12/31/2018 ALABAMA DEPARTMENT OF TRANSPORTATION...

22
Route CR-12 Project Description INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22 Type of Work INTERSECTION IMPROVEMENTS Project Length in Miles 0.020 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100064319 CMAQ 5915 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2019 $120 $30 $150 100064320 CMAQ 5915 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2019 $200 $50 $250 TOTAL COST: $320 $80 $400 Route CR-13 Project Description RESURFACING CR-13 FROM CR-52 TO THE BIBB COUNTY LINE Type of Work RESURFACING Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100064327 STPBH 5915 (253) PRELIMINARY ENGINEERING RESURFACING 2016 $10 $2 $12 100064328 STPBH 5915 (253) CONSTRUCTION RESURFACING 2017 $1,328 $332 $1,659 TOTAL COST: $1,337 $334 $1,671 1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM STIP YEARS from 10/1/2014-9/30/2019 1 of 22 COUNTY HIGHWAY PROJECTS - SHELBY STIP PLAN: 2016 - Original

Transcript of 12/31/2018 ALABAMA DEPARTMENT OF TRANSPORTATION...

Route CR-12 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.020 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064319 CMAQ 5915 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2019 $120 $30 $150

100064320 CMAQ 5915 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $200 $50 $250

TOTAL COST: $320 $80 $400

Route CR-13 ProjectDescription

RESURFACING CR-13 FROM CR-52 TO THE BIBB COUNTY LINE

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064327 STPBH 5915 (253) PRELIMINARY ENGINEERING

RESURFACING

2016 $10 $2 $12

100064328 STPBH 5915 (253) CONSTRUCTION

RESURFACING

2017 $1,328 $332 $1,659

TOTAL COST: $1,337 $334 $1,671

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

1 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-1396 ProjectDescription

CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059534 ACAA59534 ATRP (015) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $3,200 $800 $4,000

TOTAL COST: $3,200 $800 $4,000

Route CR-17 ProjectDescription

ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046237 IMD-STPBH 7112 (602) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2016 $4,925 $975 $5,900

TOTAL COST: $4,925 $975 $5,900

Route CR-17 ProjectDescription

RESURFACE CR-17 FROM CR-22 TO CR-26 (KENT DAIRY ROAD)

Type of Work RESURFACING

Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059513 ACAA59513 ATRP (010) CONSTRUCTION

RESURFACING

2018 $1,136 $284 $1,420

TOTAL COST: $1,136 $284 $1,420

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

2 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-264 ProjectDescription

BRIDGE REPLACEMENT OF BIN 11015 OVER BUCK CREEK, TURN LANES, AND RESURFACING OF CR-264 (THOMPSON ROAD) FROM 1300 FEET WEST OF WARRIOR DRIVE TO SR-119.

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059499 ACBRAA59499 ATRP (006)

CONSTRUCTION

BRIDGES AND APPROACHES

2016 $2,961 $759 $3,721

TOTAL COST: $2,961 $759 $3,721

Route CR-28 ProjectDescription

RESURFACE CR-28 FROM COLUMBIANA CITY LIMITS TO SR-145

Type of Work RESURFACING

Project Length in Miles 3.310 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061025 ACAA61025 ATRP (012) CONSTRUCTION

RESURFACING

2017 $1,482 $371 $1,853

TOTAL COST: $1,482 $371 $1,853

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

3 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-29 ProjectDescription

WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 8.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100045964 STPBH 5939 (200) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $4,274 $1,069 $5,343

100007540 STPBH 5939 (200) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,589 $397 $1,986

TOTAL COST: $5,863 $1,466 $7,329

Route CR-30 ProjectDescription

RESURFACE CR-30 FROM COLUMBIANA TO SR-145

Type of Work RESURFACING

Project Length in Miles 3.144 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061026 ACAA61026 ATRP (012) CONSTRUCTION

RESURFACING

2016 $763 $191 $954

TOTAL COST: $763 $191 $954

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

4 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-441 ProjectDescription

REPLACE BRIDGE ON CR-441 OVER FOUR MILE CREEK BIN # 5369

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059506 ACBRZ59506 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $1,527 $382 $1,908

TOTAL COST: $1,527 $382 $1,908

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

5 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-52 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-52 AND CR-13

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059508 ACAA59508 ATRP (013) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2017 $492 $123 $615

TOTAL COST: $492 $123 $615

Route CR-52 ProjectDescription

BRIDGE WIDENING (BIN 003267) ON CR-52 (4TH AVENUE) OVER BUCK CREEK

Type of Work BRIDGE WIDENING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059502 ACBR59502 ATRP (009) CONSTRUCTION

BRIDGE WIDENING

2019 $1,816 $454 $2,269

TOTAL COST: $1,816 $454 $2,269

Route CR-52 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-52 OVER CAHABA RIVER (BIN 2380) FROM OLD CAHABA LANE TO OAK VIEW LANE

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059503 STPBH-ACBR59503 ATRP (012)

CONSTRUCTION

BRIDGES AND APPROACHES

2019 $3,702 $926 $4,628

TOTAL COST: $3,702 $926 $4,628

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

6 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-55 ProjectDescription

BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056309 STPBH 5914 (250) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $772 $193 $965

100056310 STPBH 5914 (250) UTILITIES

UTILITY ADJUSTMENT

2019 $200 $50 $250

100056311 STPBH 5914 () CONSTRUCTION

BRIDGES AND APPROACHES

2019 $1,000 $250 $1,250

TOTAL COST: $1,972 $493 $2,465

Route CR-99 ProjectDescription

RESURFACE CR-99 FROM CR-47 TO SR-145

Type of Work RESURFACING

Project Length in Miles 2.084 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061023 ACAA61023 ATRP (012) CONSTRUCTION

RESURFACING

2016 $298 $74 $372

TOTAL COST: $298 $74 $372

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

7 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

>VALLEYDALE RD FR CALDWELL MILL RD TO INVERNESS CENTER CITY OF HOOVER

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033067 STPBH 9802 (905) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $2,596 $649 $3,245

TOTAL COST: $2,596 $649 $3,245

Route CR-NA ProjectDescription

SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 5.206 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063241 CMAQ 5915 (250) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2018 $520 $130 $649

100063242 STPBH-CMAQ 5915 (250)

UTILITIES

INTERSECTION IMPROVEMENTS

2019 $60 $15 $75

100063243 STPBH-CMAQ 5915 (250)

CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $1,359 $340 $1,699

TOTAL COST: $1,938 $485 $2,423

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

8 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route I -65 ProjectDescription

INTERCHANGE IMPROVEMENTS I-65 AT SR-3 (US-31) EXIT 231 GRADE, DRAIN, BASE, PAVE AND BRIDGE IN THE CITY OF CALERA

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063670 STPBH I065 (404) RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2016 $2,112 $528 $2,640

TOTAL COST: $2,112 $528 $2,640

Route I -65 ProjectDescription

INTERCHANGE IMPROVEMENTS I-65 AT SR-3 (US-31) EXIT 231 GRADE, DRAIN, BASE, PAVE AND BRIDGE IN THE CITY OF CALERA

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055554 ACAA55554 ATRP (013) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2017 $17,515 $3,747 $21,263

TOTAL COST: $17,515 $3,747 $21,263

Route NA- ProjectDescription

BIKE LANES ON JOHN FINDLEY DRIVE FROM STATE PARK ROAD TO NORTH TRAIL HEAD INCLUDING TERRACE DRIVE

Type of Work UNCLASSIFIED

Project Length in Miles 5.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064227 CMAQ 5916 (252) PRELIMINARY ENGINEERING

UNCLASSIFIED 2016 $592 $148 $740

TOTAL COST: $592 $148 $740

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

9 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

SHELBY COUNTY BICYCLE/PEDESTRIAN PLAN

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064329 CMAQ NR16 (913) SPECIAL

UNCLASSIFIED 2016 $242 $61 $303

TOTAL COST: $242 $61 $303

Route NA- ProjectDescription

HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD

Type of Work UNCLASSIFIED

Project Length in Miles 3.670 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032383 CMAQ 9802 (925) CONSTRUCTION

UNCLASSIFIED 2019 $2,261 $565 $2,826

TOTAL COST: $2,261 $565 $2,826

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

10 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

SIDEWALKS ALONG INDUSTRIAL PARK DR AND BEARDEN RD FROM SR-3 (US-31) TO PELHAM HIGH SCHOOL

Type of Work SIDEWALK

Project Length in Miles 2.840 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056503 CMAQ 5916 (250) UTILITIES

SIDEWALK 2016 $448 $146 $594

100056504 CMAQ 5916 (250) CONSTRUCTION

SIDEWALK 2016 $1,971 $501 $2,472

TOTAL COST: $2,419 $647 $3,066

Route NA- ProjectDescription

RESURFACE OLD HIGHWAY 25 FROM SR-25 TO CR-47

Type of Work RESURFACING

Project Length in Miles 1.582 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061019 ACAA61019 ATRP (012) CONSTRUCTION

RESURFACING

2016 $249 $94 $343

TOTAL COST: $249 $94 $343

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

11 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES WITHIN JEFFERSON, SHELBY AND WALKER COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060174 STPAA NR13 (909) CONSTRUCTION

SIDEWALK 2019 $1,432 $358 $1,790

TOTAL COST: $1,432 $358 $1,790

Route NA- ProjectDescription

ADD BIKE/PED LANES ALONG JOHN FINDLAY DRIVE FROM THE NORTH TRAILHEAD PARKING LOT TO SR-119 PARK ENTRANCE

Type of Work UNCLASSIFIED

Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063219 CMAQ 5915 (251) CONSTRUCTION

UNCLASSIFIED 2017 $1,547 $387 $1,934

TOTAL COST: $1,547 $387 $1,934

Route NA- ProjectDescription

INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK

Type of Work UNCLASSIFIED

Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054519 CMAQ 5917 (904) CONSTRUCTION

UNCLASSIFIED 2019 $1,032 $258 $1,290

TOTAL COST: $1,032 $258 $1,290

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

12 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route SR-119 ProjectDescription

ROADWAY IMPROVEMENTS ON SR-119 (MAIN STREET) FROM LITTLE CAHABA RIVER BRIDGE TO BLOCH STREET RESURFACING, SIGNALS, SIDEWALKS, LANDSCAPING, LIGHTING AND DRAINAGE IMPROVEMENTS

Type of Work RESURFACING

Project Length in Miles 0.427 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059152 STPBH 0119 (507) CONSTRUCTION

RESURFACING

2016 $3,733 $1,217 $4,950

TOTAL COST: $3,733 $1,217 $4,950

Route SR-119 ProjectDescription

ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 5.082 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061285 STPBH 0119 (510) PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2016 $200 $50 $250

100061286 STPBH 0119 (510) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $426 $106 $532

100063109 STPBH 0119 (510) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $600 $150 $750

TOTAL COST: $1,226 $306 $1,532

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

13 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route SR-25 ProjectDescription

ADD TURN LANES AND TRAFFIC SIGNALS AT INTERSECTION OF SR-25 AND 10TH STREET

Type of Work TURN LANES

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061018 ACAA61018 ATRP (008) CONSTRUCTION

TURN LANES 2018 $513 $183 $695

TOTAL COST: $513 $183 $695

Route SR-3 ProjectDescription

SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057649 BR 0003 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $437 $109 $546

TOTAL COST: $437 $109 $546

Route SR-3 ProjectDescription

PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.125 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039450 STPBH 7012 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $449 $112 $561

TOTAL COST: $449 $112 $561

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

14 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route SR-38 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-38 (US-280) AT OLD US-280 / WAL-MART.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061703 NH 0038 (534) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2018 $931 $233 $1,164

TOTAL COST: $931 $233 $1,164

Route SR-53 ProjectDescription

BRIDGE REPLACEMENT ON SR-53 (US-231) OVER KELLY CREEK (BIN # 2588)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.549 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100003344 BR 0053 (529) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $5,760 $1,440 $7,200

TOTAL COST: $5,760 $1,440 $7,200

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

15 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065161 CMAQ 5916 (253) PRELIMINARY ENGINEERING

SIDEWALK 2017 $323 $81 $404

100065162 CMAQ 5916 (253) RIGHT OF WAY

SIDEWALK 2019 $82 $21 $103

100065163 CMAQ 5916 (253) UTILITIES

SIDEWALK 2019 $82 $21 $103

TOTAL COST: $488 $122 $610

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

16 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 1

Route SR-25 ProjectDescription

BRIDGE REPLACEMENT ON SR-25 OVER BULLEY CREEK BIN # 000769

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.022 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066531 BR 0025 (550) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2017 $80 $20 $100

100066556 BR 0025 (550) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $500 $500 $1,000

TOTAL COST: $580 $520 $1,100

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

17 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 20

Route I -65 ProjectDescription

I-65 ADD LANES FROM SR-3 (US-31) TO CR-52 (8-LN)(PHASE 2)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.531 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044672 NHF-IMF I065 (354) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2018 $71,705 $17,039

$88,744

TOTAL COST: $71,705 $17,039

$88,744

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

18 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 22

Route CR-17 ProjectDescription

RESURFACING ON CR-17 (VALLEYDALE ROAD) FROM I-65 TO CR-29 (CALDWELL MILL ROAD) AND ON CR-43 (BEAR CREEK ROAD) FROM SR-38 (US-280) TO SR-25

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067603 STPBH 5918 () PRELIMINARY ENGINEERING

RESURFACING

2019 $80 $20 $100

TOTAL COST: $80 $20 $100

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

19 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 27

Route SR-261 ProjectDescription

INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.028 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067711 CMAQ 0261 (501) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2018 $280 $70 $350

100067712 CMAQ 0261 (501) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $326 $82 $408

TOTAL COST: $606 $152 $758

Route SR-38 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-38 (US-280) AT OLD US-280 / WAL-MART.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067753 NH 0038 (534) UTILITIES

INTERSECTION IMPROVEMENTS

2018 $410 $151 $561

TOTAL COST: $410 $151 $561

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

20 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 30

Route CR-52 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-52 AND CR-93

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059509 CMAQ 5918 (250) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $760 $190 $950

TOTAL COST: $760 $190 $950

Route NA- ProjectDescription

PROPOSED BIKE LANES ALONG JOHN FINDLAY DRIVE FROM NORTH OF STATE PARK ROAD TO THE NORTH TRAILHEAD AT OAK MOUNTAIN STATE PARK

Type of Work UNCLASSIFIED

Project Length in Miles 6.008 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064282 CMAQ 5916 (252) CONSTRUCTION

UNCLASSIFIED 2018 $4,390 $1,097 $5,487

TOTAL COST: $4,390 $1,097 $5,487

Route SR-119 ProjectDescription

ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061118 ACAA61118 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $9,839 $2,460 $12,298

TOTAL COST: $9,839 $2,460 $12,298

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

21 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 33

Route NA- ProjectDescription

MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067294 TAPAA-CMAQ TA17 (904)

CONSTRUCTION

UNCLASSIFIED 2019 $1,183 $296 $1,479

TOTAL COST: $1,183 $296 $1,479

Route NA- ProjectDescription

PELHAM TRAILS AND GREENWAYS LOCATED ALONG THE SR-3 (US-31) CORRIDOR IN PELHAM ADJACENT TO BISHOP CREEK FROM CR-105 TO SR-119 AND EVENTUALLY CROSSING UNDER I-65 AND CONTINUING TO THE ENTRANCE OF OAK MOUNTAIN STATE PARK: PHASE 1 AND 2

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065519 TAPAA-CMAQ TA16 (901)

CONSTRUCTION

UNCLASSIFIED 2019 $1,159 $290 $1,448

TOTAL COST: $1,159 $290 $1,448

1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

22 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 38