28.09.2015 bcm and mongolia's education and capabilities agenda
14.10.2010 Privatizing Mongolia's state owned assets and what this means for investors, D....
-
Upload
the-business-council-of-mongolia -
Category
Business
-
view
137 -
download
0
Transcript of 14.10.2010 Privatizing Mongolia's state owned assets and what this means for investors, D....
D. BailikhuuSPC of Mongolia
� Total State Property- 4,1 trillion ₮
� SOE’s–72
� Government institution – 934
� State share of SOE’s to sell through the Stock exchange
� To issue additional share and IPO
� To conclude a Concession Agreement
� Mainly, To attract private investment by PPP
� Conditions:◦ The evaluation of coal resources by the JORC standard◦ Mining License should be assessed in terms of property◦ Power plant and Coal liquids projects are needed to be
studied by the professionals, then it can be implemented
• Methods:◦ To issue additional shares up to 51 percent of shares
owned by the state
� Conditions:◦ New investment for technological innovation ◦ To increase the heating capacity ◦ To reduce the cost
� Methods:� Concession agreement�
� Conditions:◦ To extend service framework ◦ Equipment and Technological Innovation◦ To reduce cost ,
� Methods:◦Open bid tender
�Mongolian airline /MIAT/-Management contract
� “Mongolian stock exchange”/MSE/– Management contract
� State offers own share to the Korean telecom on contractual basis
� Should refuse, State goes whit use the privatization through open bid
� 15 strategic deposits
� To bundle shares owned by State by type of minerals
� To establish new Joint Stock company
� To trade certain percentage of state shares at domestic and international stock markets
.Tavan Tolgoi 6.4 bn t coal
Nariin Sukhait 125.5 mn t coal
Baganuur 600.0 mn t coal
Shivee Ovoo 646.2 mn t coal
Mardai 0.001 t at 0.119% O3U8
Dornod 0.029 mn t at 0.175% O3U8
Gurvan Bulag 0.016 mn t at 0.152% O3U8
Tomortei 229.3 mn t at 51.15% Fe
Oyu Tolgoi 2.7 bn t of ore; 25.4 mn t of copper; 1,028 t of gold
TsagaanSuvarga
10.6 mn t of oxides at 0.42% Cu/ 0.011% Mo; 240.1 mn t sulphidesat 0.53% Cu/0.018% Mo
Erdenet 1.2 bn t at 0.51% Cu/0.012% Mo
Burenkhaan 192.2 mn t at 21.1% P2O5
Boroo 0.025 mn t at 1.6g/t Au
TomorteinOvoo
7.7 mn t at 11.5% Zn
Asgat
Metallurgical coal
Metallurgical coal
Lignite coal
Lignite coal
Uranium
Uranium
Uranium
Iron
Copper, gold
Copper, molybdenum
Copper,molybdenum
Phosphor
Gold, ore
Zinc
Silver 6.4 mn t at 351.08g/t Ag
Reserves and qualityDeposit MineralsStage of development, start date, output p.a. Ownership structure
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
100% Erdenes
100% private (SouthgobiSands, MAK-Qinhua JV)
75% SPC, 25% locally listed
90% SPC, 10% locally listed (ope-rational part; rest by Erdenes)
100% private company
21% SPC, 21% Russian Gov., 58% Khan Resources
100% private Chinese comp.
100% Darkhan Metallurgical factory (100% owned by SPC)
34% Erdenes, 66% Ivanhoe Mines
51% SPC, 49% Russian Gov.
100% MAK (private company)
100% mult. private companies
100% Tsairtminerals (private JV)
100% Mongolrostsvetmet (50% SPC, 50% Russian Gov.)
100% Boroo Gold
Partial production, ramp-up in 2011, 15-30 mn t
Feasibility study
Production, 2.8 mn t
Production, 2.0 mn t
Feasibility study
Feasibility study
Feasibility study
Feasibility study
Development, 2013
Feasibility study
Production, 27.1 mn t of ore
Feasibility study
Close to depletion
Production, 0.07 mn t of zinc
Feasibility study
Estimated capex
USD 2.2 bn (1.6 bn for first 3 years)
N/A
–
USD 4 bn for power plant
USD 200 mn for all three
USD 100 mn
USD 12 bn (5 for first 5 years)
USD 200 mn
(USD 150 mn for downstream plant)
N/A
–
–
USD 47 mn
SOURCE: Worley Parsons; Ministry of Mineral Resource and Energy; State Property Committee
Tavan tolgoi Coal Mine
SPC
Erdenes MGL
Erdenes TT
citizens
Mongolian Mongolian Mongolian Mongolian private private private private companiescompaniescompaniescompanies
Investor Operator company
Marketing company
Mining contractPSH contract
Coal assets company
SPC
Baga nuur600 mn t
Shvee ovoo530 mn t
Nariin Suhait
130 mn tttt
Power plant
300MW
Coal mine 20mn t
Coal liquifation factory
Power plant
4800MW
Coal mine
20mil t
Electricity transmision
line 600KB
Other coal
deposits
Erdenet OT45m tn
Tsagaan suvragaAsgat
Copper and Silver
company
SPC
Copper smelting factory
SPC
Temurtei240 m tn
Temur tolgoi25m tn
Darhan metallurgical plant
zinc
Iron Assetscompany
CAU45t tn Mardai
SPC
MonAtom
3 Bulag10t tn
Coge gobi10t tn
3 saihan10t tn
Cameco
Rail way1000 km
Auto road270 km
Power Plant600Mw
Water Pipe Line 70km
220kvLine 500 km
� Corporate Governance for SOE◦ Member BoD◦ Subcommittee of BoD
� Balanced Score Card � Audit◦ E&Y◦ KPMG◦ PWH
� Disclose� IAS� IPO� Independent regulator for infrastructure � Price deregulation for infrastructure