0.2%

U2 HHlimit =U2 HlimitU2 Llimit

==

440000420000360000

UL2 LLlimit =

UL2 maxUL2 min

==

320000

6000001

Set for neutral UN voltage3U0RepType =

3U0db3U0Zero db

=Deadband1%0.2%

3U0HHlimit =3U0Hlimit3U0Llimit

==

440000420000360000

3U0LLlimit =

3U0max3U0min

==

320000

6000001

Set for negative sequence U2 voltageU2RepType =

U2 dbU2 Zero db

=Deadband1%0.2%

Set the supervision limits for high and low alarm and the hystereses for the limits in VU0HHlimit =

U0HlimitU0Llimit

==

Set the maximum and minimum value for the measuring in VU0LLlimit =

U0 maxU0 min

==

440000420000360000320000

6000001

Note! Connect alarm to measuring expander block to use them in Application configuration

U2 HHlimit =U2 HlimitU2 Llimit

==

440000420000360000

U2 LLlimit =

U2 maxU2 min

==

320000

6000001

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 40: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

40Cont

1MRK 506 267-WEN 42

Configuration of HMI displaySetting of LED's functionality

OperationRestart

Set the sequence type for the 15 LED's. Following alternative behaviour is available.tMax

On0.0 s0.0 s

Follow-SFollow-FLatchedAck-F-SLatchedAck-S-FLatchedColl-FLatchedReset-S

Set the behaviour for each of the LED's

Follow the fault with Steady lightFollow the fault with Flickering lightLatched with flickering until ack, then steady if fault is onLatched with steady until ack, then flickering if fault is on

Latched steady until reset, then steady if fault is on.

SeqTypeLED1SeqTypeLED2SeqTypeLED3SeqTypeLED4SeqTypeLED5SeqTypeLED6SeqTypeLED7SeqTypeLED8

==

LatchedAck-S-FLatchedAck-S-F

==

LatchedAck-S-FLatchedAck-S-F

==

LatchedAck-S-FLatchedAck-S-F

==

LatchedAck-S-FLatchedAck-S-F

SeqTypeLED9SeqTypeLED10SeqTypeLED11SeqTypeLED12SeqTypeLED13SeqTypeLED14SeqTypeLED15

==

LatchedAck-S-FLatchedAck-S-F

==

LatchedAck-S-FLatchedAck-S-F

==

LatchedAck-S-FLatchedAck-S-F

= LatchedAck-S-F

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 41: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

41Cont

1MRK 506 267-WEN 42

Set the Operation of the Fault Recorder functionsOperation=

Recording timesOn

PreFault Rec T=PostFault Rec T=

0.10 s0.80 s

TimeLimit=PostRetrig=

2.00 sOff

ZeroAngleRef=OpModeTest=

7On

Configuration of DREP Binary singals to be presented on HMI and DR printouts.

Ch 12

Binary signalsSignal nameZM1-TRIPZM2-TRIP

Channel No

Signal description LEDZone 1 TripZone 2Trip

OnOn

TrigOper Trig levelOnOn

Trig on 1Trig on 1

3456

ZM2-STARTZM3-TRIPZM3-STARTZM4-TRIP

789

10

ZM4-STARTZM5-TRIPZM5-STARTZCOM-TRIP

Zone 2 startZone 3Trip

OffOn

Zone 3 startZone4Trip

OffOn

OffOn

Trig on 1Trig on 1

OffOn

Trig on 1Trig on 1

Zone 4 startZone 5Trip

OffOn

Zone5 startCarrier Aided Trip

OffOn

OffOn

Trig on 1Trig on 1

OffOn

Trig on 1Trig on 1

11121314

ZCOM-CR

PHSST L315161718

PHS STPESOTF TRIP

ST EF

Carrier RecievePhase L1

OffOff

Phase L2Phase L3

OffOff

OnOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

Phase to Earth FaultSwitch Onto Fault Trip

OffOn

EF Trip time delayed stepBack-up Earth Fault protection start

OnOff

OffOn

Trig on 1Trig on 1

OnOff

Trig on 1Trig on 1

MaskShowShowShowShowShowShowShowShowShowShowShowShowShowShowShowShowShowShow

19202122

EF-STFWEF-STRVEF-CR

23242526

EF-TRWEIEFC L1EFC L2EFC L3

NA!EF Start Forward

OnOff

EF Start ReverseEF CarierReceive

OffOff

OnOff

Trig on 1Trig on 1

OffOn

Trig on 1Trig on 1

EF WEI TRIPEFC L1 Trip

OnOff

EFC L2 TripEFC L3 Trip

OffOff

OnOn

Trig on 1Trig on 1

OnOn

Trig on 1Trig on 1

27282930

EF 2ND HARMIEF TRIPZCZL-WEISTUB TRIP

31323334

PSD STARTZCAL-ECHOIOC TRIP

EF "nd Harmonic BlockInstantanous EF Trip

OffOn

Z WEI TripStub protection trip

OnOn

OffOn

Trig on 1Trig on 1

OnOn

Trig on 1Trig on 1

Power Swing Detection startZ WEI Echi Send

OffOff

Instantanous OC TripDelayed OC Trip

OnOn

OnOn

Trig on 1Trig on 1

OnOn

Trig on 1Trig on 1

ShowShowShowShowShowShowShowShowShowShowShowShowShowShowShowShow

35363738

TOC STARTTOV TRIPTOV STARTTUV TRIP

39404142

TUV STARTL1 DTTR

Delayed OC StartOvervoltage Trip

OffOn

Overvoltage StartUndervoltage Trip

OffOn

OffOn

Trig on 1Trig on 1

OffOn

Trig on 1Trig on 1

Undervoltage StartDirect Transfer Trip Recieve

OffOn

Bus CB Trip 3Ph from Binary InputBus CB Trip L1 from Binary Input

OnOn

OffOn

Trig on 1Trig on 1

OnOn

Trig on 1Trig on 1

ShowShowShowShowShowShowShowShow

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3

Page 42: 1MRK506267-WEN C en REL670 Setting Example 1

Project

Station A 400/230 kV for ABB REL 670 customerApproved Resp. dept. Title Rev ind

Max DegerfaltPrepared

MDABB PTSX

MBDate

Setting of Line protection relay REL 670

2005-11-02 for 400 kV OHL Line Station A - Station CDocument No.

CSheet

42Cont

1MRK 506 267-WEN 42

4344454647484950

THL TRIPTHL ALARM

Bus CB Trip L2 from Binary InputBus CB Trip L3 from Binary Input

OnOn

Tie CB Trip 3Ph from Binary InputTie CB Trip L1 from Binary Input

OnOn

OnOn

Trig on 1Trig on 1

OnOn

Trig on 1Trig on 1

Tie CB Trip L2 from Binary InputTie CB Trip L3 from Binary Input

OnOn

Thermal Overload TripThermal Overload Alarm

OnOn

OnOn

Trig on 1Trig on 1

OnOff

Trig on 1Trig on 1

ShowShowShowShowShowShowShowShow

51525354

Not UsedNot Used FUSE FAILNot Used

55565758

Not UsedNot UsedNot UsedNot Used

OffOff

VT Fuse faiure OnOff

OffOff

Trig on 1Trig on 1

OnOff

Trig on 1Trig on 1

OffOffOffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

59606162

Not UsedNot UsedNot UsedNot Used

63646566

Not UsedNot UsedBUS CB AR ATTEMPTBUS CB AR IN PROGR

OffOffOffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

OffOff

Bus CB AR AttemptBus CB AR In Progress

OffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

HideHideShowHideHideHideHideHideHideHideHideHideHideHideShowShow

67686970

BUS CB AR PREP 3PBUS CB AR INHIBITBUS CB POLE DISCBUS CB PD TRIP

71727374

TIE CB AR ATTEMPTTIE CB AR IN PROGRTIE CB AR PREP 3PTIE CB AR INHIBIT

BUS CB AR Prep 3Ph TripBUS CB AR Inhibit

OffOff

Bus CB Pole DiscordanceBus CB Pole Discordance Trip

OffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

Tie CB AR AttemptTie CB AR In Progress

OffOff

Tie CB AR Prep 3Ph TripTie CB AR Inhibit

OffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

75767778

TIE CB POLE DISCTIE CB PD TRIPNot UsedNot Used

79808182

BUS CB BUTRIPTIE CB BUTRIPBUS CB CLOSEDBUS CB OPEN

Tie CB Pole DiscordanceTie CB Pole Discordance Trip

OffOnOffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

Bus CB Circuit Breaker failureTie CB Circuit Breaker failure

OnOn

Busbar Circuit Breaker ClosedBusbar Circuit Breaker Open

OffOff

OnOn

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

ShowShowShowShowShowShowShowShowShowShowHideHideShowShowShowShow

83848586

BUS CBREADYTIE CB CLOSEDTIE CB OPENTIE CBREADY

87888990

LINE 1 DS CLOSEDLINE 1 DS OPENLINE 2 DS CLOSEDLINE 2 DS OPEN

Busbar Circuit Breaker ReadyTie Circuit Breaker Closed

OffOff

Tie Circuit Breaker OpenTie Circuit Breaker Ready

OffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

Line 1 DSClosedLine 1 DS Open

OffOff

Line 2 DS ClosedLine 2 DS Open

OffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

91929394

TEST ACTIVEACTIVE SETTING GR1ACTIVE SETTING GR2Not Used

9596

Not UsedNot Used

Test ActiveActive setting Group 1

OffOff

Active setting Group 2 OffOff

OffOff

Trig on 1Trig on 1

OffOff

Trig on 1Trig on 1

OffOff

OffOff

Trig on 1Trig on 1

ShowShowShowShowShowShowShowShowShowShowShowHideHideHide

We

rese

rve

all r

ight

s in

this

doc

umen

t and

in th

e in

form

atio

n co

ntai

ned

ther

ein.

Rep

rodu

ctio

n, u

se

or d

iscl

osur

e to

third

par

ties

with

out e

xpre

ss

auth

ority

is s

trict

ly fo

rbid

den.

©A

BB

PTS

XP

rinto

ut 2

007-

05-2

3