1452 Truss, Type C & D Installation Inspection Report of Transportation 1452 (0 /19) TRUSS, TYPE C &...
Transcript of 1452 Truss, Type C & D Installation Inspection Report of Transportation 1452 (0 /19) TRUSS, TYPE C &...
![Page 1: 1452 Truss, Type C & D Installation Inspection Report of Transportation 1452 (0 /19) TRUSS, TYPE C & D INSTALLATION INSPECTION REPORT To be completed in conjunction with Truss, Type](https://reader035.fdocuments.us/reader035/viewer/2022062415/5fc7394985006d09642f2fd2/html5/thumbnails/1.jpg)
PAGE 1 OF 1Michigan Department
of Transportation 1452 (05/19)
TRUSS, TYPE C & DINSTALLATION INSPECTION REPORT
To be completed in conjunction with Truss, Type C & D InstallationInspection Procedure and submitted to the Structural Fabrication Unit.
File Naming Convention: 1452 SN-CS-JN Date.pdf
GENERAL INFORMATIONSTRUCTURE # CONTROL SECTION JOB NUMBER DATE
REGION COUNTY ROUTE
LOCATION DESCRIPTION
GPS LAT______________________________ __________ ○
GPS LONG__________________________________ ____ ○
STRUCTURE INFORMATION
TRUSSSTANDARD PLAN #
SIGN CONNECTION STANDARD PLAN #
FOUNDATION STANDARD PLAN #
SIGN LEGEND
VISUAL INSPECTION
CHORD TO UPRIGHT CONNECTIONWELDSBOLTS
STRUCTURE BASE & FOUNDATIONWELDSFOUNDATION
CHORD TO CHORD CONNECTION BOLTSANCHOR BOLT ID # LH
RH
ANCHOR BOLT INSPECTION (LH/RH)1 2 3 4 5 6 7 8
SOUNDINGANCHOR NUTS
1 2 3 4 5 6 7 8ANCHOR BOLTPROJECTION (P)
1 2 3 4 5 6 7 8STAND-OFFDISTANCE (S)
1 2 3 4 5 6 7 8ULTRASONICTESTING
REMARKS
INSPECTOR COMPANY