Route I -10 Project Description SOUTHWEST REGION, MOBILE AREA SIGN REPLACEMENT ON I-10, I-65 AND I-165 Type of Work SIGN REHABILITATION Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100055398 IM MR15 (901) CONSTRUCTION SIGN REHABILITATION 2021 $5,601 $622 $6,224 TOTAL COST: $5,601 $622 $6,224 Route NA- Project Description CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 9 CAMERAS, FIBER OPTIC CABLE, MESSAGE SIGNS, AND VEHICLE DETECTION DEVICES. I-65 FROM FINLEY BLVD N. TO FIELDSTOWN RD, AND US-78 FROM I-59 NORTH/WEST TO GRAYSVILLE. Type of Work UNCLASSIFIED Project Length in Miles 16.500 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100029543 CMAQ 9802 () PRELIMINARY ENGINEERING UNCLASSIFIED 2020 $460 $115 $575 TOTAL COST: $460 $115 $575 2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023 1 of 305 HIGHWAY PROJECTS - AREAWIDE FIVE YEAR PLAN: 2019 - Original FIVE YEAR PLAN FOR PLAN 2019

Transcript of 1/30/2019 ALABAMA DEPARTMENT OF...

Route I -10 ProjectDescription

SOUTHWEST REGION, MOBILE AREA SIGN REPLACEMENT ON I-10, I-65 AND I-165

Type of Work SIGN REHABILITATION

Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055398 IM MR15 (901) CONSTRUCTION

SIGN REHABILITATION

2021 $5,601 $622 $6,224

TOTAL COST: $5,601 $622 $6,224

Route NA- ProjectDescription

CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 9 CAMERAS, FIBER OPTIC CABLE, MESSAGE SIGNS, AND VEHICLE DETECTION DEVICES. I-65 FROM FINLEY BLVD N. TO FIELDSTOWN RD, AND US-78 FROM I-59 NORTH/WEST TO GRAYSVILLE.

Type of Work UNCLASSIFIED

Project Length in Miles 16.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029543 CMAQ 9802 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $460 $115 $575

TOTAL COST: $460 $115 $575

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

1 of 305

HIGHWAY PROJECTS - AREAWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 3A ELECTRONICS AND EQUIPMENT TO BE INSTALLED IN THE TMC.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032142 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $2,117 $529 $2,647

TOTAL COST: $2,117 $529 $2,647

Route NA- ProjectDescription

CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 9 CAMERAS, FIBER OPTIC CABLE, MESSAGE SIGNS, AND VEHICLE DETECTION DEVICES. I-65 FROM FINLEY BLVD N. TO FIELDSTOWN RD, AND US-78 FROM I-59 NORTH/WEST TO GRAYSVILLE.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032145 CMAQ 9802 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $465 $116 $581

100032143 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $4,948 $1,237 $6,185

TOTAL COST: $5,413 $1,353 $6,766

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

2 of 305

HIGHWAY PROJECTS - AREAWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 8 CAMERAS, FIBER OPTIC CABLE, MESSAGE SIGNS, AND VEHICLE DETECTION DEVICES. I-20/59 FR ARKADELPHIA RD SOUTHWEST TO SOUTH OF I-459.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032146 CMAQ 9802 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $460 $115 $575

100032144 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $5,466 $1,366 $6,832

TOTAL COST: $5,926 $1,482 $7,408

Route NA- ProjectDescription

ALDOT CMS / IMS MARKETING ACTIVITY, PHASE 2 PROJECT IS IN TIP / STIP BREAKOUT OF PROJECT 8C-009-802-PX0-UNC.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029548 CMAQ 9802 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $230 $58 $288

TOTAL COST: $230 $58 $288

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

3 of 305

HIGHWAY PROJECTS - AREAWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CONGESTION MANAGEMENT DIVERSION ROUTE, SPONSOR: ALDOT.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029530 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $1,277 $319 $1,597

TOTAL COST: $1,277 $319 $1,597

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

4 of 305

HIGHWAY PROJECTS - AREAWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-75 ProjectDescription

WIDEN AND RESURFACE CR-75 (MCQUEEN SMITH RD) FROM SR-3 (US-31, S MEMORIAL DR) TO CR-2 (COBBS FORD RD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100050962 STPMN 7812 (600) UTILITIES

ADDITIONAL ROADWAY LANES

2020 $51 $13 $64

100050963 STPMN 7812 (600) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $8,388 $2,097 $10,485

TOTAL COST: $8,439 $2,110 $10,549

Route CR-85 ProjectDescription

WIDEN AND RESURFACE CR-85 FROM SR-3 (US-31) TO CR-40

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 4.245 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064374 STPAA 0118 (253) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $806 $202 $1,008

TOTAL COST: $806 $202 $1,008

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

5 of 305

HIGHWAY PROJECTS - AUTAUGA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

DRAINAGE IMPROVEMENTS ON SOUTH NORTHINGTON ST. (LINK # 5162) , FROM DOSTER STREET TO NORTH OF THIRD STREET SOUTH OF PRATTVILLE

Type of Work DRAINAGE CORRECTION

Project Length in Miles 0.100 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039970 STPMN 7809 (600) CONSTRUCTION

DRAINAGE CORRECTION

2020 $1,331 $333 $1,664

TOTAL COST: $1,331 $333 $1,664

Route CR-NA ProjectDescription

RESURFACING ON MARTIN LUTHER KING JR DRIVE FROM 6TH STREET TO THE PRATTVILLE CITY LIMITS AND ON UPPER KINGSTON ROAD FROM 6TH STREET TO THE PRATTVILLE CITY LIMITS

Type of Work RESURFACING

Project Length in Miles 2.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057524 STPAA 0118 () CONSTRUCTION

RESURFACING

2019 $346 $87 $433

TOTAL COST: $346 $87 $433

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

6 of 305

HIGHWAY PROJECTS - AUTAUGA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING ON UPPER KINGSTON ROAD FROM WEST 6TH STREET NORTH TO MOSES ROAD (SITE 1) AND ON GARDNER ROAD FROM UPPER KINGSTON ROAD TO MARTIN LUTHER KING JR DRIVE (SITE 2)

Type of Work RESURFACING

Project Length in Miles 2.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063684 STPMN 0115 () PRELIMINARY ENGINEERING

RESURFACING

2019 $36 $9 $45

100063685 STPMN 0115 () CONSTRUCTION

RESURFACING

2020 $320 $80 $400

TOTAL COST: $356 $89 $445

Route CR-NA ProjectDescription

ADDITIONAL TURN LANES AT INTERSECTIONS ON FAIRVIEW AVENUE BETWEEN SR-3 (US-31) AND JASMINE TRAIL

Type of Work TURN LANES

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068602 STPMN 0115 () PRELIMINARY ENGINEERING

TURN LANES 2020 $196 $49 $245

100063689 STPMN 0115 () CONSTRUCTION

TURN LANES 2021 $2,400 $600 $3,000

TOTAL COST: $2,596 $649 $3,245

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

7 of 305

HIGHWAY PROJECTS - AUTAUGA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

RESURFACE AND SAFETY SIDE SLOPE IMPROVEMENTS ON I-65 FROM 1 MILE SOUTH CR-61 OVERPASS TO CHILTON COUNTY LINE

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 8.020 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055206 IM-HSIP I065 (472) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2019 $15,570 $1,730 $17,300

TOTAL COST: $15,570 $1,730 $17,300

Route SR-3 ProjectDescription

ADD TURN LANES AT INTERSECTIONS ON SR-3 (US-31) BETWEEN 6TH STREET (PRATTVILLE) NORTH TO I-65

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063687 STPMN 0115 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $2,000 $500 $2,500

TOTAL COST: $2,000 $500 $2,500

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

8 of 305

HIGHWAY PROJECTS - AUTAUGA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-6 ProjectDescription

US-82 FROM SR-14 TO US-31 IN PRATTVILLE - ADDITIONAL LANES

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.740 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100004463 NH 0006 (504) UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2023 $1,733 $433 $2,166

100004425 NHF 0006 (504) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2023 $13,417 $3,354 $16,772

TOTAL COST: $15,150 $3,787 $18,937

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

9 of 305

HIGHWAY PROJECTS - AUTAUGA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-99 ProjectDescription

ADD PAVED SHOULDERS ON CR-99 FROM CARRIER DRIVE TO SPANISH COVE DRIVE

Type of Work SHOULDER WIDENING

Project Length in Miles 1.640 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063404 STPLL 0219 () CONSTRUCTION

SHOULDER WIDENING

2023 $408 $102 $510

TOTAL COST: $408 $102 $510

Route CR-99 ProjectDescription

ADD PAVED SHOULDERS ON CR-99 FROM CR-91 TO CARRIER DRIVE

Type of Work SHOULDER PAVING

Project Length in Miles 0.000 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063634 STPLL 0215 () PRELIMINARY ENGINEERING

SHOULDER PAVING

2020 $20 $5 $25

TOTAL COST: $20 $5 $25

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

10 of 305

HIGHWAY PROJECTS - BALDWIN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -10 ProjectDescription

I-10 BAYWAY WIDENING FROM MOBILE COUNTY LINE TO EAST OF SR-16 (US-90) AT SPANISH FORT

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 7.591 Urban Area EASTERN SHORE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062415 NHP3 I010 () UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $874 $218 $1,092

100062416 NHP3 I010 () CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $651,248 $162,812

$814,060

TOTAL COST: $652,122 $163,030

$815,152

Route I -10 ProjectDescription

I-10 INTERCHANGE AT CR-68 WITH CONNECTOR TO (983) BALDWIN BEACH EXPRESS

Type of Work LIGHTING

Project Length in Miles 2.000 Urban Area EASTERN SHORE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055054 IM I010 () CONSTRUCTION

LIGHTING 2021 $931 $103 $1,034

TOTAL COST: $931 $103 $1,034

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

11 of 305

HIGHWAY PROJECTS - BALDWIN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -10 ProjectDescription

WIDEN I-10 FROM EAST END OF BAYWAY BRIDGE TO 0.5 MILE EAST OF SR-181

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 4.072 Urban Area EASTERN SHORE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055816 NHP3 I010 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $13,882 $3,470 $17,352

TOTAL COST: $13,882 $3,470 $17,352

Route I -10 ProjectDescription

RESURFACING ON I-10 FROM SR-59 TO 0.3 MILE EAST OF CR-64 (WILCOX ROAD)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 9.461 Urban Area EASTERN SHORE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067472 IM I010 (343) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $3,218 $358 $3,576

TOTAL COST: $3,218 $358 $3,576

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

12 of 305

HIGHWAY PROJECTS - BALDWIN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-180 ProjectDescription

SR-180 NEW LOCATION AND WIDENING FROM SR-59 IN GULF SHORES TO FOLEY BEACH EXPRESS

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 4.740 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040566 STPAA 0180 () RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2021 $3,358 $839 $4,197

100040567 STPAA 0180 () UTILITIES

GRADE, DRAIN, BASE AND PAVE

2021 $1,096 $274 $1,370

TOTAL COST: $4,453 $1,113 $5,567

Route SR-180 ProjectDescription

SR-180 WIDENING FR FOLEY BEACH EXPRESS TO SR-161 IN ORANGE BEACH

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.869 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040588 STPAA 0180 (501) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $1,014 $253 $1,267

TOTAL COST: $1,014 $253 $1,267

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

13 of 305

HIGHWAY PROJECTS - BALDWIN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-181 ProjectDescription

SR-181, ADDITIONAL LANES FROM SR-42 (US-98) TO CR-32

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 3.630 Urban Area EASTERN SHORE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044781 STPAA 0181 () RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2023 $4,174 $1,044 $5,218

100044782 STPAA 0181 () UTILITIES

GRADE, DRAIN, BASE AND PAVE

2023 $2,722 $680 $3,402

TOTAL COST: $6,896 $1,724 $8,620

Route SR-181 ProjectDescription

SR-181, ADDITIONAL LANES FROM CR-32 TO SR-104

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 5.030 Urban Area EASTERN SHORE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044786 STPAA 0181 (503) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2023 $1,297 $324 $1,622

TOTAL COST: $1,297 $324 $1,622

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

14 of 305

HIGHWAY PROJECTS - BALDWIN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-181 ProjectDescription

HYDRAULIC REVIEW AND DRAINAGE IMPROVEMENTS ALONG SR-181 FROM CR-64 TO SOUTH OF SR-16 (US-90)

Type of Work DRAINAGE CORRECTION

Project Length in Miles 3.160 Urban Area EASTERN SHORE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062477 STPAA 0181 (507) CONSTRUCTION

DRAINAGE CORRECTION

2020 $656 $164 $820

TOTAL COST: $656 $164 $820

Route SR-42 ProjectDescription

ADD PAVED SHOULDERS ON SR-42 (US-98) FROM BARCLAY AVENUE TO ALABAMA STATE LINE

Type of Work SHOULDER PAVING

Project Length in Miles 1.348 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060029 STPLL 0042 () CONSTRUCTION

SHOULDER PAVING

2020 $265 $66 $331

TOTAL COST: $265 $66 $331

Route SR-42 ProjectDescription

ADD PAVED SHOULDERS ON SR-42 (US-98) FROM HILLCREST RD TO BARCLAY AVE

Type of Work SHOULDER PAVING

Project Length in Miles 0.000 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063635 STPLL 0215 () PRELIMINARY ENGINEERING

SHOULDER PAVING

2021 $20 $5 $25

TOTAL COST: $20 $5 $25

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

15 of 305

HIGHWAY PROJECTS - BALDWIN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-1 ProjectDescription

REMOVE (BIN 007606), (BIN 007607) AND PEDESTRIAN (BIN 011380) ON SR-1 (US-431) OVER ABANDONED GEORGIA SOUTHWESTERN RAILROAD. REMOVE AND REPLACE (BIN 007604) AND (BIN 007605) AND REMOVE PEDESTRIAN (BIN 011379) ON SR-1 (US-431) OVER CHEWALLA CREEK

Type of Work OVERPASS REMOVAL

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040558 BR 0001 () RIGHT OF WAY

OVERPASS REMOVAL

2021 $88 $22 $109

100040559 BR 0001 () UTILITIES

OVERPASS REMOVAL

2022 $118 $29 $147

100040561 BR 0001 () CONSTRUCTION

OVERPASS REMOVAL

2022 $4,867 $1,217 $6,084

TOTAL COST: $5,073 $1,268 $6,341

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

16 of 305

HIGHWAY PROJECTS - BARBOUR

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-58 ProjectDescription

SLOPE FAILURE REPAIRS ON CR-58 (UNIVERSITY WAY) APPROXIMATELY 0.5 MILE SOUTHEAST OF SR-6 (US-82) AND EXTENDING FOR APPROXIMATELY 100 FT, FHWA DISASTER #AL 2017-01 (DDIR REPORT #BIBB-1)

Type of Work SLIDE CORRECTION

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068471 ER 9020 (907) CONSTRUCTION

SLIDE CORRECTION

2017 $30 $0 $30

TOTAL COST: $30 $0 $30

Route SR-5 ProjectDescription

REPLACE BRIDGE ON SR-5 OVER BLUE GIRTH CREEK (BIN# 002651) AND RELIEF (BIN# 002650)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.555 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049167 BR 0005 (556) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $8,776 $2,194 $10,970

TOTAL COST: $8,776 $2,194 $10,970

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

17 of 305

HIGHWAY PROJECTS - BIBB

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-6 ProjectDescription

BRIDGE REPLACEMENT ON SR-6 (US-82) OVER SANDY CREEK (BIN 1189)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.826 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066953 BR 0006 (573) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $122 $31 $153

100066954 BR 0006 (573) UTILITIES

BRIDGE REPLACEMENT

2020 $165 $41 $206

100066955 BR 0006 (573) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,978 $495 $2,473

TOTAL COST: $2,265 $566 $2,832

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

18 of 305

HIGHWAY PROJECTS - BIBB

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN BLOUNT / ST CLAIR COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061456 STPAA NR13 (934) CONSTRUCTION

SIDEWALK 2019 $103 $26 $129

TOTAL COST: $103 $26 $129

Route SR-53 ProjectDescription

REPLACE BRIDGE AND APPROACHES ON SR-53 (US-231) OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER BIN 002844 STR #53-5-3.3

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038326 BR 0053 (559) RIGHT OF WAY

BRIDGES AND APPROACHES

2020 $23 $6 $29

100003356 BR 0053 () CONSTRUCTION

BRIDGES AND APPROACHES

2022 $210 $53 $263

TOTAL COST: $233 $58 $292

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

19 of 305

HIGHWAY PROJECTS - BLOUNT

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-74 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES (BIN 004560) ON SR-74 (US-278) AT LOCUST FORK, GRADE, DRAIN, BASE, PAVE, BRIDGE, AND BRIDGE REMOVAL

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 1.136 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067595 BR 0074 (537) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $868 $217 $1,085

100003565 BR 0074 (537) CONSTRUCTION

BRIDGES AND APPROACHES

2019 $2,897 $724 $3,622

TOTAL COST: $3,766 $941 $4,707

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

20 of 305

HIGHWAY PROJECTS - BLOUNT

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-79 ProjectDescription

REPL BIN#004658 ON SR-79 OVER BLACKBURN FORK OF LITTLE WARRIOR RIVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044645 BR 0079 (500) UTILITIES

BRIDGE REPLACEMENT

2023 $296 $74 $370

100003396 BR 0079 (500) CONSTRUCTION

BRIDGE REPLACEMENT

2023 $8,335 $2,084 $10,419

TOTAL COST: $8,631 $2,158 $10,789

Route SR-79 ProjectDescription

SR-79ATSR-160 IN CLEVELAND, TRAFFIC CONTROL SIGNAL, SIGNS, CHANNELIZE BUS DR.,WIDEN FOR LEFT TURN LANES

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 0.105 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048708 NH 0079 () RIGHT OF WAY

SAFETY IMPROVEMENTS

2021 $171 $43 $213

100040214 NH 0079 (502) CONSTRUCTION

SAFETY IMPROVEMENTS

2021 $1,072 $268 $1,340

TOTAL COST: $1,242 $311 $1,553

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

21 of 305

HIGHWAY PROJECTS - BLOUNT

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

REST AREA REPLACEMENT NB AND SB I-65 NEAR GREENVILLE BLDG AND PK

Type of Work REST AREA REHABILITATION

Project Length in Miles 0.041 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100001665 IM I065 (423) CONSTRUCTION

REST AREA REHABILITATION

2020 $9,090 $1,010 $10,100

TOTAL COST: $9,090 $1,010 $10,100

Route I -65 ProjectDescription

SIGN REHABILITATION ALONG I-65 FROM CONECUH CL THROUGH BUTLER, LOWNDES, MONTGOMERY, ELMORE, AND AUTAUGA TO CHILTON CL.

Type of Work SIGN REHABILITATION

Project Length in Miles 92.467 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054300 IM I065 (407) CONSTRUCTION

SIGN REHABILITATION

2020 $3,573 $397 $3,969

TOTAL COST: $3,573 $397 $3,969

Route SR-185 ProjectDescription

ROADWAY IMPROVEMENTS SR-185, INCLUDING ROADWAY WIDENING, SIGNALS AND TURN LANE FROM CR-42 (MANNINGHAM ROAD) TO 0.2 MILE NORTH CR-73 (CAHABA RD)

Type of Work ROADWAY WIDENING

Project Length in Miles 0.670 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056506 STPAA 0185 (501) CONSTRUCTION

ROADWAY WIDENING

2020 $1,401 $350 $1,751

TOTAL COST: $1,401 $350 $1,751

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

22 of 305

HIGHWAY PROJECTS - BUTLER

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-440 ProjectDescription

CR-440 (64TH STREET) BRIDGE REPLACEMENTBIN # 6204 NEAR WEAVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054937 STPOA 7448 () RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $29 $7 $36

100054938 STPOA 7448 () UTILITIES

BRIDGE REPLACEMENT

2021 $19 $5 $24

100054939 STPOA 7448 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $382 $96 $478

TOTAL COST: $430 $107 $537

Route CR-NA ProjectDescription

RESURFACING ALEXANDRIA/JACKSONVILLE HIGHWAY FROM JACKSONVILLE CITY LIMITS TO MCCLELLAN ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064930 STPOA 0815 () CONSTRUCTION

RESURFACING

2019 $1,143 $286 $1,428

TOTAL COST: $1,143 $286 $1,428

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

23 of 305

HIGHWAY PROJECTS - CALHOUN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT NOBLE STREET AND 4TH STREET

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063208 STPOA 0815 (255) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $206 $52 $258

TOTAL COST: $206 $52 $258

Route CR-NA ProjectDescription

RESURFACING, STRIPING, AND DRAINAGE IMPROVEMENTS ON MOUNTAIN STREET NE FROM SR-21 TO 8TH AVENUE NE CITY OF JACKSONVILLE

Type of Work RESURFACING

Project Length in Miles 0.587 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064884 STPOA 0815 (258) CONSTRUCTION

RESURFACING

2019 $377 $94 $472

TOTAL COST: $377 $94 $472

Route CR-NA ProjectDescription

RESURFACING CHURCH AVENUE FROM 11TH STREET TO SR-21

Type of Work RESURFACING

Project Length in Miles 3.350 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064886 STPOA 0815 () CONSTRUCTION

RESURFACING

2019 $893 $223 $1,116

TOTAL COST: $893 $223 $1,116

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

24 of 305

HIGHWAY PROJECTS - CALHOUN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON AIRPORT ROAD AT COLDWATER CREEK BIN # 11215 CITY OF OXFORD

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064888 STPOA 0815 (260) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $8 $2 $10

100064889 STPOA 0815 (260) UTILITIES

BRIDGE REPLACEMENT

2020 $62 $15 $77

100064890 STPOA 0815 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $734 $184 $918

TOTAL COST: $804 $201 $1,006

Route CR-NA ProjectDescription

RESURFACE WEST 9TH STREET AND CAFFEY DRIVE FROM SR-78 TO BARRY STREET CITY OF OXFORD

Type of Work RESURFACING

Project Length in Miles 2.180 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064892 STPOA 0815 () CONSTRUCTION

RESURFACING

2019 $323 $81 $404

TOTAL COST: $323 $81 $404

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

25 of 305

HIGHWAY PROJECTS - CALHOUN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

NEW SIGNAL AND LANE INSTALLATION IMPROVEMENTS AT BYNUM LEATHERWOOD (CR-109) AND OLD GADSDEN ROAD

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064897 STPOA 0815 () CONSTRUCTION

SIGNALIZATION 2020 $727 $182 $909

TOTAL COST: $727 $182 $909

Route CR-NA ProjectDescription

RESURFACE RUSSELL DRIVE FROM ALEXANDRIA ROAD TO PEACEBURG ROAD CITY OF WEAVER

Type of Work RESURFACING

Project Length in Miles 0.660 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064899 STPOA 0818 () CONSTRUCTION

RESURFACING

2020 $327 $82 $409

TOTAL COST: $327 $82 $409

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

26 of 305

HIGHWAY PROJECTS - CALHOUN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-204 ProjectDescription

BRIDGE REPLACEMENT OVER ABANDONED RAILROAD AND TALLAHATCHEE CREEK ON SR-204 (BIN 4684)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.050 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049969 BR 0204 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $280 $70 $349

100049971 BR 0204 () CONSTRUCTION

BRIDGE REPLACEMENT

2025 $3,430 $857 $4,287

TOTAL COST: $3,709 $927 $4,637

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

27 of 305

HIGHWAY PROJECTS - CALHOUN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-21 ProjectDescription

SIGNAL UPGRADE SR-21 AT BALTZELL GATE ROAD

Type of Work SIGNALIZATION

Project Length in Miles 0.015 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047014 STPOA 0021 (516) CONSTRUCTION

SIGNALIZATION 2019 $107 $27 $133

TOTAL COST: $107 $27 $133

Route SR-21 ProjectDescription

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF LENLOCK LANE AND SR-21 IN THE CITY OF ANNISTON

Type of Work SIGNALIZATION

Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047016 STPOA 0021 (543) CONSTRUCTION

SIGNALIZATION 2019 $170 $42 $212

TOTAL COST: $170 $42 $212

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

28 of 305

HIGHWAY PROJECTS - CALHOUN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-4 ProjectDescription

RE-CONFIGURE INTERSECTION SR-4 (US-78)ATCR-186 (BARRY STREET)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057405 STPOA 0004 (536) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $791 $198 $989

100057406 STPOA 0004 (536) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $94 $23 $117

100057407 STPOA 0004 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $529 $132 $661

TOTAL COST: $1,414 $353 $1,767

Route SR-9 ProjectDescription

REPLACE BRIDGE BIN 005152, SR-9 OVER SOUTHERN RR, 1.8 MILES N OF SR-4(US-78) NEAR IRON CITY (SUFF=43.1,STAT=FO, 2001 HBRRP LIST)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061463 BR 0009 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $131 $33 $164

100041404 BR 0009 () CONSTRUCTION

BRIDGE REPLACEMENT

2025 $2,996 $749 $3,745

TOTAL COST: $3,127 $782 $3,909

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

29 of 305

HIGHWAY PROJECTS - CALHOUN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -85 ProjectDescription

REPLACEMENT OF WELCOME CENTER ON I-85ATGEORGIA LINE SMALL URBAN LANETT. REST AREA

Type of Work REST AREA REHABILITATION

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054187 IMF I085 (317) CONSTRUCTION

REST AREA REHABILITATION

2019 $11,811 $1,312 $13,123

TOTAL COST: $11,811 $1,312 $13,123

Route I -85 ProjectDescription

PAVEMENT REHABILITATION ON I-85 FROM THE LEE COUNTY LINE (MP 69.068) TO 1.5 MILES NORTH OF CR-388 (MP 71.964)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 2.896 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066477 IM I085 (360) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $1,880 $209 $2,088

100067306 IM I085 (363) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $8,759 $973 $9,732

TOTAL COST: $10,639 $1,182 $11,821

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

30 of 305

HIGHWAY PROJECTS - CHAMBERS

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-77 ProjectDescription

BRIDGE REPLACEMENT ON SR-77 AT HOOTALOOCO CREEK 4.8 MILES NORTH WEST OF US-431 BIN 2600

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.050 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100003702 BR 0077 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $2,204 $551 $2,755

TOTAL COST: $2,204 $551 $2,755

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

31 of 305

HIGHWAY PROJECTS - CHAMBERS

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-68 ProjectDescription

BRIDGE REMOVAL BIN 002591, SR-68 OVER TAG RAILROAD 0.5 MILE NORTH OF SR-273 (SUFF=64.4, STATUS=FO)

Type of Work BRIDGE REMOVAL

Project Length in Miles 0.266 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049710 BR 0068 (505) UTILITIES

BRIDGE REMOVAL

2019 $17 $4 $21

100049707 BR 0068 (505) CONSTRUCTION

BRIDGE REMOVAL

2020 $3,082 $770 $3,852

TOTAL COST: $3,099 $775 $3,874

Route SR-9 ProjectDescription

BIN #003411 BR REPL AND APP ON SR-9 OVER TERRAPIN CR #9-10-7.4

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100003725 BR 0009 (508) CONSTRUCTION

BRIDGES AND APPROACHES

2019 $7,746 $1,936 $9,682

TOTAL COST: $7,746 $1,936 $9,682

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

32 of 305

HIGHWAY PROJECTS - CHEROKEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-145 ProjectDescription

REPLACE BRIDGE ON SR-145 OVER WAXAHATCHEE CREEK, BIN 005318

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.454 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049163 BR 0145 (504) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $6,613 $1,653 $8,266

TOTAL COST: $6,613 $1,653 $8,266

Route SR-3 ProjectDescription

BRIDGE WIDENING BIN# 006916 ON SR-3 (US-31) AT I-65 IN CLANTON (EXIT 205)

Type of Work BRIDGE WIDENING

Project Length in Miles 0.190 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065815 BR 0003 (607) CONSTRUCTION

BRIDGE WIDENING

2019 $1,525 $381 $1,906

TOTAL COST: $1,525 $381 $1,906

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

33 of 305

HIGHWAY PROJECTS - CHILTON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-10 ProjectDescription

REPLACE BRIDGE, BIN 003199, SR-10 OVER TUCKABUM CREEK (SUFF=54.2, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.300 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049161 BR 0010 (515) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $3,015 $754 $3,769

TOTAL COST: $3,015 $754 $3,769

Route SR-12 ProjectDescription

BRIDGE REPLACEMENT ON SR-12 (US-84) OVER TOMBIGBEE RIVER AND RELIEF BRIDGES BIN # 006199, 006200, 006201 (SUFF = 46.2, STA = 2)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 4.225 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040182 BRF 0101 (559) UTILITIES

BRIDGE REPLACEMENT

2022 $479 $120 $599

100038706 BRF 0101 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $20,482 $5,121 $25,603

TOTAL COST: $20,961 $5,240 $26,201

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

34 of 305

HIGHWAY PROJECTS - CHOCTAW

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-39 ProjectDescription

RESURFACE CR-39 (11 MILE POST ROAD) FROM SILVER CREEK ACCESS RD SOUTH 1.050 MILES

Type of Work RESURFACING

Project Length in Miles 1.050 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063538 FLAP-STPNU FLAP (026)

CONSTRUCTION

RESURFACING

2019 $31 $8 $39

TOTAL COST: $31 $8 $39

Route CR-NA ProjectDescription

RESURFACE OLD LOCK 1 ROAD FROM THE PAVEMENT JOINT AT THE OLD LOCK 1 PARK ENTRANCE EAST FOR 1.204 MILES

Type of Work RESURFACING

Project Length in Miles 1.204 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063540 FLAP FLAP (025) CONSTRUCTION

RESURFACING

2018 $165 $94 $259

TOTAL COST: $165 $94 $259

Route SR-13 ProjectDescription

RELOCATE INTERSECTION SR-13 (US-43)ATCR-3 (MCVAY RD) FROM 0.1 MILE N OF CR-484 (TELLIE TRAIL) TO 0.4 MILE NORTH OF CR-3 (MCVAY RD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.670 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054558 NH 0013 (564) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $420 $105 $526

TOTAL COST: $420 $105 $526

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

35 of 305

HIGHWAY PROJECTS - CLARKE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-18 ProjectDescription

CR-18 BRIDGE REPLACEMENT OVER TALLAPOOSA RIVER BIN # 12270 (R.A.M.P.)

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060386 ACBRZ60386 ATRP (013)

CONSTRUCTION

BRIDGE 2019 $2,104 $526 $2,630

TOTAL COST: $2,104 $526 $2,630

Route SR-46 ProjectDescription

SR-46 BRIDGE REPLACEMENT OVER CANE CREEK (BIN# 2108) NORTH OF I-20

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.070 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049186 BR 0046 (503) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,943 $736 $3,679

TOTAL COST: $2,943 $736 $3,679

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

36 of 305

HIGHWAY PROJECTS - CLEBURNE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-167 ProjectDescription

BRIDGE REPLACEMENT AND NEW ALIGNMENT ON SR-167 OVER PEA RIVER WITH RELIEF BRIDGES (BINS # 006033, 006034 AND 006035)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.183 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061396 BRF 0167 (508) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $10,874 $2,719 $13,593

TOTAL COST: $10,874 $2,719 $13,593

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

37 of 305

HIGHWAY PROJECTS - COFFEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

IMPROV TO RIVER RD FR BRICK HATTON TO SR-184, FRANKFORD RD FR LITTLE BEAR CR TO TUSCUMBIA CL, WOODMONT DR FR PONDEROSA DR TO TUSCUMBIA CL, RIVER RD FROM SR-133 TO FORD RD, LIME KILN RD, CO LN RD FR SR-20 TO OLD HWY 20, SOCKWELL LN FR SR-157 TO SR-20

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065034 STPOA 1716 () CONSTRUCTION

RESURFACING

2022 $2,409 $602 $3,011

TOTAL COST: $2,409 $602 $3,011

Route CR-NA ProjectDescription

RESURFACING, LEVELING, AND DRAINAGE IMPROVEMENTS ON COX BOULEVARD FROM AVALON AVENUE TO SECOND STREET INCLUDING NORFOLK-SOUTHERN RAILROAD CROSSING

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056076 STPOA 8822 (601) RIGHT OF WAY

RESURFACING

2019 $495 $124 $619

100056077 STPOA 8822 (601) UTILITIES

RESURFACING

2020 $91 $23 $114

100056078 STPOA 8822 (601) CONSTRUCTION

RESURFACING

2020 $1,856 $464 $2,320

TOTAL COST: $2,442 $611 $3,053

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

38 of 305

HIGHWAY PROJECTS - COLBERT

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

VARIOUS STREET IMPROVEMENTS ON N COMMONS ST W, N COMMONS ST E, KING ST, 6TH ST, E COMMONS ST N, E COMMONS ST S, JOE WHEELER DR, N DICKSON ST, E 5TH ST, HOOK ST

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065036 STPOA 1716 (250) CONSTRUCTION

RESURFACING

2019 $1,771 $443 $2,214

TOTAL COST: $1,771 $443 $2,214

Route CR-NA ProjectDescription

NATCHEZ TRACE PARKWAY OVERLAY PARK ROAD FROM MP 316.55 TO MP 334.55

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067955 FLAP FLAP () CONSTRUCTION

RESURFACING

2019 $4,170 $1,042 $5,212

TOTAL COST: $4,170 $1,042 $5,212

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

39 of 305

HIGHWAY PROJECTS - COLBERT

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-2 ProjectDescription

REPLACE BRIDGES AND APPROACHES, BIN 001708 AND BIN 005442, ON SR-2 (US-72) OVER ASHE BOULEVARD (SUFF=66.2, STATUS=FO)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.200 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055932 BRF 0002 (529) UTILITIES

BRIDGES AND APPROACHES

2019 $273 $68 $342

100049340 BRF 0002 (529) CONSTRUCTION

BRIDGES AND APPROACHES

2019 $4,246 $1,061 $5,307

TOTAL COST: $4,519 $1,130 $5,649

Route SR-20 ProjectDescription

SAFETY IMPROVEMENTS TO INTERSECTION OF SR-20 AND SR-157

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056500 NH 0020 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2021 $767 $192 $959

TOTAL COST: $767 $192 $959

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

40 of 305

HIGHWAY PROJECTS - COLBERT

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

REPLACE BRIDGES I-65 OVER SEPULGA RIVER AND RELIEF,BIN 6808,6809,6810,6811,6812 AND 6813

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.277 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057625 IM I065 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $22,743 $2,527 $25,270

TOTAL COST: $22,743 $2,527 $25,270

Route SR-12 ProjectDescription

SR-12 (US-84) ADDITIONAL LANES FROM MP 96.3 TO I-65

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.860 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064652 HPPF A107 (900) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2019 $333 $83 $416

100064653 HPPF-NHF A107 (900) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2020 $4,789 $1,197 $5,986

TOTAL COST: $5,122 $1,281 $6,403

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

41 of 305

HIGHWAY PROJECTS - CONECUH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

CULVERT REPLACEMENT ON SANDERS ROAD OVER AN UNNAMED TRIBUTARY TO THE YELLOW RIVER - CCP 20-365-17

Type of Work DRAINAGE CORRECTION

Project Length in Miles 1.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068177 FLAP FLAP (020) CONSTRUCTION

DRAINAGE CORRECTION

2019 $120 $30 $150

TOTAL COST: $120 $30 $150

Route SR-12 ProjectDescription

RESURFACE AND 2' SAFETY WIDENING, FLATTEN SLOPES, EXTEND DRAINAGE STRUCTURES, ACQUIRE RIGHT OF WAY AND BRIDGE RAIL RETROFITS ON SR-12 (US-84) FROM CONECUH COUNTY TO WEST END OF ARROW LOOP RD.

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 4.024 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058169 NH-HSIP 0012 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2021 $222 $52 $275

100058171 NH-HSIP 0012 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2022 $3,317 $778 $4,094

TOTAL COST: $3,539 $830 $4,369

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

42 of 305

HIGHWAY PROJECTS - COVINGTON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-9 ProjectDescription

BRIDGE REPLACEMENT (BIN 002285) ON SR-9 (US-331) OVER LIGHTWOOD KNOT CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.380 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033503 BR 0009 (573) RIGHT OF WAY

BRIDGE REPLACEMENT

2020 $288 $72 $360

100038583 BR 0009 (573) UTILITIES

BRIDGE REPLACEMENT

2021 $292 $73 $365

100033501 BR 0009 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $2,891 $723 $3,613

TOTAL COST: $3,470 $868 $4,338

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

43 of 305

HIGHWAY PROJECTS - COVINGTON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-9 ProjectDescription

US-331, ADL LNS FR CR-17 AT SARDIS TO CR-5 N OF HIGHLAND HOME

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 6.682 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100004066 NH 0009 () RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2024 $2,787 $697 $3,483

100038584 NH 0009 () UTILITIES

GRADE, DRAIN, BASE AND PAVE

2025 $2,828 $707 $3,535

100004061 NH 0009 () CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2026 $22,313 $5,578 $27,892

TOTAL COST: $27,928 $6,982 $34,910

Route SR-9 ProjectDescription

REPLACE BRIDGE, BIN 003021, SR-9 (US-331) OVER PATSALIGA CREEK (SUFF=57.9, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.400 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068211 BR 0009 (541) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $485 $121 $606

100049232 BR 0009 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $7,324 $1,831 $9,155

TOTAL COST: $7,809 $1,952 $9,761

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

44 of 305

HIGHWAY PROJECTS - CRENSHAW

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON CONVENT ROAD NORTH EAST OVER EIGHTMILE CREEK BIN# 6659

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061111 ACBR61111 ATRP (013) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,390 $348 $1,738

TOTAL COST: $1,390 $348 $1,738

Route I -65 ProjectDescription

I-65 RECONSTRUCT NORTH AND SOUTH BOUND LANES AND ADDITIONAL LANES AND WIDEN OVERPASS SR-91

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 5.960 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063586 NH I065 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2023 $1,733 $433 $2,166

TOTAL COST: $1,733 $433 $2,166

Route I -65 ProjectDescription

NEW LIGHTING SYSTEM FOR REST AREA ON I-65 IN CULLMAN COUNTY

Type of Work LIGHTING

Project Length in Miles 1.500 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057470 IM I065 (481) CONSTRUCTION

LIGHTING 2019 $1,530 $170 $1,700

TOTAL COST: $1,530 $170 $1,700

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

45 of 305

HIGHWAY PROJECTS - CULLMAN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON I-65 FROM SOUTH OF CR-222 (MP 304.100) TO SR-74 (US-278) AT MP 307.500

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 3.400 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067549 IM I065 (495) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $4,350 $483 $4,833

100066223 IM I065 (482) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2019 $14,973 $1,664 $16,636

TOTAL COST: $19,322 $2,147 $21,469

Route I -65 ProjectDescription

RESURFACE I-65 FROM HURRICANE CREEK (MP 315.665) TO SOUTH OF THE CSX RAILROAD BRIDGE (MP 319.055)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 3.393 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066225 IM I065 (490) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $1,783 $198 $1,981

TOTAL COST: $1,783 $198 $1,981

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

46 of 305

HIGHWAY PROJECTS - CULLMAN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-157 ProjectDescription

SR-157, ADDITIONAL LANES AND BRIDGES FROM SR-69 TO EAST OF SR-3 (US-31) NORTH OF CULLMAN. BRIDGES OVER LAKE CATOMA AND CSX RAILROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 4.417 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038840 NH 0157 (506) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2020 $230 $58 $288

100038842 NH 0157 (506) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2020 $19,935 $4,984 $24,919

TOTAL COST: $20,165 $5,041 $25,207

Route SR-69 ProjectDescription

ADDITIONAL LANES ON SR-69 FROM 4TH AVE. WEST OF EIGHT MILE CREEK TO EASTPOINT (INT. OF SR-69 AND US-278)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.810 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100043195 NH A103 (900) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2023 $4,841 $1,210 $6,051

TOTAL COST: $4,841 $1,210 $6,051

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

47 of 305

HIGHWAY PROJECTS - CULLMAN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-74 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON SR-74 (US-278) OVER CROOKED CREEK, BIN 001617

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 1.610 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068184 BR 0074 () RIGHT OF WAY

BRIDGES AND APPROACHES

2021 $82 $21 $103

100068185 BR 0074 () UTILITIES

BRIDGES AND APPROACHES

2023 $84 $21 $105

100068183 BR 0074 () CONSTRUCTION

BRIDGES AND APPROACHES

2023 $7,567 $1,892 $9,459

TOTAL COST: $7,734 $1,933 $9,667

Route SR-91 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON SR-91 OVER DUCK RIVER, BIN 004129

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.500 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068171 BR 0091 () RIGHT OF WAY

BRIDGES AND APPROACHES

2021 $82 $21 $103

100068172 BR 0091 () UTILITIES

BRIDGES AND APPROACHES

2022 $83 $21 $104

100068170 BR 0091 () CONSTRUCTION

BRIDGES AND APPROACHES

2022 $4,579 $1,145 $5,723

TOTAL COST: $4,744 $1,186 $5,930

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

48 of 305

HIGHWAY PROJECTS - CULLMAN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-47 ProjectDescription

RESURFACE CR-47 FROM DALE/HOUSTON COUNTY LINE TO SR-134 (GISSENDANNER ROAD)

Type of Work RESURFACING

Project Length in Miles 5.180 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065700 STPOA 2316 () CONSTRUCTION

RESURFACING

2020 $729 $182 $912

TOTAL COST: $729 $182 $912

Route CR-47 ProjectDescription

RESURFACING CR-47 FROM SR-134 TO THE HOUSTON COUNTY LINE

Type of Work RESURFACING

Project Length in Miles 1.020 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062463 STPOA 2314 () CONSTRUCTION

RESURFACING

2020 $722 $181 $903

TOTAL COST: $722 $181 $903

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

49 of 305

HIGHWAY PROJECTS - DALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT AT VARIOUS LOCATIONS (DISTRICT 5) PHASE 3

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060243 STPAA NR13 () CONSTRUCTION

SIDEWALK 2020 $185 $46 $231

TOTAL COST: $185 $46 $231

Route SR-14 ProjectDescription

BRIDGE REPLACEMENT ON SR-14 AT BLUE GIRTH SWAMP (BIN 1556 AND 1557)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.261 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061670 BR 0014 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $3,215 $804 $4,018

TOTAL COST: $3,215 $804 $4,018

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

50 of 305

HIGHWAY PROJECTS - DALLAS

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-22 ProjectDescription

REPL BIN 008103 ON SR-22 OVER SOUTHERN RR NEAR SAFFORD

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100002696 BR 0201 (513) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2022 $141 $35 $176

TOTAL COST: $141 $35 $176

Route SR-22 ProjectDescription

SR-22 FR END OF EXISTING 4-LN TO CR-63

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 5.436 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100008928 STPAA 0022 (504) UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2021 $2,149 $537 $2,686

100008924 STPAA 0022 (504) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2021 $20,977 $5,244 $26,221

TOTAL COST: $23,125 $5,781 $28,907

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

51 of 305

HIGHWAY PROJECTS - DALLAS

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -59 ProjectDescription

RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.60)

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 7.750 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066508 IM I059 () CONSTRUCTION

PAVEMENT REHABILITATION

2020 $32,133 $3,570 $35,704

TOTAL COST: $32,133 $3,570 $35,704

Route NA- ProjectDescription

WELCOME CENTER REHABILITATION ALONG I-59 NEAR GEORGIA STATE LINE

Type of Work REST AREA REHABILITATION

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047076 IM I059 (334) CONSTRUCTION

REST AREA REHABILITATION

2022 $9,273 $1,030 $10,303

TOTAL COST: $9,273 $1,030 $10,303

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN DEKALB AND JACKSON COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060151 STPAA NR13 () CONSTRUCTION

SIDEWALK 2020 $156 $39 $195

TOTAL COST: $156 $39 $195

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

52 of 305

HIGHWAY PROJECTS - DEKALB

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-7 ProjectDescription

REPL BR, BIN 000481, SR-7 (US-11) OVER DRY CREEK (SUFF=66.9, STAT=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.021 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100041641 BR 0007 (529) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,807 $452 $2,259

TOTAL COST: $1,807 $452 $2,259

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

53 of 305

HIGHWAY PROJECTS - DEKALB

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-59 ProjectDescription

INSTALL MICRO-SURFACING PAVEMENT AND TRAFFIC STRIPE ON CR-59 (FIRETOWER ROAD) FROM CR-8 (REDLAND ROAD) NORTH TO SR-14

Type of Work RESURFACING

Project Length in Miles 3.900 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067724 STPMN 2618 () CONSTRUCTION

RESURFACING

2019 $143 $36 $179

TOTAL COST: $143 $36 $179

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

54 of 305

HIGHWAY PROJECTS - ELMORE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-8 ProjectDescription

WIDENING ON CR-8 (REDLAND ROAD) FROM SR-9 (US-231) TO CR-4 (RIFLE RANGE ROAD) AND BRIDGE REPLACEMENT AT HARWELL MILL CREEK (BIN #10936) AND INTERSECTION IMPROVEMENTS AT CR-8 (REDLAND ROAD) AND CR-4 (RIFLE RANGE ROAD)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.480 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063232 STPAA 2615 (250) UTILITIES

WIDENING AND RESURFACING (RDWY)

2019 $400 $100 $500

100063233 STPMN 2615 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $1,200 $300 $1,500

100067261 STPMN 2615 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $1,520 $380 $1,900

TOTAL COST: $3,120 $780 $3,900

Route CR-8 ProjectDescription

INSTALL MICRO-SURFACING PAVEMENT AND TRAFFIC STRIPE ON CR-8 (REDLAND ROAD) FROM THE INTERSECTION OF CR-4 (RIFLE RANGE ROAD) TO CR-116 (MARSHELL ROAD)

Type of Work RESURFACING

Project Length in Miles 7.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067722 STPMN 2618 () CONSTRUCTION

RESURFACING

2019 $276 $69 $345

TOTAL COST: $276 $69 $345

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

55 of 305

HIGHWAY PROJECTS - ELMORE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN TO ACCOMMODATE A CENTER TURN LANE ON RIFLE RANGE RD FROM DOZIER RD TO TOLL BRIDGE RD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063705 STPMN 2615 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2021 $480 $120 $600

TOTAL COST: $480 $120 $600

Route CR-NA ProjectDescription

RESURFACE, SIDEWALK IMPROVEMENTS, LANDSCAPING AND PEDESTRIAN LIGHTING FIXTURES ON SOUTH MAIN ST FROM EAST BRIDGE ST TO US-231 (SR-9)

Type of Work RESURFACING

Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056090 STPMN CN11 () CONSTRUCTION

RESURFACING

2020 $640 $160 $800

TOTAL COST: $640 $160 $800

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

56 of 305

HIGHWAY PROJECTS - ELMORE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING ON COMPANY STREET, HILL STREET AND ORLINE STREET; RESURFACING, LANDSCAPING AND DECORATIVE LIGHTING FIXTURES ON COURT STREET, EAST BRIDGE FROM SOUTH MAIN STREET TO HILL STREET IN THE CITY OF WETUMPKA

Type of Work RESURFACING

Project Length in Miles 0.300 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063025 STPAA 2615 (252) CONSTRUCTION

RESURFACING

2019 $386 $96 $482

TOTAL COST: $386 $96 $482

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT COOSADA PARKWAY AND COOSADA ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063710 STPMN 2615 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2020 $40 $10 $50

100063711 STPMN 2619 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2023 $160 $40 $200

TOTAL COST: $200 $50 $250

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

57 of 305

HIGHWAY PROJECTS - ELMORE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT COOSADA PARKWAY AND ALABAMA RIVER PARKWAY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063712 STPMN 2615 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2020 $40 $10 $50

100063713 STPMN 2615 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $160 $40 $200

TOTAL COST: $200 $50 $250

Route CR-NA ProjectDescription

RESURFACE POSSOM TROT ROAD FROM COOSA RIVER ROAD TO LIGHTWOOD ROAD

Type of Work RESURFACING

Project Length in Miles 1.800 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063716 STPMN 2615 () PRELIMINARY ENGINEERING

RESURFACING

2020 $4 $1 $5

100063717 STPMN 2615 () CONSTRUCTION

RESURFACING

2020 $252 $63 $315

TOTAL COST: $256 $64 $320

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

58 of 305

HIGHWAY PROJECTS - ELMORE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE, DRAINAGE IMPROVEMENTS AND BIKE LANES ON BROWNS ROAD FROM SR-143 (MAIN STREET) TO SR-14

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.760 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064614 STPAA 2615 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $304 $76 $380

TOTAL COST: $304 $76 $380

Route I -65 ProjectDescription

INTERCHANGE LIGHTING ON I-65 AT SR-14 (EXIT 181) - PRATTVILLE / MILLBROOK

Type of Work LIGHTING

Project Length in Miles 1.200 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055339 IM I065 (418) CONSTRUCTION

LIGHTING 2020 $1,636 $182 $1,818

TOTAL COST: $1,636 $182 $1,818

Route NA- ProjectDescription

ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT AT VARIOUS LOCATIONS (DISTRICTS 1 AND 3)

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060170 STPAA NR13 (925) CONSTRUCTION

SIDEWALK 2020 $168 $42 $210

TOTAL COST: $168 $42 $210

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

59 of 305

HIGHWAY PROJECTS - ELMORE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-14 ProjectDescription

ADD LANE SR-14 FROM 0.5 MILE WEST CR-3 (INGRAM RD) TO CR-153 (COOSADA PKWY)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.870 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064189 STPAA 0014 (541) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2025 $3,774 $943 $4,717

100064194 STPAA 0014 (541) UTILITIES

ADDITIONAL ROADWAY LANES

2026 $803 $201 $1,004

100054496 STPAA 0014 (541) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2026 $10,264 $2,566 $12,830

TOTAL COST: $14,841 $3,710 $18,552

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

60 of 305

HIGHWAY PROJECTS - ELMORE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

RESURFACING ON I-65 FROM SR-21 TO 0.4 MILE NORTH OF CR-40

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 12.280 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066470 IM I065 (491) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2019 $20,044 $2,227 $22,271

TOTAL COST: $20,044 $2,227 $22,271

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

61 of 305

HIGHWAY PROJECTS - ESCAMBIA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR- NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON 4TH STREET FROM SR-25 (US-411/RAINBOW DRIVE) TO SR-1 (US-278 WEST MEIGHAN BLVD) IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064628 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2020 $45 $11 $56

TOTAL COST: $45 $11 $56

Route CR-290 ProjectDescription

WIDENING, RESURFACING AND TRAFFIC STRIPE ON LAY SPRINGS ROAD AND MOON ROAD FROM GADSDEN CITY LIMITS TO TABOR ROAD (CR-291)

Type of Work RESURFACING

Project Length in Miles 6.700 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056668 STPOA 2814 (252) CONSTRUCTION

RESURFACING

2019 $2,175 $544 $2,719

TOTAL COST: $2,175 $544 $2,719

Route CR-330 ProjectDescription

RESURFACE CR-330 (TIDMORE BEND ROAD) FROM CR-345 (WHITE CHAPEL RD) TO COOSA RIVER

Type of Work RESURFACING

Project Length in Miles 4.170 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100050715 STPOA 2814 () CONSTRUCTION

RESURFACING

2020 $633 $158 $791

TOTAL COST: $633 $158 $791

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

62 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN AND RESURFACE SOUTH 11TH STREET FROM CR-203 (BLACK CREEK PARKWAY) TO NEAR PIEDMONT AVENUE

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.560 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048747 STPOA 8121 (601) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $1,830 $492 $2,322

TOTAL COST: $1,830 $492 $2,322

Route CR-NA ProjectDescription

ADDITIONAL LANES ON LUMLEY ROAD FROM STEELE STATION ROAD TO SR-25 (US-411)IN RAINBOW CITY

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.400 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063550 STPOA 2815 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2020 $158 $158 $315

100063551 STPOA 2815 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2020 $1,064 $266 $1,330

100063552 STPOA 2815 () UTILITIES

ADDITIONAL ROADWAY LANES

2021 $1,055 $264 $1,318

100063553 STPOA 2815 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2022 $2,739 $685 $3,423

TOTAL COST: $5,015 $1,372 $6,387

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

63 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING CHURCH STREET FROM SR-77 TO SR-25 (US-411)IN RAINBOW CITY

Type of Work RESURFACING

Project Length in Miles 0.250 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063621 STPOA 2815 () CONSTRUCTION

RESURFACING

2019 $104 $26 $130

TOTAL COST: $104 $26 $130

Route CR-NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON NORTH COLLEGE STREET FROM RAILROAD AVENUE TO RABBITTOWN ROAD

Type of Work RESURFACING

Project Length in Miles 2.385 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064395 STPOA 2818 (250) CONSTRUCTION

RESURFACING

2019 $438 $110 $548

TOTAL COST: $438 $110 $548

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

64 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING MAIN STREET FROM SR-1 (US-431) TO NORTH OF HATLEY AVENUE IN THE CITY OF GLENCOE

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064389 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2020 $29 $7 $36

100064392 STPOA 2815 () CONSTRUCTION

RESURFACING

2020 $282 $70 $352

TOTAL COST: $310 $78 $388

Route CR-NA ProjectDescription

RESURFACING AIR DEPOT ROAD FROM COLLEGE PARKWAY TO LONESOME BEND ROAD IN THE CITY OF GLENCOE

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064394 STPOA 2815 () CONSTRUCTION

RESURFACING

2020 $306 $77 $383

TOTAL COST: $306 $77 $383

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

65 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RECONSTRUCTION OF SOUTH 11TH STREET FROM BLACK CREEK PARKWAY TO THE BRIDGE AT BLACK CREEK

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064625 STPOA 2815 (252) CONSTRUCTION

PAVEMENT REHABILITATION

2020 $374 $94 $468

TOTAL COST: $374 $94 $468

Route CR-NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON 4TH STREET FROM SR-25 (US-411/RAINBOW DRIVE) TO SR-1 (US-278 WEST MEIGHAN BLVD) IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064629 STPOA 2815 () CONSTRUCTION

RESURFACING

2020 $255 $64 $318

TOTAL COST: $255 $64 $318

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON HICKORY STREET OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 003666

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064638 STPOA 2815 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,429 $357 $1,787

TOTAL COST: $1,429 $357 $1,787

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

66 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CHESTNUT STREET FROM 5TH STREET TO BLACK CREEK IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064640 STPOA 2815 () CONSTRUCTION

RESURFACING

2020 $290 $73 $363

TOTAL COST: $290 $73 $363

Route CR-NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON WALNUT STREET FROM SR-25 (US-411/ALBERT RAINS BLVD) TO 12TH STREET IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064641 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2019 $42 $11 $53

100064642 STPOA 2815 () CONSTRUCTION

RESURFACING

2020 $243 $61 $304

TOTAL COST: $285 $71 $357

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

67 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND TRAFFIC STRIPE ON RANDALL STREET FROM 6TH STREET TO 11TH STREET IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064643 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2020 $25 $6 $31

100064644 STPOA 2815 () CONSTRUCTION

RESURFACING

2020 $140 $35 $174

TOTAL COST: $164 $41 $205

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON FORREST AVENUE OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 000741

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064645 STPOA 2815 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $187 $47 $234

100064646 STPOA 2815 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,072 $268 $1,340

TOTAL COST: $1,259 $315 $1,574

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

68 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON GEORGE WALLACE DRIVE OVER NOWLIN BRANCH IN THE CITY OF GADSDEN BIN# 011233

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064650 STPOA 2815 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $126 $32 $158

100064651 STPOA 2815 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $715 $179 $893

TOTAL COST: $841 $210 $1,051

Route CR-NA ProjectDescription

PARTIAL REALIGNMENT AND RESURFACING OF SOUTH 11TH STREET FROM THE BRIDGE OVER BLACK CREEK TO RANDALL STREET IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064654 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2020 $68 $17 $85

100064655 STPOA 2815 () CONSTRUCTION

RESURFACING

2021 $390 $97 $487

TOTAL COST: $458 $114 $572

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

69 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN ETOWAH COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061454 STPAA NR13 () CONSTRUCTION

SIDEWALK 2020 $36 $9 $45

TOTAL COST: $36 $9 $45

Route SR-205 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON SR 205 OVER ATN RAILROAD (BIN 000438) (SUFF = 47.4)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.380 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064725 BR 0205 (507) RIGHT OF WAY

BRIDGES AND APPROACHES

2020 $84 $21 $105

100064724 BR 0205 (507) UTILITIES

BRIDGES AND APPROACHES

2020 $63 $16 $79

100064723 BR 0205 () CONSTRUCTION

BRIDGES AND APPROACHES

2021 $2,403 $601 $3,004

TOTAL COST: $2,550 $638 $3,188

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

70 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-211 ProjectDescription

WIDENING AND RESURFACING OF SR-211 (NOCCALULA ROAD) FROM TABOR ROAD TO SCENIC DRIVE IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 1.210 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064657 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2020 $89 $22 $111

100064658 STPOA 2815 () CONSTRUCTION

RESURFACING

2021 $1,494 $374 $1,868

TOTAL COST: $1,583 $396 $1,978

Route SR-77 ProjectDescription

SR-77 FROM SR-7 (US-11) TO SR-1 (US-431) (ADDITIONAL LANES)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 3.212 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100004854 NH 0077 () PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE AND PAVE

2021 $1,334 $333 $1,667

TOTAL COST: $1,334 $333 $1,667

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

71 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-77 ProjectDescription

SR-77 FR I-59 RAMP(WEST SIDE) TO US-11 IN ATTALLA

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.800 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064756 NH 0077 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2021 $425 $106 $531

100054836 NH 0077 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2021 $1,198 $299 $1,497

100049111 NH 0077 () UTILITIES

ADDITIONAL ROADWAY LANES

2024 $924 $231 $1,155

100004852 NH 0077 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2024 $6,439 $1,610 $8,049

TOTAL COST: $8,985 $2,246 $11,231

Route SR-77 ProjectDescription

REPLACE BRIDGE, BIN 002035, SR-77 (NORTH BOUND) OVER COOSA RIVER. (SUFF=56.8, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.600 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100050052 BR A181 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $16,741 $4,185 $20,926

TOTAL COST: $16,741 $4,185 $20,926

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

72 of 305

HIGHWAY PROJECTS - ETOWAH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-433 ProjectDescription

BRIDGE REPLACEMENT CR-433 (SELMAN ROAD) OVER BOXES CREEK BIN # 11440 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060329 ACBRZ60329 ATRP () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $686 $171 $857

TOTAL COST: $686 $171 $857

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ON SR-18 AND SR-171 IN FAYETTE COUNTY AND SR-17, SR-18, SR-96 AND SR-118 IN LAMAR COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061462 STPAA NR13 (944) CONSTRUCTION

SIDEWALK 2019 $162 $41 $203

TOTAL COST: $162 $41 $203

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

73 of 305

HIGHWAY PROJECTS - FAYETTE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-13 ProjectDescription

SR-13 BRIDGE REPLACEMENT OVER CLEAR CREEK (BIN 005845) AND BRIDGE REMOVAL OVER SOUTHERN RR (ABAND) (BIN 005846)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.450 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038407 BR 0013 (513) RIGHT OF WAY

BRIDGE REPLACEMENT

2022 $24 $6 $30

100038406 BR 0013 (513) CONSTRUCTION

BRIDGE REPLACEMENT

2024 $5,236 $1,309 $6,545

TOTAL COST: $5,260 $1,315 $6,574

Route SR-18 ProjectDescription

BRIDGE REPLACEMENT SR-18 (US-43) OVER DEADWATER CREEK WEST OF BANKSTON, BIN 000278

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.570 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061122 RP-BR 0018 (505) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,997 $749 $3,746

TOTAL COST: $2,997 $749 $3,746

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

74 of 305

HIGHWAY PROJECTS - FAYETTE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-19 ProjectDescription

INTERSECTION IMPROVEMENTS AT SR-19 AND SR-172 AND SR-172 AND SR-187

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.250 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063461 STPAA 0019 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2021 $64 $16 $80

100063462 STPAA 0019 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2021 $149 $37 $186

100063463 STPAA 0019 () UTILITIES

INTERSECTION IMPROVEMENTS

2022 $249 $62 $311

100063464 STPAA 0019 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2022 $343 $86 $429

TOTAL COST: $804 $201 $1,005

Route SR-24 ProjectDescription

INTERCHANGE LIGHTING AT SR-24 (CORR V) AND SR-19

Type of Work LIGHTING

Project Length in Miles 0.760 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060599 NH 0024 () CONSTRUCTION

LIGHTING 2020 $841 $210 $1,051

TOTAL COST: $841 $210 $1,051

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

75 of 305

HIGHWAY PROJECTS - FRANKLIN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-243 ProjectDescription

BRIDGE REPLACEMENT (BIN 008912) ON SR-243 OVER CEDAR CREEK (SUFF = 6.0, STAT = 1)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.025 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049146 BR 0243 (504) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $285 $71 $357

100049147 BR 0243 (504) UTILITIES

BRIDGE REPLACEMENT

2020 $115 $29 $144

100040791 BR 0243 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $1,734 $434 $2,168

TOTAL COST: $2,135 $534 $2,669

Route SR-247 ProjectDescription

REPLACE BRIDGE, BIN 008467, SR-247 OVER CEDAR CREEK. (SUFF=46.8, STATUS=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.500 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049911 BR 0247 (501) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $57 $14 $71

100049912 BR 0247 (501) UTILITIES

BRIDGE REPLACEMENT

2020 $57 $14 $72

100049913 BR 0247 (501) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $4,255 $1,064 $5,318

TOTAL COST: $4,369 $1,092 $5,461

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

76 of 305

HIGHWAY PROJECTS - FRANKLIN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CURB RAMP INSTALLATIONS AND MODIFICATIONS ON STATE ROUTES AT VARIOUS LOCATIONS IN GENEVA AND HOUSTON COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060276 STPAA NR13 () CONSTRUCTION

SIDEWALK 2020 $589 $147 $736

TOTAL COST: $589 $147 $736

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

77 of 305

HIGHWAY PROJECTS - GENEVA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

NORTHBOUND AND SOUTHBOUND REST AREA RENOVATIONS ALONG I-59 AT EUTAW

Type of Work REST AREA REHABILITATION

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049320 IM I059 () CONSTRUCTION

REST AREA REHABILITATION

2023 $670 $74 $744

TOTAL COST: $670 $74 $744

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN GREENE AND PICKENS COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060103 STPAA NR13 (926) CONSTRUCTION

SIDEWALK 2020 $236 $59 $295

TOTAL COST: $236 $59 $295

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

78 of 305

HIGHWAY PROJECTS - GREENE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-103 ProjectDescription

BRIDGE REPLACEMENT CR-103 (ERIE ROAD) OVER TRIBUTARY TO WRIGHTS CREEK BIN # 5036 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060342 ACBRZ60342 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $241 $60 $301

TOTAL COST: $241 $60 $301

Route CR-103 ProjectDescription

BRIDGE REPLACEMENT CR-103 (ERIE ROAD) OVER BAPTIZING BRANCH BIN # 5035 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060346 ACBRZ60346 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $267 $67 $333

TOTAL COST: $267 $67 $333

Route CR-12 ProjectDescription

RESURFACE CR-12 FROM SR-25 TO SR-61 (R.A.M.P.)

Type of Work RESURFACING

Project Length in Miles 4.010 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060354 ACNU60354 ATRP (012) CONSTRUCTION

RESURFACING

2018 $1,084 $271 $1,355

TOTAL COST: $1,084 $271 $1,355

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

79 of 305

HIGHWAY PROJECTS - HALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-16 ProjectDescription

BRIDGE REPLACEMENT CR-16 OVER BIG GERMAN CREEK BIN # 8278

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060350 ACBRZ60350 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $126 $32 $158

TOTAL COST: $126 $32 $158

Route CR-16 ProjectDescription

BRIDGE REPLACEMENT (RELIEF) CR-16 OVER BIG GERMAN CREEK BIN # 7946

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060351 ACBRZ60351 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $342 $85 $427

TOTAL COST: $342 $85 $427

Route CR-16 ProjectDescription

RESURFACE CR-16 FROM SR-25 TO SR-61 (R.A.M.P.)

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060355 ACNU60355 ATRP (012) CONSTRUCTION

RESURFACING

2018 $991 $248 $1,239

TOTAL COST: $991 $248 $1,239

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

80 of 305

HIGHWAY PROJECTS - HALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-192 ProjectDescription

BRIDGE REPLACEMENT CR-192 (DUNKIN LOOP ROAD) OVER HARDIN CREEK BIN # 3708 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060336 ACBRZ60336 ATRP (006)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $406 $101 $507

TOTAL COST: $406 $101 $507

Route CR-198 ProjectDescription

BRIDGE REPLACEMENT CR-198 (DAVID CAMPBELL ROAD) OVER GILE CREEK BIN # 12515 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060344 ACBRZ60344 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $404 $101 $504

TOTAL COST: $404 $101 $504

Route CR-2 ProjectDescription

REPLACE BRIDGE CR-2 OVER YELLOW CREEK TRIBUTARY BIN # 15728

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060353 ACBRZ60353 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $90 $22 $112

TOTAL COST: $90 $22 $112

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

81 of 305

HIGHWAY PROJECTS - HALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-21 ProjectDescription

REPLACE BRIDGE (CR-21) SOUTH BYPASS BIN # 7050 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060356 ACBRZ60356 ATRP (014)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $306 $76 $382

TOTAL COST: $306 $76 $382

Route CR-28 ProjectDescription

REPLACE BRIDGE CR-28 OVER BIG GERMAN CREEK TRIBUTARY BIN # 2825

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060352 ACBRZ60352 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $90 $22 $112

TOTAL COST: $90 $22 $112

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

82 of 305

HIGHWAY PROJECTS - HALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-40 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-40 (GREER CREEK ROAD) OVER GREER CREEK AND TRIBUTARY TO GREER CREEK BIN # 5029 AND 6854 BIN# 5030 (R.A.M.P.)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060338 ACBRZ60338 ATRP (006)

CONSTRUCTION

BRIDGES AND APPROACHES

2019 $698 $174 $872

TOTAL COST: $698 $174 $872

Route CR-50 ProjectDescription

BRIDGE REPLACEMENT CR-50 OVER ELLIOT'S CREEK BIN # 9729

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060348 ACBR60348 ATRP (012) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $360 $90 $450

TOTAL COST: $360 $90 $450

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

83 of 305

HIGHWAY PROJECTS - HALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-51 ProjectDescription

BRIDE REPLACEMENT (RELIEF) OVER BIG BRUSH CREEK ON CR-51 BIN # 10051

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060349 ACBRZ60349 ATRP (012)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $358 $89 $447

TOTAL COST: $358 $89 $447

Route NA- ProjectDescription

WETLAND MITIGATION AREA AT PRAIRIE CREEK

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064688 STPAA 3315 () CONSTRUCTION

UNCLASSIFIED 2019 $400 $100 $500

TOTAL COST: $400 $100 $500

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN PERRY AND HALE COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060105 STPAA NR13 () CONSTRUCTION

SIDEWALK 2020 $276 $69 $345

TOTAL COST: $276 $69 $345

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

84 of 305

HIGHWAY PROJECTS - HALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-25 ProjectDescription

RESURFACING AND LIME STABILIZATION ON SR-25 FROM 1.7 MILES SOUTH CR-10 (MP-41.180) TO PICKS CREEK (MP-48.026).

Type of Work RESURFACING

Project Length in Miles 6.846 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057824 STPAA 0025 (535) CONSTRUCTION

RESURFACING

2021 $2,436 $609 $3,045

TOTAL COST: $2,436 $609 $3,045

Route SR-25 ProjectDescription

RESURFACING AND LIME STABILIZATION ON SR-25 FROM MARENGO COUNTY LINE (MP 37.007) TO .35 MILE SOUTH OF CR-57 (MP 41.153) AND FROM .65 MILE SOUTH OF CR-54 (MP 48.180) TO INTERSECTION OF SR-69 IN GREENSBORO.

Type of Work RESURFACING

Project Length in Miles 7.580 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057826 STPAA 0025 (536) CONSTRUCTION

RESURFACING

2021 $876 $219 $1,095

TOTAL COST: $876 $219 $1,095

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

85 of 305

HIGHWAY PROJECTS - HALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-10 ProjectDescription

REPLACE BRIDGE, BIN 002543, SR-10 OVER MCRAE MILL CREEK (SUFF=55.2, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.086 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049234 BR 0010 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $4,040 $1,010 $5,050

TOTAL COST: $4,040 $1,010 $5,050

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

86 of 305

HIGHWAY PROJECTS - HENRY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-25 ProjectDescription

CR-25 (DENTON RD) ADD LANES FROM SR-210 (ROSS CLARK CIRCLE) TO WESTGATE PARKWAY

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.203 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100008618 STPOA 9450 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $4,331 $2,231 $6,561

TOTAL COST: $4,331 $2,231 $6,561

Route CR-33 ProjectDescription

RESURFACE CR-33 FROM THE SOUTH CITY LIMIT OF ASHFORD TO OLD US HIGHWAY 84

Type of Work RESURFACING

Project Length in Miles 1.290 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065701 STPOA 3516 () CONSTRUCTION

RESURFACING

2021 $193 $48 $241

TOTAL COST: $193 $48 $241

Route CR-41 ProjectDescription

RESURFACE CR-41 (WALDEN DRIVE) FROM KINSEY ROAD TO BROAD STREET

Type of Work RESURFACING

Project Length in Miles 1.770 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065702 STPOA 3516 () CONSTRUCTION

RESURFACING

2021 $326 $82 $408

TOTAL COST: $326 $82 $408

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

87 of 305

HIGHWAY PROJECTS - HOUSTON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-51 ProjectDescription

RESURFACE CR-51 (BETHEL ROAD) FROM CR-41 (BROAD STREET) TO SR-1 (US-431)

Type of Work RESURFACING

Project Length in Miles 0.890 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065705 STPOA 3516 () CONSTRUCTION

RESURFACING

2022 $148 $37 $185

TOTAL COST: $148 $37 $185

Route CR-55 ProjectDescription

RESURFACE CR-55 (BROADWAY STREET) FROM THE SOUTH CITY LIMIT OF ASHFORD TO OLD US HIGHWAY 84

Type of Work RESURFACING

Project Length in Miles 0.830 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065706 STPOA 3516 () CONSTRUCTION

RESURFACING

2023 $172 $43 $215

TOTAL COST: $172 $43 $215

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

88 of 305

HIGHWAY PROJECTS - HOUSTON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-65 ProjectDescription

RESURFACE CR-65 (COWARTS CREEK RD/SOUTH BROAD STREET) FROM CR-24 (LUCY GRADE ROAD) TO SR-12 (US-84)

Type of Work RESURFACING

Project Length in Miles 2.767 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065697 STPOA 3516 () CONSTRUCTION

RESURFACING

2023 $364 $91 $455

TOTAL COST: $364 $91 $455

Route CR-65 ProjectDescription

RESURFACE CR-65 (N BROAD STREET) AND CR-41 (OMUSSEE ROAD) FROM SR-12 (US-84) TO SR-52 ( COLUMBIA HIGHWAY)

Type of Work RESURFACING

Project Length in Miles 3.320 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065698 STPOA 3516 () CONSTRUCTION

RESURFACING

2020 $464 $116 $580

TOTAL COST: $464 $116 $580

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

89 of 305

HIGHWAY PROJECTS - HOUSTON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE SUGGS ROAD FROM HEADLAND AVENUE TO THE HOUSTON/HENRY COUNTY LINE

Type of Work RESURFACING

Project Length in Miles 0.970 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065703 STPOA 3516 () CONSTRUCTION

RESURFACING

2021 $198 $50 $248

TOTAL COST: $198 $50 $248

Route CR-NA ProjectDescription

RESURFACE HOSEA ROAD FROM THE GENEVA / HOUSTON COUNTY LINE TO SR-605 (BRANNON STAND ROAD)

Type of Work RESURFACING

Project Length in Miles 0.970 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065704 STPOA 3516 () CONSTRUCTION

RESURFACING

2022 $146 $37 $183

TOTAL COST: $146 $37 $183

Route SR-210 ProjectDescription

ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM US-231 SOUTH TO BAUMAN DRIVE

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.700 Urban Area DOTHAN COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062175 NHF 0210 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2023 $4,087 $1,022 $5,109

TOTAL COST: $4,087 $1,022 $5,109

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

90 of 305

HIGHWAY PROJECTS - HOUSTON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-117 ProjectDescription

REHABILITATE BIN #006378 OVER TENNESSE RIVER AND BIN #006377 OVER TENNESSEE RIVER RELIEF

Type of Work BRIDGE REHABILITATION

Project Length in Miles 1.200 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100002736 BR 0117 (506) RIGHT OF WAY

BRIDGE REHABILITATION

2020 $300 $75 $374

100002735 BR 0117 () CONSTRUCTION

BRIDGE REHABILITATION

2021 $11,678 $2,920 $14,598

TOTAL COST: $11,978 $2,994 $14,972

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

91 of 305

HIGHWAY PROJECTS - JACKSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-35 ProjectDescription

SR-35 ADDITIONAL LANES FROM CR-62 (WILLIAM ST) TO NORTH OF CR-124 (SCENIC DR)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.136 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100053776 NH 0035 () UTILITIES

ADDITIONAL ROADWAY LANES

2025 $2,101 $525 $2,626

100053774 NH 0035 (523) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2025 $5,580 $1,395 $6,976

TOTAL COST: $7,681 $1,920 $9,601

Route SR-35 ProjectDescription

SR-35 ADDITIONAL LANES FROM CR-124(SCENIC DR) TO THE TENNESSEE RIVER

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.314 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049112 NHF 0035 (507) UTILITIES

ADDITIONAL ROADWAY LANES

2025 $2,764 $691 $3,455

100038314 NHF 0035 (507) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2025 $25,198 $6,299 $31,497

TOTAL COST: $27,962 $6,990 $34,952

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

92 of 305

HIGHWAY PROJECTS - JACKSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-18 ProjectDescription

EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064232 STPBH 3715 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2020 $1,600 $400 $2,000

100064233 STPBH 3715 () UTILITIES

ADDITIONAL ROADWAY LANES

2020 $1,360 $340 $1,700

100064234 STPBH 3715 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $5,045 $1,261 $6,306

TOTAL COST: $8,005 $2,001 $10,006

Route CR-2303 ProjectDescription

CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.

Type of Work RAMP REVISIONS

Project Length in Miles 0.560 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040771 STPBHF 7026 (601) CONSTRUCTION

RAMP REVISIONS

2020 $10,723 $2,681 $13,403

TOTAL COST: $10,723 $2,681 $13,403

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

93 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-30 ProjectDescription

CR-30 (OLD SPRINGVILLE RD) IMPROVEMENTS TO VARIOUS INTERSECTIONS FROM CARDINAL DRIVE TO CR-153 (CLAY/TRUSSVILLE RD) CITY OF CLAY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056273 STPBH 7245 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $2,040 $510 $2,550

100056275 STPBH 7245 () UTILITIES

INTERSECTION IMPROVEMENTS

2022 $1,128 $282 $1,410

TOTAL COST: $3,168 $792 $3,960

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

94 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-337 ProjectDescription

RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337 (MCCALLA ROAD) FROM CR-20 (OLD TUSCALOOSA HIGHWAY) TO CR-18 (EASTERN VALLEY ROAD)

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059497 ACAA59497 ATRP (007) CONSTRUCTION

RESURFACING

2020 $1,257 $314 $1,571

TOTAL COST: $1,257 $314 $1,571

Route CR-337 ProjectDescription

RESURFACING AND TURN LANES ON CR-337 (MCCALLA ROAD) FROM CR-18 (EASTERN VALLEY ROAD) TO CR-20 (OLD TUSCALOOSA HIGHWAY)

Type of Work TURN LANES

Project Length in Miles 0.960 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060502 STPBH 3713 () RIGHT OF WAY

TURN LANES 2019 $1,572 $393 $1,965

100060504 STPBH 3713 () UTILITIES

TURN LANES 2019 $560 $140 $700

TOTAL COST: $2,132 $533 $2,665

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

95 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-46 ProjectDescription

CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056290 STPBH 7021 (600) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $1,200 $300 $1,500

TOTAL COST: $1,200 $300 $1,500

Route CR-52 ProjectDescription

CR-52 (MORGAN RD) ADDITIONAL LANES FROM I-459 TO CR-2 (SOUTH SHADES CREST RD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 2.470 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007542 STPBH 7002 (600) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $9,907 $2,477 $12,383

TOTAL COST: $9,907 $2,477 $12,383

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

96 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-6 ProjectDescription

>PARKWOOD RD IMPROVEMENTS - PHASE 3 PARKWOOD ROADATPINELANE SE AND HILLTOP ROAD.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007636 STPBH 9802 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $9 $2 $11

100007630 STPBH 9802 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $709 $177 $886

TOTAL COST: $718 $179 $897

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

97 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-65 ProjectDescription

BRIDGES ON CR-65 MINOR RD TO BIRMINGPORT RD (ENS ADM)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.050 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007588 STPBH 7147 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,710 $427 $2,137

TOTAL COST: $1,710 $427 $2,137

Route CR-65 ProjectDescription

CR-65 (HILLCREST RD) FROM SR-5(US-78) TO CORRIDOR X (PRELIMINARY ENGINEERING-DESIGN)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040404 STPBH 7174 (600) PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $487 $122 $608

100038801 STPBH 7174 () RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2021 $6,650 $1,663 $8,313

100040405 STPBH 7174 () UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2022 $158 $39 $197

100038803 STPBH 7174 () CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2022 $8,800 $2,200 $11,000

TOTAL COST: $16,095 $4,024 $20,118

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

98 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-94 ProjectDescription

CR-94 (DANIEL PAYNE DRIVE) ADD CONTINUOUS TWO-WAY LEFT TURN LANE FROM CR-105 (CHERRY AVE) TO I-65 (PROJECT SPONSOR THE CITY OF BIRMINGHAM)

Type of Work TURN LANES

Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100042371 STPBH 3716 () RIGHT OF WAY

TURN LANES 2020 $45 $11 $56

100042372 STPBH 3716 () UTILITIES

TURN LANES 2020 $146 $36 $182

100042373 STPBH 3716 () CONSTRUCTION

TURN LANES 2020 $1,947 $487 $2,433

TOTAL COST: $2,138 $534 $2,672

Route CR-NA ProjectDescription

FINLEY BLVD. EXT FROM 26TH STREET (US-31) TO 27TH AVENUE NEAR 32ND STREET NORTH

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059888 STPBH 7173 () UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $3,041 $760 $3,801

100046959 STPBH 7173 () CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $19,882 $4,971 $24,853

TOTAL COST: $22,924 $5,731 $28,655

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

99 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

>VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060490 STPBH 9802 (904) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $80 $20 $100

100007628 STPBH 9802 (904) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $5,245 $1,311 $6,556

TOTAL COST: $5,325 $1,331 $6,656

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD RD. AND MONTEVALLO RD., SITE 3. CROSSHAVEN DR. AND GREEN VALLEY DR.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007629 STPBH 9802 (924) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $2,655 $664 $3,318

TOTAL COST: $2,655 $664 $3,318

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

100 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

GALLERIA BOULEVARD EXTENSION FROM CR-458 (LORNA ROAD) TO SR-150

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.350 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056488 STPBH 3715 (255) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2020 $400 $100 $500

100056489 STPBH 3715 (255) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2020 $3,200 $800 $4,000

TOTAL COST: $3,600 $900 $4,500

Route CR-NA ProjectDescription

HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.

Type of Work TURN LANES

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007555 STPBH 7020 (601) CONSTRUCTION

TURN LANES 2019 $2,017 $504 $2,521

TOTAL COST: $2,017 $504 $2,521

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

101 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

>GARDENDALE - MAIN STREET FR TARRANT DR. TO REDMAYNE RD. PROJECT SPONSOR: JEFFERSON COUNTY.

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007597 STPBH 7164 (600) RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2020 $275 $69 $343

100007595 STPBH 7164 (600) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2021 $1,638 $409 $2,047

TOTAL COST: $1,912 $478 $2,390

Route CR-NA ProjectDescription

EAST LAKE BLVD FROM 39TH ST TO 40TH ST N, ADD TURN LANES ; WEST OF B'HAM INTERNATIONAL AIRPORT (PHASE 2)

Type of Work TURN LANES

Project Length in Miles 0.170 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100053046 STPBH 7173 () CONSTRUCTION

TURN LANES 2020 $240 $60 $300

TOTAL COST: $240 $60 $300

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

102 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

JEFFERSON COUNTY TOPICS (PHASE 9) TARRANT HUFFMAN ROAD FROM SR-79 (OLD PINSON HIGHWAY) TO TREADWELL ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007609 STPBH 7229 (602) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2021 $3,691 $923 $4,614

TOTAL COST: $3,691 $923 $4,614

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059460 STPBH 3717 (250) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,644 $411 $2,055

TOTAL COST: $1,644 $411 $2,055

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

103 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029563 STPBH 9802 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $243 $61 $304

100029566 STPBH 9802 () UTILITIES

UTILITY ADJUSTMENT

2020 $658 $164 $822

100029510 STPBH 9802 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $3,597 $899 $4,496

TOTAL COST: $4,498 $1,125 $5,623

Route CR-NA ProjectDescription

ITS TRAFFIC SIGNALIZATION, SYSTEM WIDE TIMING PLAN AND PHASE 1 EQUIPMENT UPGRADE PLAN FOR TRAFFIC SIGNAL SYSTEM AT 100 INTERSECTIONS

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039866 CMAQ NR01 () PRELIMINARY ENGINEERING

SIGNALIZATION 2020 $747 $187 $933

100039867 CMAQ NR01 () CONSTRUCTION

SIGNALIZATION 2020 $1,352 $338 $1,691

TOTAL COST: $2,099 $525 $2,624

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

104 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 2

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039868 CMAQ NR04 () PRELIMINARY ENGINEERING

SIGNALIZATION 2020 $575 $144 $719

100039869 CMAQ NR04 () CONSTRUCTION

SIGNALIZATION 2020 $3,452 $863 $4,315

TOTAL COST: $4,027 $1,007 $5,034

Route CR-NA ProjectDescription

ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 3

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039870 CMAQ NR06 () PRELIMINARY ENGINEERING

SIGNALIZATION 2020 $575 $144 $719

100039871 CMAQ NR06 () CONSTRUCTION

SIGNALIZATION 2020 $3,452 $863 $4,315

TOTAL COST: $4,027 $1,007 $5,034

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

105 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059893 HPP-STPBH 1602 (519) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $876 $219 $1,095

100033434 HPP-STPBH 1602 (519) UTILITIES

BRIDGE REPLACEMENT

2019 $424 $106 $530

100059894 STPBH 1602 (519) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,680 $420 $2,100

TOTAL COST: $2,980 $745 $3,725

Route CR-NA ProjectDescription

RESURFACE RUTLEDGE DRIVE FROM CR-56(ALLISON BONNETT MEMORIAL DRIVE) TO WOODWARD ROAD AND RESURFACE WILKES ROAD FROM WOODWARD ROAD TO SR-5 (US-11) CITY OF MIDFIELD

Type of Work RESURFACING

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059488 ACAA59488 ATRP (006) CONSTRUCTION

RESURFACING

2019 $674 $169 $843

TOTAL COST: $674 $169 $843

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

106 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANE AT CALDWELL MILL ROAD AND JAGUAR DRIVE IN THE CITY OF HOOVER

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062345 CMAQ 3714 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2020 $40 $10 $50

100062346 CMAQ 3714 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $40 $10 $50

100062347 CMAQ 3714 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $90 $22 $112

100062348 CMAQ 3714 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $692 $173 $865

TOTAL COST: $862 $216 $1,078

Route CR-NA ProjectDescription

ROADWAY AND INTERSECTION IMPROVEMENTS ON CAHABA RIVER ROAD FROM SR-38 (US-280) TO KEY DRIVE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 3.350 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063245 STPBH 3716 (252) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $800 $200 $1,000

100063246 STPBH 3716 (252) UTILITIES

INTERSECTION IMPROVEMENTS

2021 $1,000 $250 $1,250

100063247 STPBH 3716 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2021 $4,150 $1,037 $5,187

TOTAL COST: $5,950 $1,487 $7,437

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

107 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS CAHABA RD/SR-38(US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064200 CMAQ 3715 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $300 $75 $375

100064201 CMAQ 3715 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $420 $105 $526

100064202 CMAQ 3715 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $1,779 $445 $2,224

TOTAL COST: $2,499 $625 $3,124

Route CR-NA ProjectDescription

UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064216 STPBH 3716 () CONSTRUCTION

LIGHTING 2019 $800 $200 $1,000

TOTAL COST: $800 $200 $1,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

108 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

PAVEMENT REHABILITATION ON LAKESHORE PARKWAY FROM VENICE ROAD TO LEAF LAKE DRIVE

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064225 STPBH 3715 () CONSTRUCTION

PAVEMENT REHABILITATION

2019 $800 $200 $1,000

TOTAL COST: $800 $200 $1,000

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064311 CMAQ 3715 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $160 $40 $200

100064312 CMAQ 3715 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $160 $40 $200

100064313 CMAQ 3715 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $480 $120 $600

TOTAL COST: $800 $200 $1,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

109 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK, CITY OF MOUNTAIN BROOK

Type of Work BRIDGE REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066111 STPBH 3716 (256) RIGHT OF WAY

BRIDGE REHABILITATION

2020 $80 $20 $100

100066112 STPBH 3716 (256) UTILITIES

BRIDGE REHABILITATION

2020 $80 $20 $100

100066113 STPBH 3716 () CONSTRUCTION

BRIDGE REHABILITATION

2020 $880 $220 $1,100

TOTAL COST: $1,040 $260 $1,300

Route CR-NA ProjectDescription

13TH STREET SOUTH - ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS FROM 1ST AVE SOUTH TO 10TH AVE SOUTH

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068127 CMAQ 3718 () PRELIMINARY ENGINEERING

STREETSCAPE

2019 $299 $75 $374

100068128 CMAQ 3718 () UTILITIES

STREETSCAPE

2021 $82 $21 $103

100068129 CMAQ 3718 () CONSTRUCTION

STREETSCAPE

2021 $1,714 $429 $2,143

TOTAL COST: $2,096 $524 $2,620

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

110 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -20 ProjectDescription

CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FR DMS #5 (3/4 MI WEST OF ENSLEY AVE (EXIT120)) TO I-65 (EXIT 124) AND ALONG US-280 FR SR-119 TO I-20/I-59 (EXIT 126), INCLUDES CCTV, RADAR, ETC. ELECTRONIC DEVICES AND EQUIPMENT

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046084 CMAQ NR05 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $52 $13 $66

100046086 CMAQ NR05 () CONSTRUCTION

UNCLASSIFIED 2020 $1,049 $262 $1,312

100046085 CMAQ NR05 () SPECIAL

UNCLASSIFIED 2020 $193 $48 $242

TOTAL COST: $1,295 $324 $1,619

Route I -20 ProjectDescription

PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE JEFFERSON/ST CLAIR COUNTY LINE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068066 IM I020 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $6,300 $700 $7,000

TOTAL COST: $6,300 $700 $7,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

111 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -459 ProjectDescription

INTERCHANGE LIGHTING ON I-459 AT CR-18 (EXIT #1) AND CR-52 (EXIT #6) (PRIORITY #29)

Type of Work LIGHTING

Project Length in Miles 4.564 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100005120 IM I459 () CONSTRUCTION

LIGHTING 2020 $1,617 $180 $1,797

TOTAL COST: $1,617 $180 $1,797

Route I -459 ProjectDescription

COLONNADE DRIVE RELOCATION (GRADE, DRAIN, BASE, PAVE, AND RETAINING WALL)

Type of Work RAMP REVISIONS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038955 IM I459 (306) CONSTRUCTION

RAMP REVISIONS

2021 $1,854 $206 $2,059

TOTAL COST: $1,854 $206 $2,059

Route I -459 ProjectDescription

I-459, RAMP MODIFICATIONS AT THE SR-38 (US-280) INTERCHANGE (PHASE 3)

Type of Work RAMP REVISIONS

Project Length in Miles 0.080 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063754 IM I459 () CONSTRUCTION

RAMP REVISIONS

2022 $26,250 $2,917 $29,167

TOTAL COST: $26,250 $2,917 $29,167

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

112 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -459 ProjectDescription

INTERCHANGE AT I-459 AND CR-2 (SOUTH SHADES CREST ROAD) INCLUDES BRIDGE OVER INTERSTATE AND RAMP BRIDGE OVER RAILROAD, CITY OF HOOVER

Type of Work INTERCHANGE

Project Length in Miles 0.002 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062062 STPBHF I459 (310) PRELIMINARY ENGINEERING

INTERCHANGE

2020 $1,200 $300 $1,500

100056292 STPBHF I459 (310) RIGHT OF WAY

INTERCHANGE

2021 $1,600 $400 $2,000

TOTAL COST: $2,800 $700 $3,500

Route I -59 ProjectDescription

PAVEMENT REHABILITATION ON I-20/59 FROM ARKADELPHIA ROAD TO THE SOUTH END OF THE CENTRAL BUSINESS DISTRICT BRIDGE NEAR 15TH STREET AND ON I-65 FROM SOUTH OF 1ST AVENUE NORTH TO 16TH STREET NORTH

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063656 IM I059 (410) CONSTRUCTION

PAVEMENT REHABILITATION

2020 $14,048 $1,561 $15,609

TOTAL COST: $14,048 $1,561 $15,609

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

113 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -59 ProjectDescription

RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE

Type of Work RESURFACING

Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062068 IM I059 () CONSTRUCTION

RESURFACING

2020 $12,593 $1,399 $13,993

TOTAL COST: $12,593 $1,399 $13,993

Route I -59 ProjectDescription

ADD LANES ON I-59 FROM 18TH/19TH STREET (EXIT112) TO VALLEY ROAD (EXIT 118)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 6.270 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056495 NH I059 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2024 $300 $75 $375

100039736 IM-NH I059 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2026 $352 $43 $395

TOTAL COST: $652 $118 $770

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

114 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -59 ProjectDescription

SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)

Type of Work SIGN REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100042475 IM I059 () CONSTRUCTION

SIGN REHABILITATION

2019 $3,766 $418 $4,184

TOTAL COST: $3,766 $418 $4,184

Route I -59 ProjectDescription

CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FROM 0.75 MILE WEST OF ENSLEY AVE (EXIT 120) TO I-65 (EXIT 124) AND ALONG SR-38 (US-280) FROM SR-119 TO I-59 (EXIT 126), INCLUDES FIBER, POLES, ECT, NONE ELECTRONICS

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046082 CMAQ NR05 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $89 $22 $111

100046083 CMAQ NR05 () CONSTRUCTION

UNCLASSIFIED 2020 $1,181 $295 $1,477

TOTAL COST: $1,270 $317 $1,587

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

115 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -59 ProjectDescription

I-59 FR MP 132.16AT1ST AV N TO MP 137.19ATI-459 6 LANES

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064120 NH I059 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2024 $1,750 $437 $2,187

100045051 NH I059 () UTILITIES

ADDITIONAL ROADWAY LANES

2026 $122 $30 $152

100004982 NH I059 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2027 $39,061 $9,765 $48,826

TOTAL COST: $40,932 $10,233

$51,166

Route I -59 ProjectDescription

RECONSTRUCTION AND LANE ADDITION ON I-59 FROM I-459 TO CR-10 (CHALKVILLE MOUNTAIN ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064600 IM-NH I059 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2025 $469 $83 $552

100064602 IM-NH I059 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2028 $20,315 $3,585 $23,900

TOTAL COST: $20,784 $3,668 $24,452

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

116 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

ROADWAY LIGHTING I-65 FROM 5100' SOUTH OF ALFORD AVENUE TO 6TH AVENUE NORTH

Type of Work LIGHTING

Project Length in Miles 7.700 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048475 STPBH I065 (445) CONSTRUCTION

LIGHTING 2021 $5,556 $1,389 $6,945

TOTAL COST: $5,556 $1,389 $6,945

Route I -65 ProjectDescription

CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM US-31 TO RALEIGH AVENUE. OVERPASS (PRIORITY #35)

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055415 IM I065 () CONSTRUCTION

PAVEMENT REHABILITATION

2020 $9,414 $1,046 $10,460

TOTAL COST: $9,414 $1,046 $10,460

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

117 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

PLANING, RESURFACING, STRIPING, MARKINGS AND SAFETY IMPROVEMENTS TO GUARDRAILS AND GUARDRAIL END ANCHORS ON I-65 FROM MOUNT OLIVE INTERCHANGE TO .78 MILE NORTH OF SR-160

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 13.400 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060142 IM-HSIP I065 (484) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $20,036 $2,226 $22,262

TOTAL COST: $20,036 $2,226 $22,262

Route NA- ProjectDescription

OXMOOR VALLEY GREENWAY-BIKE TRAIL PROJECT SPONSOR:CITY OF BIRMINGHAM (1.) FROM SAND RIDGE/LITTLE SHADES CREEK TO OXMOOR VILLAGE CENTER.

Type of Work UNCLASSIFIED

Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029522 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $1,450 $363 $1,813

TOTAL COST: $1,450 $363 $1,813

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

118 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

HOOVER-TRAFFIC CONTROL CENTER

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029518 STPBH 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $198 $49 $247

TOTAL COST: $198 $49 $247

Route NA- ProjectDescription

SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO GRADE, DRAIN, BASE, PAVE, BRIDGE, STRIPING, SIGNING AND LANDSCAPING CITY OF HOMEWOOD JEFFERSON COUNTY

Type of Work UNCLASSIFIED

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029525 CMAQ 9802 (911) CONSTRUCTION

UNCLASSIFIED 2019 $2,945 $736 $3,682

100029526 CMAQ 9802 (912) CONSTRUCTION

UNCLASSIFIED 2021 $4,735 $1,184 $5,919

TOTAL COST: $7,680 $1,920 $9,600

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

119 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

BESSEMER RAIL TO TRAIL CONVERSION PROJECT FROM THE HOOVER CITY LIMITS NEAR PARKWOOD TO SR-150 AT LAKESHORE PARKWAY CONNECTION -CITY OF BESSEMER PROJECT SPONSOR

Type of Work UNCLASSIFIED

Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029565 CMAQ 9802 () RIGHT OF WAY

UNCLASSIFIED 2020 $633 $158 $791

100029524 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $1,114 $278 $1,392

TOTAL COST: $1,746 $437 $2,183

Route NA- ProjectDescription

"CBD INCIDENT AND CONGESTION MANAGMENT PROGRAM"

Type of Work UNCLASSIFIED

Project Length in Miles 0.270 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029534 CMAQ 9802 (926) CONSTRUCTION

UNCLASSIFIED 2020 $1,367 $342 $1,709

TOTAL COST: $1,367 $342 $1,709

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

120 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CONGESTION MGT TRAFFIC SYSTEM (PHASE 7) FIBER OPTIC CABLE MESSAGE SIGNS AND VEHICLE DETECTION DEVICES, SR-3 FR UNIV. BLVD TO SR-38 THEN SR-38 FR SR-3 TO SR-119

Type of Work UNCLASSIFIED

Project Length in Miles 16.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029515 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $4,603 $1,151 $5,754

TOTAL COST: $4,603 $1,151 $5,754

Route NA- ProjectDescription

CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 3 AND 3A PROJECT SPONSOR: ALDOT, TRANSPORTATION MANAGEMENT CENTER TO BE BUILT AT 3RD DIVISION COMPLEX

Type of Work UTILITY ADJUSTMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040855 CMAQ 9802 () UTILITIES

UTILITY ADJUSTMENT

2020 $12 $3 $14

100029517 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2021 $4,881 $1,220 $6,102

TOTAL COST: $4,893 $1,223 $6,116

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

121 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM (PHASE 4) PROJECT SPONSOR:ALDOT,REGIONAL HIGHWAY RADIO: TO BE BUILTATCORNER 26TH ST AND 12 AVE N

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029519 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $575 $144 $719

TOTAL COST: $575 $144 $719

Route NA- ProjectDescription

TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)

Type of Work UNCLASSIFIED

Project Length in Miles 5.900 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052630 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $1,151 $288 $1,439

TOTAL COST: $1,151 $288 $1,439

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

122 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

OLD LEEDS ROAD BICYCLE LANES FROM IRONDALE CITY LIMITS/ BERMUDA DR TO GRANTS MILL. WIDEN TO 31 FT TO ACCOMMODATE TWO 14-FOOT WIDE TRAVEL LANES WITH THE REMAINDER AS PAVED SHOULDER. PROJECT SPONSOR: IRONDALE

Type of Work UNCLASSIFIED

Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032371 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $600 $150 $750

TOTAL COST: $600 $150 $750

Route NA- ProjectDescription

>SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD

Type of Work UNCLASSIFIED

Project Length in Miles 2.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032397 CMAQ 9802 () RIGHT OF WAY

UNCLASSIFIED 2019 $63 $16 $78

TOTAL COST: $63 $16 $78

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

123 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CITY OF BIRMINGHAM ARTERIAL CCTV 41 INTERSECTIONS WITH FIBER OPTIC CABLE INSTALLED, PHASE 2.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033183 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $426 $106 $532

TOTAL COST: $426 $106 $532

Route NA- ProjectDescription

VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N

Type of Work UNCLASSIFIED

Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039850 CMAQ NR03 () RIGHT OF WAY

UNCLASSIFIED 2021 $174 $44 $218

100039851 CMAQ NR03 () CONSTRUCTION

UNCLASSIFIED 2022 $1,763 $441 $2,204

TOTAL COST: $1,938 $484 $2,422

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

124 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET

Type of Work UNCLASSIFIED

Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039846 CMAQ NR02 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2019 $513 $128 $641

100039847 CMAQ NR02 () RIGHT OF WAY

UNCLASSIFIED 2020 $259 $65 $324

100039848 CMAQ NR02 () CONSTRUCTION

UNCLASSIFIED 2021 $2,619 $655 $3,273

TOTAL COST: $3,390 $848 $4,238

Route NA- ProjectDescription

VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N

Type of Work UNCLASSIFIED

Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039849 CMAQ NR03 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $345 $86 $432

TOTAL COST: $345 $86 $432

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

125 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

VALLEY CREEK GREENWAY FROM 12TH STREET AT RICKWOOD FIELD TO AVENUE W AT FIVE POINTS WEST

Type of Work UNCLASSIFIED

Project Length in Miles 1.950 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039852 CMAQ NR06 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $460 $115 $575

100039853 CMAQ NR06 () RIGHT OF WAY

UNCLASSIFIED 2020 $138 $35 $173

100039854 CMAQ NR06 () CONSTRUCTION

UNCLASSIFIED 2020 $460 $115 $575

TOTAL COST: $1,059 $265 $1,323

Route NA- ProjectDescription

ITS FIBER OPTIC PLAN, CITY WIDE FOR ITS ARTERIAL INCIDENT MGT.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039861 STPBH NR01 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $135 $34 $169

TOTAL COST: $135 $34 $169

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

126 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

ITS MONITORS, VIDEO CAMERA, 7 LOCATIONS. EMERGENGY RESPONSE ROUTING

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039864 STPBH NR01 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $19 $5 $23

100039865 STPBH NR01 () CONSTRUCTION

UNCLASSIFIED 2020 $187 $47 $234

TOTAL COST: $206 $51 $257

Route NA- ProjectDescription

ITS MONITORS, VIDEO CAMERAS NSRR, 41ST ST NORTH TO BRUSSELS CIRCLE ( RAILROAD CROSSING)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039872 STPBH NR01 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $140 $35 $175

100039873 STPBH NR01 () CONSTRUCTION

UNCLASSIFIED 2020 $234 $58 $292

TOTAL COST: $374 $94 $468

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

127 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CAHABA RIVER EAST GREENWAY; OFF CR-115-1 (OLD ROCKY RIDGE RD) NEAR CHESTNUT RIDGE (SUB-DIVISION) AND CAHABA RIVER

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039922 CMAQ CN07 (911) CONSTRUCTION

UNCLASSIFIED 2020 $449 $112 $561

TOTAL COST: $449 $112 $561

Route NA- ProjectDescription

CAHABA RIVER GREENWAY-PHASE 3 (TRUSSVILLE) CORRIDOR STUDY FOR A PEDESTRIAN BRIDGE OVER THE CAHABA RIVER, SOUTH OF SR-7 (US-11)

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048496 CMAQ PE07 (912) PRELIMINARY ENGINEERING

CORRIDOR STUDY

2020 $41 $10 $52

TOTAL COST: $41 $10 $52

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

128 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

CAHABA RIVER GREENWAY-PHASE 4 (TRUSSVILLE) CORRIDOR STUDY FOR WALKWAY AND TRAILHEAD CONNECTING CONNECTING SENIOR CENTER TO THE CAHABA RIVER GREENWAY, NORTH OF SR-7 (US-11)

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048497 CMAQ PE07 (911) PRELIMINARY ENGINEERING

CORRIDOR STUDY

2020 $41 $10 $52

TOTAL COST: $41 $10 $52

Route NA- ProjectDescription

RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE

Type of Work UNCLASSIFIED

Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054521 STPBH 3716 (250) CONSTRUCTION

UNCLASSIFIED 2019 $2,724 $681 $3,405

TOTAL COST: $2,724 $681 $3,405

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

129 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD

Type of Work STREETSCAPE

Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056316 STPBH 7117 () CONSTRUCTION

STREETSCAPE

2020 $2,613 $653 $3,266

TOTAL COST: $2,613 $653 $3,266

Route NA- ProjectDescription

SIDEWALKS ON PARTS OF 24 TH STREET NORTH, BERKLEY AVENUE, ARLINGTON AVENUE AND OWEN AVENUE IN BESSEMER

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056510 CMAQ NR13 (954) CONSTRUCTION

SIDEWALK 2019 $546 $137 $683

TOTAL COST: $546 $137 $683

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

130 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

SIDEWALKS ALONG CR-99 (COLUMBIANA RD) FROM SR-3 (US-31,MONTGOMERY HIGHWAY) TO SHADES CREST RD IN VESTAVIA HILLS

Type of Work SIDEWALK

Project Length in Miles 1.350 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056515 CMAQ NR13 () PRELIMINARY ENGINEERING

SIDEWALK 2020 $189 $47 $236

100056516 CMAQ NR13 () RIGHT OF WAY

SIDEWALK 2021 $92 $23 $115

100056517 CMAQ NR13 () UTILITIES

SIDEWALK 2022 $90 $22 $112

TOTAL COST: $371 $93 $463

Route NA- ProjectDescription

REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK

Type of Work UNCLASSIFIED

Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056520 CMAQ RW13 () RIGHT OF WAY

UNCLASSIFIED 2019 $90 $23 $113

100056521 CMAQ UT14 () UTILITIES

UNCLASSIFIED 2019 $87 $22 $108

100056522 CMAQ CN14 () CONSTRUCTION

UNCLASSIFIED 2019 $568 $142 $710

TOTAL COST: $745 $186 $931

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

131 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)

Type of Work SIDEWALK

Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056541 CMAQ 7282 (600) CONSTRUCTION

SIDEWALK 2019 $824 $206 $1,030

TOTAL COST: $824 $206 $1,030

Route NA- ProjectDescription

SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOUDLAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK GRADE, DRAIN, CURB AND GUTTER, AND SIDEWALK

Type of Work SIDEWALK

Project Length in Miles 1.420 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056547 CMAQ 3715 (254) CONSTRUCTION

SIDEWALK 2019 $742 $185 $927

TOTAL COST: $742 $185 $927

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

132 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER

Type of Work SIDEWALK

Project Length in Miles 1.810 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056557 CMAQ NR13 (961) RIGHT OF WAY

SIDEWALK 2020 $109 $27 $137

100056558 CMAQ NR13 (961) UTILITIES

SIDEWALK 2021 $102 $26 $128

100056559 CMAQ NR13 () CONSTRUCTION

SIDEWALK 2021 $2,830 $708 $3,538

TOTAL COST: $3,042 $760 $3,802

Route NA- ProjectDescription

SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS

Type of Work SIDEWALK

Project Length in Miles 0.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057172 CMAQ 7030 (600) RIGHT OF WAY

SIDEWALK 2019 $72 $18 $90

100057173 CMAQ 7030 (600) UTILITIES

UTILITY ADJUSTMENT

2020 $73 $18 $91

100057174 CMAQ 7030 (600) CONSTRUCTION

SIDEWALK 2020 $2,116 $529 $2,645

TOTAL COST: $2,261 $565 $2,826

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

133 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE

Type of Work STREETSCAPE

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033432 STPBH 3716 (251) CONSTRUCTION

STREETSCAPE

2019 $661 $165 $827

TOTAL COST: $661 $165 $827

Route NA- ProjectDescription

BIRMINGHAM SAFE ROUTES TO SCHOOL, SIDEWALKS ON TARRANT-HUFFMAN ROAD FROM WILLIAMSBURG TO ROEBUCK DR, AND WALKWAY TO CONNECT ROSE DR TO GASTON MIDDLE AND NORTH ROEBUCK ELEMENTARY SCHOOLS

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048384 STPBH CN07 (906) CONSTRUCTION

SIDEWALK 2020 $253 $63 $316

TOTAL COST: $253 $63 $316

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

134 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

BUILDING COMMUNITIES PROGRAMS FY 2019-2020

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062376 STPBH NR19 () SPECIAL

UNCLASSIFIED 2019 $550 $138 $688

TOTAL COST: $550 $138 $688

Route NA- ProjectDescription

NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH

Type of Work STREETSCAPE

Project Length in Miles 0.630 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059190 CMAQ 3715 (257) CONSTRUCTION

STREETSCAPE

2020 $520 $130 $650

TOTAL COST: $520 $130 $650

Route NA- ProjectDescription

SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICE FOR SUBRECIPIENT (FY 2014 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062364 STPBH TR16 () TRANSIT

UNCLASSIFIED 2020 $1,018 $255 $1,273

TOTAL COST: $1,018 $255 $1,273

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

135 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY

Type of Work UNCLASSIFIED

Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064288 CMAQ 3715 (267) RIGHT OF WAY

UNCLASSIFIED 2019 $40 $10 $50

100064289 CMAQ 3715 (267) UTILITIES

UNCLASSIFIED 2020 $40 $10 $50

100064290 CMAQ 3715 () CONSTRUCTION

UNCLASSIFIED 2020 $320 $80 $400

TOTAL COST: $400 $100 $500

Route NA- ProjectDescription

PEDESTRIAN IMPROVEMENTS- BIKELANES, SIDEWALKS, AND CROSSWALKS- 2ND AVENUE SOUTH FROM 28TH STREET TO 30TH STREET, AND 29TH STREET FROM 2ND AVENUE TO 3RD AVENUE

Type of Work UNCLASSIFIED

Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064292 CMAQ 3715 (262) RIGHT OF WAY

UNCLASSIFIED 2019 $75 $19 $94

100064293 CMAQ 3715 (262) UTILITIES

UNCLASSIFIED 2020 $83 $21 $104

100064294 CMAQ 3715 () CONSTRUCTION

UNCLASSIFIED 2020 $600 $150 $750

TOTAL COST: $758 $190 $948

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

136 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH

Type of Work STREETSCAPE

Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064297 CMAQ 3715 () CONSTRUCTION

STREETSCAPE

2019 $816 $204 $1,020

TOTAL COST: $816 $204 $1,020

Route NA- ProjectDescription

ZOO SIDEWALK CONNECTOR FROM POINCIANA DRIVE TO 20TH PLACE SOUTH, ALONG 20TH PLACE SOUTH TO CAHABA ROAD

Type of Work SIDEWALK

Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064299 CMAQ 3715 (268) CONSTRUCTION

SIDEWALK 2019 $496 $124 $619

TOTAL COST: $496 $124 $619

Route NA- ProjectDescription

SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM VALLEY AVENUE TO 16TH STREET SOUTH

Type of Work SIDEWALK

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064303 CMAQ 3715 () CONSTRUCTION

SIDEWALK 2019 $1,600 $400 $2,000

TOTAL COST: $1,600 $400 $2,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

137 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD

Type of Work SIDEWALK

Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064315 CMAQ 3715 (263) RIGHT OF WAY

SIDEWALK 2019 $40 $10 $50

100064316 CMAQ 3715 (263) UTILITIES

SIDEWALK 2020 $40 $10 $50

100064317 CMAQ 3715 () CONSTRUCTION

SIDEWALK 2020 $960 $240 $1,200

TOTAL COST: $1,040 $260 $1,300

Route NA- ProjectDescription

OZONE AWARENESS PROGRAM FOR JEFFERSON AND SHELBY COUNTIES FY 2019 AND FY 2020

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064488 CMAQ NR19 (900) SPECIAL

UNCLASSIFIED 2018 $400 $100 $500

TOTAL COST: $400 $100 $500

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

138 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT (FY 2015 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065085 STPBH TR17 () TRANSIT

UNCLASSIFIED 2020 $2,000 $500 $2,500

TOTAL COST: $2,000 $500 $2,500

Route NA- ProjectDescription

SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2014 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065086 STPBH TR16 () TRANSIT

UNCLASSIFIED 2020 $400 $100 $500

TOTAL COST: $400 $100 $500

Route NA- ProjectDescription

SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT ( FY 2016 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065087 STPBH TR18 () TRANSIT

UNCLASSIFIED 2020 $1,818 $455 $2,273

TOTAL COST: $1,818 $455 $2,273

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

139 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2015 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065088 STPBH TR17 () TRANSIT

UNCLASSIFIED 2020 $1,080 $270 $1,350

TOTAL COST: $1,080 $270 $1,350

Route NA- ProjectDescription

SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2016 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065089 STPBH TR18 () TRANSIT

UNCLASSIFIED 2020 $950 $237 $1,187

TOTAL COST: $950 $237 $1,187

Route NA- ProjectDescription

SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT (FY 2017 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065090 STPBH TR19 () TRANSIT

UNCLASSIFIED 2020 $1,826 $456 $2,282

TOTAL COST: $1,826 $456 $2,282

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

140 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2017 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065091 STPBH TR19 () TRANSIT

UNCLASSIFIED 2020 $953 $238 $1,191

TOTAL COST: $953 $238 $1,191

Route NA- ProjectDescription

18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065219 CMAQ TA15 (903) RIGHT OF WAY

STREETSCAPE

2019 $82 $21 $103

100065220 CMAQ TA15 (903) UTILITIES

STREETSCAPE

2019 $82 $21 $103

100064505 TAPAA-CMAQ TA15 (903)

CONSTRUCTION

STREETSCAPE

2019 $1,200 $300 $1,500

TOTAL COST: $1,365 $341 $1,706

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

141 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065503 CMAQ TA14 (930) RIGHT OF WAY

SIDEWALK 2019 $82 $21 $103

100065504 CMAQ TA14 (930) UTILITIES

SIDEWALK 2019 $82 $21 $103

100062999 TAPAA-CMAQ TA14 (930)

CONSTRUCTION

SIDEWALK 2019 $899 $225 $1,123

TOTAL COST: $1,063 $266 $1,329

Route NA- ProjectDescription

PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065615 ACIM-ACCMAQ-CMAQ 3716 ()

CONSTRUCTION

STREETSCAPE

2020 $32,675 $4,787 $37,462

TOTAL COST: $32,675 $4,787 $37,462

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

142 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

BIKESHARE WAYFINDING SIGNS AT VARIOUS LOCATIONS IN DOWNTOWN BIRMINGHAM

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066622 CMAQ 3717 () CONSTRUCTION

UNCLASSIFIED 2019 $1,120 $280 $1,400

TOTAL COST: $1,120 $280 $1,400

Route NA- ProjectDescription

WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066709 CMAQ 3717 () CONSTRUCTION

STREETSCAPE

2019 $1,224 $306 $1,530

TOTAL COST: $1,224 $306 $1,530

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

143 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

STREETSCAPE AND OTHER PEDESTRIAN IMPROVEMENTS ALONG THE FOLLOWING BLOCKS IN DOWNTOWN BIRMINGHAM: 4TH AVE. N FROM 15TH N TO 17TH N, 5TH AVE. N FROM 15TH N TO 17TH N,15TH ST. N FROM 4TH AVE. N TO 5TH AVE. N, 16TH ST. N FROM 4TH AVE. N TO 5TH AVE. N.

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067027 CMAQ 3717 () UTILITIES

STREETSCAPE

2019 $122 $31 $153

100067028 CMAQ 3717 () CONSTRUCTION

STREETSCAPE

2019 $408 $102 $510

TOTAL COST: $530 $133 $663

Route NA- ProjectDescription

SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068125 CMAQ 3718 () RIGHT OF WAY

SIDEWALK 2020 $41 $10 $51

100068124 CMAQ 3718 () UTILITIES

SIDEWALK 2020 $82 $20 $102

100068126 CMAQ 3718 () CONSTRUCTION

SIDEWALK 2020 $1,906 $476 $2,382

TOTAL COST: $2,028 $507 $2,535

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

144 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

BIRMINGHAM RIDE SHARE PROGRAMS APPORTIONMENT FY 2019 - FY 2020

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068135 STPBH TR18 () SPECIAL

UNCLASSIFIED 2019 $1,300 $0 $1,300

TOTAL COST: $1,300 $0 $1,300

Route SR-119 ProjectDescription

REPLACE BRIDGE, BIN 001308, SR-119 OVER UNNAMED BRANCH, 1.3 MILES NORTH SHELBY COUNTY LINE (SUFF=56.3, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049954 BR 0119 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $228 $57 $285

100049986 BR 0119 () RIGHT OF WAY

BRIDGE REPLACEMENT

2022 $59 $15 $73

100049987 BR 0119 () UTILITIES

BRIDGE REPLACEMENT

2022 $35 $9 $44

100049955 BR 0119 () CONSTRUCTION

BRIDGE REPLACEMENT

2023 $2,362 $591 $2,953

TOTAL COST: $2,684 $671 $3,355

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

145 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-150 ProjectDescription

PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER

Type of Work PEDESTRIAN OVERPASS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064228 CMAQ 3715 () RIGHT OF WAY

PEDESTRIAN OVERPASS

2020 $84 $21 $105

100064229 CMAQ 3715 () UTILITIES

PEDESTRIAN OVERPASS

2020 $84 $21 $105

100064230 CMAQ 3715 () CONSTRUCTION

PEDESTRIAN OVERPASS

2020 $841 $210 $1,051

TOTAL COST: $1,009 $252 $1,261

Route SR-150 ProjectDescription

BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066943 BR 0150 (505) UTILITIES

BRIDGE REPLACEMENT

2020 $247 $62 $309

100066944 BR 0150 (505) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,236 $309 $1,545

TOTAL COST: $1,484 $371 $1,855

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

146 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-3 ProjectDescription

BR REPL AND APP ON SR-3 (US-31) BIN# 002243 OVER SOU RR #3-37-15.8B

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100003818 BR 7044 (600) PRELIMINARY ENGINEERING

BRIDGES AND APPROACHES

2023 $126 $31 $157

TOTAL COST: $126 $31 $157

Route SR-3 ProjectDescription

SR-3(US-31) FROM COLUMBIANA RD TO SHADES CREST RD VESTAVIA HILLS, TRAFFIC CONTROL SYSTEM

Type of Work UNCLASSIFIED

Project Length in Miles 3.265 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039842 CMAQ 003 () CONSTRUCTION

UNCLASSIFIED 2019 $636 $159 $796

TOTAL COST: $636 $159 $796

Route SR-3 ProjectDescription

SLOPE STABILIZATION ON SR-3 (US-31) AT BROOKWOOD MEDICAL CENTER DRIVE

Type of Work SLIDE CORRECTION

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056427 NH 0003 () CONSTRUCTION

SLIDE CORRECTION

2020 $91 $23 $114

TOTAL COST: $91 $23 $114

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

147 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-3 ProjectDescription

SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064209 STPBH 0003 () CONSTRUCTION

LIGHTING 2020 $1,600 $400 $2,000

TOTAL COST: $1,600 $400 $2,000

Route SR-3 ProjectDescription

AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.

Type of Work STREETSCAPE

Project Length in Miles 1.598 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064507 CMAQ 0003 () CONSTRUCTION

STREETSCAPE

2019 $2,602 $650 $3,252

TOTAL COST: $2,602 $650 $3,252

Route SR-38 ProjectDescription

BRIDGE WIDENING ON SR-38 (US-280) OVER I-459 FROM SUMMIT BOULEVARD TO BLUE LAKE DRIVE

Type of Work BRIDGE WIDENING

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060860 BR 0038 () CONSTRUCTION

BRIDGE WIDENING

2022 $267 $67 $334

TOTAL COST: $267 $67 $334

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

148 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-4 ProjectDescription

REPLACE BRIDGE, BIN 000884, SR-4 (US-78) OVER LITTLE CAHABA RIVER (SUFF=58.4, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049988 BR 0004 () RIGHT OF WAY

BRIDGE REPLACEMENT

2020 $58 $14 $72

100049989 BR 0004 () UTILITIES

BRIDGE REPLACEMENT

2022 $35 $9 $44

100049957 BR 0004 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $2,639 $660 $3,299

TOTAL COST: $2,732 $683 $3,415

Route SR-4 ProjectDescription

INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.260 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065396 STPAA 0004 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $412 $103 $515

100065397 STPAA 0004 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $416 $104 $520

100063799 STPAA 0004 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $2,522 $631 $3,153

TOTAL COST: $3,351 $838 $4,188

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

149 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-5 ProjectDescription

BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.681 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100002809 BR 0005 (517) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $5,135 $1,284 $6,418

TOTAL COST: $5,135 $1,284 $6,418

Route SR-5 ProjectDescription

SR-5 (US-78) ADD LANES FROM FINLEY BLVD. TO PRATT HWY (2ND ST) (PHASE 2)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.810 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063746 NH 0005 (510) PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2023 $217 $54 $271

TOTAL COST: $217 $54 $271

Route SR-7 ProjectDescription

WIDEN SR-7(US-11) FR END OF 5-LANE FACILITY, EAST OF CHALKVILLE RD TO THE CAHABA RIVER BRIDGE

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.441 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039839 STPBH 7073 (602) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $2,049 $512 $2,562

TOTAL COST: $2,049 $512 $2,562

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

150 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM SR-75 TO 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD). INCLUDES SINGLE BRIDGES ON BROOKWOOD ROAD AT STATIONS 8+01 TO 11+31 AND STATIONS 21+70 TO 22+28. GRADE, DRAIN, PARTIAL BASE AND PAVE, AND BRIDGE.

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058452 ACNHF 1602 (556) RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2044 $5,285 $1,321 $6,606

TOTAL COST: $5,285 $1,321 $6,606

Route SR-959 ProjectDescription

(BNB) DUAL MAINLINE BRGS OVER CR-129 (GLENWOOD RD), TURKEY CREEK, CR-131 (MAJESTIC RD) / CSX RR, CR-121 (BRADFORD ROAD), CR-141 (OLD DIXIANA RD), SR-79, AND SELF CREEK STATIONS 2149+00 TO 2158+00. ALSO INCLUDES RAMP C BRIDGE AT SR-79.

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058465 ACNHF 1602 (553) CONSTRUCTION

BRIDGE 2042 $31,413 $7,853 $39,266

TOTAL COST: $31,413 $7,853 $39,266

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

151 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.13 MILE WEST OF I-65 TO 0.09 MILE WEST OF SR-3 (US-31). INCLUDES ACCEL/DECEL LANES ON I-65

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.210 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047841 ACNHF 1602 () RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2025 $15,330 $3,832 $19,162

TOTAL COST: $15,330 $3,832 $19,162

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE INCLUDES DUAL MAINLINE BRIDGES OVER US-31, RAMP A AND B, BRIDGES AT US-31 AND RAMP 3 AND 4, BRIDGES AT I-65

Type of Work BRIDGE

Project Length in Miles 0.970 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047834 ACNHF 1602 () CONSTRUCTION

BRIDGE 2024 $59,136 $14,784

$73,920

TOTAL COST: $59,136 $14,784

$73,920

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

152 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.09 MILE WEST OF SR-3 (US-31) TO CUNNINGHAM CREEK

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 1.877 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047848 ACNHF 1602 () RIGHT OF WAY

GRADE, DRAIN AND BRIDGE

2034 $8,028 $2,007 $10,035

TOTAL COST: $8,028 $2,007 $10,035

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CUNNINGHAM CREEK.

Type of Work BRIDGE

Project Length in Miles 0.240 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047854 ACNHF 1602 () CONSTRUCTION

BRIDGE 2040 $59,832 $14,958

$74,789

TOTAL COST: $59,832 $14,958

$74,789

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

153 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-959 ProjectDescription

SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM CUNNINGHAM CREEK TO 0.39 MI EAST OF SR-79. GRADE, DRAIN, PARTIAL BASE AND PAVE.

Type of Work GRADE AND DRAIN

Project Length in Miles 6.840 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058461 ACNHF 1602 (555) RIGHT OF WAY

GRADE AND DRAIN

2038 $20,892 $5,223 $26,116

TOTAL COST: $20,892 $5,223 $26,116

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.

Type of Work BRIDGE

Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048413 APDF 1602 (550) CONSTRUCTION

BRIDGE 2023 $42,174 $10,544

$52,718

TOTAL COST: $42,174 $10,544

$52,718

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

154 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SR-75, CR-159 (CEDAR MT. ROAD), CR-2186 (CAVERN RD / BUD ALISON RD), AND CR-30 (OLD SPRINGVILLE ROAD). ALSO INCLUDES SINGLE RAMP H AND I BRIDGES AT SR-75.

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056652 ACNHF 1602 (561) CONSTRUCTION

BRIDGE 2048 $376,303 $94,076

$470,378

TOTAL COST: $376,303 $94,076

$470,378

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE RD) TO I-59. INCLUDES ACCEL/DECEL LANES ON I-59 BETWEEN CR-2133 (DEERFOOT PKWY) AND CR-2145 (HONOR KEITH RD / LILES LN) AND BRIDGE OVER I-59 ON CR-2137 (ADVENT CIRCLE)

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 3.360 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058456 ACNHF 1602 (557) RIGHT OF WAY

GRADE, DRAIN AND BRIDGE

2027 $1,873 $468 $2,341

TOTAL COST: $1,873 $468 $2,341

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

155 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CR-2137 (ADVENT CIRCLE) AND SINGLE BRIDGES ON RAMP O AND RAMP Q OVER I-59.

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056660 ACNHF 1602 (554) CONSTRUCTION

BRIDGE 2030 $38,174 $9,543 $47,717

TOTAL COST: $38,174 $9,543 $47,717

Route SR-959 ProjectDescription

FY 2020 AND 2021 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063385 APDF 1602 () SPECIAL

UNCLASSIFIED 2020 $2,353 $0 $2,353

TOTAL COST: $2,353 $0 $2,353

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

156 of 305

HIGHWAY PROJECTS - JEFFERSON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-17 ProjectDescription

BIN # 002561 OVER BUTAHATCHEE RIVER ON SR-17

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.700 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064122 BR 0174 (534) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $294 $74 $368

100002717 BR 0174 (534) RIGHT OF WAY

BRIDGE REPLACEMENT

2020 $53 $13 $67

100045191 BR 0174 (534) UTILITIES

BRIDGE REPLACEMENT

2022 $117 $29 $147

100002715 BR 0174 (534) CONSTRUCTION

BRIDGE REPLACEMENT

2027 $19,496 $4,874 $24,370

TOTAL COST: $19,961 $4,990 $24,951

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

157 of 305

HIGHWAY PROJECTS - LAMAR

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-16 ProjectDescription

CR-16 BRIDGE REPLACEMENT OVER CYPRESS CREEK IN LAUDERDALE COUNTY BIN #001434

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.100 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059049 STPOA 3914 (251) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $40 $10 $50

100059050 STPOA 3914 (251) UTILITIES

BRIDGE REPLACEMENT

2020 $39 $10 $49

100059051 STPOA 3914 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,213 $303 $1,516

TOTAL COST: $1,292 $323 $1,615

Route CR-NA ProjectDescription

WIDENING RICKWOOD ROAD FROM RAILROAD TO CHISHOLM ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063588 STPOA 3915 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $60 $15 $75

100063589 STPOA 3915 () UTILITIES

ADDITIONAL ROADWAY LANES

2020 $320 $80 $400

100063590 STPOA 3915 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $1,280 $320 $1,600

TOTAL COST: $1,660 $415 $2,075

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

158 of 305

HIGHWAY PROJECTS - LAUDERDALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-2 ProjectDescription

BRIDGE REPLACEMENT (BIN 001709) ON SR-2 (US-72) OVER SR-20

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.370 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038052 BR 0002 (579) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $2,279 $570 $2,848

100038505 BR 0002 (579) UTILITIES

BRIDGES AND APPROACHES

2020 $691 $173 $864

100002587 BR 0002 () CONSTRUCTION

BRIDGES AND APPROACHES

2020 $4,737 $1,184 $5,921

TOTAL COST: $7,707 $1,927 $9,634

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

159 of 305

HIGHWAY PROJECTS - LAUDERDALE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-270 ProjectDescription

BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER BIG NANCE CREEK (BIN # 349) AND RELIEF BRIDGE (BIN # 348) IN THE CITY OF COURTLAND (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060555 ACBRZ60555 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $910 $227 $1,137

TOTAL COST: $910 $227 $1,137

Route CR-270 ProjectDescription

BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER NORFOLK SOUTHERN RAILROAD IN THE CITY OF COURTLAND (BIN 397)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060567 ACBRZ60567 ATRP (014)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $432 $108 $540

TOTAL COST: $432 $108 $540

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

160 of 305

HIGHWAY PROJECTS - LAWRENCE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-101 ProjectDescription

REPLACE BRIDGE, BIN 001493, SR-101 OVER BIG NANCE CREEK. (SUFF=36.0, STATUS=SD)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.500 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049906 BR 0101 (570) RIGHT OF WAY

BRIDGES AND APPROACHES

2020 $58 $14 $72

100049907 BR 0101 (570) UTILITIES

BRIDGES AND APPROACHES

2021 $58 $15 $73

100049908 BR 0101 () CONSTRUCTION

BRIDGES AND APPROACHES

2021 $2,895 $724 $3,618

TOTAL COST: $3,010 $753 $3,763

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

161 of 305

HIGHWAY PROJECTS - LAWRENCE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-197 ProjectDescription

FULL DEPTH RECLAMATION, SEAL, AND RESURFACE CR-197 FROM CR-208 TO CR-240

Type of Work RESURFACING

Project Length in Miles 2.400 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062982 STPPC 4118 () CONSTRUCTION

RESURFACING

2019 $672 $168 $840

TOTAL COST: $672 $168 $840

Route CR-243 ProjectDescription

RESURFACING ON CR-243 FROM CR-223 TO CR-298 IN SMITHS STATION

Type of Work RESURFACING

Project Length in Miles 3.200 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067543 STPPC 4117 () CONSTRUCTION

RESURFACING

2020 $704 $176 $880

TOTAL COST: $704 $176 $880

Route CR-249 ProjectDescription

RESURFACING ON CR-249 FROM CR-379 TO CR-318 IN SMITHS STATION

Type of Work RESURFACING

Project Length in Miles 1.700 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067545 STPPC 4117 () CONSTRUCTION

RESURFACING

2020 $442 $111 $553

TOTAL COST: $442 $111 $553

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

162 of 305

HIGHWAY PROJECTS - LEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-318 ProjectDescription

RESURFACING ON CR-318 FROM CR-248 (SUMMERVILLE ROAD) TO CR-249 IN SMITHS STATION

Type of Work RESURFACING

Project Length in Miles 4.800 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067544 STPPC 4117 () CONSTRUCTION

RESURFACING

2020 $1,056 $264 $1,320

TOTAL COST: $1,056 $264 $1,320

Route CR-379 ProjectDescription

RESURFACING ON CR-379 FROM SR-1 (US-280) TO THE BRIDGE OVER HARDING LAKE IN SMITHS STATION

Type of Work RESURFACING

Project Length in Miles 9.700 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067546 STPPC 4117 () CONSTRUCTION

RESURFACING

2021 $1,300 $325 $1,625

TOTAL COST: $1,300 $325 $1,625

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

163 of 305

HIGHWAY PROJECTS - LEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-40 ProjectDescription

RESURFACING,WIDENING,TRAFFIC SIGNALS AND DRAINAGE IMPROVEMENTS ON SOUTH COLLEGE STREET,SAMFORD AVENUE, GAY STREET, AND REESE AVENUE

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.968 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065891 STPOA 4116 (250) RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2019 $663 $166 $828

100065892 STPOA 4116 (250) UTILITIES

WIDENING AND RESURFACING (RDWY)

2020 $271 $68 $338

100061106 STPOA 4116 (250) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $3,591 $898 $4,488

TOTAL COST: $4,524 $1,131 $5,655

Route CR-63 ProjectDescription

BRIDGE REPLACEMENT ON (CR-63) NORTH UNIROYAL ROAD BIN # 3663

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061109 ACBR61109 ATRP (015) CONSTRUCTION

BRIDGE 2020 $722 $180 $902

TOTAL COST: $722 $180 $902

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

164 of 305

HIGHWAY PROJECTS - LEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

ADD TURN LANE ON DONAHUE DRIVE FROM NORTH OF BRAGG AVENUE TO CARY DRIVE

Type of Work TURN LANES

Project Length in Miles 0.470 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100008577 STPOA 4116 () RIGHT OF WAY

TURN LANES 2020 $408 $102 $510

100033351 STPOA 4116 () UTILITIES

TURN LANES 2020 $522 $131 $653

100008575 STPOA 4116 () CONSTRUCTION

TURN LANES 2020 $2,246 $562 $2,808

TOTAL COST: $3,176 $794 $3,971

Route CR-NA ProjectDescription

SEPARATE TRUCK ENTRANCES AND EXITS ON NORTHPARK DRIVE TO BENEFIT PROJECT THUNDER IN THE CITY OF OPELIKA

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060172 IAR-041-000-015 () CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $0 $1,481 $1,481

TOTAL COST: $0 $1,481 $1,481

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

165 of 305

HIGHWAY PROJECTS - LEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING ON MELANIE LANE FROM SUMMERVILLE ROAD TO RIVERCHASE DRIVE IN PHENIX CITY

Type of Work RESURFACING

Project Length in Miles 0.751 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067423 STPPC 4117 () PRELIMINARY ENGINEERING

RESURFACING

2019 $58 $15 $73

100067424 STPPC 4117 () CONSTRUCTION

RESURFACING

2020 $367 $92 $459

TOTAL COST: $426 $106 $532

Route CR-NA ProjectDescription

RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM LOWNDES STREET TO GATEWAY DRIVE (SR-38/US-280)

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068462 STPOA 4118 () CONSTRUCTION

RESURFACING

2020 $1,371 $343 $1,714

TOTAL COST: $1,371 $343 $1,714

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

166 of 305

HIGHWAY PROJECTS - LEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM WESTEND COURT (FIVE POINTS) TO GATEWAY DRIVE (SR-38/US-280)

Type of Work RESURFACING

Project Length in Miles 0.592 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068463 STPOA 4118 () PRELIMINARY ENGINEERING

RESURFACING

2019 $56 $14 $69

100068464 STPOA 4118 () RIGHT OF WAY

RESURFACING

2019 $20 $5 $25

100068465 STPOA 4118 () UTILITIES

RESURFACING

2020 $51 $13 $64

100068466 STPOA 4118 () CONSTRUCTION

RESURFACING

2021 $1,072 $268 $1,339

TOTAL COST: $1,198 $300 $1,498

Route I -85 ProjectDescription

BRIDGE WIDENING - BRIDGES BIN 008593 AND 008594 OVER CHOCTAFAULA CREEK ; BRIDGES BIN 007262 AND BIN 007263 OVER HALAWAKEE CREEK

Type of Work BRIDGE WIDENING

Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066325 IM I085 (331) PRELIMINARY ENGINEERING

BRIDGE WIDENING

2019 $250 $28 $278

100051084 IM I085 () CONSTRUCTION

BRIDGE WIDENING

2022 $3,254 $362 $3,615

TOTAL COST: $3,504 $389 $3,894

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

167 of 305

HIGHWAY PROJECTS - LEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -85 ProjectDescription

I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL EXTENSIONS NB OFF RAMP AND SB ON RAMP

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.800 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067237 IM I085 (362) RIGHT OF WAY

BRIDGE REPLACEMENT

2020 $92 $10 $102

100067238 IM I085 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $16,495 $1,833 $18,328

TOTAL COST: $16,587 $1,843 $18,430

Route I -85 ProjectDescription

RESURFACE I-85 FROM 1.340 MILES SOUTH OF ANDREWS ROAD (EXIT 66) TO THE CHAMBERS COUNTY LINE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 3.775 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067348 IM I085 (361) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $1,631 $181 $1,812

TOTAL COST: $1,631 $181 $1,812

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

168 of 305

HIGHWAY PROJECTS - LEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-51 ProjectDescription

REPLACE BRIDGE BIN 002013, SR-51 OVER ROBINSON CREEK (SUFF=44.1, STATUS = SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.150 Urban Area AUBURN-OPELIKA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067706 BR 0051 (512) UTILITIES

BRIDGE REPLACEMENT

2019 $8 $2 $10

100003743 BR 0051 () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,171 $293 $1,464

TOTAL COST: $1,180 $295 $1,475

Route SR-51 ProjectDescription

BRIDGE REPLACEMENT ON SR-51 OVER WATULA CREEK BIN 002012

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.200 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066232 BR 0051 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $41 $10 $52

100012530 BR 0051 () CONSTRUCTION

BRIDGE REPLACEMENT

2023 $629 $157 $786

TOTAL COST: $670 $168 $838

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

169 of 305

HIGHWAY PROJECTS - LEE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON THACH ROAD OVER AN UNAMED CREEK (BIN # 4132)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061859 ACBRZ61859 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $282 $70 $352

TOTAL COST: $282 $70 $352

Route CR-NA ProjectDescription

REHABILITATE ROCKHOUSE ROAD (ROUTE 15) AT WHEELER NATIONAL WILDLIFE REFUGE

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 4.370 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066414 PFH 4217 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $1,236 $0 $1,236

TOTAL COST: $1,236 $0 $1,236

Route I -565 ProjectDescription

RESURFACING I-565 FROM I-65 (MP 0.00) TO MP 5.63

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 5.630 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066497 IM I565 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2020 $5,600 $622 $6,223

TOTAL COST: $5,600 $622 $6,223

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

170 of 305

HIGHWAY PROJECTS - LIMESTONE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

CLEAR ZONE SAFETY IMPROVEMENTS ON I-65 FROM MP 339.40 TO MP 351.25

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 11.850 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040334 IM I065 () CONSTRUCTION

SAFETY IMPROVEMENTS

2020 $1,618 $180 $1,798

TOTAL COST: $1,618 $180 $1,798

Route I -65 ProjectDescription

WELCOME CENTER REHABILITATION NEAR I-65 NORTH OF ATHENS

Type of Work REST AREA COMPLETE

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100045459 IMF I065 () CONSTRUCTION

REST AREA COMPLETE

2021 $9,181 $1,020 $10,201

TOTAL COST: $9,181 $1,020 $10,201

Route I -65 ProjectDescription

RESURFACING ON I-65 FROM 0.2 MILE NORTH OF SR-2 (US-72) TO 0.1 MILE SOUTH OF CSXT OVERPASS

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 7.750 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065908 IM I065 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $9,817 $1,091 $10,908

TOTAL COST: $9,817 $1,091 $10,908

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

171 of 305

HIGHWAY PROJECTS - LIMESTONE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-2 ProjectDescription

WIDENING SR-2(US-72) FROM JEFFERSON ST TO JUST EAST OF CSX RAILROAD UNDERPASS IN ATHENS GRADE, DRAIN, BASE, PAVE, SIGNAL, AND RETAINING WALLS

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.059 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067910 DEF-NHF A205 (937) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $212 $15 $227

100067911 DEF-NHF A205 (937) UTILITIES

ADDITIONAL ROADWAY LANES

2020 $122 $31 $153

100055214 DEF-NHF A205 (937) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2021 $1,410 $352 $1,762

TOTAL COST: $1,744 $398 $2,142

Route SR-2 ProjectDescription

INTERSECTION IMPROVEMENTS TO INTERSECTION OF SR-2 (US-72) AND CR-71 (MOORESVILLE RD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.500 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058225 NH 0002 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2021 $69 $17 $86

100058226 NH 0002 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2021 $688 $172 $861

TOTAL COST: $757 $189 $947

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

172 of 305

HIGHWAY PROJECTS - LIMESTONE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-3 ProjectDescription

BRIDGE REPLACEMENT BINS 006153 AND 001391 ON SR-3 (US-31) OVER NORFOLK SOUTHERN RAILROAD

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.006 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100037845 BR 0003 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $4,945 $1,236 $6,182

TOTAL COST: $4,945 $1,236 $6,182

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

173 of 305

HIGHWAY PROJECTS - LIMESTONE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

I-65 DISTRICT WIDE GUARDRAIL REPLACEMENT FROM THE CONECUH COUNTY LINE TO THE MONTGOMERY COUNTY LINE

Type of Work GUARDRAIL

Project Length in Miles 53.172 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066450 IM I065 () PRELIMINARY ENGINEERING

GUARDRAIL 2019 $138 $15 $153

100066451 IM I065 () CONSTRUCTION

GUARDRAIL 2019 $3,063 $340 $3,403

TOTAL COST: $3,201 $356 $3,556

Route SR-8 ProjectDescription

REPLACE BRIDGE, BIN 002917, SR-8 (US-80) OVER BIG SWAMP CREEK. (SUFF=63.0, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 2.500 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100050031 BRF 0008 (581) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $3,661 $915 $4,576

TOTAL COST: $3,661 $915 $4,576

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

174 of 305

HIGHWAY PROJECTS - LOWNDES

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-81 ProjectDescription

BRIDGE REPLACEMENT ON SR-81 OVER UPHAPEE CREEK BIN # 2853

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.160 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061664 BR 0081 () CONSTRUCTION

BRIDGES AND APPROACHES

2023 $6,631 $1,658 $8,288

TOTAL COST: $6,631 $1,658 $8,288

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

175 of 305

HIGHWAY PROJECTS - MACON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-17 ProjectDescription

2 FT SAFETY WIDENING AND RESURFACING OF CR-17(BALCH ROAD)FROM .53 MILE SOUTH OF CR-21(BROWNS FERRY ROAD)TO NORTH OF CR-27(GOOCH LANE)IN THE CITY OF MADISON

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.450 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046745 DE-STPAA-STPHV AL81 (940)

CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $1,486 $195 $1,681

TOTAL COST: $1,486 $195 $1,681

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

176 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-19 ProjectDescription

ADDITIONAL LANES ON CR-19 (JEFF ROAD) FROM 0.8 MILES SOUTH OF CR-28 (CAPSHAW ROAD) TO NORTH OF DOUGLASS ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.800 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061458 ACAA61458 ATRP (015) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $9,045 $4,455 $13,500

TOTAL COST: $9,045 $4,455 $13,500

Route CR-19 ProjectDescription

ADDITIONAL LANES ON JEFF ROAD (CR-19) FROM DOUGLASS ROAD TO SR-53

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.200 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062241 STPHV 4514 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2020 $800 $200 $1,000

100062256 STPHV 4514 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2022 $1,800 $450 $2,250

TOTAL COST: $2,600 $650 $3,250

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

177 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-242 ProjectDescription

CR-242 (OLD HIGHWAY 431) FOUR (4) BRIDGE REPLACEMENTS. BIN NUMBERS 313, 558, 559, AND 314

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062252 STPHV 4514 () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $6,792 $1,698 $8,490

TOTAL COST: $6,792 $1,698 $8,490

Route CR-93 ProjectDescription

ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-983 (DOMINION CIRCLE) TO CR-406 (NAUGHER ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.300 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061222 ACAA61222 ATRP (010) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $10,385 $5,115 $15,500

TOTAL COST: $10,385 $5,115 $15,500

Route CR-93 ProjectDescription

ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-406 (NAUGHER ROAD) TO CR-389 (RIVERTON ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061457 ACAA61457 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $6,536 $1,634 $8,170

TOTAL COST: $6,536 $1,634 $8,170

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

178 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE AND APPRO CHURCH STREET BRIDGE OVER BIG SPRING AT BIG SPRING PARK

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100051833 DEF A179 (922) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $40 $0 $40

100051834 DEF A179 (922) UTILITIES

BRIDGES AND APPROACHES

2020 $277 $0 $277

100051835 DEF-STPHVF A179 (922)

CONSTRUCTION

BRIDGES AND APPROACHES

2020 $4,072 $718 $4,790

TOTAL COST: $4,389 $718 $5,107

Route CR-NA ProjectDescription

HUNTSVILLE NORTHERN BYPASS FROM 1.2 MILES EAST OF CR-86 (PULASKI PIKE) TO 1500 FT EAST OF SR-1 (US-231/431) INTERSECTION

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 4.200 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061851 NHF-STPAAF 4514 (252)

CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $18,951 $4,738 $23,688

TOTAL COST: $18,951 $4,738 $23,688

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

179 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

HUNTSVILLE NORTHERN BYPASS FROM 1500 FEET EAST OF SR-1 (US-231/431) INTERSECTION TO WINCHESTER ROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 6.060 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062236 STPHV 4514 () RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2021 $1,520 $380 $1,900

100062237 STPHV 4514 () UTILITIES

GRADE, DRAIN, BASE AND PAVE

2022 $1,506 $376 $1,882

100062238 STPHV 4514 () CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2022 $20,000 $5,000 $25,000

TOTAL COST: $23,026 $5,756 $28,782

Route CR-NA ProjectDescription

KELLNER ROAD EXTENSION FROM WALL TRIANA HWY TO SOUTH OF BUSINESS PARK BLVD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 2.200 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061239 ACAA61239 ATRP (010) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2020 $8,040 $3,960 $12,000

TOTAL COST: $8,040 $3,960 $12,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

180 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WHEELER NATIONAL WILDLIFE REFUGE REHABILITATE ROCKHOUSE ROAD (ROUTE 15)

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067956 FLAP FLAP () CONSTRUCTION

PAVEMENT REHABILITATION

2020 $960 $240 $1,200

TOTAL COST: $960 $240 $1,200

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

181 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

IMPROVE PEDESTRIAN FACILITIESATFIVE POINTS ; PROJECT LOCATED NEAR HOLMES AV, PRATT AV, AND ANDREW JACKSON AV. IN HUNTSVILLE

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100045139 STPAA AL61 (900) CONSTRUCTION

STREETSCAPE

2019 $474 $119 $593

TOTAL COST: $474 $119 $593

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN MADISON COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060145 STPAA NR13 (945) CONSTRUCTION

SIDEWALK 2019 $390 $98 $488

TOTAL COST: $390 $98 $488

Route NA- ProjectDescription

DRY CREEK GREENWAY FROM INDIAN CREEK GREENWAY/GATES MILL ROAD TO THE INTERSECTION OF ARCH STREET AND BILTMORE DRIVE IN NORTHWEST HUNTSVILLE

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067267 TAPHV TA17 (946) CONSTRUCTION

UNCLASSIFIED 2019 $400 $100 $500

TOTAL COST: $400 $100 $500

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

182 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-1 ProjectDescription

SR-1 (MEMORIAL PARKWAY) FROM 0.31 MI S OF CR-75 (MASTIN LAKE RD) TO CR-65 (WINCHESTER RD) INCLUDING AN OVERPASS AT CR-75 AND ACCESS IMPROVEMENTS TO CR-65

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.629 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100004926 NHF 8510 (009) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $33,413 $8,353 $41,766

TOTAL COST: $33,413 $8,353 $41,766

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

183 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-2 ProjectDescription

ADDITIONAL LANES SR-2 (US-72) FROM BALCH ROAD TO HUGHES ROAD IN THE CITY LIMITS OF MADISON

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.552 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061224 ACAA61224 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2022 $4,400 $2,167 $6,567

TOTAL COST: $4,400 $2,167 $6,567

Route SR-2 ProjectDescription

ADDITIONAL LANES SR-2 (US-72) FROM COUNTY LINE ROAD TO PROVIDENCE MAIN ROAD IN THE CITY OF HUNTSVILLE

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 5.440 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061845 NHF 0002 (566) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2020 $6,182 $1,545 $7,727

100061846 NHF 0002 (566) UTILITIES

ADDITIONAL ROADWAY LANES

2021 $2,458 $614 $3,072

100061847 NH 0002 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2022 $24,000 $6,000 $30,000

TOTAL COST: $32,639 $8,160 $40,799

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

184 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-53 ProjectDescription

ACCESS MANAGEMENT AND INTERSECTION IMPROVEMENTS ON SR-53 (US-231) FROM HOBBS ISLAND ROAD TO SOUTH OF WEATHERLY ROAD

Type of Work UNCLASSIFIED

Project Length in Miles 4.194 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061839 NH 0053 (571) RIGHT OF WAY

UNCLASSIFIED 2020 $323 $81 $404

100061838 NH 0053 (571) UTILITIES

UNCLASSIFIED 2020 $1,246 $311 $1,557

100061840 RP-NH 0053 () CONSTRUCTION

UNCLASSIFIED 2020 $9,302 $2,326 $11,628

TOTAL COST: $10,871 $2,718 $13,589

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

185 of 305

HIGHWAY PROJECTS - MADISON

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-38 ProjectDescription

BRIDGE REPLACEMENT ON CR-38 OVER ELAM BRANCH BIN#7404 (RAMP)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060438 ACBRZ60438 ATRP () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $290 $72 $362

TOTAL COST: $290 $72 $362

Route CR-44 ProjectDescription

BRIDGE REPLACEMENT ON CR-44 OVER DRY CREEK BIN # 13020 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060439 ACBRZ60439 ATRP (009)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $398 $99 $497

TOTAL COST: $398 $99 $497

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

186 of 305

HIGHWAY PROJECTS - MARENGO

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-13 ProjectDescription

REPL BIN 002547, SR-13 (US-43) OVER AGR RR, SOUTHEAST OF DEMOPOLIS (SUFF=44.5, STAT=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.020 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100041301 BRF 0013 (501) UTILITIES

BRIDGE REPLACEMENT

2019 $2,571 $643 $3,214

100041302 BRF 0013 (501) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $3,985 $996 $4,981

TOTAL COST: $6,556 $1,639 $8,195

Route SR-69 ProjectDescription

BRIDGE REPLACEMENT ON SR-69 OVER WHIRL CREEK BIN# 5977

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060178 BR 0069 (544) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,400 $600 $3,000

TOTAL COST: $2,400 $600 $3,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

187 of 305

HIGHWAY PROJECTS - MARENGO

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-8 ProjectDescription

REPL BRIDGE AND RELIEF SR-8 (US-80) BIN 003018 AND BIN # 003017 OVER COTTONWOOD CREEK, EAST OF FAUNSDALE

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.603 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100043730 BRF 0008 (542) UTILITIES

BRIDGE REPLACEMENT

2020 $92 $23 $116

100043731 BRF 0008 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $3,057 $764 $3,821

TOTAL COST: $3,150 $787 $3,937

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

188 of 305

HIGHWAY PROJECTS - MARENGO

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-9 ProjectDescription

BRIDGE REPLACEMENT ON CR-9 OVER BARNSVILLE CK (RAMP)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060456 ACBRZ60456 ATRP (008)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $521 $130 $652

TOTAL COST: $521 $130 $652

Route I -22 ProjectDescription

PLANING AND RESURFACING ON I-22 FROM SR-129 INTERCHANGE AT MP 29.950 TO EAST OF THE SR-233 OVERPASS AT MP 34.460

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 4.510 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064936 IM I022 (305) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2019 $11,524 $1,280 $12,805

TOTAL COST: $11,524 $1,280 $12,805

Route I -22 ProjectDescription

RESURFACING ON I-22 FROM MP 0.00 AT THE MISSISSIPPI STATE LINE TO MP 6.00 JUST WEST OF REESE ROAD OVERPASS

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 6.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068043 IM I022 (310) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2020 $2,164 $240 $2,404

TOTAL COST: $2,164 $240 $2,404

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

189 of 305

HIGHWAY PROJECTS - MARION

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -22 ProjectDescription

RESURFACING ON I-22 FROM MP 6.00 JUST WEST OF REESE ROAD OVERPASS TO MP 16.8 AT EXIT 16

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 10.800 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068045 IM I022 (309) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2020 $3,958 $440 $4,398

TOTAL COST: $3,958 $440 $4,398

Route I -22 ProjectDescription

RESURFACING ON I-22 FROM EXIT 16 (MP 16.800) TO EXIT 22 (MP 22.600)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 5.800 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068047 IM I022 (308) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2020 $2,613 $290 $2,903

TOTAL COST: $2,613 $290 $2,903

Route I -22 ProjectDescription

RESURFACING ON I-22 FROM EXIT 22 (MP 22.600) TO EXIT 30 (MP 29.950)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 7.350 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068048 IM I022 (311) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $227 $25 $253

TOTAL COST: $227 $25 $253

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

190 of 305

HIGHWAY PROJECTS - MARION

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT AT VARIOUS LOCATIONS (DISTRICT 3)

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061282 STPAA NR13 (931) CONSTRUCTION

SIDEWALK 2019 $335 $84 $418

TOTAL COST: $335 $84 $418

Route SR-118 ProjectDescription

REPLACE BRIDGE, BIN 009166, SR-118 OVER LITTLE NEW RIVER. (SUFF=19.0, STATUS=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.600 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049902 BR 0118 (512) RIGHT OF WAY

BRIDGE REPLACEMENT

2021 $58 $15 $73

100049903 BR 0118 (512) UTILITIES

BRIDGE REPLACEMENT

2021 $58 $15 $73

100049904 BR 0118 (512) CONSTRUCTION

BRIDGE REPLACEMENT

2022 $3,275 $819 $4,093

TOTAL COST: $3,391 $848 $4,238

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

191 of 305

HIGHWAY PROJECTS - MARION

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-17 ProjectDescription

INTERSECTION IMPROVEMENT ON SR-17 AT SR-74 IN CITY OF HAMILTON

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.200 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063748 STPAA 0017 (539) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2023 $65 $16 $81

TOTAL COST: $65 $16 $81

Route SR-17 ProjectDescription

INTERSECTION IMPROVEMENTS AT SR-17 (US-43) AND SR-172 AND SR-17 (US-43) AND SR-187

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.150 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063612 STPAA 0017 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2020 $84 $21 $105

100058750 STPAA 0017 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2021 $184 $46 $229

100058751 STPAA 0017 () UTILITIES

INTERSECTION IMPROVEMENTS

2021 $459 $115 $574

100058752 STPAA 0017 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2022 $555 $139 $693

TOTAL COST: $1,281 $320 $1,601

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

192 of 305

HIGHWAY PROJECTS - MARION

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-168 ProjectDescription

REPLACE BRIDGE, BIN 003362, SR-168 OVER SHORT CREEK 3 MILES EAST SR-1 (US-431) (SUFF=48.1, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049732 BR 0168 (501) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $85 $21 $107

100049733 BR 0168 (501) UTILITIES

BRIDGE REPLACEMENT

2020 $40 $10 $50

100049734 BR 0168 (501) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $2,751 $688 $3,439

TOTAL COST: $2,877 $719 $3,597

Route SR-69 ProjectDescription

SR-69 REL FR US-231 INT TO MAIN ST IN ARAB SURVEY AND PLAN PREPARATION SMALL URBAN ARAB

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.811 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100008848 STPAA 0069 () RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2021 $6,842 $1,710 $8,552

100033082 STPAA 0069 () UTILITIES

GRADE, DRAIN, BASE AND PAVE

2022 $292 $73 $365

100008845 STPAA 0069 (519) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2023 $4,623 $1,156 $5,778

TOTAL COST: $11,757 $2,939 $14,696

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

193 of 305

HIGHWAY PROJECTS - MARSHALL

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-75R ProjectDescription

RELOCATION OF SR-75 AROUND THE ALBERTVILLE AIRPORT EXPANSION (HORTON ROAD) FROM CR-152 SOUTH (ONEONTA CUT-OFF ROAD) TO CR-325 NORTH (TURNPIKE ROAD).

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.990 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060124 STPAA 0075 (529) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2023 $2,252 $563 $2,815

TOTAL COST: $2,252 $563 $2,815

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

194 of 305

HIGHWAY PROJECTS - MARSHALL

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-25 ProjectDescription

NEW ALIGNMENT OF CR-25 (MCFARLAND ROAD) FROM CR-28 (OLD PASCAGOULA ROAD) TO CR-358 (THREE NOTCH ROAD)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 4.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059789 STPMB 4918 (250) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2020 $4,800 $1,200 $6,000

100059790 STPMB 4918 (250) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2021 $1,920 $480 $2,400

100059791 STPMB 4918 () CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2022 $10,480 $2,620 $13,100

TOTAL COST: $17,200 $4,300 $21,500

Route CR-32 ProjectDescription

THREE NOTCH ROAD (CR-32) ADDITIONAL LANES FROM SCHILLINGER ROAD TO MCDONALD ROAD.

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052462 STPMB 4919 (250) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2021 $732 $183 $915

100052463 STPMB 4919 (250) UTILITIES

ADDITIONAL ROADWAY LANES

2022 $360 $90 $450

100052464 STPMB 4919 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2023 $3,600 $900 $4,499

TOTAL COST: $4,691 $1,173 $5,864

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

195 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-32 ProjectDescription

CR-32 (THREE NOTCH RD) ADDITIONAL LANES FROM CR-25 (BEN HAMILTON RD) TO CR-39 (MCDONALD RD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052465 STPMB 7502 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2020 $262 $66 $328

100052594 STPMB 7502 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2021 $796 $199 $994

100052595 STPMB 7502 () UTILITIES

ADDITIONAL ROADWAY LANES

2021 $389 $97 $487

100052596 STPMB 7502 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2021 $3,893 $973 $4,867

TOTAL COST: $5,340 $1,335 $6,675

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

196 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-32 ProjectDescription

CR-32 (THREE NOTCH RD) ADDITIONAL LANES FROM CR-33 (DAWES RD.) TO CR-25 (BEN HAMILTON RD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052466 STPMB 7502 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2020 $262 $66 $328

100052597 STPMB 7502 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2021 $796 $199 $994

100052598 STPMB 7502 () UTILITIES

ADDITIONAL ROADWAY LANES

2021 $389 $97 $487

100052599 STPMB 7502 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2021 $3,893 $973 $4,867

TOTAL COST: $5,340 $1,335 $6,675

Route CR-39 ProjectDescription

MCDONALD ROAD (CR-39) ADDITIONAL LANES FROM NORTH OF I-10 TO OLD PASCAGOULA ROAD.

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.500 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052449 STPMB 7612 (600) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2020 $560 $140 $700

100052450 STPMB 7612 (600) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2020 $3,840 $960 $4,800

TOTAL COST: $4,400 $1,100 $5,500

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

197 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-56 ProjectDescription

ADDITIONAL LANES WITH REALIGNMENT ON CR-56 FROM 0.28 MILE WEST OF ELIZA JORDAN ROAD TO SNOW ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.460 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068532 STPMB 4918 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2019 $1,040 $260 $1,300

100068533 STPMB 4918 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2021 $1,200 $300 $1,500

100068534 STPMB 4918 () UTILITIES

UNCLASSIFIED 2022 $800 $200 $1,000

100068535 STPMB 4918 () CONSTRUCTION

UNCLASSIFIED 2023 $7,920 $1,980 $9,900

TOTAL COST: $10,960 $2,740 $13,700

Route CR-656 ProjectDescription

ZEIGLER BLVD ADDITIONAL LANES FROM ATHEY RD TO FOREST HILL DR

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.410 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100037215 DBMB-STPMB 7550 (600)

CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $14,120 $3,530 $17,650

TOTAL COST: $14,120 $3,530 $17,650

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

198 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-656 ProjectDescription

CR-656 (ZEIGLER BLVD) ADD LANES FROM CR-372 (SCHILLINGER RD) TO CR-429 (CODY RD)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.200 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046895 STPMB 7550 (601) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $7,520 $1,880 $9,400

TOTAL COST: $7,520 $1,880 $9,400

Route CR-656 ProjectDescription

ADDITIONAL LANES ON CR-656 (ZEIGLER BLVD) FROM CR-70 (TANNER WILLIAMS RD) TO CR-31 (SCHILLINGER RD)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.400 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055881 STPMB 7550 (602) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2019 $1,504 $376 $1,880

100055882 STPMB 7550 (602) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2020 $896 $224 $1,120

100055883 STPMB 7550 (602) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2020 $4,000 $1,000 $5,000

TOTAL COST: $6,400 $1,600 $8,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

199 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

FLORIDA ST, GOVERNMENT BLVD TO AIRPORT BLVD (MOBILE)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.640 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007699 STPMB 7522 () PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE AND PAVE

2022 $36 $9 $45

TOTAL COST: $36 $9 $45

Route CR-NA ProjectDescription

FLORIDA ST, AIRPORT BLVD TO SPRINGHILL AVE (MOBILE)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.390 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007700 STPMB 7522 () PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE AND PAVE

2022 $36 $9 $45

TOTAL COST: $36 $9 $45

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

200 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

DAUPHIN STREET ADDITIONAL LANES FROM SAGE AVENUE TO WEST OF I-65 AT SPRINGHILL MEMORIAL HOSPITAL.

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 1.100 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052458 STPMB 7533 () RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $216 $54 $270

100052459 STPMB 7533 () UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2021 $225 $56 $281

100052460 STPMB 7533 () CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2021 $5,656 $1,414 $7,070

TOTAL COST: $6,097 $1,524 $7,621

Route CR-NA ProjectDescription

MCGREGOR AVENUE WIDENING FROM AIRPORT BOULEVARD TO DAUPHIN STREET AND INSTALLATION OF A ROUNDABOUT AT DAUPHIN STREET

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.490 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052601 STPMBF 7508 (600) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2020 $1,200 $300 $1,500

100052602 STPMBF 7508 (600) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2020 $2,706 $676 $3,382

TOTAL COST: $3,906 $976 $4,882

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

201 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - AIRPORT BLVD FROM UNIVERSITY BLVD TO HILLCREST ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066707 STPMB 4918 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $450 $113 $563

TOTAL COST: $450 $113 $563

Route I -10 ProjectDescription

I-10 MOBILE RIVER BRIDGE AND BAYWAY FROM EXIT 24 (BROAD STREET) TO MOBILE COUNTY LINE

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 4.409 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062411 NHP3 I010 () UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $8,080 $1,010 $9,090

100062412 NHP3 I010 () CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $890,416 $222,604

$1,113,020

TOTAL COST: $898,496 $223,614

$1,122,110

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

202 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -10 ProjectDescription

ADD LANES I-10 FR CR-39 TO CR-59 (CAROL PLANTATION RD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 4.460 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064147 NH I010 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2025 $265 $66 $331

100033461 NH I010 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2027 $27,800 $6,950 $34,750

TOTAL COST: $28,065 $7,016 $35,081

Route I -10 ProjectDescription

I-10 ROADWAY LIGHTING REHAB FROM SR-16 (EXIT 27) TO SR-16 (EXIT 35) ALONG THE BAYWAY BRIDGE

Type of Work LIGHTING

Project Length in Miles 7.467 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055108 IM I010 (331) CONSTRUCTION

LIGHTING 2020 $1,561 $173 $1,734

TOTAL COST: $1,561 $173 $1,734

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

203 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -10 ProjectDescription

I-10 INTERCHANGE MODIFICATIONS FROM TEXAS STREET (EXIT: 25A) TO WEST TUNNEL ENTRANCE .

Type of Work INTERCHANGE

Project Length in Miles 1.080 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055752 IMF AL06 (900) UTILITIES

INTERCHANGE

2020 $450 $50 $500

100055753 IMP3F AL06 (900) CONSTRUCTION

INTERCHANGE

2020 $27,000 $3,000 $30,000

TOTAL COST: $27,450 $3,050 $30,500

Route I -10 ProjectDescription

DESIGN OF VARIOUS INTELLIGENT TRANSPORTATION SYSTEM DEVICES AND FIBER BACKBONE ALONG I-10, I-65, I-165, SR-16 (US-90), SR-42 (US-98), SR-59 WITHIN THE MOBILE AND BALDWIN URBAN AREA

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area EASTERN SHORE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057419 IM MR17 () CONSTRUCTION

UNCLASSIFIED 2019 $8,263 $918 $9,181

TOTAL COST: $8,263 $918 $9,181

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

204 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -165 ProjectDescription

RESURFACING I-165 SERVICE ROADS FROM .04 MILE SOUTH OF BAY BRIDGE ROAD TO .08 MILE NORTH OF WHISTLER STREET

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 1.700 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058195 IM I165 (303) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2019 $2,137 $237 $2,375

TOTAL COST: $2,137 $237 $2,375

Route I -65 ProjectDescription

INTERCHANGE IMPROVEMENTS AT I-65 AND SR-13 (US-43), SOUTH OF CREOLA

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100050693 IM I065 (380) UTILITIES

INTERSECTION IMPROVEMENTS

2023 $134 $15 $149

TOTAL COST: $134 $15 $149

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN MOBILE

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060122 STPAA NR13 (910) CONSTRUCTION

SIDEWALK 2020 $653 $163 $817

TOTAL COST: $653 $163 $817

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

205 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-13 ProjectDescription

CULVERT REPLACMENT, BIN 5715, SR-13 (US-43) OVER STEELE CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061588 BR 0013 (601) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,560 $640 $3,200

TOTAL COST: $2,560 $640 $3,200

Route SR-158X ProjectDescription

SR-158 EXTENSION LOTT ROAD OVERPASS AND JUG HANDLE. GRADE, DRAIN, BASE, PAVE, AND BRIDGE (EB SEABURY CREEK TRIBUTARY AND PARTIAL LOTT ROAD)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.770 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060154 NHF 0158 (505) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $16,000 $4,000 $20,000

100060155 NHF 0158 (503) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2023 $10,525 $2,631 $13,157

TOTAL COST: $26,525 $6,631 $33,157

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

206 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-16 ProjectDescription

REPLACE BRIDGE, BIN 008714, SR-16 (US-90) WESTBOUND OVER TENSAW-SPANISH RIVER. (SUFF=49.7, STATUS=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.653 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056130 BRF 0016 (522) UTILITIES

BRIDGE REPLACEMENT

2019 $451 $113 $564

100049566 BRF 0016 (522) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $19,873 $4,968 $24,842

TOTAL COST: $20,324 $5,081 $25,405

Route SR-163 ProjectDescription

BRIDGE REPLACEMENT ON SR-163 OVER PERCH CREEK BIN 011865 FROM MP 3.931 TO MP 3.983

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.052 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067047 BR 0163 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $4,733 $1,183 $5,917

TOTAL COST: $4,733 $1,183 $5,917

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

207 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-17 ProjectDescription

BRIDGE REPL SR-17(US-45) (STR#17-49-35.7) OVER BENNETTS CK BIN 003218

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.020 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100002812 BR 0017 (574) RIGHT OF WAY

BRIDGE REPLACEMENT

2020 $9 $2 $11

100043179 BR 0017 (574) UTILITIES

BRIDGE REPLACEMENT

2021 $117 $29 $146

100002811 BR 0017 (574) CONSTRUCTION

BRIDGE REPLACEMENT

2021 $2,548 $637 $3,185

TOTAL COST: $2,673 $668 $3,342

Route SR-217 ProjectDescription

REPLACE BRIDGE, BIN 004471, SR-217 OVER BIG CREEK. (SUFF=50.6, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.111 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049586 BR 0217 (501) UTILITIES

BRIDGE REPLACEMENT

2022 $29 $7 $37

100049584 BR 0217 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $884 $221 $1,105

TOTAL COST: $913 $228 $1,142

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

208 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-42 ProjectDescription

EXTEND EASTBOUND BRIDGE ON SR-42 (US-98) OVER BIG CREEK EAST 1440'

Type of Work BRIDGE

Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054972 NHF 0042 (511) CONSTRUCTION

BRIDGE 2019 $8,130 $2,032 $10,162

TOTAL COST: $8,130 $2,032 $10,162

Route SR-42 ProjectDescription

US-98 EASTBOUND LANES FROM MISSISSIPPI LINE TO 0.5 MILE EAST OF GLENWOOD ROAD. BASE AND PAVE

Type of Work BASE AND PAVE

Project Length in Miles 4.870 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040584 NH 0042 (509) CONSTRUCTION

BASE AND PAVE

2020 $14,560 $3,640 $18,200

TOTAL COST: $14,560 $3,640 $18,200

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

209 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-42R ProjectDescription

CONSTRUCT BRIDGE ON (CR-63) WILMER-GEORGETOWN ROAD OVER SR-42 (US-98) WITH JUGHANDLE INTERCHANGE ONTO SR-42 (US-98)

Type of Work BRIDGE

Project Length in Miles 0.010 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066917 BP-049-042-015 () RIGHT OF WAY

BRIDGE 2018 $0 $240 $240

100060480 NHF 0042 (535) CONSTRUCTION

BRIDGE 2020 $6,979 $1,745 $8,723

TOTAL COST: $6,979 $1,985 $8,963

Route SR-42R ProjectDescription

CONSTRUCT BRIDGE ON GLENWOOD ROAD OVER SR-42 (US-98)

Type of Work BRIDGE

Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052812 NHF 0042 (517) CONSTRUCTION

BRIDGE 2020 $4,429 $1,107 $5,536

TOTAL COST: $4,429 $1,107 $5,536

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

210 of 305

HIGHWAY PROJECTS - MOBILE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

ADA REQUIRED SIDEWALK CURB RAMP INSTALLATIONS ON VARIOUS STATE ROUTES IN MONROE AND WILCOX COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060287 STPAA NR13 (957) CONSTRUCTION

SIDEWALK 2019 $361 $90 $451

TOTAL COST: $361 $90 $451

Route SR-12 ProjectDescription

BRIDGE RAIL RETROFIT (BIN 011202) AND GUARDRAIL ON SR-12 (US-84) FROM CLARKE COUNTY LINE TO 0.367 MILE EAST OF CR-1

Type of Work BRIDGE REHABILITATION

Project Length in Miles 2.700 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052611 NH 0012 (535) CONSTRUCTION

BRIDGE REHABILITATION

2020 $447 $112 $559

TOTAL COST: $447 $112 $559

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

211 of 305

HIGHWAY PROJECTS - MONROE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-18 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CR-18 (SNOWDOUN CHAMBERS ROAD) FROM CR-61 (HOBBIE ROAD) TO CR-39 (WOODLEY ROAD)

Type of Work RESURFACING

Project Length in Miles 5.380 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067620 STPMN 5118 () PRELIMINARY ENGINEERING

RESURFACING

2019 $4 $1 $5

100067621 STPMN 5118 () CONSTRUCTION

RESURFACING

2019 $751 $188 $939

TOTAL COST: $755 $189 $944

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

212 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-2120 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS

Type of Work RESURFACING

Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067622 STPMN 5118 () PRELIMINARY ENGINEERING

RESURFACING

2020 $4 $1 $5

TOTAL COST: $4 $1 $5

Route CR-2120 ProjectDescription

RESURFACE AND TRAFFIC STRIPE ALABAMA RIVER PARKWAY (CR-2120) FROM END OF TOLL BRIDGE OVER THE ALABAMA RIVER TO THE MONTGOMERY CITY LIMITS

Type of Work RESURFACING

Project Length in Miles 1.682 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067623 STPMN 5118 (252) CONSTRUCTION

RESURFACING

2019 $446 $111 $557

TOTAL COST: $446 $111 $557

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

213 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-234 ProjectDescription

RESURFACE AND WIDEN RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.820 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064673 STPMN 5115 () PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2020 $286 $71 $357

100064674 STPMN 5115 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2021 $170 $42 $212

100064675 STPMN 5115 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2022 $2,400 $600 $3,000

TOTAL COST: $2,855 $714 $3,569

Route CR-236 ProjectDescription

RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.

Type of Work RESURFACING

Project Length in Miles 2.130 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059831 STPMN 5116 () CONSTRUCTION

RESURFACING

2020 $2,400 $600 $3,000

TOTAL COST: $2,400 $600 $3,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

214 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-24 ProjectDescription

RESURFACE CR-24 (CLOVERFIELD/FEDERAL ROAD) FROM THE LOWNDES COUNTY LINE TO SR-3 (US-31) - MCP 51-82-17

Type of Work RESURFACING

Project Length in Miles 2.960 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067616 STPAA 5117 (252) CONSTRUCTION

RESURFACING

2019 $572 $143 $715

TOTAL COST: $572 $143 $715

Route CR-33 ProjectDescription

BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060092 STPMN 7702 (601) RIGHT OF WAY

BRIDGE REPLACEMENT

2020 $60 $15 $75

100060091 STPMN 7702 (601) UTILITIES

BRIDGE REPLACEMENT

2020 $160 $40 $200

100055807 STPMN 7702 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,600 $400 $2,000

TOTAL COST: $1,820 $455 $2,275

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

215 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-39 ProjectDescription

BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060096 STPAA 7701 (602) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $60 $15 $75

100060095 STPMN 7701 (602) UTILITIES

BRIDGE REPLACEMENT

2020 $160 $40 $200

100055809 STPMN 7701 (602) CONSTRUCTION

BRIDGE REPLACEMENT

2021 $2,340 $585 $2,925

TOTAL COST: $2,560 $640 $3,200

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

216 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-42 ProjectDescription

RESURFACE AND TRAFFIC STRIPE HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331) TO INCLUDE AN AT-GRADE RAILROAD CROSSING WITH CSX TRANSPORTATION

Type of Work RESURFACING

Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064378 STPMN 5118 (251) CONSTRUCTION

RESURFACING

2019 $1,279 $320 $1,599

TOTAL COST: $1,279 $320 $1,599

Route CR-42 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331)

Type of Work RESURFACING

Project Length in Miles 2.737 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064377 STPMN 5118 () PRELIMINARY ENGINEERING

RESURFACING

2019 $4 $1 $5

TOTAL COST: $4 $1 $5

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

217 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-43 ProjectDescription

WIDEN, RESURFACE AND ADD TURN LANES CR-43(BELL RD) FROM NORTH END I-85 BRIDGE TO SR-8 (US-80, ATLANTA HWY), TURN LANESATBELL GABLES, BELL ROAD MANOR, BELL ROAD COURT, OLIVER DRIVE AND HENLEY WAY

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044515 STPMN 7707 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $888 $222 $1,110

TOTAL COST: $888 $222 $1,110

Route CR-54 ProjectDescription

RESURFACING ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3 (US-31)

Type of Work RESURFACING

Project Length in Miles 3.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067638 STPMN 5118 () PRELIMINARY ENGINEERING

RESURFACING

2020 $64 $16 $80

100067639 STPMN 5118 () CONSTRUCTION

RESURFACING

2022 $2,800 $700 $3,500

TOTAL COST: $2,864 $716 $3,580

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

218 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-74 ProjectDescription

RESURFACING ANDERSON ROAD/LOWER WETUMPKA ROAD (CR-74) FROM ALABAMA RIVER PARKWAY TO SR-9 (US-231)

Type of Work RESURFACING

Project Length in Miles 5.230 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064380 STPAA 5117 (253) CONSTRUCTION

RESURFACING

2019 $1,340 $335 $1,674

TOTAL COST: $1,340 $335 $1,674

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ATLANTA HIGHWAY FROM MOUNTAINVIEW DRIVE TO SR-9 (US-231:EAST BLVD)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040822 STPMN 7771 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $692 $173 $865

TOTAL COST: $692 $173 $865

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

219 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.710 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044273 STPMN 7724 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2019 $1,052 $263 $1,315

100044272 STPMN 7724 () UTILITIES

WIDENING AND RESURFACING (RDWY)

2020 $1,642 $411 $2,053

100007740 STPMN 7724 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $4,737 $1,184 $5,921

TOTAL COST: $7,431 $1,858 $9,289

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT PERRY HILL ROAD AND ATLANTA HIGHWAY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064161 STPMN 5115 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $800 $200 $1,000

100064162 STPMN 5115 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $5,600 $1,400 $7,000

TOTAL COST: $6,400 $1,600 $8,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

220 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.450 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100053061 STPAA 7733 (602) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2019 $973 $243 $1,217

100045392 STPMN 7733 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $1,474 $368 $1,842

100053059 STPAA 7733 (601) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2021 $1,898 $474 $2,372

TOTAL COST: $4,345 $1,086 $5,431

Route CR-NA ProjectDescription

RESURFACE AND SIDEWALK BEAUTIFICATION SOUTH COURT STREET FROM CR-233 (FAIRVIEW AVENUE) TO SR-6 (US-331,SOUTH BOULEVARD)

Type of Work RESURFACING

Project Length in Miles 1.720 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054277 STPAA 7729 (600) CONSTRUCTION

RESURFACING

2019 $3,200 $800 $4,000

TOTAL COST: $3,200 $800 $4,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

221 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE ADAMS AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURT STREET, AND WASHINGTON AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURTATLEE STREET

Type of Work RESURFACING

Project Length in Miles 0.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054280 STPMN CN10 () CONSTRUCTION

RESURFACING

2020 $1,316 $329 $1,645

TOTAL COST: $1,316 $329 $1,645

Route CR-NA ProjectDescription

RESURFACE SOUTH PERRY STREET FROM CR-233 (FAIRVIEW AVENUE) TO ARBA STREET

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054282 STPMN 7716 () CONSTRUCTION

RESURFACING

2020 $1,125 $281 $1,406

TOTAL COST: $1,125 $281 $1,406

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

222 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

DRAINAGE, WIDENING, RESURFACING, SIGNALS AND LANDSCAPING FAIRVIEW AVENUE (CR-233) FROM I-65 TO SOUTH COURT STREET

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.810 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054285 STPMN 7730 (600) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $3,360 $840 $4,200

TOTAL COST: $3,360 $840 $4,200

Route CR-NA ProjectDescription

BRIDGE PAINTING ON AIRBASE BOULEVARD (BIN#011513, #011514), MAXWELL AFB ENTRANCE (#006013), UPPER WETUMPKA ROAD (#008715 AND 008716), MADISON AVENUE (#011480)

Type of Work BRIDGE PAINTING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060098 STPMN 5113 () CONSTRUCTION

BRIDGE PAINTING

2020 $200 $50 $250

TOTAL COST: $200 $50 $250

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

223 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040817 STPMN 5116 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $1,248 $312 $1,560

TOTAL COST: $1,248 $312 $1,560

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064606 STPAA 5116 (250) RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2020 $200 $50 $250

100064607 STPMN 5116 (250) UTILITIES

WIDENING AND RESURFACING (RDWY)

2020 $40 $10 $50

TOTAL COST: $240 $60 $300

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

224 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059726 STPMN 5115 (251) UTILITIES

RESURFACING

2020 $80 $20 $100

100063695 STPMN 5115 () CONSTRUCTION

RESURFACING

2020 $3,200 $800 $4,000

TOTAL COST: $3,280 $820 $4,100

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM NOBLE AVE. TO HIGH ST.

Type of Work RESURFACING

Project Length in Miles 0.600 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063696 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $87 $22 $108

100063697 STPMN 5115 () CONSTRUCTION

RESURFACING

2021 $997 $249 $1,247

TOTAL COST: $1,084 $271 $1,355

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

225 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM JEFFERSON ST. TO POLLARD ST.

Type of Work RESURFACING

Project Length in Miles 0.200 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063698 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $35 $9 $43

100063699 STPMN 5115 () CONSTRUCTION

RESURFACING

2022 $398 $99 $497

TOTAL COST: $433 $108 $541

Route CR-NA ProjectDescription

RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.

Type of Work RESURFACING

Project Length in Miles 2.100 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063731 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $342 $86 $428

100063732 STPMN 5115 () CONSTRUCTION

RESURFACING

2021 $3,939 $985 $4,923

TOTAL COST: $4,281 $1,070 $5,351

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

226 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON DAILRAIDA ROAD FROM ATLANTA HWY TO GUNTER AFB

Type of Work RESURFACING

Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064163 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $232 $58 $290

100064164 STPMN 5115 () CONSTRUCTION

RESURFACING

2022 $2,085 $521 $2,606

TOTAL COST: $2,316 $579 $2,896

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON LOWER WETUMPKA ROAD FROM TOLVERT STREET TO THE BYPASS

Type of Work RESURFACING

Project Length in Miles 1.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064165 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $257 $64 $321

100064166 STPMN 5115 () CONSTRUCTION

RESURFACING

2021 $2,314 $579 $2,893

TOTAL COST: $2,571 $643 $3,214

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

227 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON DAY STREET BRIDGE BIN # 016848

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064167 STPMN 5115 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $824 $206 $1,030

100064168 STPMN 5115 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $7,416 $1,854 $9,270

TOTAL COST: $8,240 $2,060 $10,300

Route CR-NA ProjectDescription

WIDEN MARLER ROAD TO 3-LANE FROM SR-8 (US-80) TO OKFUSKI TRAIL

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.500 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064169 STPMN 5115 () PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2020 $800 $200 $1,000

100064170 STPMN 5115 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2021 $1,600 $400 $2,000

100064171 STPMN 5115 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2022 $13,040 $3,260 $16,300

TOTAL COST: $15,440 $3,860 $19,300

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

228 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

CONVERT SOUTH COURT STREET FROM FAIRVIEW AVENUE TO ARBA STREET FROM ONE-WAY TO TWO-WAY

Type of Work RESURFACING

Project Length in Miles 1.064 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064180 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $8 $2 $10

100064156 STPMN 5115 () CONSTRUCTION

RESURFACING

2020 $1,680 $420 $2,100

TOTAL COST: $1,688 $422 $2,110

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON RAY THORINGTON ROAD FROM PARK CROSSING TO PIKE ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066880 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2019 $200 $50 $250

100066881 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $2,800 $700 $3,500

TOTAL COST: $3,000 $750 $3,750

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

229 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON MCGEHEE ROAD FROM WOODLEY ROAD TO SOUTHERN BLVD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066882 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2020 $160 $40 $200

100066883 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $3,376 $844 $4,220

TOTAL COST: $3,536 $884 $4,420

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON VIRGINIA LOOP ROAD FROM SR-6 (US-231) TO WOODLEY ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066884 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2020 $200 $50 $250

100066885 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $976 $244 $1,220

TOTAL COST: $1,176 $294 $1,470

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

230 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON ATLANTA HIGHWAY FROM ANN STREET TO PERRY HILL ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066886 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2020 $200 $50 $250

100066887 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $4,000 $1,000 $5,000

TOTAL COST: $4,200 $1,050 $5,250

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067611 STPAA 5117 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $32 $8 $40

100067613 STPAA 5117 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $80 $20 $100

100067614 STPMN 5117 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $400 $100 $500

TOTAL COST: $512 $128 $640

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

231 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING ON MCINNIS ROAD FROM WOODLEY ROAD TO NARROW LANE ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067636 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2020 $80 $20 $100

100067637 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $2,400 $600 $3,000

TOTAL COST: $2,480 $620 $3,100

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

232 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

RESURFACE I-65 FROM CATOMA CREEK TO NORTH OF FAIRVIEW AVENUE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 2.980 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066453 IM I065 (494) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $2,849 $317 $3,166

TOTAL COST: $2,849 $317 $3,166

Route I -65 ProjectDescription

RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 2.030 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066459 IM I065 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2020 $2,061 $229 $2,290

TOTAL COST: $2,061 $229 $2,290

Route I -85 ProjectDescription

SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY AND MACON COUNTY TO LEE COUNTY LINE

Type of Work SIGN REHABILITATION

Project Length in Miles 47.460 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054302 IM I085 (333) CONSTRUCTION

SIGN REHABILITATION

2020 $2,535 $282 $2,817

TOTAL COST: $2,535 $282 $2,817

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

233 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -85 ProjectDescription

BRIDGE REPLACEMENT ON I-85 NB AND SB OVER LINE CREEK (INCLUDING TWO RELIEF BRIDGES) BIN # 7554, 7555, 7556, 7557, 7566, 7567

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.480 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059252 IM I085 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $2,430 $270 $2,700

100059253 IM I085 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $23,182 $2,576 $25,758

TOTAL COST: $25,612 $2,846 $28,458

Route I -85 ProjectDescription

PAVEMENT REHAB AND SLAB REPAIRS ON I-85 FROM I-65 TO JUST NORTH OF THE HALL STREET OVERPASS

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 1.842 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062472 IM I085 (357) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $2,536 $282 $2,818

TOTAL COST: $2,536 $282 $2,818

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

234 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

RETROFITTING OF HANDICAP RAMPS ON VARIOUS STREETS IN THE CITY OF MONTGOMERY DOWNTOWN CENTRAL BUSINESS DISTRICT

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060100 STPMN 5113 () CONSTRUCTION

SIDEWALK 2020 $400 $100 $500

TOTAL COST: $400 $100 $500

Route NA- ProjectDescription

STREET LIGHT CONVERSION TO LED IN CENTRAL BUSINESS DISTRICT (CITY OF MONTGOMERY)

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063693 STPMN 5115 () CONSTRUCTION

LIGHTING 2020 $1,653 $413 $2,066

TOTAL COST: $1,653 $413 $2,066

Route NA- ProjectDescription

DAY STREET/MAXWELL AIR FORCE BASE FEASIBILITY STUDY

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063733 STPMN 5115 () SPECIAL

CORRIDOR STUDY

2020 $240 $60 $300

TOTAL COST: $240 $60 $300

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

235 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-110 ProjectDescription

ADDITIONAL LANES ON SR-110 FROM CHANTILLY PKWY TO CR-294 (BRIDLEBROOK BLVD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.030 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100043877 STPAA 0110 (501) UTILITIES

ADDITIONAL ROADWAY LANES

2021 $714 $179 $893

100050187 STPAA 0110 (501) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2021 $2,917 $729 $3,647

TOTAL COST: $3,631 $908 $4,539

Route SR-110 ProjectDescription

ADDITIONAL LANES ON SR-110 FROM CR-294 (BRIDLEBROOK BLVD) TO THE OUTER LOOP

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.450 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067733 STPAA 0110 (502) UTILITIES

ADDITIONAL ROADWAY LANES

2041 $498 $124 $622

TOTAL COST: $498 $124 $622

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

236 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-271 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-271 (EXIT 9) ONTO I-85 SOUTHBOUND

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067646 STPAA 0271 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $2,040 $510 $2,550

TOTAL COST: $2,040 $510 $2,550

Route SR-6 ProjectDescription

BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN #000735 STR #6-51-17.5

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.010 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038170 BR 0006 (563) UTILITIES

BRIDGES AND APPROACHES

2019 $242 $61 $303

100004312 BR 0006 () CONSTRUCTION

BRIDGES AND APPROACHES

2020 $3,981 $995 $4,976

TOTAL COST: $4,223 $1,056 $5,279

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

237 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-8 ProjectDescription

WIDEN AND RESURFACE SR-8 (US-80) FROM THE WAUGH INTERSECTION TO THE MARLER ROAD INTERSECTION

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064153 STPMN 5115 () PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2020 $203 $51 $254

100064154 STPMN 5115 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2020 $160 $40 $200

100064155 STPMN 5115 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2021 $1,669 $417 $2,086

TOTAL COST: $2,032 $508 $2,540

Route SR-8 ProjectDescription

TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064157 STPMN 5115 () SPECIAL

CORRIDOR STUDY

2020 $96 $24 $120

TOTAL COST: $96 $24 $120

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

238 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-9 ProjectDescription

EXTEND SEVICE ROAD ALONG SR-9 (NOTHERN BLVD) NORTH BOUND FROM HACKEL DRIVE TO PLANTATION WAY AND SOUTHBOUND FROM LAGOON PARK DRIVE TO THE EXISTING SERVICE ROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.760 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063744 NH 0009 (533) PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE AND PAVE

2023 $69 $17 $87

TOTAL COST: $69 $17 $87

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

239 of 305

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

CLEAR ZONE SAFETY IMPROVEMENTS ON I-65 FROM MP 319.710 TO MP 326.850

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 7.140 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100001761 IM I065 () CONSTRUCTION

SAFETY IMPROVEMENTS

2023 $4,510 $501 $5,011

TOTAL COST: $4,510 $501 $5,011

Route I -65 ProjectDescription

PAINT, RETROFIT BRIDGE RAILS AND REPLACE VARIOUS BEARING ASSEMBLIES ON I-65 BRIDGES OVER THE TENNESSEE RIVER, BIN# 010882 AND 010883

Type of Work BRIDGE REHABILITATION

Project Length in Miles 1.880 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100042493 IM I065 () CONSTRUCTION

BRIDGE REHABILITATION

2021 $10,092 $1,121 $11,213

TOTAL COST: $10,092 $1,121 $11,213

Route SR-20 ProjectDescription

PAVEMENT REHABILITATION ON SR-20 (US-72) FROM MP 67.147 EAST OF RR SPUR TO MP 68.600 WEST OF BRIDGE OVER RR

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 1.453 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061923 NH 0020 () CONSTRUCTION

PAVEMENT REHABILITATION

2021 $2,548 $637 $3,185

TOTAL COST: $2,548 $637 $3,185

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

240 of 305

HIGHWAY PROJECTS - MORGAN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-3 ProjectDescription

REPLACE SOUTHBOUND BRIDGE, BIN 000882, SR-3 (US-31) OVER CEDAR CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049717 BR 0003 (591) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $58 $14 $72

100049718 BR 0003 (591) UTILITIES

BRIDGE REPLACEMENT

2019 $40 $10 $50

100049719 BR 0003 (591) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,040 $510 $2,550

TOTAL COST: $2,138 $534 $2,672

Route SR-36 ProjectDescription

BRIDGE REPLACEMENT ON SR-36 BIN # 001775 OVER GUM SPRING CREEK (MP 28.839) AND BIN # 001776 ROAN CREEK (MP 29.229) (SUFF = 54.5, STAT = 2)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.326 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066926 BR 0036 (503) UTILITIES

BRIDGE REPLACEMENT

2019 $163 $41 $204

100040782 BR 0036 (503) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,449 $612 $3,062

TOTAL COST: $2,613 $653 $3,266

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

241 of 305

HIGHWAY PROJECTS - MORGAN

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-14 ProjectDescription

REPLACE BRIDGE ON SR-14 OVER LUBBUB CREEK BIN # 002672

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.833 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060610 BR 0014 (521) UTILITIES

BRIDGE REPLACEMENT

2019 $188 $47 $235

100049165 BR 0014 (521) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,721 $680 $3,402

TOTAL COST: $2,909 $727 $3,637

Route SR-14 ProjectDescription

BRIDGE REPLACEMENT ON SR-14 OVER BLUBBER CREEK WEST OF ALICEVILLE, BIN # 003677

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.570 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061125 BR 0014 (536) UTILITIES

BRIDGE REPLACEMENT

2019 $75 $19 $94

100061126 BR 0014 (536) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,612 $653 $3,265

TOTAL COST: $2,687 $672 $3,358

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

242 of 305

HIGHWAY PROJECTS - PICKENS

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-6 ProjectDescription

SR-6 (US-82) FROM WEST OF GORDO TO TUSCALOOSA COUNTY LINE

Type of Work BASE AND PAVE

Project Length in Miles 6.740 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032473 NHF 0006 (576) CONSTRUCTION

BASE AND PAVE

2020 $22,935 $5,734 $28,669

TOTAL COST: $22,935 $5,734 $28,669

Route SR-6 ProjectDescription

ADD CENTER TURN LANE ON SR-6 (US-82) FROM THE 4 LANES WEST OF REFORM TO 3RD AVENUE SOUTHEAST IN THE CITY OF REFORM

Type of Work TURN LANES

Project Length in Miles 1.600 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068073 NH 0006 () RIGHT OF WAY

TURN LANES 2019 $1,414 $354 $1,768

100068074 NH 0006 () UTILITIES

TURN LANES 2019 $2,020 $505 $2,525

100068075 NH 0006 () CONSTRUCTION

TURN LANES 2019 $5,656 $1,414 $7,070

TOTAL COST: $9,090 $2,273 $11,363

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

243 of 305

HIGHWAY PROJECTS - PICKENS

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-22 ProjectDescription

REPLACE BR #22-56-1.5A OVER TALLAPOOSA RIVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.900 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100003447 BR 451 () RIGHT OF WAY

BRIDGE REPLACEMENT

2021 $24 $6 $29

100003442 BR 451 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $7,492 $1,873 $9,365

TOTAL COST: $7,516 $1,879 $9,395

Route SR-22 ProjectDescription

REPLACE BRIDGE, BIN 004332, SR-22 OVER WEHADKEE CREEK (SUFF=55.7, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.061 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049192 BR 0022 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $2,645 $661 $3,306

TOTAL COST: $2,645 $661 $3,306

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

244 of 305

HIGHWAY PROJECTS - RANDOLPH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-22R ProjectDescription

REALIGNMENT OF SR-22 FROM SR-22/MAINSTREET INTERSECTION TO US-431 IN ROANOKE

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.670 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100004420 STPAA 0022 (505) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2020 $7,847 $1,962 $9,809

TOTAL COST: $7,847 $1,962 $9,809

Route SR-48 ProjectDescription

REPLACE BRIDGE, BIN 000798, SR-48 OVER FOX CREEK (SUFF = 3.6, STATUS = SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.020 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047362 BR 0048 (502) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $3,368 $842 $4,210

TOTAL COST: $3,368 $842 $4,210

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

245 of 305

HIGHWAY PROJECTS - RANDOLPH

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-296 ProjectDescription

REPLACE BRIDGE ON CR-427 (OPELIKA ROAD) BIN # 1730 AND IMPROVEMENTS ON CR-296 (CUTRATE ROAD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059582 STPPC-ACAABRZ59582 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,395 $349 $1,743

TOTAL COST: $1,395 $349 $1,743

Route CR-NA ProjectDescription

RESURFACING AND WIDENING ON FREEMAN ROAD FROM SANDFORT ROAD TO SR-1 (US-431) IN PHENIX CITY

Type of Work RESURFACING

Project Length in Miles 2.300 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067563 STPPC 5717 () CONSTRUCTION

RESURFACING

2021 $322 $81 $403

TOTAL COST: $322 $81 $403

Route CR-NA ProjectDescription

WIDEN AND RESURFACE BRADLEY ROAD FROM NUCKOLS ROAD TO SR-165

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.940 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063092 STPPC 5714 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $412 $103 $515

TOTAL COST: $412 $103 $515

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

246 of 305

HIGHWAY PROJECTS - RUSSELL

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN AND RESURFACE LATO ROAD FROM UCHEE HILL HIGHWAY

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.880 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063093 STPPC 5714 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $403 $101 $504

TOTAL COST: $403 $101 $504

Route CR-NA ProjectDescription

WIDEN AND RESURFACE TARVER ROAD FROM LATO ROAD TO NUCKOLS ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.240 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063094 STPPC 5714 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $314 $78 $392

TOTAL COST: $314 $78 $392

Route CR-NA ProjectDescription

RESURFACING AND WIDENING ON OWENS ROAD FROM MCCLENDON ROAD TO PATTERSON ROAD IN FORT MITCHELL

Type of Work RESURFACING

Project Length in Miles 0.496 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067564 STPPC 5717 () CONSTRUCTION

RESURFACING

2021 $69 $17 $87

TOTAL COST: $69 $17 $87

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

247 of 305

HIGHWAY PROJECTS - RUSSELL

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING AND WIDENING ON OWENS ROAD FROM SR-165 TO MCCLENDON ROAD IN FORT MITCHELL

Type of Work RESURFACING

Project Length in Miles 1.200 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067565 STPPC 5717 () CONSTRUCTION

RESURFACING

2022 $168 $42 $210

TOTAL COST: $168 $42 $210

Route CR-NA ProjectDescription

RESURFACING AND WIDENING ON MCCLENDON ROAD FROM OWENS ROAD TO OWENS ROAD IN FORT MITCHELL

Type of Work RESURFACING

Project Length in Miles 1.884 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067566 STPPC 5717 () CONSTRUCTION

RESURFACING

2021 $264 $66 $330

TOTAL COST: $264 $66 $330

Route CR-NA ProjectDescription

BRICKYARD ROAD RESURFACING FROM DILLINGHAM STREET TO STATE DOCKS ROAD

Type of Work RESURFACING

Project Length in Miles 2.100 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063082 STPPC 5716 () CONSTRUCTION

RESURFACING

2019 $1,038 $260 $1,298

TOTAL COST: $1,038 $260 $1,298

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

248 of 305

HIGHWAY PROJECTS - RUSSELL

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRICKYARD ROAD RESURFACING FROM STATE DOCKS ROAD TO CITY LIMITS

Type of Work RESURFACING

Project Length in Miles 2.100 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063086 STPPC 5716 () CONSTRUCTION

RESURFACING

2019 $366 $92 $458

TOTAL COST: $366 $92 $458

Route CR-NA ProjectDescription

SOUTH RAILROAD STREET RESURFACING FROM BEGINNING OF SOUTH RAILROAD STREET TO STADIUM DRIVE

Type of Work RESURFACING

Project Length in Miles 1.360 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063088 STPPC 5716 () CONSTRUCTION

RESURFACING

2019 $791 $198 $989

TOTAL COST: $791 $198 $989

Route CR-NA ProjectDescription

SOUTH RAILROAD STREET RESURFACING FROM STADIUM DRIVE TO SUMMERVILLE DRIVE

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063090 STPPC 5716 () CONSTRUCTION

RESURFACING

2019 $633 $158 $791

TOTAL COST: $633 $158 $791

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

249 of 305

HIGHWAY PROJECTS - RUSSELL

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING ON SOUTH SEALE ROAD FROM SR-1 (US-431) TO THE BRIDGE AT SR-38 (US-280)

Type of Work RESURFACING

Project Length in Miles 4.111 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067443 STPPC 5717 () PRELIMINARY ENGINEERING

RESURFACING

2019 $45 $11 $56

100067444 STPPC 5717 () CONSTRUCTION

RESURFACING

2020 $287 $72 $359

TOTAL COST: $332 $83 $415

Route CR-NA ProjectDescription

RESURFACING ON 16TH AVENUE FROM SR-38 (US-280) TO INGERSOL COURT IN PHENIX CITY

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067445 STPPC 5717 () PRELIMINARY ENGINEERING

RESURFACING

2019 $72 $18 $90

100067446 STPPC 5717 () CONSTRUCTION

RESURFACING

2020 $458 $115 $573

TOTAL COST: $530 $133 $663

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

250 of 305

HIGHWAY PROJECTS - RUSSELL

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON SEALE ROAD OVER COCHGALECHEE CREEK BIN # 004291 IN PHENIX CITY

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area PHENIX CITY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067447 STPPC 5717 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $32 $8 $40

100067448 STPPC 5717 () UTILITIES

BRIDGE REPLACEMENT

2020 $32 $8 $40

100067449 STPPC 5717 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $352 $88 $440

TOTAL COST: $416 $104 $520

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

251 of 305

HIGHWAY PROJECTS - RUSSELL

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-11 ProjectDescription

SHELBY CR-11 (PHASE 2) GUARDRAIL AND RAILROAD CROSSING IMPROVMENTS: FROM SR-3 TO CR-68

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 1.580 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040846 STPBH 7118 () UTILITIES

SAFETY IMPROVEMENTS

2020 $10 $2 $12

100007571 STPBH 7118 () CONSTRUCTION

SAFETY IMPROVEMENTS

2020 $323 $81 $403

TOTAL COST: $332 $83 $415

Route CR-11 ProjectDescription

WIDEN AND RESURFACE CR-11 FROM SR-3 (US-31) TO CR-332 (WEATHERLY WAY)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 3.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007575 STPBH 7118 () PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2020 $190 $48 $238

100007576 STPBH 7118 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2021 $1,937 $484 $2,421

100007577 STPBH 7118 () UTILITIES

UTILITY ADJUSTMENT

2022 $963 $241 $1,204

100007572 STPBH 7118 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2022 $3,078 $770 $3,848

TOTAL COST: $6,169 $1,542 $7,711

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

252 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-12 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064320 CMAQ 5915 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $200 $50 $250

100064321 CMAQ 5915 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $160 $40 $200

100064322 CMAQ 5915 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $1,600 $400 $2,000

TOTAL COST: $1,960 $490 $2,450

Route CR-1396 ProjectDescription

CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059534 ACAA59534 ATRP (015) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $3,200 $800 $4,000

TOTAL COST: $3,200 $800 $4,000

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

253 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-17 ProjectDescription

ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046238 STPBH 7112 (602) UTILITIES

ADDITIONAL ROADWAY LANES

2020 $553 $138 $691

100046239 STPBH 7112 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $3,149 $787 $3,936

TOTAL COST: $3,702 $925 $4,627

Route CR-17 ProjectDescription

RESURFACE CR-17 FROM CR-22 TO CR-26 (KENT DAIRY ROAD)

Type of Work RESURFACING

Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059513 ACAA59513 ATRP (010) CONSTRUCTION

RESURFACING

2018 $1,136 $284 $1,420

TOTAL COST: $1,136 $284 $1,420

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

254 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-17 ProjectDescription

RESURFACING ON CR-17 (VALLEYDALE ROAD) FROM I-65 TO CR-29 (CALDWELL MILL ROAD) AND ON CR-43 (BEAR CREEK ROAD) FROM SR-38 (US-280) TO SR-25

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067607 STPBH 5918 () CONSTRUCTION

RESURFACING

2020 $1,200 $300 $1,500

TOTAL COST: $1,200 $300 $1,500

Route CR-29 ProjectDescription

WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100045964 STPBH 5939 (200) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $4,274 $1,069 $5,343

100007540 STPBH 5939 (200) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,589 $397 $1,986

TOTAL COST: $5,863 $1,466 $7,329

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

255 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-52 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-52 OVER CAHABA RIVER (BIN 2380) FROM OLD CAHABA LANE TO OAK VIEW LANE

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059503 STPBH-ACBR59503 ATRP (012)

CONSTRUCTION

BRIDGES AND APPROACHES

2019 $3,702 $926 $4,628

TOTAL COST: $3,702 $926 $4,628

Route CR-52 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-52 AND CR-93

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059509 CMAQ 5918 (250) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $760 $190 $950

TOTAL COST: $760 $190 $950

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

256 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-55 ProjectDescription

BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056309 STPBH 5914 (250) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $772 $193 $965

100056310 STPBH 5914 (250) UTILITIES

UTILITY ADJUSTMENT

2019 $200 $50 $250

100056311 STPBH 5914 () CONSTRUCTION

BRIDGES AND APPROACHES

2020 $1,000 $250 $1,250

TOTAL COST: $1,972 $493 $2,465

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

257 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

>VALLEYDALE RD FR CALDWELL MILL RD TO INVERNESS CENTER CITY OF HOOVER

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033064 STPBH 9802 (905) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $10,212 $2,553 $12,765

TOTAL COST: $10,212 $2,553 $12,765

Route CR-NA ProjectDescription

SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.853 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063242 STPBH-CMAQ 5915 (250)

UTILITIES

INTERSECTION IMPROVEMENTS

2019 $60 $15 $75

100063243 STPBH-CMAQ 5915 (250)

CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $1,359 $340 $1,699

TOTAL COST: $1,419 $355 $1,774

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

258 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

CONGESTION MGT. TRAFFIC SYSTEM, SUPP. ITS DEVICES ALONG I-65 FROM SR-119 (EXIT 246) TO NORTH OF I-20/I-59 (EXIT 261), INCLUDES CCTV AND RADAR

Type of Work UNCLASSIFIED

Project Length in Miles 15.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046079 CMAQ I065 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2020 $213 $53 $266

100046081 CMAQ I065 () CONSTRUCTION

UNCLASSIFIED 2020 $2,817 $704 $3,521

100046080 CMAQ I065 () SPECIAL

UNCLASSIFIED 2020 $469 $117 $587

TOTAL COST: $3,499 $875 $4,374

Route I -65 ProjectDescription

BRIDGE WIDEN ON I-65 CSX RR AND BUXAHATCHEE CK, SOUTH OF EXIT 228 BIN# 006832 AND #006833

Type of Work BRIDGE WIDENING

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055322 IMF I065 () PRELIMINARY ENGINEERING

BRIDGE WIDENING

2020 $746 $83 $829

100055323 IMF I065 () CONSTRUCTION

BRIDGE WIDENING

2022 $7,000 $778 $7,778

TOTAL COST: $7,746 $861 $8,607

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

259 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

BRIDGE WIDENING ON I-65 OVER L AND N RAILROAD, 0.8 MILE NORTH OF SR-3 (US-31) IN CALERA, BIN #006484 AND #006485

Type of Work BRIDGE WIDENING

Project Length in Miles 0.040 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055332 IMF I065 () PRELIMINARY ENGINEERING

BRIDGE WIDENING

2020 $368 $41 $409

100055333 IMF I065 () CONSTRUCTION

BRIDGE WIDENING

2022 $3,756 $417 $4,173

TOTAL COST: $4,125 $458 $4,583

Route I -65 ProjectDescription

BRIDGE WIDENING ON I-65 SOUTH OF SR-3 (US-31) IN ALABASTER BIN #006489 AND #006490 OVER L AND N RR, BIN #006491 AND #006492 OVER CR-26 AND BIN #006493 AND #006494 OVER L AND N RR/CR-87

Type of Work BRIDGE WIDENING

Project Length in Miles 0.540 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055334 IMF I065 () PRELIMINARY ENGINEERING

BRIDGE WIDENING

2020 $1,297 $144 $1,442

100055335 IMF I065 () CONSTRUCTION

BRIDGE WIDENING

2022 $12,212 $1,357 $13,569

TOTAL COST: $13,509 $1,501 $15,010

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

260 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

BUCK CREEK MULTI-USE TRAIL FROM BUCK CREEK TO THOMPSON HIGH SCHOOL. TRAIL WILL LINK HIGH DENSITY RESIDENTIAL PARTS OF ALABASTER TO DESTINATIONS SUCH AS PARKS AND SCHOOLS. PROJECT SPONSOR: CITY OF ALABASTER .

Type of Work UNCLASSIFIED

Project Length in Miles 1.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032369 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $230 $58 $288

TOTAL COST: $230 $58 $288

Route NA- ProjectDescription

HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD

Type of Work UNCLASSIFIED

Project Length in Miles 3.670 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032383 CMAQ 9802 (925) CONSTRUCTION

UNCLASSIFIED 2019 $2,261 $565 $2,826

100032386 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $287 $72 $358

TOTAL COST: $2,547 $637 $3,184

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

261 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK

Type of Work UNCLASSIFIED

Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054519 CMAQ 5917 (904) CONSTRUCTION

UNCLASSIFIED 2019 $1,032 $258 $1,290

TOTAL COST: $1,032 $258 $1,290

Route NA- ProjectDescription

CALERA NORTHERN BYPASS FROM SR-25 WEST OF CALERA TO SR-3 (US-31) NORTH OF CALERA

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100050235 HPP A152 (901) PRELIMINARY ENGINEERING

GRADE, DRAIN AND BRIDGE

2020 $299 $75 $374

100050243 HPP A152 () RIGHT OF WAY

GRADE, DRAIN AND BRIDGE

2021 $1,796 $449 $2,245

100050244 HPP A152 () UTILITIES

GRADE, DRAIN AND BRIDGE

2022 $292 $73 $365

100050239 HPP-STPBH A152 () CONSTRUCTION

GRADE, DRAIN AND BRIDGE

2022 $4,863 $1,216 $6,078

TOTAL COST: $7,250 $1,812 $9,062

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

262 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES WITHIN JEFFERSON, SHELBY AND WALKER COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060174 STPAA NR13 (909) CONSTRUCTION

SIDEWALK 2019 $1,432 $358 $1,790

TOTAL COST: $1,432 $358 $1,790

Route NA- ProjectDescription

PROPOSED BIKE LANES ALONG JOHN FINDLAY DRIVE FROM NORTH OF STATE PARK ROAD TO THE NORTH TRAILHEAD AT OAK MOUNTAIN STATE PARK

Type of Work UNCLASSIFIED

Project Length in Miles 6.008 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064282 CMAQ 5916 (252) CONSTRUCTION

UNCLASSIFIED 2018 $4,390 $1,097 $5,487

TOTAL COST: $4,390 $1,097 $5,487

Route NA- ProjectDescription

DOWNTOWN SIDEWALK IMPROVEMENT ALONG SR-25 (US-231) IN DOWNTOWN VINCENT.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064513 TAPNU TA15 (909) CONSTRUCTION

SIDEWALK 2019 $400 $100 $500

TOTAL COST: $400 $100 $500

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

263 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065162 CMAQ 5916 (253) RIGHT OF WAY

SIDEWALK 2019 $82 $21 $103

100065163 CMAQ 5916 (253) UTILITIES

SIDEWALK 2020 $83 $21 $104

TOTAL COST: $166 $41 $207

Route NA- ProjectDescription

MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067294 TAPAA-CMAQ TA17 (904)

CONSTRUCTION

UNCLASSIFIED 2019 $1,183 $296 $1,479

TOTAL COST: $1,183 $296 $1,479

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

264 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-119 ProjectDescription

ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061118 ACAA61118 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $9,839 $2,460 $12,298

TOTAL COST: $9,839 $2,460 $12,298

Route SR-119 ProjectDescription

ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061286 STPBH 0119 (510) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $426 $106 $532

100063109 STPBH 0119 (510) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $600 $150 $750

TOTAL COST: $1,026 $256 $1,282

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

265 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-25 ProjectDescription

BRIDGE REPLACEMENT ON SR-25 OVER BULLEY CREEK BIN # 000769

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.011 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066556 BR 0025 (550) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $500 $500 $1,000

TOTAL COST: $500 $500 $1,000

Route SR-261 ProjectDescription

ADD LANES SR-261 FROM BEARDEN RD TO SR-3 (US-31)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046437 STPAA 7112 () UTILITIES

ADDITIONAL ROADWAY LANES

2020 $1,381 $345 $1,726

100009265 STPAA 7112 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $22,372 $5,593 $27,965

TOTAL COST: $23,753 $5,938 $29,691

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

266 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-261 ProjectDescription

HELENA BYPASS FROM CR-52 WEST OF HELENA TO SR-261 NORTH OF HELENA

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 5.897 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049209 HPP A139 () RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2021 $1,945 $486 $2,431

100049210 HPP A139 () UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2022 $117 $29 $146

100049211 HPP-STPBH A139 () CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2022 $20,826 $5,207 $26,033

TOTAL COST: $22,888 $5,722 $28,610

Route SR-261 ProjectDescription

INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067712 CMAQ 0261 (501) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $326 $82 $408

100067713 CMAQ 0261 (501) UTILITIES

INTERSECTION IMPROVEMENTS

2021 $595 $149 $743

100067714 CMAQ 0261 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2021 $1,210 $303 $1,513

TOTAL COST: $2,131 $533 $2,664

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

267 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-3 ProjectDescription

PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.125 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039450 STPBH 7012 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $449 $112 $561

TOTAL COST: $449 $112 $561

Route SR-3 ProjectDescription

SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057649 BR 0003 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $437 $109 $546

100057650 BR 0003 () CONSTRUCTION

BRIDGE REPLACEMENT

2025 $4,585 $1,146 $5,732

TOTAL COST: $5,022 $1,255 $6,277

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

268 of 305

HIGHWAY PROJECTS - SHELBY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -20 ProjectDescription

BRIDGE ANDAPPROACHES (BIN 007850 AND 007851) ON I-20 OVER COOSA RIVER AT ST. CLAIR AND TALLADEGA CO LINE

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 1.500 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064150 BR I020 () PRELIMINARY ENGINEERING

BRIDGES AND APPROACHES

2020 $704 $176 $880

100042214 BR I020 () CONSTRUCTION

BRIDGES AND APPROACHES

2025 $18,048 $4,512 $22,560

TOTAL COST: $18,752 $4,688 $23,441

Route I -20 ProjectDescription

PAVEMENT REHABILITATION ON I-20 FROM THE JEFFERSON COUNTY LINE TO 0.87 MILE EAST OF KELLY CREEK ROAD

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 4.983 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068218 IM I020 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $6,818 $758 $7,575

TOTAL COST: $6,818 $758 $7,575

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

269 of 305

HIGHWAY PROJECTS - ST. CLAIR

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -59 ProjectDescription

I-59 REPLACE BRIDGES, BIN 007238 (SUFF=40.1, STATUS=SD) AND BIN 007239 (SUFF=65.4, STATUS=FO), OVER MUCKLEROY CREEK, SOUTH OF SR-53 (US-231)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.200 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049965 BRF I059 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $285 $71 $357

100049999 BRF I059 () RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $57 $14 $71

100049998 BRF I059 () UTILITIES

BRIDGE REPLACEMENT

2023 $36 $9 $45

100049966 BRF I059 () CONSTRUCTION

BRIDGE REPLACEMENT

2023 $5,898 $1,474 $7,372

TOTAL COST: $6,276 $1,569 $7,844

Route I -59 ProjectDescription

CONCRETE PAVEMENT REHAB ON I-59 FROM JEFFERSON COUNTY LINE TO NORTH OF SR-23

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 8.660 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066472 IM I059 () CONSTRUCTION

PAVEMENT REHABILITATION

2021 $14,454 $1,606 $16,060

TOTAL COST: $14,454 $1,606 $16,060

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

270 of 305

HIGHWAY PROJECTS - ST. CLAIR

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-23 ProjectDescription

BR REPL AND APP ON SR-23 OVER BRANCH #000226 STR #23-58-0.7

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040861 BR 5815 (200) UTILITIES

BRIDGE REPLACEMENT

2020 $23 $6 $29

100013032 BR 5815 (200) CONSTRUCTION

BRIDGE REPLACEMENT

2021 $946 $237 $1,183

TOTAL COST: $969 $242 $1,212

Route SR-25 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-25(US-411) AT PARK AVENUE AND AT CR-6 (SANIE ROAD/SIMPSON ROAD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064325 CMAQ 0025 (547) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $1,513 $378 $1,892

TOTAL COST: $1,513 $378 $1,892

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

271 of 305

HIGHWAY PROJECTS - ST. CLAIR

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-34 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.002 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066390 STPAA-HSIP 0034 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $316 $45 $361

100066391 STPAA-HSIP 0034 () UTILITIES

INTERSECTION IMPROVEMENTS

2021 $455 $65 $520

100066392 STPAA-HSIP 0034 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2021 $1,366 $195 $1,561

TOTAL COST: $2,137 $305 $2,442

Route SR-53 ProjectDescription

SR-53 (US-231) ADD LANES FROM CR-516 (CROPWELL DR) TO SR-34

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.590 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056633 STPAA 0053 () UTILITIES

ADDITIONAL ROADWAY LANES

2020 $15 $4 $19

100056635 STPAA 0053 (565) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $3,363 $841 $4,204

TOTAL COST: $3,379 $845 $4,223

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

272 of 305

HIGHWAY PROJECTS - ST. CLAIR

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-7 ProjectDescription

ROADWAY AND DRAINAGE IMPROVEMENTS ON SR-7(US-11) AT SPRINGVILLE MIDDLE SCHOOL

Type of Work DRAINAGE CORRECTION

Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052628 HPP A187 (900) CONSTRUCTION

DRAINAGE CORRECTION

2019 $640 $160 $800

TOTAL COST: $640 $160 $800

Route SR-7 ProjectDescription

DRAINAGE IMPROVEMENTS ON SR-7 (US-11) FROM ROBINSON ST. TO NEAR TERRY ST. AND DOWNTOWN SPRINGVILLE STREET

Type of Work DRAINAGE CORRECTION

Project Length in Miles 0.789 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055162 HPP 10AL (002) CONSTRUCTION

DRAINAGE CORRECTION

2019 $633 $158 $791

TOTAL COST: $633 $158 $791

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

273 of 305

HIGHWAY PROJECTS - ST. CLAIR

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

FY-2019 LEVEL OF EFFORT FEDERAL AID RESURFACING SOUTHEAST REGION

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033116 STATE RESURFACING LVOE ()

SPECIAL

UNCLASSIFIED 2019 $46,592 $11,648

$58,240

TOTAL COST: $46,592 $11,648

$58,240

Route NA- ProjectDescription

LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046551 TAP LVOE () SPECIAL

UNCLASSIFIED 2019 $52,730 $13,183

$65,913

TOTAL COST: $52,730 $13,183

$65,913

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

274 of 305

HIGHWAY PROJECTS - STATEWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

LEVEL OF EFFORT SAFETY PROGRAM FY-2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048788 SAFETY LVOE () SPECIAL

UNCLASSIFIED 2019 $61,306 $6,812 $68,118

TOTAL COST: $61,306 $6,812 $68,118

Route NA- ProjectDescription

LEVEL OF EFFORT COUNTY ALLOCATED FUNDS FY 2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056581 COUNTY LVOE () SPECIAL

UNCLASSIFIED 2019 $35,711 $8,928 $44,639

TOTAL COST: $35,711 $8,928 $44,639

Route NA- ProjectDescription

LEVEL OF EFFORT FEDERAL AID RESURFACING EAST CENTRAL REGION FOR FY 2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057571 STATE RESURFACING LVOE ()

SPECIAL

UNCLASSIFIED 2019 $28,288 $7,072 $35,360

TOTAL COST: $28,288 $7,072 $35,360

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

275 of 305

HIGHWAY PROJECTS - STATEWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

LEVEL OF EFFORT FEDERAL AID RESURFACING NORTH REGION FOR FY 2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063428 STATE RESURFACING LVOE ()

SPECIAL

UNCLASSIFIED 2019 $36,608 $9,152 $45,760

TOTAL COST: $36,608 $9,152 $45,760

Route NA- ProjectDescription

LEVEL OF EFFORT FEDERAL AID RESURFACING WEST CENTRAL REGION FOR FY 2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063432 STATE RESURFACING LVOE ()

SPECIAL

UNCLASSIFIED 2019 $28,288 $7,072 $35,360

TOTAL COST: $28,288 $7,072 $35,360

Route NA- ProjectDescription

LEVEL OF EFFORT FEDERAL AID RESURFACING SOUTH WEST REGION FOR FY 2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063436 STATE RESURFACING LVOE ()

SPECIAL

UNCLASSIFIED 2019 $26,624 $6,656 $33,280

TOTAL COST: $26,624 $6,656 $33,280

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

276 of 305

HIGHWAY PROJECTS - STATEWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

LEVEL OF EFFORT SEC. 5307 SMALL URBAN TRANSIT - OPR, CAPITAL, JARC - (FY 2015 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063770 FTA9 TR19 () TRANSIT

UNCLASSIFIED 2019 $8,305 $2,076 $10,381

TOTAL COST: $8,305 $2,076 $10,381

Route NA- ProjectDescription

LEVEL OF EFFORT SEC. 5307 SMALL URBAN TRANSIT - OPR, CAPITAL, JARC - FY 2016

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063781 FTA9 TR20 () TRANSIT

UNCLASSIFIED 2020 $8,350 $2,088 $10,438

TOTAL COST: $8,350 $2,088 $10,438

Route NA- ProjectDescription

LEVEL OF EFFORT SEC. 5310 SMALL URBAN AND RURAL TRANSIT CAPITAL (FY 2016 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063782 UMTA TR19 () TRANSIT

UNCLASSIFIED 2019 $2,756 $689 $3,445

TOTAL COST: $2,756 $689 $3,445

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

277 of 305

HIGHWAY PROJECTS - STATEWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

LEVEL OF EFFORT SEC. 5311 - OPR, ADMIN, CAPITAL, INTERCITY BUS, RTAP, APPALACHIAN DEV, (FY 2016 APPORTIONMENT)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063783 RTAP TR19 () TRANSIT

UNCLASSIFIED 2019 $20,641 $5,160 $25,802

TOTAL COST: $20,641 $5,160 $25,802

Route NA- ProjectDescription

ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2022

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064438 FRT-STPAA-STPNU ATRP (999)

SPECIAL

UNCLASSIFIED 2022 $116,000 $25,460

$141,460

TOTAL COST: $116,000 $25,460

$141,460

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

278 of 305

HIGHWAY PROJECTS - STATEWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067513 RECREATIONAL TRAILS LVOE ()

SPECIAL

UNCLASSIFIED 2019 $1,732 $433 $2,165

TOTAL COST: $1,732 $433 $2,165

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

279 of 305

HIGHWAY PROJECTS - STATEWIDE

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON NAT JONES ROAD 0.5 MILES SOUTH OF WATSON ROAD BIN #12051

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061899 ACBRZ61899 ATRP (017)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $191 $48 $239

TOTAL COST: $191 $48 $239

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON WATSON ROAD OVER TIFALLILA CREEK 0.1 MILES SOUTH OF CR-30 BIN # 6027

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061901 ACBRZ61901 ATRP () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $127 $32 $159

TOTAL COST: $127 $32 $159

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT OVER TIFALLILA CREEK ON WATSON ROAD 2.0 MILES SOUTH OF CR-30 BIN # 6028

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062010 ACBRZ62010 ATRP (016)

CONSTRUCTION

BRIDGE REPLACEMENT

2020 $246 $62 $308

TOTAL COST: $246 $62 $308

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

280 of 305

HIGHWAY PROJECTS - SUMTER

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-17 ProjectDescription

REPLACE BRIDGE, BIN 002307, SR-17 OVER SUCARNOOCHEE RIVER RELIEF (SUFF=11.6, STATUS=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.150 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049155 BR 0017 () RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $14 $3 $17

100049156 BR 0017 () UTILITIES

BRIDGE REPLACEMENT

2020 $42 $10 $52

100049157 BR 0017 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $4,386 $1,096 $5,482

TOTAL COST: $4,441 $1,110 $5,551

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

281 of 305

HIGHWAY PROJECTS - SUMTER

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-7 ProjectDescription

BRIDGE REPLACEMENT ON SR-7(US-11) OVER TOOMSUBA CREEK BIN 002909 AND BIN 002908 RELIEF (SUFF=50.5, STATUS=2)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.301 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100042197 BR 0007 (502) UTILITIES

BRIDGE REPLACEMENT

2021 $144 $36 $181

100038699 BR 0007 (502) CONSTRUCTION

BRIDGE REPLACEMENT

2021 $3,485 $871 $4,356

TOTAL COST: $3,629 $907 $4,537

Route SR-7 ProjectDescription

BRIDGE REPLACEMENT ON SR-7 (US-11) OVER PARKER CREEK. BIN #002884, STR # 7-60-13.153. (SUFF=45.2, STAT=2)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040205 BR 0007 (503) UTILITIES

BRIDGE REPLACEMENT

2022 $171 $43 $214

100040203 BR 0007 (503) CONSTRUCTION

BRIDGE REPLACEMENT

2022 $1,285 $321 $1,606

TOTAL COST: $1,456 $364 $1,819

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

282 of 305

HIGHWAY PROJECTS - SUMTER

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-47 ProjectDescription

EXTENSION OF CR-047 (PRIEBES MILL ROAD) FROM CR-058 (JENIFER ROAD) NEAR JENIFER TO SR-21

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059434 ACNU59434 ATRP (007) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $4,944 $1,236 $6,180

TOTAL COST: $4,944 $1,236 $6,180

Route CR-NA ProjectDescription

MAGNOLIA STREET IMPROVEMENTS FROM SR-77 TO SR-4 (US-78) IN LINCOLN

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.830 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062174 ACNU62174 ATRP (005) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $1,822 $455 $2,277

TOTAL COST: $1,822 $455 $2,277

Route I -20 ProjectDescription

INTERCHANGE LIGHTING ON I-20 AT CR-207 (EXIT 165)

Type of Work LIGHTING

Project Length in Miles 0.402 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100004964 IM I020 (338) CONSTRUCTION

LIGHTING 2021 $656 $73 $729

TOTAL COST: $656 $73 $729

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

283 of 305

HIGHWAY PROJECTS - TALLADEGA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-21 ProjectDescription

SR-21 BIN # 2634 BRIDGE REPLACEMENT OVER CHEAHA CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.700 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060130 BR 0021 (554) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $3,379 $845 $4,224

TOTAL COST: $3,379 $845 $4,224

Route SR-21 ProjectDescription

SR-21 REPLACE BRIDGE BIN #001441 NO. 21-61-27.1 OVER SOUTHERN RAILROAD

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100002467 BR 0021 () RIGHT OF WAY

BRIDGE REPLACEMENT

2021 $393 $98 $491

100002464 BR 0021 () CONSTRUCTION

BRIDGE REPLACEMENT

2024 $3,213 $803 $4,017

TOTAL COST: $3,606 $902 $4,508

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

284 of 305

HIGHWAY PROJECTS - TALLADEGA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-34 ProjectDescription

REPL BIN 003153, SR-34 OVER POOR HOUSE BRANCH, NEAR CR-366. (SUFF=47.8, STAT=FO, 2001 HBRRP LIST)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.013 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100041617 BR 0034 () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,573 $393 $1,966

TOTAL COST: $1,573 $393 $1,966

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

285 of 305

HIGHWAY PROJECTS - TALLADEGA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-50 ProjectDescription

REPLACE BRIDGE ON SR-50 OVER WIND CREEK BIN 004389

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.003 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067062 BR 0050 (505) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $202 $51 $253

100049968 BR 0050 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $2,518 $630 $3,148

TOTAL COST: $2,720 $680 $3,400

Route SR-63 ProjectDescription

BRIDGE REPLACEMENT (BIN 014307) ON SR-63 OVER SUGAR CREEK #63-62-11.9

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067663 BR 0063 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,224 $306 $1,530

TOTAL COST: $1,224 $306 $1,530

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

286 of 305

HIGHWAY PROJECTS - TALLAPOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-107 ProjectDescription

PATCHING, RESURFACING AND STRIPING ON CR-107 (FRANK LARY ROAD) FROM CR-54 (MITT LARY ROAD) TO CR-98 (LARY LAKE ROAD)

Type of Work RESURFACING

Project Length in Miles 1.945 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061864 ACOA61864 ATRP (017) CONSTRUCTION

RESURFACING

2020 $705 $176 $882

TOTAL COST: $705 $176 $882

Route CR-115 ProjectDescription

BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION CREEK BIN# 12089

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059617 ACBRZ59617 ATRP (007)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $938 $235 $1,173

TOTAL COST: $938 $235 $1,173

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

287 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-124 ProjectDescription

BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK BIN# 14309

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059618 ACBRZ59618 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $383 $96 $479

TOTAL COST: $383 $96 $479

Route CR-124 ProjectDescription

BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER AN UNNAMED TRIBUTARY TO BINION CREEK BIN#12282

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059619 ACBRZ59619 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $241 $60 $302

TOTAL COST: $241 $60 $302

Route CR-1358 ProjectDescription

BRIDGE REPLACEMENT ON CR-1358 (HOLMAN CHURCH ROAD) OVER KANSAS CITY SOUTHERN RAILROAD

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059621 ACBRZ59621 ATRP (007)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $694 $173 $867

TOTAL COST: $694 $173 $867

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

288 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-66 ProjectDescription

ADDITIONAL LANES ON BEAR CREEK ROAD AND BEAR CREEK CUTOFF ROAD FROM SR-69 TO SR-215

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066303 TRC-ST-063-999-024 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2019 $0 $1,236 $1,236

100066304 TRC-ST-063-999-025 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $0 $412 $412

100066305 TRC-ST-063-999-026 () UTILITIES

ADDITIONAL ROADWAY LANES

2019 $0 $3,194 $3,194

100066306 TRC-ST-063-999-027 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $0 $6,244 $6,244

TOTAL COST: $0 $11,086

$11,086

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

289 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK

Type of Work TURN LANES

Project Length in Miles 1.150 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100008464 STPOA 6317 (250) RIGHT OF WAY

TURN LANES 2019 $901 $225 $1,127

100043870 STPOA 6317 (250) UTILITIES

TURN LANES 2020 $455 $114 $569

100008460 STPOA 6317 () CONSTRUCTION

TURN LANES 2020 $5,463 $1,366 $6,829

TOTAL COST: $6,820 $1,705 $8,524

Route CR-NA ProjectDescription

RESURFACE VARIOUS ELIGIBLE STREETS IN THE CITY OF TUSCALOOSA FY10

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100053859 STPAA 6314 () CONSTRUCTION

RESURFACING

2020 $246 $61 $307

TOTAL COST: $246 $61 $307

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

290 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING KENNEDY MILL ROAD FROM SR-216 TO HOLT-PETERSON ROAD

Type of Work RESURFACING

Project Length in Miles 0.760 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061867 ACOA61867 ATRP (017) CONSTRUCTION

RESURFACING

2020 $364 $91 $455

TOTAL COST: $364 $91 $455

Route CR-NA ProjectDescription

RESURFACING HOLT-PETERSON ROAD FROM KENNEDY MILL ROAD TO ALABAMA AVENUE

Type of Work RESURFACING

Project Length in Miles 2.020 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061868 ACOA61868 ATRP (017) CONSTRUCTION

RESURFACING

2020 $750 $188 $938

TOTAL COST: $750 $188 $938

Route CR-NA ProjectDescription

WIDENING OF FOSTERS FERRY ROAD FROM JOE MALISHAM PARKWAY TO 29TH STREET

Type of Work RESURFACING

Project Length in Miles 1.365 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061873 ACOA61873 ATRP (017) CONSTRUCTION

RESURFACING

2019 $1,491 $373 $1,864

TOTAL COST: $1,491 $373 $1,864

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

291 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING SAND ROAD FROM ROMULUS ROAD TO FROG RIDGE ROAD.

Type of Work RESURFACING

Project Length in Miles 1.236 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061874 ACOA61874 ATRP (017) CONSTRUCTION

RESURFACING

2020 $378 $95 $473

TOTAL COST: $378 $95 $473

Route CR-NA ProjectDescription

WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100008465 STPOA 6314 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2019 $451 $113 $563

100043871 STPOA 6314 () UTILITIES

WIDENING AND RESURFACING (RDWY)

2020 $273 $68 $341

100008461 STPOA 6314 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $455 $114 $569

TOTAL COST: $1,179 $295 $1,474

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

292 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -59 ProjectDescription

RESURFACING ON I-59 (I-20) FROM SR-69 (I-359) TO EAST OF SR-6 (US-82) AND ADDITIONAL LANES BETWEEN SR-215 AND SR-6 (US-82), GRADE, DRAIN, BASE, PAVE, SIGNING, STRIPING, AND RESURFACING

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 2.500 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039473 IM-NH I059 (399) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $3,858 $923 $4,780

TOTAL COST: $3,858 $923 $4,780

Route NA- ProjectDescription

CURB RAMP INSTALLATION ON STATE ROUTES AT VARIOUS LOCATIONS IN TUSCALOOSA COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068201 STPAA NR18 () CONSTRUCTION

SIDEWALK 2020 $224 $56 $281

TOTAL COST: $224 $56 $281

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

293 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-13 ProjectDescription

BR #13-63-46.4A ROCKY CREEK RELIEF BR ON US-43

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100003223 BR 0354 () RIGHT OF WAY

BRIDGE REPLACEMENT

2022 $12 $3 $15

100003222 BR 0354 () CONSTRUCTION

BRIDGE REPLACEMENT

2023 $413 $103 $517

TOTAL COST: $425 $106 $531

Route SR-215 ProjectDescription

ADD LANES ON SR-215 FROM SR-216 TO SR-7 (US-11) AND REALIGN INTERSECTION WITH SR-7 (US-11)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.400 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066568 NH 0215 (504) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2024 $962 $241 $1,203

100066569 NH 0215 (504) UTILITIES

ADDITIONAL ROADWAY LANES

2024 $945 $236 $1,181

100066570 NH 0215 (504) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2025 $5,784 $1,446 $7,230

TOTAL COST: $7,691 $1,923 $9,614

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

294 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-5 ProjectDescription

SR-5 BRG REMOVAL 5-63-2.3 AANDB OVER L AND N RR (ABAND), BIN 005799 AND 005800

Type of Work OVERPASS REMOVAL

Project Length in Miles 0.880 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057835 BR 0005 (540) UTILITIES

OVERPASS REMOVAL

2022 $67 $17 $84

100038399 BR 0005 () CONSTRUCTION

OVERPASS REMOVAL

2022 $764 $191 $955

TOTAL COST: $831 $208 $1,038

Route SR-6 ProjectDescription

WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD

Type of Work INTERCHANGE

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065855 TRC-ST-063-006-018 () RIGHT OF WAY

INTERCHANGE

2019 $0 $455 $455

100064404 TRC-ACAA64404 ATRP (004)

CONSTRUCTION

INTERCHANGE

2019 $7,257 $1,814 $9,072

TOTAL COST: $7,257 $2,269 $9,526

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

295 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-6 ProjectDescription

ACCESS MANAGEMENT AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/MCFARLAND BLVD.) FROM ROSE BLVD. TO SR-69

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 4.282 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065115 TRC-ST-063-999-039 () UTILITIES

INTERSECTION IMPROVEMENTS

2022 $0 $531 $531

100065114 TRC-ST-063-999-040 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2022 $0 $7,195 $7,195

TOTAL COST: $0 $7,725 $7,725

Route SR-6 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-6 (US-82 / MCFARLAND BOULEVARD) AT SR-69

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.410 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068733 NH 0006 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $408 $102 $510

100068734 NH 0006 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $612 $153 $765

100068735 NH 0006 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $24,482 $6,121 $30,603

TOTAL COST: $25,503 $6,376 $31,878

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

296 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-69 ProjectDescription

INTERSECTION IMPROVEMENT ON SR-69ATCR-84 (CHARLIE SHIRLEY RD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.380 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057493 TRC-ST-063-999-035 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2021 $0 $105 $105

100057494 TRC-ST-063-999-036 () UTILITIES

INTERSECTION IMPROVEMENTS

2022 $0 $241 $241

100053306 TRC-ST-063-999-037 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2022 $0 $627 $627

TOTAL COST: $0 $973 $973

Route SR-69 ProjectDescription

REALIGNMENT OF INTERSECTION SR-69 AT CR-62 (UNION CHAPEL RD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.360 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100053651 TRC-ST-063-069-013 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2018 $0 $1,022 $1,022

TOTAL COST: $0 $1,022 $1,022

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

297 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-69 ProjectDescription

SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.430 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057986 TRC-ST-063-999-030 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $0 $2,081 $2,081

100057987 TRC-ST-063-999-031 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $0 $51,877

$51,877

TOTAL COST: $0 $53,959

$53,959

Route SR-7 ProjectDescription

REPLACE WARRIOR RIVER REL(7-63-10.6)ON US-11ATMP 70.0

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.300 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100013141 BR 0007 () RIGHT OF WAY

BRIDGE REPLACEMENT

2021 $29 $7 $36

100042253 BR 0007 () UTILITIES

BRIDGE REPLACEMENT

2021 $117 $29 $146

100013137 BR 0007 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $782 $196 $978

TOTAL COST: $928 $232 $1,160

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

298 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-7 ProjectDescription

REPLACE WARRIOR RIVER REL(7-63-11.5)ON US-11ATMP 70.9

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.300 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100013142 BR 0007 () RIGHT OF WAY

BRIDGE REPLACEMENT

2021 $29 $7 $36

100042254 BR 0007 () UTILITIES

BRIDGE REPLACEMENT

2021 $117 $29 $146

100013138 BR 0007 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $666 $166 $832

TOTAL COST: $812 $203 $1,014

Route SR-7 ProjectDescription

REPLACE BRIDGE (BIN 005140) ON SR-7 (US-11) OVER NORFOLK SOUTHERN RAILROAD (SUFF =12.5, STAT= SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.262 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055891 BR 0007 (546) RIGHT OF WAY

BRIDGE REPLACEMENT

2020 $125 $31 $156

100055892 BR 0007 (546) UTILITIES

BRIDGE REPLACEMENT

2020 $141 $35 $176

100055893 BR 0007 (546) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,214 $304 $1,518

TOTAL COST: $1,480 $370 $1,850

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

299 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-7 ProjectDescription

SR-7 (US-11) ADD LANE FROM LOWER COALING RD (MP 92.960) TO HAGLER COALING RD (MP 94.007)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.047 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057792 STPAA 0007 (534) UTILITIES

ADDITIONAL ROADWAY LANES

2022 $2,405 $601 $3,006

100057793 STPAA 0007 (534) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2023 $4,458 $1,114 $5,572

TOTAL COST: $6,862 $1,716 $8,578

Route SR-7 ProjectDescription

ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 6.920 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068755 STPAA 0007 (549) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $4,848 $1,212 $6,060

100068756 STPAA 0007 (549) UTILITIES

ADDITIONAL ROADWAY LANES

2020 $4,896 $1,224 $6,121

100068757 STPAA 0007 (549) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $33,459 $8,365 $41,824

TOTAL COST: $43,204 $10,801

$54,005

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

300 of 305

HIGHWAY PROJECTS - TUSCALOOSA

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-64 ProjectDescription

BRIDGE ALONG CR-64 (BROWNS BRIDGE ROAD) OVER LOST CREEK BIN # 11168

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060969 ACBRZ60969 ATRP (008)

CONSTRUCTION

BRIDGES AND APPROACHES

2019 $1,558 $389 $1,947

TOTAL COST: $1,558 $389 $1,947

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON SMITH CHAPEL ROAD OVER MILL CREEK BIN# 87

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060970 ACBRZ60970 ATRP (008)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $825 $206 $1,031

TOTAL COST: $825 $206 $1,031

Route I -22 ProjectDescription

PLANING AND RESURFACING ON I-22 FROM JUST EAST OF BYLER ROAD OVERPASS AT MP 40.3 TO JUST EAST OF EXIT 46 AT MP 47.185

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 6.910 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065945 IM I022 (307) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $7,142 $794 $7,935

TOTAL COST: $7,142 $794 $7,935

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

301 of 305

HIGHWAY PROJECTS - WALKER

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-5 ProjectDescription

BIN #007638 ON SR-5 OVER SR-69 (US-78)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040851 BRF 0005 (534) UTILITIES

BRIDGE REPLACEMENT

2021 $23 $6 $29

100003188 BR 0005 (534) CONSTRUCTION

BRIDGE REPLACEMENT

2021 $5,765 $1,441 $7,206

TOTAL COST: $5,788 $1,447 $7,235

Route SR-5 ProjectDescription

REMOVE BIN #004013, SR-5 (US-78) OVER ABANDONED FRISCO (BNSF) RAILROAD, NEAR DORA

Type of Work BRIDGE REMOVAL

Project Length in Miles 0.090 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065246 BR 0005 () PRELIMINARY ENGINEERING

BRIDGE REMOVAL

2020 $125 $31 $156

100042712 BR 0005 () RIGHT OF WAY

BRIDGE REMOVAL

2022 $12 $3 $15

100042711 BR 0005 () UTILITIES

BRIDGE REMOVAL

2022 $59 $15 $73

100042710 BR 0005 () CONSTRUCTION

BRIDGE REMOVAL

2023 $533 $133 $666

TOTAL COST: $728 $182 $910

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

302 of 305

HIGHWAY PROJECTS - WALKER

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-69 ProjectDescription

REPLACE BRIDGE, BIN 004090, SR-69 OVER BURLINGTON RAILROAD, SOUTH OF SR-124 (SUFF=46, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.200 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049979 BR 0069 () RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $57 $14 $71

100049980 BR 0069 () UTILITIES

BRIDGE REPLACEMENT

2021 $35 $9 $44

100049945 BR 0069 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $2,639 $660 $3,299

TOTAL COST: $2,731 $683 $3,414

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

303 of 305

HIGHWAY PROJECTS - WALKER

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-5 ProjectDescription

REPLACE BRIDGE, BIN 001717, ON SR-5 OVER MUD CREEK. (SUFF 50.0,STAT=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.100 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100051323 BR 0005 () RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $39 $10 $49

100051324 BR 0005 () UTILITIES

BRIDGE REPLACEMENT

2020 $219 $55 $273

100051325 BR 0005 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,934 $483 $2,417

TOTAL COST: $2,191 $548 $2,739

Route SR-5 ProjectDescription

SR-5 BRIDGE REPLACEMENT BIN 002261 AT CUB CREEK AND BIN 002262 AT MOCCASIN CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052919 BRF 0005 (527) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $5,153 $1,288 $6,442

TOTAL COST: $5,153 $1,288 $6,442

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

304 of 305

HIGHWAY PROJECTS - WILCOX

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-13 ProjectDescription

SR-13 FROM WALKER COUNTY LINE TO SR-74 (US-278) BASE AND PAVE

Type of Work BASE AND PAVE

Project Length in Miles 6.342 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100004676 NH 0013 () PRELIMINARY ENGINEERING

BASE AND PAVE

2022 $335 $84 $419

100004671 NH 0013 () CONSTRUCTION

BASE AND PAVE

2023 $10,879 $2,720 $13,598

TOTAL COST: $11,214 $2,804 $14,018

Route SR-13 ProjectDescription

SR-13 FROM WALKER COUNTY LINE TO SR-74 (US-278) BASE AND PAVE

Type of Work GRADE AND DRAIN

Project Length in Miles 6.342 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100004681 NH 0013 () RIGHT OF WAY

GRADE AND DRAIN

2021 $2,451 $613 $3,063

100048225 NH 0013 () UTILITIES

GRADE AND DRAIN

2021 $350 $88 $438

100004672 NH 0013 () CONSTRUCTION

GRADE AND DRAIN

2022 $5,830 $1,457 $7,287

TOTAL COST: $8,630 $2,158 $10,788

2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

305 of 305

HIGHWAY PROJECTS - WINSTON

FIVE YEAR PLAN: 2019 - Original