18.12.07 DRWS07 KEK Global Design Effort 1
2007 ILC Damping Rings Mini-Workshop 18-20 December, 2007
High Energy Accelerator Research Organization
KEK, Tsukuba, Japan
Marc RossGDE
18.12.07 DRWS07 KEK Global Design Effort 2
Role of R & D in the Engineering Design
Goals of the ED Phase:• Reduce cost and risk
– Technical• Facilitate governmental (and inter-
governmental) discussions– “…engineering design of the project in sufficient
technical detail that approval from all involved governments can be sought,…”
– Political
• Update the design, and the value estimate, and provide a project plan
18.12.07 DRWS07 KEK Global Design Effort 3
R & D Plan
• Prioritization based on expected ‘cost / benefit’
• Top-3 identified:– High Gradient cavities– CFS ‘value engineering’ ◄– Beam test facilities (7 each) ◄
• (ATF, CESR-TA, …)
• Expect to update this list in next 2 months, leading up to the Tohoku GDE meeting 03.03.2008
Impact on DR plans
18.12.07 DRWS07 KEK Global Design Effort 4
Prioritization of ED Phase R & D• Based on
– Direct ‘value estimate’ impact• Second e+ DR• CFS design
– Technical risk • Risk ‘register’ developed mid-2007
– Schedule• Which activities can provide guidance by the time EDR is
to be completed?– July 2010
• What do we really need?– What would be useful?
• What would be important as we get underway?
18.12.07 DRWS07 KEK Global Design Effort 5
ED Phase R & D Plan
• To be published 01.2008– Written by PM, with help from Group Leaders
(Wolski, Seryi,…) and regional/institutional managers
• Describes top-3, with schedule and etc• Lists resources hoped-for, worldwide
– Allows funding agency managers to compare• Describes management outline
– (not management detail for top-3)– (this should be developed in next 3 months)
18.12.07 DRWS07 KEK Global Design Effort 6
From R & D Plan – top 3: (1)
FY06 FY07 FY08 FY09 FY10 TOTAL FY11 FY12 Americas (actual) (actual) ED-P
Cavity orders 8 12 18 40 40 108 40 40 Total 'process and test' cycles 40 60 90 115 276 120 120
FY06 FY07 FY08 FY09 FY10 FY11 FY12 Asia (actual) (actual)
Cavity orders 8 7 15 25 15 59 39 39 Total 'process and test' cycles 21 45 75 45 152 117 117
2004-08* 2007 2008 2009 2010 2011 2012 Europe (actual) (actual) Cavity orders 60 838 898 Total 'process and test' cycles 14 15 30 100 109 354 354
Global totals Global totals - cavity fabrication 76 19 33 903 55 1065 79 79 Global totals - cavity tests 0 75 120 195 260 538 591 591
• Superconducting cavity testing:
18.12.07 DRWS07 KEK Global Design Effort 7
CFS Requirements and VE (2)
2008 2009N D J F M A M J J A S O N D J F M A M J J A S
2.1.1.1 - Final Criteria Development and Design EDR I Functional requirements template publicationFunctional requirements complete - Main linacFunctional requirements complete -BDS and IRFunctional requirements complete - Sources, DR, RTML
CFS - Update RDR Main Linac designCFS - Update RDR design other areas
2.2.2.1 Cost and Schedule Development - Baseline Value EngineeringProcess water value engineering - Main linacUnderground Space usage – Main linacAir Handling – all areasUnderground Space usage – non-linacSurface buildingsElectrical – all areasProject Schedule
18.12.07 DRWS07 KEK Global Design Effort 8
Beam Test Facility (3)
Test Facility Deliverable Date
ATF Generation of 1 pm-rad low emittance beam 2009
ATF2 35 nm beam size 2010
STF RF Unit demonstration 2011
FLASH Full 10mA, 1 GeV, high-repetition rate operation 2008
ILC-SLACESA Energy spectrometer, energy spread and collimator tests 2008
ILCTA-NML RF Unit demonstration 2012
CESR-TA Electron cloud mitigation tests 2010
18.12.07 DRWS07 KEK Global Design Effort 9
What will the above cost?
• Are these goals feasible• Group Leaders, WP coordinators must
answer– Answer must be supported by existing /
expected institutional and regional support
• What else is there that belongs on this list?– Kickers– Impedance
18.12.07 DRWS07 KEK Global Design Effort 10
For Tohoku GDE meeting:
• (from this workshop?)• Develop plan for 3 subtopics, including details
– Purpose, overall goal, how it fits in– Activities, Problems– Schedule– Milestones, deliverables– Resources– Priorities
• Review progress before GDE meeting
18.12.07 DRWS07 KEK Global Design Effort 11
UK groups – we support you:
• Excerpts from Barry’s letter to John Denham, Dec 15:
• (italics mcr)
• “A global effort has been organized toward these goals, involving an unprecedented collaboration of leading accelerator physicists from around the world working jointly on the R&D and design of this very challenging concept.”
18.12.07 DRWS07 KEK Global Design Effort 12
Emphasis on your leadership role
• “It is no accident that these UK accelerator physicists have risen to leadership roles in the ILC, based almost solely on their intellectual efforts. I strongly urge that the UK reconsider its role on the ILC, and especially in regard to preserving support for the intellectual effort that has been so effective.”
18.12.07 DRWS07 KEK Global Design Effort 13
and on ‘consensus – based’ design
• “Our plan in the ILC global design effort is to pursue the R&D to develop the concepts for the ILC, so that it will be possible to propose such a machine in the future. Whenever the ILC is proposed, it will have uniquely been created as the product of a combined worldwide collaboration of accelerator scientists and particle physicists.”
• These are the marks of a multi-lateral collaboration with genuine international support.