STOP!STOP!
16587-FL
Call Us First!DO NOT RETURN TO STORE.
For immediate help with assembly or product information
Call our toll-free number:
1-800-577-9663
or email:
Our staff is ready to provide assistance.
April through October M - F 8:00 AM to 6:00 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST
(This page intentionally left blank.)
BEFORE YOU BEGIN
IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
- CUSTOMER SERVICE -
Call: 1-800-577-9663 email: [email protected]
requirements before building
Contact our Customer Service Team if engineered drawings are needed to pull local permits.
To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are listed on page 8
Inventory all parts listed on pages 4-6. Contact our Customer Service Team if any parts are missing or damaged.
You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.
KEEP THIS MANUAL FOR FUTURE REFERENCE
ASSEMBLY MANUAL
ACTUAL FLOOR SIZE IS VALENCIA 10' x 8' (305 x 244 cm)VALUE SERIESA Backyard Products Company
BEGIN¸
TOOLS
Safety! Always use approved safety glasses during assembly.
OptionalRequired
HELPFUL REMINDER SYMBOLS
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
= Assistance Required; two or more people.
= Ensure squareness.
= Important required step or operation.
= Helpful assembly hint.
= Mark part with pencil.
= Beginning of steps for assembly or installation.
❑ Gloves
❑ Clamps
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no way B C
❑ Safety Glasses
❑ Tape Measure
❑ Paint Tools
❑
❑ Wood Glue
❑ Caulk Gun❑ Hammer
❑
❑ Pencil
❑ PhillipsScrewdriver
❑
❑❑
❑ Nail Pouch
❑
❑ Nail Gun
❑ Square or
❑ Shingle Blades
A B C
❑ Utility Knife
3
COMPLETING YOUR SHED You will need these additional materials:
OPTIONAL MATERIALS
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
3-TAB SHINGLES ...........................................5 Bundles
........................................2 Gallons
............................................................2 Tubes
IMPORTANT!
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
4
RS RS
FLO
OR Treated lumber is stamped:
TREATED
TREATED
TREATED
Nominal Board Size Actual Size
PARTS IDENTIFICATION AND SIZESDO
ORR
OO
FTR
IMW
ALLS
stamped on some parts.
PARTS LISTINVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.
OO
GUSSET
CT
CORNER TRIM
BE
CGA
CJA
CCA
CHA
CBA
UU
TP
STL
CDA
UM
CIA
3/4"(1,9 cm)
measurement
GAA
1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)
2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)
2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)
1" x 3".................3/4" x 2-1/2" (1,9 x 6,3 cm)
YA
ROOF PANELS
WALL PANEL & DOOR PARTS LIST
NOTE: Panel parts are not stamped
RIGHT DOOR
NOTES
6
BOXES
BOXES
FLOOR PANELS (Not Included)
quantities shown below.
NOTES
NAIL BOXES
DOOR HARDWARE (Not actual size)
FASTENER/HARDWARE BAG
METAL THRESHOLD
NOTES
8
BUILDING ANATOMY
1
2
3
4
5
6
1
3
2
5
64
FLOOR LEVELING OPTIONS
Measurements to
shingles in direct contact with ground.
If you are building your shed on a concrete foundation see the following page.
CONCRETE
Gravel
Asphalt Shingles
GravelGravel
Shingle
Shingle material locations.
A
BC
4"(10,2 cm)
3-1/2"(8,9 cm)
DOOR
Caulk
MUST be treated lumber.
MUST be treated lumber.
AActual Size B C
CONCRETE FOUNDATION
on a concrete slab refer to the diagram below.
Hint: Use treated lumber in
.
NOTES
Treated Sill Plate
sill plate andconcrete.
DOOR
5
LEVEL AND SQUARE FLOOR FRAME
BEGIN
1̧
2
3
4
Check for frame squareness by measuring diagonally across corners. If the
using one fastener at ends of each runner. Move to the opposite end of the frame.
sure the frame remains square .
FLOOR FRAME
93"(236,2 cm)
Center on marks
Center onmarks
SEAM
SEAM
96"(243,8 cm)
116-1/2"(295,9 cm)
96"(243,8 cm)
92-1/2"(235 cm)
72"(182,9 cm)
48"(121,9 cm)
24"(61 cm)
24"(61 cm)
20-1/2"(52,1 cm)
1-1/2”(3,8 cm)
DOOR
3
seams as shown.
end of boards.
FLOOR FRAME
StampTREATED
2
BEGIN
1̧
HINT:
TREATED
TREATED
TREATED
Nails
Nails
NOTE THISMEASUREMENT
DOOR
48"(121,9 cm)
3/4"(1,9 cm)
96"(243,8 cm)
6" (15,2 cm)edges of panel
12" (30,5 cm)inside panel
20-1/2"(52,1 cm)
DOOR
Grid linesUP opposite
corner
Seams
Nails
Nails
FLOOR
.2
BEGIN
1̧1
3
4
.
NOTE THISMEASUREMENT
48"(121,9 cm)
20-1/2"(52,1 cm)
96"(243,8 cm)
6"(15,2 cm)
12"(30,5 cm)
DOOR
7
5
6
Grid linesUP
FLOOR PANELS
HINT:
IMPORTANT!
PARTS REQUIRED:
SIDE WALL FRAMES
2
BEGIN
1̧HINT:
TP
TP
Nails
TP
UM
Repeat steps 1-2 to build second side wall frame.3
GAUGE
SIDE WALL PANELS
3
2
Place panel onto side frame with primed side up as shown. BEGIN
1̧1
Nails
Primedside up
SIDE WALL PANELS
4
Repeat steps 1-4 to build second side wall.5
Nails
Nails
Primedside up
Nails
BACK WALL FRAME
CDA
CDA
2 Attach UM
at seams as shown.
BEGIN
1̧
HINT:
SEAM
Nails
CDA
UM
46-1/8"(117,2 cm)
3/4"(1,9 cm)
3/4"(1,9 cm)
6"(15,2 cm)
12"(30,5 cm)
4
5
3
BEGIN HERE
BACK WALL
Primed side up
2 Nails
GAUGE
.
apart inside panel.
Move to the opposite end. Using the long edge of the panel as a lever move the
.
2 Nails
23-7/8"(60,6 cm)
3/4"(1,9 cm)
6"(15,2 cm)
46-1/8"(117,2 cm)
6"(15,2 cm)
12"(30,5 cm)
BACK WALL
6shown with primed side facing up .
shown with primed side facing up.
7
8
9
Primedside up
Primedside up
GAUGE
FRONT WALL FRAME
STL UU
CGACHA
2 Attach UM
at seam as shown.
BEGIN
1̧
HINT:
wall frame.3
Maintain dimensionsMaintain
dimensions
CGA
UU
STL
UM
CHA
"panels onto wall frame as shown with primed sides up.
"
3
4
2
1BEGIN
Use OO
FRONT WALL
Center
OO
5
Maintain
measurements
Screws
OO
Primedside up
Primedside up
Place CCA
3
4
2
1BEGIN
.
Proceed to standing your walls.
FRONT WALL
44444
CCA
Nails
CCA
BACK / FRONT WALL INSTALLATION
Nails
YA
.
2
3
Repeat steps 1-3 to stand your wall.
Assistance required to hold wall upright
4
or use rafter YA as a temporary brace.
BEGIN
1
Temporary brace
YA
SIDE WALL INSTALLATION
Screw
iNaili
iNaili
5
.
.
Ensure the measurement between the panel edges are the same along the entire length. Then .
.
Repeat Steps 1-4 for opposite wall.Remove rafter temporary braces
1
2
3
4
BEGIN¸
Nails
Same Measurement
iNaili
DO
OR
WALL DOUBLERS
Nails
2
1BEGIN
as shown.
apart
CIA CJA
CJA
CIA
CJA
CIA
Fit base of Rafters in cornersof back wall
RAFTERS
Gusset
7
STEPS 2-4 to attach second gusset to other side.
Repeat STEPS 2-5 to build three additional rafter assemblies. Remove CBA.
4
5
6
3
2
Glue
GlueCenter
Gusset
Use CBA as
Nails
You will build assemblies.
Place two rafter halves in the corner of back and side wall and CBA. Rafters contact at peak.
Position and square CBAscrews as shown.
BEGIN
1̧
YAYA
Contact at peak
HINT:
help assemble rafters!
CBA
YA
24”(61 cm)
24”(61 cm)
24”(61 cm)
22-5/8”(57,5 cm)
22-5/8”(57,5 cm)
Mark doubler to measurements shown.
connection .
1
2
3
BEGIN
RAFTER INSTALLATION
Screws
Dimensions are to
30
GABLES
2
3
4
1BEGIN
Secure center gable panel to two CBA
Align top gable panel centered on middle gable panel and secure using
Measure and mark center gable panel as shownRepeat Steps 1 - 3 to build second gable.
Primed side UP
Primed side UP
Mark center on top and bottom of panel
Primed side UP
Primed side UP
CBA
CBA
CBA
GABLE INSTALLATION
2
3gable panel assemblies.
1BEGIN
Center gable assembly on side wall using mark. Gable connectors CBAto top of frame.
.
Repeat STEPS 1-2 at opposite side.
Nails
Screws
CBA
CBA
GABLE TRIM INSTALLATION
Screws
Install right-front gable trim as shown.
apart. Screw through panels into gable trim.
Repeat above steps to install right-rear gable trim as shown.
2
3
Repeat above steps to secure the left gable trim .
4
5
GABLE TRIM
1BEGIN
Mark
33
FASCIA TRIM
CT
BE
.BEGIN
1̧
2
3
Repeat process on opposite side.
CT
CT
BE
BE
apart
Angle top nailsto hit doubler
34
ROOF PANELS
2
BEGIN
1̧
Move to the opposite end. Using the long edge of the panel as a
the peak and there is
to the gable trim . You may need to move your
measurement. Secure panel with
measurement on the rafter the peak .
the corners.
GableTrim
Nails
Nails
at peak
at peak
Block
ROOF PANELS
at peak
Keep spacing between the center of the rafters at the lower edge of the
nail into each rafter . Move to the top of the panel and keep spacing between the center of the
nail into each rafter .
measurement .
the upper panels
trim .
Repeat process to attach panels on the opposite side.
3
4
seams
36
3
side wall frame and attach with
top plate and doubler
2
BEGIN
1̧
Glue
DOOR SUPPORT
HINT:
attached to doors.
BEGIN
1̧1
2
3
Attach temporary supports OOTighten secuely.
Attach temporary supports GAATighten secuely.
DOORS
OO
GAA
Make sure spacer is attached.
Tighten screws
BLACK BLACK
Slight Offset Slight Offset
securely.
OFFSET
(4) 3" (7,6 cm) Screws
Screws 1-1/4" (3,2 cm)
Bottom edges Flush.
NOTE: Screw hole will be used later.
5/8"(1,6 cm)3/8"
(1 cm)
3/8" (1 cm)
5/8"(1,6 cm)
OFFSET
GREEN RED
3/4" (1,9 cm)
23-1/2" (59,7 cm)
23-1/2" (59,7 cm)
3/4" (1,9 cm)
OO
GAA
38
OO
Flushagainst wall panels.
Fig. AOO
DOORS
Screw
4
Measure and mark center of door opening. Center doors on mark as shown .5
6
7
Remove temporary supports and ledger board. Check doors open properly.
8
Attach temporary support OO.
.
top plate and
and stud.
on mark.
OO
Center
CENTER
Fig. B
Two Screws
Door Trim
Hinge Board
Fig. A
Door Panel
4
trim
. Use two screws at seams.
3
DOOR TRIM & THRESHOLD
coating screws
Screws
2
BEGIN
1
METAL THRESHOLD
40
DOOR WEATHERSTRIP
OO
Screws
Secure OO OO 2
Center OO in door
Screws
OO
OO vertically on the left door in the door opening OOthe door trim
BEGIN
1
5
On right door center OO vertically in door opening . OO will offset the .
3
Secure OO OO 4
Place bolts onto OOBolt is open when loop is contacting base .
Mark and pre-drill holes for screws.
to slide into.
Place bolts onto OOis open when loop is contacting base .
Mark and pre-drill holes for screws.
to slide into.
your barrel bolts.
DOOR
DOOR HARDWARE
2
3
4
BEGIN
1
HINT: With door
and tap with hammer to leave a mark in wood for drilling.
OO
OO
8
PRE-DRILL
PRE-DRILL
LOCATE AND PRE-DRILL HOLES
OPEN POSITION
OPEN POSITION
Loop contacts base.
Loop contacts base.
in open position.
BEGIN
1
SetScrew
SIDE VIEW
RIGHT DOOR.
Pre-drill and
Drill-through.
Drill Bits
4
3
Measure and mark location of hole on outside of right door as shown
Keep drilled hole squareto trim to avoid breaking
Attach inside handle and secure with set screw as shown.
DOOR HARDWARE
43
2
3
COLLAR TIES
BEGIN
1̧
Nails
Nails
44
apart
Place parts under front and back eave trim and under side gable panel cutouts as shown.
BEGIN
1̧
2
3
Repeat on each corner of shed.
CORNER TRIM
panel cutout eave trim
1/4"(0,6 cm)
3-1/2" (8,9 cm)
3-1/2" (8,9 cm)
4
BEGIN
1̧You will build two shutters the same.
both sides
both sides
2
3 Repeat steps to build your second shutter.
Primed side
WINDOW SHUTTERS
46
WINDOW SHUTTERS
BEGIN
1̧ Seal grade caulk.
2
3
Attach screws as shown.
Mark center of window frame as shown.
HINT: Caulk behind frame near edge before installing.
WINDOW SHUTTERS
CENTER into wall frame
from inside
Mark
Mark
7
shown.
5
6
4
Nail into wall frame inside.
X
Repeat steps to attach shutter on opposite side.
nails. Nail into window frame inside.
window and shutters.
48
and all around the door trim.
be easily overlooked that must be painted:
Paint under door trim to match shed color. Note:
PAINT & CAULK
ROOF FELT
DRIP EDGE
Snip bottom side of drip edge andbend over to other side of roof.
under roof felt on eave side .
to trim.
Drip
1"(2,5 cm)
NAILS
Sealing Strip 1"(2,5 cm)
1/2"(1,3 cm)
SHINGLES
NOTE:
BEGIN
1
TABS UP
SHEDSHED
SHINGLE NAIL PATTERNNotchNotch
SHINGLES continued...
22
SHEDRIGHT SIDE
Notch- or -
Notch
Continue installing rows of shingles by staggering at front.
4
stagger each row. 3
RIGHT SIDE SHED
SHED
Notch
Notch
9
Using your shingle hooked blade carefully cut shingles along chalk line.
5
6
7
8
SHINGLES continued...
or less.
CUT
3
SHINGLES - RIDGE CAP
Note:
Cut shingles into THREE pieces. Hint:
2
BEGIN
1
SHED
24 to 26Pieces
SHINGLES - RIDGE CAPcontinued...
Continue installing ridge cap to back of roof.4
5
6
7
8
Cap
WARRANTYBackyard Storage Solutions, LLC warrants the following:1. Every product is warranted from defects in workmanship and manufacturing for one year.2. All hardware and metal components are warranted for two years.3. Trim is warranted for 10 years.4. Waferboard siding and sheathing is warranted for two years.5. SmartSide™ siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings.6. Timber series buildings’ siding and trim are warranted for 10 years.7. Solar Shed windows are warranted for 1 year.8. Cedar lumber is warranted for 15 years.9. Cedar doors and Cedar Garden Center are warranted for 10 years.10. Metal roof is warranted for 25 years.
Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC paythe cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on anaffected part, it will be prorated from the date of purchase.
CONDITIONSThe warranty is effective only when:1. The unit has been erected in accordance with the assembly instructions.2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.3. The failure occurs when the unit is owned by the original purchaser.4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and notification
of the failure in writing within the warranty period specified above.5. Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification
to inspect and verify the failure prior to commencement of any repair work.
REQUIREMENTSStorage Buildings & PlayhousesTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly;
above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of SmartSide™ andwaferboard siding to include all exterior walls and all sides and all edges of doors.
Gazebos, Pergolas & Timber BuildingsTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of theexposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative, an exterior oil-basedsemi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as neededthereafter to maintain your warranty.
Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. Theminimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the groundwhen building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard
events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (whichleads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred
to construct your unit. This warranty gives you certain specific rights that vary from state to state.
CLAIM PROCEDURETo make a claim under this warranty, you can either call 1-888-827-9056 or prepare a letter. Please have ready the information below whenyou call or include the information when writing:1. The model and size of the product.2. A list of the part(s) for which the claim is made.3. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice.4. Run code, as listed on the yellow warranty card enclosed in the product package.
Mail the above information to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162
Limited ConditionalWarranty *
*WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.IMPORTANT: This is your warranty certificate.Please complete and mail your warranty card to properly validate your warranty.
Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by
eventually
caulk