1.Initial setting time of cement: 40 to 60min 30 to 60min 15 to 60min 35 to 60min.

62
CTEP-TECHNICAL QUIZ- 1

description

 2. Role of GYPSM in cement is  a) Control initial setting time  b) Increase the strength  c) Increase the durability  d) Reduce crack

Transcript of 1.Initial setting time of cement: 40 to 60min 30 to 60min 15 to 60min 35 to 60min.

Page 1: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

CTEP-TECHNICAL QUIZ-1

Page 2: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

1.Initial setting time of cement: 40 to 60min 30 to 60min 15 to 60min 35 to 60min

Page 3: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

2. Role of GYPSM in cement is a) Control initial setting time b) Increase the strength c) Increase the durability d) Reduce crack

Page 4: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

3. Maximum size of aggregate for general R.C.C works

A. 20mmB. 40mmC. 50mmD. 60mm

Page 5: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

4. The test is used to detect presence of uncombined lime in cement

A. FinenessB. SoundnessC. Setting time D. Compressive strength

Page 6: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

5. Soundness test is performed with the help of

A. Le-chatelier apparatus B. Autoclave testC. Vicat’s needleD. Normal consistency

Page 7: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

6. Compressive strength at the end of 3days should not be less than

A. 11.5 N/sq.mmB. 12.5 N/sq.mmC. 17.5 N/sq.mmD. 18.5 N/sq.mm

Page 8: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

7. Crushing strength of good concrete aggregate should be

A. MaximumB. MinimumC. AverageD. None of the above

Page 9: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

8. Weight of a single cement bag isA. 30 kg B. 40 kgC. 50 kgD. 60 kg

Page 10: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

9. The slump value of ordinary R.C.C works for beams and slabs is

A. 20 to 30mmB. 50 to 100mmC. 75 to 150mmD. 12 to 25mm

Page 11: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

10. Factor affecting workability of concrete:A. Water in the mixB. Maximum size of particleC. Ratio of coarse and fine aggregate D. All the above

Page 12: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

11. The size of coarse aggregate decreases, workability of concrete

A. Decrease B. IncreaseC. Doesn’t a matter D. None of the above

Page 13: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

12. Height of the slump cone isA. 10cmB. 20cmC. 30cmD. 40cm

Page 14: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

13. Specific gravity of cementA. 2.15B. 1C. 1.5D. 3.15

Page 15: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

14. The curing period of an ordinary Portland cement is

A. 3 to 7 daysB. 7 to 14daysC. 14 to 21 daysD. None of the above

Page 16: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

15. The entrained air in concrete A. Increase workabilityB. Decrease workabilityC. Increase strengthD. None of the above

Page 17: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

16. Workability of concrete can be improved by

A. More sand B. More cementC. More fine aggregateD. Fineness of coarse aggregate

Page 18: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

17. Workability of concrete can be improved by adding

A. IronB. SodiumC. Zinc D. Sulphur

Page 19: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

18. After casting, an ordinary cement concrete on drying

A. ShrinksB. Expands C. Remains unchanged D. Can expand or shrink

Page 20: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

19. Strength of concrete is directly proportional to

A. Cement water ratioB. Water cement ratioC. Sand cement ratio D. Water aggregate ratio

Page 21: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

20. The poison ratio for concrete ranges between

A. 0.10 and 0.15B. 0.15 and 0.25C. 0.25 and 0.30D. 0.30 and 0.35

Page 22: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

21. Slump test is a measure of A. Tensile strengthB. Compressive strengthC. Impact valueD. Consistency

Page 23: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

22. Durability of concrete is affected byA. Cider B. VinegarC. Alcohol D. Both (a) and (b)

Page 24: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

23. Light weight concrete is used in A. Heat resistance B. Air conditioning of buildingC. Non load bearing wallD. Reducing thickness

Page 25: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

24. ISI specified full strength of concrete after

A. 7daysB. 15daysC. 21daysD. 28days

Page 26: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

25. High temperature A. Increase the strength of concreteB. Decrease the strength of concreteC. No effect on the strength of concreteD. Low effect on the strength of concrete

Page 27: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

26. Early strength of cement is caused by A. Tri calcium silicate B. Di calcium silicateC. Tri calcium aluminateD. Gypsum

Page 28: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

27. Three main raw material used for Portland cement as

A. Lime stone, sandstone clayB. Lime, silica and clayC. Lime, clay and gypsumD. Silica, alumina, gypsum

Page 29: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

28. When water is added to cement A. Heat is generated B. Heat is absorbedC. Chemical reaction is started D. Impurities are washed out

Page 30: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

29. White cement is produced inA. Flyash kilnB. Coal kilnC. Oil fired kilnD. Electrical form kiln

Page 31: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

30.If cement is very fine, thenA. More is the surface areaB. More is the separation of water at top of

concreteC. The reaction with water gets retardedD. Less shrinkage and cracking of concrete

Page 32: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

31. Percentage void ration of cement isA. 50B. 40C. 30D. 20

Page 33: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

32. Specific gravity of portland cement isA. 3.50B. 3.30C. 3.15D. 3.00

Page 34: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

33. Vicat’s apparatus is used for A. Fineness testB. Consistency testC. Soundness testD. Final setting time

Page 35: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

34. Gypsum containA. Carbon dioxide and calciumB. Water and calcium suphateC. Hydrogen sulphide and calciumD. Lime

Page 36: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

35. Percentage of gypsum added in cement is

A. 0.25 B. 1C. 2D. 8

Page 37: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

36. Bulking of aggregate is due to A. Moisture content B. Absorbed waterC. Voids D. Less compaction

Page 38: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

37. Maximum bulking factor of sand is A. 1.00B. 1.10C. 1.2D. 1.4

Page 39: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

38. Increase in fineness modulus of aggregate indicates

A. Finer gradingB. Irregular grading C. Gap grading D. None of these

Page 40: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

39. Loss angeles machine is used to test aggregate for

A. Crushing strengthB. Abrasion resistanceC. Water absorptionD. None of these

Page 41: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

40. Factor safety of concrete is based on itsA. Yield stressB. Ultimate stressC. Both (a) and (b)D. None of these

Page 42: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

41. The portion of brick cut across its widthA. BatB. Half brickC. Both (a) and (b)D. None of these

Page 43: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

42. pH value of water for quality concrete shall not be less than

A. 2 B. 4C. 6D. 12

Page 44: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

43. Workability of cement concrete is more for

A. Big size aggregateB. Round shape aggregateC. Properly graded aggregateD. All of these

Page 45: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

44. Bulk density of aggregate is expressed as

A. Kg/litre B. Kg/m3

C. T/ m3

D. None of these

Page 46: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

45.Which of the following is not a mortar?A. Lime mortarB. Surki mortarC. Surki sand mortarD. Fire resistance mortar

Page 47: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

46. Segregation means separation of A. Water from aggregates and cementB. Fine aggregate from coarse aggregateC. Cement paste from coarse aggregateD. All of these

Page 48: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

47. Admixture in ordinary concrete is A. Expoxy resinB. Fly ashC. CaOD. Quartzite

Page 49: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

48. Normal curing period of lime mortar isA. 3daysB. 7daysC. 10daysD. 14days

Page 50: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

49. Compacting factor test of cement concrete determines its

A. StrengthB. PorosityC. Degree of compacting under loadsD. Workability

Page 51: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

50. Sand in mortar is needed forA. Decreasing the quantity of cementB. Reducing shrinkageC. Increasing the strengthD. All of these

Page 52: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

51. Curing of concrete at high temperature results in

A. Increase in ultimate strengthB. Cracking of concreteC. Decrease in ultimate strengthD. Early development of ultimate strength

Page 53: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

52. A good aggregate should beA. Colored B. Hard and durableC. Strong and chemically inertD. All of these

Page 54: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

53. Unit weight of cement in kg/ m3

A. 1600B. 2000C. 2400D. 2500

Page 55: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

54. Percentage of gypsum added in cement is

A. 0.25B. 1C. 2D. 8

Page 56: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

55. Gypsum is a A. Slow setting materialB. Quick setting material C. Setting agent D. Heat resisting material

Page 57: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

56. If sea water is used for preparing concrete, it

A. Will cause efflorescenceB. May corrode the reinforcementC. Will cause dampnessD. All of these

Page 58: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

57. Presence of entrained air in air results inA. Reduced bleeding B. Lower densityC. Decreased strength at all gasesD. All of these

Page 59: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

58. Expansion joints are provided if length of the concrete exceeds

A. 20mB. 45mC. 60mD. 75m

Page 60: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

59. Workability can be measured byA. K-slump testerB. Compaction factor testC. Vee-Bee testD. All of these

Page 61: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.

60. Size of fine aggregate should not exceed

A. 2.75mmB. 3.75mmC. 4.75mmD. 5.75mm

Page 62: 1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.