REQUISITIONS LIST
COMPANY NAME :PETRO CHINA
FEEL FREE TO CONTACT US AT ([email protected])
NN-NO. -26
PAYMENT
IN USD
MATERIAL
NATURENOTESPECENQ.REFSER
$ 100
Provision of EngineeringFeasibility Study for the
Construction of a TemporaryHazardous Waste Storage
Facility at Halfaya Oil Field
31-Halfaya -20131
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
2/93
PetroChina International Iraq FZE Iraq Branch..
Tenders AnnouncementTenders by: PetroChina International Iraq FZE Iraq
Branch (PetroChina), Operator at Halfaya Oil Field
(about 35km southeast of Amarah city) in Iraq,
PetroChina is assigned the operator in the consortium,
alongside partners TOTAL E&P Iraq PETRONAS
Carigali Sdn. Bhd. and the State Partner South Oil
Company to develop Halfaya Oil field under contract
(DPSC) with Missan Oil Company.
The Announced Tende sr is listed below:
Tender NoTender Title
6100176Provision of the Supply Chain
Management Training for Iraqi
Local Hires1From 8:00 am on 24th April 2013 to 4:00pm on
6th May2013Bidding collectionperiod
USD 100.00Bid Collection fee
[email protected] atnoC
61000171
Provision of Engineering
Feasibility Study for the
Construction of a Temporary
Hazardous Waste Storage
Facility at Halfaya Oil Field2
From 8:00 am on 24th
April 2013 to 4:00pm
on 24th
May2013
Bidding collection
period
USD 100.00Bid Collection fee
[email protected] atnoC
2. QUALIFICATIONS AND DOCUMENTS
REQUIRED FOR ITB PACKAGE
REQUEST:2.1) Filled ITB Package Request Form.
2.2) ITB request fees receipt.
2.3) Copy of Certificate of Incorporation.
2.4) Copy of Certificate of Contracting/Trade.
2.5) Original Power of Attorney to whom ITB package will
be issued. This Power of Attorney must be signed by the
legal representative of the interested comp3. CONTACT INFORMATION:
All interested companies, shall submit all the required
documents to given email address or to PetroChina Amarah
Office.
Contact : Dept. of Contracts, Procurement& Logistics
PetroChina International Iraq FZE Iraq
Branch.
Address : PetroChina Base Camp, KahlaaMissan Governorate,
: .. "(
)" ( 53 (
. :
1 60016
00 20324 .2036400 001 [email protected]
2
61000171.
00 2420340024203.
2.2-1 .(.2-2 )2-3. )2-4 ./(2-5 ( .)(
3.
.:
... :
.
mailto:[email protected]:[email protected] -
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
3/93
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
4/93
INVITATION TO BID
FOR
TENDER NO: 61000171
FOR
PROVISION OF ENGINEERING FEASIBILITY STUDY FOR THE
CONSTRUCTION OF A TEMPORARY HAZARDOUS WASTE
STORAGE FACILITY AT HALFAYA OIL FIELD
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
5/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 2 of 67
INDEX TO TENDER FORM
INVITATION TO BID LETTER
SECTION I ACKNOWLEDGEMENT FORM
SECTION II INSTRUCTIONS TO BIDDER
1. PURPOSE OF INSTRUCTIONS
2. ITB ACKNOWLEDGEMENT
3. GENERAL
4. PREPARATION OF BID
5. SUBMISSION OF BID
6. EVALUATION OF BID
7. CONSIDERATION OF BID
8. ACCEPTANCE OR REJECTION OF BID
9. REQUEST FOR FURTHER INFORMATION BY BIDDER
10. MODIFICATION BY COMPANY
11. CONFIDENTIALITY OF BID
12. VALIDITY OF BID
13. DESCRIPTION OF THE SERVICES AND CONTRACTOR
EQUIPMENT
SECTION III FORM OF BID
PART 1 FORM OF BID LETTER
PART 2 FORM E - BID EXCEPTIONS
PART 3. GENERAL AND TECHNICAL BID SUBMISSION
3.1 GENERAL
FORM G1: BIDDERS QUESTIONNAIRE (DETAILS OF BIDDER)
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
6/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 3 of 67
FORM G2: BIDDERS QUESTIONNAIRE (FINANCIAL INFORMATION OF
BIDDER)
FORM G3: PARENT COMPANY GUARANTEE
FORM G4:CONFIDENTIALITY STATEMENT
FORM G5: DECLARATION
FORM G6: LETTER OF INDEMNITY
FORM G7: ITB SUPPLEMENTS
3.2 TECHNICAL
FORM T1: PERSONNEL AND KEY PERSONNEL
FORM T2: EXECUTION PLANS AND MANAGEMENT OF THE SERVICES
FORM T3: SUBCONTRACTOR(S) AND SUBCONTRACT PLAN
FORM T4: PREVIOUS AND CURRENT WORK
FORM T5: COMPULSORY INSURANCES
FORM T6: QUALITY ASSURANCE DOCUMENTATION
FORM T7: SAFETY PROGRAMME
FORM E PART A: BID EXCEPTIONS
PART 4. COMMERCIAL BID
FORM C1: FORM OF QUOTATION
FORM C2: PAYMENT SCHEDULE
FORME PART B: BID EXCEPTIONS
PART 5.BID BOND
FORM B1: BID BOND
SECTION IV PRO-FORMA AGREEMENT FOR THE PROVISION
OF PROVISION OF ENGINEERING FEASIBILITY STUDY FOR THE
CONSTRUCTION OF A TEMPORARY HAZARDOUS WASTE
STORAGE FACILITY AT HALFAYA OIL FIELD
SECTION V DEFINITIONS
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
7/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 4 of 67
INVITATION TO BID LETTER
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
8/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 5 of 67
24 April, 2013
To: All bidders
Tender title : Provision of Engineering Feasibility Study for the
Construction of a Temporary Hazardous Waste StorageFacility at Halfaya Oil Field
Tender Number : 61000171
Subject : Invitation to bid.
To Whom It May Concern:
PetroChina International Iraq FZE Iraq Branch (the COMPANY) is pleased to invite
your company to participate in the aforementioned Bid for the AGREEMENT. The
COMPANY is sincerely appreciative and thankful for your interest to bid and looks forward
to a successful Bid process.
Included with this letter are the following documents (collectively with this letter, the Bid
Package):
(a) Acknowledgement Form;
(b) Instructions to Bidder;
(c) Form of Bid;
(d) Pro-forma Agreement for the Provision of Engineering Feasibility Study forthe Construction of a Temporary Hazardous Waste Storage Facility at
Halfaya Oil Field(e) Definitions.
Please acknowledge receipt of this Invitation to Bid Letter and the Bid Package within
seven (7) days from the date mentioned above by completing, executing and delivering the
attached Acknowledgement Form to Tender Committee Secretary by email to
[email protected] or by facsimile at 00971-04 440 41 90. Your
failure to properly deliver the Acknowledgement Form within such time period may result
in your disqualification.
Bidder must ensure that the Bid is received at the address set out in paragraph 5.2(a)
mentioned in Section II Instructions To Bidder no later than 05:00 pm on 24th of May,2013 (Local time in Dubai, the Bid Closing Date).
Thank you for your time and consideration and for your interest in the Bid.
___________
Tender Committee Secretary
mailto:[email protected]:[email protected]:[email protected] -
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
9/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 6 of 67
SECTION I
ACKNOWLEDGEMENT FORM
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
10/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 7 of 67
ACKNOWLEDGEMENT FORM[LETTERHEAD OF BI DDER]
To: PetroChina International Iraq FZE Iraq Branch
Department of Contract, Procurement and Logistics
P.O. Box: 500486, Office No. A 402, Fourth Floor,
Building No. 10, Dubai Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190
Email :[email protected]
Attn: Tender Committee Secretary
Tender title: Provision of Engineering Feasibility Study for the Construction of a
Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender Number :61000171Subject : Acknowledgement Form
Note: Bidder is required to indicate its intention to bid by completing and returning
this form within seven (7) calendar days from the issuance date of the
invitation to bid documents (the ITB Documents).
We acknowledge receipt of your ITB Documents for the above services.
* A) We intend to submit a bona fide and compliant bid by the date and time stated in the
ITB Documents.
The person handling this bid on our behalf is:
NameDesignationTelephone No
FaxNoCell-phoneNo. Email
Address:
*B) Please be advised that we will not be participating in this bid because:
We will return the full ITB Documents by:..
*Delete either A) or B)
C) Acknowledged by:
Name :
Designation :
Date :
Company Name :
Signature :
Company Address and Stamp :
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
11/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 8 of 67
SECTION II
INSTRUCTIONS TO BIDDER
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
12/93
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
13/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 10 of 67
INSTRUCTIONS TO BIDDER
1. PURPOSE OF INSTRUCTIONS
(a) Where reference is made to Bidder, it shall also include Bidders principal
where appropriate.
(b) Unless otherwise defined herein or the context requires, the expressions
herein shall have meanings ascribed to them in Section V.
(c) These instructions are to inform Bidder of the proper practices, which must
be adopted to satisfy the requirements of COMPANY for the submission of
Bid and the award of AGREEMENT. Deviations from these instructionsmay result in Bidders Bid being disqualified.
(d) The Instructions to Bidder are part of and are to be read in conjunction with
all other sections of the invitation to bid documents (the ITB
Documents).
(e) The ITB Documents comprise the following:
Invitation to Bid Letter
Section I Acknowledgement Form
Section II Instructions to Bidder
Section III Form of Bid
Section IV Pro-forma Agreement for the Provision of Engineering
Feasibility Study for the Construction of a Temporary Hazardous
Waste Storage Facility at Halfaya Oil Field
Section V Definitions
2. ITB ACKNOWLEDGEMENT
2.1 Completeness of ITB Documents
Bidder shall check the contents of the ITB Documents to ensure that there are no
omissions or discrepancies. Bidder shall immediately notify COMPANY in writing
of any omissions or discrepancies found in the ITB Documents or any doubt as to
the precise meaning of any item, word or figure or any other question whatsoever.
2.2 Intention to Bid
(a) Bidder is required to complete the Acknowledgement Form and return the
signed copy to the COMPANY by fax or email within seven (7) calendar
days of the issuance date of the ITB Documents.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
14/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 11 of 67
(b) Bidder is advised to confirm its companys address and name a
representative to whom all communication from COMPANY shall be
addressed.
2.3 Decline to Bid
Should Bidder decline to submit a Bid, Bidder is required to give reason(s) and
return the ITB Documents before the Bid Closing Date with the following sentence
clearly marked in bold on the cover envelope:
(a) Decline to Bid documents returned
(b) Tender number and title
(c) Bidders name
3. GENERAL
(a) COMPANY herein invites Bidder to submit a Bid for the subject tender on
the terms and conditions contained in this ITB package. The successful
Bidder shall perform in accordance with the requirements set out in the
ITB.
(b) Bidders are expected to submit a Bid for the entire scope of Services as
described in the ITB Documents, and any Bid that does not cover such
scope of Services shall be deemed to be non-compliant with these
instructions and subject to rejection.
4. PREPARATION OF BID
4.1 Bid Forms
In order to conduct a thorough, efficient and objective evaluation, certain minimum
information is required to be included in the Bid. Bidder is required to strictly
follow the Bid forms format as set forth in Section III in the presentation of its
capabilities. Failure to comply strictly with this instruction may result in Bidders
Bid being rejected and disqualified from this tender.
4.2 Provision of Sufficient Information
The Bidders technical ability to perform the Services is an integral part of the
evaluation process. Bidder is therefore advised that the Bid should include
sufficient technical information to enable this matter to be considered properly.
Failure to include sufficient technical information may result in the Bid not
receiving appropriate attention and recognition, and thus damaging its chance of
award.
4.3 Bidders Form of Bid
(a) The original Form of Bid Letter in Section III must be included with the
Bid and shall show the full legal name, place of incorporation andregistered business address of Bidder including its mailing address. It shall
be signed by the person duly authorized to bind Bidder to the Bid and shall
be dated. In addition, Bidder shall provide evidence of authority of the
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
15/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 12 of 67
person signing the Bid, such as a Power of Attorney and/or authenticated
copy of minutes or resolutions of its board of directors.
(b) Bidders company name must be inserted at the foot of each page of the
Form of Bid and all pages are to be signed/initialed by the individual
signing the Bid. If erasures or changes appear in the Bid, each such erasureor change shall be initialed and dated by the individual signing the Bid.
(c) The language of all documents and communications pertaining to this Bid
shall be in English.
(d) Bidder is to ensure that all prices and other details in the Bid are correct at
the time of submission. COMPANY will not entertain any changes or
revisions including without limitation any revisions of typographical or
arithmetical errors after the Bid Closing Date.
(e)
All costs in the preparation and submission of the Bid including anyclarifications, discussions and/or meetings shall be at Bidders cost,
irrespective of whether an AGREEMENT is entered into or not.
4.4 Bid Bond
(a) Each Bidder is required to submit, as part of its Bid, a bid bond in the form
identified below, and in the amount one percent (1%) of the bid value in
accordance with the information it provides in Part 5of Section III (the
Bid Bond).
(b) The form of the required Bid Bond is included in the ITB Documents as
Form B1 (Bid Bond) in Part 5of Section III. The Bid Bond shall be issued
by a commercial bank or other financial institution acceptable to the
COMPANY based on its long-term debt rating; provided, however, that
COMPANY shall have the right to accept a commercial bank or other
financial institution with no rating.
(c) An unsuccessful Bidder will be returned with its Bid Bond within thirty
(30) days following notification by the COMPANY that its Bid was
unsuccessful. The COMPANY shall return the Bid Bond to the successful
Bidder following delivery by the successful Bidder to the COMPANY of
the Performance Security (Bank Guarantee), the Bank Guarantee shall beissued in the form of Appendix F attached to the AGREEMENT(the
Bank Guarantee).
(d) The Bid Bond may be called upon by the COMPANY, in its sole and
absolute discretion, in the following cases:
(i) if a Bidder, having been declared to be the successful Bidder
by the COMPANY, refuses to execute the AGREEMENT
within three(3) days from the date of a written demand by the
COMPANY to enter into the AGREEMENT;
(ii) if a Bidder withdraws or repudiates its Bid after the Bid
Closing Date but before the expiry of the Bid Validity Period;
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
16/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 13 of 67
(iii) if a Bidder violates any of the COMPANY's guidelines on
business conduct;
(iv) if a Bidder violates any applicable law with respect to the
submission of its Bid;
(v) if a Bidder fails to submit the required content of the
commercial and technical schedules required under Parts 3 and
4 of Section III of the ITB Documents; or
(vi) if a Bidder, having been declared to be the successful Bidder,
and had selected the Bank Guarantee Option, fails to extend its
Bid Bond until it is replaced with the Bank Guarantee.
4.5 Bid Currency
(a) Bidder is required to price all Services as required in Section III.
(b) Bids shall be quoted inclusive of all Taxes and shall be based on the
information and materials provided in Sections IV and V of the ITB
Documents.
(c) Bidder is required to submit the Bid in U.S. Dollars. The price shall prevail
throughout the duration of the AGREEMENT and shall not be subject to
revision by reason of currency fluctuations.
4.6 Licensing
Bidder shall obtain and submit copies of all necessary consents, permits, licenses,
approvals, authorizations, executions and/or waivers.
4.7 Subcontracting
If a Bid has not been specifically submitted by a joint venture or other form of
association and Bidder proposes to associate with an affiliated or non-affiliated
company for any Services, such other company shall be a Subcontractor and shall
not be a party to the proposed AGREEMENT, unless otherwise agreed in writing
by COMPANY.
4.8 Joint Venture/Partnership/Agency
(a) Joint venture or contractor partnership arrangements (if any) must be
clearly indicated under the relevant area in Form G1 of Section III.
Co-ventures or joint ventures shall be jointly and severally liable under any
Contract awarded to them. Certified assurances regarding the financial
structure and standing of any such partner companies will be required by
COMPANY. Bids by partnership shall disclose the full names of all
partners and shall be signed with the partnership name by one of themembers of the partnership or by an authorized representative, for which
details of such authority is requested by COMPANY. The details of any
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
17/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 14 of 67
partnership structure shall be submitted in the Bid together with a copy of
the formal association or joint venture agreement.
(b) A successful Bidder who is agent for another organization or organizations
shall be required, as a condition of award of the AGREEMENT, to provide:
(i) an authorization letter by such organization; and (ii) a Parent CompanyGuarantee by such organization of the performance and financial
obligations to be assumed by such Bidder under the AGREEMENT.
5. SUBMISSION OF BID
5.1 Bid Package
(a) Each submission of a Bid must be made separately ina sealed package (the
Bid Package) that contains the following:
(i) One (1) original copy of the duly completed and executed Bid
Letter in the form set out in Part 1 of Section III;
(ii) One (1) sealed envelope containing one (1) original set of the duly
completed forms set out in, and the information and other materials
as required in, Part 3 of Section III(the General and Technical
Bid Submission). In addition, the electronic copy of the technical
bid should be prepared and sealed inside the envelope;
(iii) One (1) sealed envelope containing one (1) copy set of the General
and Technical Bid Submission;
(iv) One (1) sealed envelope containing the first one (1) original set of
the duly completed forms set out in, and the information and other
materials as required in, Part 4 of Section III (the First
Commercial Bid Submission).The electronic copy of the
commercial bid should be prepared and sealed inside as well; and
(v) One (1) sealed envelope containing the second one (1) original set
of the duly completed forms set out in, and the information and
other materials as required in, Part 4 of Section III (the Second
Commercial Bid Submission).The electronic copy of the
commercial bid should be prepared and sealed inside as well; and
(vi) One (1) sealed envelope containing one (1) copy set of the
Commercial Bid Submission.
(vii) One (1) sealed envelope containing original of the duly signed Bid
Bond as per FORM B1 attached to PART 5- BID BOND.
(b) In the event of any discrepancy between the original set and copies, the
original set shall govern.
(c) Any Bid submitted to the COMPANY that does not comprise all of the
above 7(seven) documentswill be deemed invalid, and will not be consideredin the commercial evaluation.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
18/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 15 of 67
(d) Any Bid submitted to the COMPANYin which any of the above documents
are not sealed separately, will be deemed invalid, and will not be considered
in the evaluation.
(e) General and Technical Bid Submission and Commercial Bid Submission
shall be submittedseparately, fails to meet this requirement will beconsidered invalid and will not considered in the evaluation.
(f) The General and Technical Bid Submission must not contain any
information regarding Bidders proposed pricing of or compensation for the
Services. If any Bidder includes any such information or materials in its
General and Technical Bid Submission, its Bid will be deemed invalid, and
will not be taken into consideration of evaluation.
5.2 Bid Labelling
(a) The word Original and Copy shall be clearly marked on each envelope.Bids shall be clearly marked Confidential and shall be sealed in separate
packages, clearly marked in bold letters as follows and submitted to the
following address:
CONFIDENTIAL
BID LETTER; OR
ORIGINAL GENERAL AND TECHNICAL PROPOSAL; OR
FIRST ORIGINAL COMMERCIAL PROPOSAL; OR
SECOND ORIGINAL COMMERCIAL PROPOSAL; ORCOPY GENERAL AND TECHNICAL PROPOSAL; OR
COPY COMMERCIAL PROPOSAL;OR
ORIGINAL BID BOND.
TenderNo.: 6100071
Tender Title: PROVISION OF ENGINEERING FEASIBILITY
STUDY FOR THE CONSTRUCTION OF A
TEMPORARY HAZARDOUS WASTE STORAGE
FACILITY AT HALFAYA OIL FIELD
To: PetroChina International Iraq FZE Iraq Branch
Department of Contract, Procurement and Logistics
P.O. Box: 500486, Fourth Floor, Building No. 10,
Dubai Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190
Email :[email protected]
ATTN: Tender Committee Secretary
Submitted By : [Name of Bidder]
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
19/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 16 of 67
[Contact Person, Address and Phone and Fax
Numbers of Bidder]
(b) Each envelope within the Bid Package must also be clearly marked and
labelled as set out in paragraph (a) above, and shall also clearly identify thecontents therein, i.e. whether it is the General and Technical Bid Submission
or the Commercial Bid Submission, and whether it is the original set or the
copy set. Each envelope must also be sealed. Any Bid Package without the
above mentioned label on the envelope will be considered invalid and
will not be considered in the evaluation process.
5.3 Delivery of Bid
(a) Bidder is strongly advised to deliver the Bid by hand to ensure timely
receipt by COMPANY. If Bidder elects to mail the Bid, Bidder is advised
to use fast and reliable delivery service e.g. courier.
(b) Responsibility of timely delivery of the Bid to the correct address within
the required time period rests fully with the Bidder. COMPANY shall not
accept late submissions nor will it accept any responsibility for the
non-receipt of the Bid.
5.4 Bid Closing Date
(a) Bidder must ensure that the Bid is received at the address set out in
paragraph 5.2(a) above no later than the Bid Closing Date as mentioned in
the Invitation To Bid Letter.
(b) Bids received later than the Bid Closing Date and time specified above
shall be rejected unopened.
5.5 Bid Submission Place
The only official place where the BIDS should be delivered, submitted to
COMPANY, and received by COMPANY.
PetroChina International I raq FZE I raq Branch
Department of Contract, Procurement and LogisticsP.O. Box: 500486, Office No. A 402, Fourth Floor, Building No. 10, Dubai
Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
20/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 17 of 67
6. TECHNICAL CLARIFICATION AND INSPECTION
6.1 Technical Clarifications
COMPANY shall be entitled to seek technical clarifications after submission of
Bids.
If a Bidders response to the technical clarifications fails to comply with the
clarification requirements including, but not limited to, an unclear or ambiguous
response or a response containing inconsistencies or deviations, or submitted the
response after the Clarification Closing Date, Bidder shall bear the risk of having
their Bid being rejected without further opportunity to make amendments.
6.2 Interviews/Reviews by COMPANY
(a) In addition to reviewing the Bidders Bid, COMPANY may interview Key
Personnel nominated in the Bid as part of the Bid evaluation process.
COMPANY may also require a detailed demonstration of Bidders
facilities to obtain a full understanding of Bidders Bid.
(b) COMPANYs Bid review team may visit the Bidders and/or
Subcontractors facilities. COMPANY may also require a detailed
demonstration of Subcontractors facilities and conduct interviews with
Subcontractors key personnel. COMPANY anticipates that the key
personnel proposed will be involved in the preparation of the Bid and will
be willing and able to perform the Services.
Notwithstanding the requirements of this clause 6.2, COMPANY reserves the right
to audit Bidders quality, safety, health and environment management systems
during the Bid evaluation period.
7. CONSIDERATION OF BID
(a) COMPANY reserves the right to request any further information it may
deem necessary to evaluate the Bid, which may include but not be limited
to a breakdown of, or supplement to, any lump sum prices, rates or
percentages proposed.
(b) No part of any Bid submitted will be returned to Bidder except for the bid
bond.
8. ACCEPTANCE ORREJECTION OF BID
(a) COMPANY may reject any or all Bids received, or may accept any Bid
that, in COMPANYs sole judgment, is the most advantageous to
COMPANY. COMPANY reserves the right to accept or reject, all, or parts
of, Bidders Bid at COMPANYs discretion, and will be under no
obligation to explain the reasons thereof.
(b) The successful Bidder will be required to enter into a formal
AGREEMENT with COMPANY which will be on the same terms andsubject to the same conditions as are contained in the ITB Documents,
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
21/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 18 of 67
subject to any clarifications issued during or prior to the evaluation of the
Bid.
(c) COMPANY shall not be deemed to have accepted any offer unless and
until an AGREEMENT is duly signed or COMPANY sends a binding
Letter of Award to the successful Bidder, signed by a duly authorisedrepresentative of COMPANY.
(d) COMPANY reserves the right to require the successful Bidder to enter into
the AGREEMENT with an affiliated entity of the COMPANY.
(e) COMPANY may at its own discretion split the AGREEMENT to more
than one Bidder at its own discretion and will be under no obligation to
explain the reasons thereof.
9. REQUEST FOR FURTHER INFORMATION BY BIDDER
(a) Any further information which may be required by Bidder in order to
complete its Bid or any interpretation thereof, must be obtained by
facsimile or by writing, sent to the address given below:
PetroChina International Iraq FZE Iraq Branch
Department of Contract, Procurement and Logistics
P.O. Box: 500486, Fourth Floor,
Building No. 10, Dubai Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190
Email :[email protected]
Attn: Tender Committee Secretary
Any such request must be delivered to COMPANY not later than seven (7)
calendar days prior to the Bid Closing Date.
Request shall be prepared in the following form and failing to comply with
this form may lead to rejection of the request.
FURTHER INFORMATION REQUEST FORM
Tender Title: Tender No.: Request Date:
Item NoReference Part/Article No. in
ITB/PageQuestions Description COMPANYs Answers
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
22/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 19 of 67
(b) Any further information, interpretation, advice or modifications given by or
agreed upon by COMPANY shall be distributed to all Bidders by letter or
facsimile without revealing the identity of the original enquirer.
(c) Except as provided herein, Bidder is not permitted to contact or
communicate with any members of COMPANYs staff (nor any staff of
consultant companies engaged by COMPANY for the preparation of the
ITB Documents) on any matter relating to this Bid. Uninvited visits to
COMPANYs offices to discuss the ITB Documents are not permitted.
10. MODIFICATION BY COMPANY
(a) COMPANY reserves the right to modify the ITB Documents following
issue of the same to the Bidder. Any modification to the ITB Documents
made by COMPANY shall be advised to Bidder not later than seven (7)calendar days prior to the Bid Closing Date. Any modification shall be
issued as invitation to bid supplements (notice-to-Bidders and/or addendum)
and shall be deemed to constitute part of the ITB Documents.
(b) COMPANY reserves the right to issue clarifications modifying the ITB
Documents during the evaluation period if it so requires.
11. CONFIDENTIALITY OF BID
By submission of a Bid, Bidder warrants that:
(a) All documents delivered to Bidder shall be handled confidentially and shall
be used only for the purpose of preparing the Bid. Such documents shall
not be duplicated or disclosed to others unless explicitly for the purpose of
formulating the Bid in response to this invitation to Bid;
(b) The prices in the Bid have been arrived at independently, without
consultation, communication, agreement or understanding for the purpose
of restricting competition, as to any matter relating to such prices, with any
other bidders or with any competitors;
(c) Unless otherwise required by law, the prices which have been quoted in the
Bid have not knowingly been disclosed by Bidder, directly or indirectly, to
any other bidders or competitors, nor will they be so disclosed;
(d) No attempt has been made or will be made by Bidder to induce any other
person or company to submit or not to submit a Bid for the purpose of
restricting competition; and
(e) Bidder has adhered to the highest standards of business ethics and, in
particular, has established precautions to prevent any of its officers,
employees, or agents from making, receiving or offering substantial gifts,
entertainment, payment, loans, or other considerations which may
influence individuals in respect of this invitation to Bid.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
23/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 20 of 67
12. VALIDITY OF BID
(a) The Bid shall be firm and irrevocable and shall be valid for a period of
ninety (90) calendar days from the Bid Closing Date (as may be extended
by the Bidder and COMPANYpursuant to paragraph (b) below, the Bid
Validity Period), and shall not be retracted or withdrawn during theperiod. COMPANY shall have the right to accept any Bid at any time
before the expiration of such period.
(b) Bidder shall indicate in the Form of Bid (Section III) the price adjustment
to extend the Bid Validity Period for each 30-calendar day period up to an
additional period of 60 calendar days beyond the initial Bid Validity
Period.
13. DESCRIPTION OF THE SERVICES
Please refer to Appendix A of the AGREEMENT set out in Part IV.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
24/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 21 of 67
SECTION III
FORM OF BID
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
25/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 22 of 67
TABLE OF CONTENTS
BIDDER SHALL SUBMIT ITS BID IN THE FORMAT AND SEQUENCE PROVIDED
BY THE FOLLOWING BID FORMS:
Page No.TABLE OF CONTENTS ......................................................................................................... 9
PART 1. FORM OF BID LETTER ..................................................................................... 23
PART 2. FORM E - BID EXCEPTIONS ............................................................................ 29
PART 3. GENERAL AND TECHNICAL BID ................................................................... 29
3.1 GENERAL ............................................................................................................... 31
FORM G1: BIDDERS QUESTIONNAIRE (DETAILS OF BIDDER) .................. 31FORM G2: BIDDERS QUESTIONNAIRE (FINANCIAL INFORMATION OF
BIDDER) ....37
FORM G3: PARENT COMPANY GUARANTEE .................................................. 38
FORM G4: CONFIDENTIALITY STATEMENT .......................................................
FORM G5: DECLARATION .................................................................................... 43
FORM G6: LETTER OF INDEMNITY.................................................................... 44
FORM G7: ITB SUPPLEMENTS ............................................................................. 45
3.2 TECHNICAL ................................................................ 44
FORM T1: PERSONNEL AND KEY PERSONNEL .............................................. 44
FORM T2: EXECUTION PLANS AND MANAGEMENT OF THE SERVICES . 45
FORM T3: SUBCONTRACTOR(S) AND SUBCONTRACT PLAN ..................... 45
FORM T4: PREVIOUS AND CURRENT WORK .................................................. 48
FORM T5: COMPULSORY INSURANCES ........................................................... 49
FORM T6: QUALITY ASSURANCE DOCUMENTATION ................................. 50
FORM E PART A: BID EXCEPTIONS.... 58
PART 4. COMMERCIAL............................................................................................... 58
FORM C1: FORM OF QUOTATION ..........................................................................FORM C2: PAYMENT SCHEDULE ....................................................................... 67
FORM E PART B: BID EXCEPTIONS ..68
PART 5. BID BOND ...................................................................................................... 69
FORM B1: FORM OF BID BOND .......................................................................... 70
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
26/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 23 of 67
PART 1
FORM OF BID LETTER
Unless the context requires, capitalized terms not otherwise defined in this document shallbe defined in accordance with Section V Definitions.
PART 1. FORM OF BID LETTER
The originalBidder's Bid Letter (strictly in the form specified below) shall be signed by the
person duly authorized to bind the Bidder to the Bid and shall be dated.
Date: ___________
To: PetroChina International Iraq FZE Iraq BranchDepartment of Contract, Procurement and Logistics
P.O. Box: 500486, Fourth Floor,
Building No. 10, Dubai Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190
Email :[email protected]
Attn.:Tender Committee Secretary
Tender No. : 61000171
Tender Title : Tender for theProvision of Engineering Feasibility Study for the
Construction of a Temporary Hazardous Waste Storage Facility at Halfaya
Oil FieldSubject : Bid Letter
Dear Sir/Madam,
We, the undersigned (the Bidder), having carefully examined and understood the ITB
Documents, hereby submit to you (the COMPANY) our Bid, comprising this letter, the
General and Technical Bid Submission and the Commercial Bid Submission. We agree to
be bound by this Bid for the validity period specified, and we further agree:
1. The Services
If selected by Company, (i) to perform the Services in the manner specified in the
AGREEMENT and in accordance with the methods specified in Form T2 Execution
Plans and Management of the Services by using the organization and personnel
specified in Form T1 Personnel and Key Personnel; (ii) to perform all other
obligations in accordance with the AGREEMENT; and (iii) to assume all
responsibilities imposed upon us by the AGREEMENT;
\
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
27/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 24 of 67
2. Bidder's Bid
We confirm that the Bid fully complies in all respects to the requirements of the ITB
Documents issued by COMPANY, except for the BidExceptions listed in Form E;
3. Compensation
If selected by COMPANY, to accept as compensation for satisfactory provision of
the Servicesspecified in the AGREEMENT, the compensation specified in our
Commercial Bid Submission;
4. Timing
If selected by COMPANY, we shall commence and complete the Services in
accordance with the time required to complete such Services in accordance with theAGREEMENT;
5. Insurance
If selected by COMPANY, upon award of AGREEMENT, we will provide
COMPANY with certificates of insurance required including all endorsements
required by the AGREEMENT. Said certificates shall contain the AGREEMENT
identification number to which they apply;
6. Validity of Bid
That this Bid shall be firm and irrevocable and shall be valid for ninety (90) calendar
days from the Bid Closing Date(as may be extended by the Bidder and COMPANY
pursuant to paragraph 12 (b) in SECTION II-INSTRUCTIONS TO BIDDER) and
may be accepted by COMPANY at any time during the validity period by written
notification to us;
7. Exclusive Right of COMPANY
That COMPANY reserves the right to reject any and all offers made by us in our
Bid without giving reasons therefore. COMPANY also reserves the right to proceedwith performing the Services. COMPANY in its sole discretion may award the
AGREEMENT to any Bidder submitting a Bid. We further agree that the submission
of this Bid and possible subsequent discussions, meetings and clarifications do not
involve COMPANY incurring any costs whatsoever; and
8. Correspondence
That all written correspondence from Bidder with regard to this Bid is to be
addressed to the following:
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
28/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 25 of 67
Attn: Tender Committee Secretary
To: PetroChina International Iraq FZE Iraq Branch
Department of Contract, Procurement and Logistics
P.O. Box: 500486, Fourth Floor,
Building No. 10, Dubai Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190Email :[email protected]
Bidders Signature
The undersigned is duly authorized to sign on behalf of and to bind us to the provision of
this Bid.
Bidder:
Authorized signature:
Name:
Title/Designation:
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
29/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 26 of 67
PART 2
BID EXCEPTIONS
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
30/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 27 of 67
BID EXCEPTIONS
If Bidder has any change that is considered of mutual benefit or if there is any exception to
the terms and conditions of the AGREEMENT or any other part of the ITB Documents,
Bidder must state the changes or exceptions proposed by using the format in Form E Part A
(to be submitted in the Technical Proposal) and Form E Part B (to be submitted in theCommercial Proposal) and giving specific reasons thereof.
Bidder shall maintain the same changes/exceptions for both Form E Part A (to be submitted
in the Technical Proposal) and Form E Part B (to be submitted in the Commercial Proposal).
If COMPANY finds additional changes/exceptions in Form E Part B during the
commercial evaluation, COMPANY shall reject the additional changes/exceptions
without applying any cost impact.
Bidder must indicate clearly the effect, if any, these changes or exceptions may have onBidder's general, technical or commercial if the changes or exceptions are rejected by
COMPANY.
Change(s) or exception(s) to the AGREEMENT or any other part of the ITB Documents
expressed after the closing date of the bid will not be entertained.
COMPANY reserves the right to accept or reject any or all of the proposed change(s) or
exception(s). COMPANY will review each change or exception on a case-by-case basis.
If Bidder cannot accept COMPANY's wording at any price, and is willing to take riskhaving its Bid Proposal rejected on this basis, then Bidder must make the following
statement:
"FIRM - Will not accept COMPANY's wording at any price".
The above statement shall be clearly mentioned under the "COST IMPACT" column in the
following forms:
1.
FORM E PART A: BID EXCEPTIONS (to be submitted in the Technical Proposal)and;
2. FORM E PART B: BID EXCEPTIONS (to be submitted in the commercial proposal)
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
31/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 28 of 67
PART 3
GENERAL AND TECHNICAL BID SUBMISSION
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
32/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 29 of 67
PART 3. GENERAL AND TECHNICAL BID
(a) Bidder shall comply with all requirements to perform and complete the
Servicesas set forth in the AGREEMENT and shall, as a demonstration of its
experience and capabilities, complete Parts 3.1 and 3.2. It should be noted
that non-compliance with the requirements set forth herein or omission of
any Bid form may render Bidder's Bid to be unacceptable.
(b) When a Bid form contains more than one (1) sheet, the Bid form shall be
paginated in such a way that the response can be easily identified, e.g.
pagination in the form of Form G1, page 1 of 5 and so on. The first sheet
of each form shall be given Page 1. Each page shall bear the
AGREEMENT number at the top right hand corner of the sheet.
(c) The corresponding forms under individual parts to be completed and
submitted in Bidder's General and Technical Bid Submission are listed
below.
(d) Technical Proposal shall not contain any price information; otherwise the Bid
may be rejected.
3.1 GENERAL
FORM G1: BIDDERS QUESTIONNAIRE (DETAILS OF BIDDER)
FORM G2: BIDDERS QUESTIONNAIRE (FINANCIAL INFORMATION OFBIDDER)
FORM G3: PARENT COMPANY GUARANTEE
FORM G4: CONFIDENTIALITY STATEMENT
FORM G5: DECLARATION
FORM G6: LETTER OF INDEMNITY
FORM G7: ITB SUPPLEMENTS
FORM G8: BANK GUARANTEE
3.2 TECHNICAL
FORM T1: PERSONNEL AND KEY PERSONNELFORM T2: EXECUTION PLANS AND MANAGEMENT OF THE SERVICES
FORM T3: SUBCONTRACTOR(S) AND SUBCONTRACT PLAN
FORM T4: PREVIOUS AND CURRENT WORK
FORM T5: COMPULSORY INSURANCES
FORM T6: QUALITY ASSURANCE DOCUMENTATION
FORM T7: SAFETY PROGRAMME
FORM E PART A: BID EXCEPTIONS
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
33/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 30 of 67
GENERAL AND TECHNICAL BID SUBMISSION
PART 3.1
GENERAL
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
34/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 31 of 67
3.1 GENERAL
BIDDERS QUESTIONNAIRE
FORM G1: BIDDERS QUESTIONNAIRE (DETAILS OF BIDDER)
This form MUSTbe completely filled in by Bidder. Write Nil or NA (not applicable)
where appropriate.
INSTRUCTIONS : This form is divided into two (2) sections:
1. Section 1 : to be completed by the Bidder.
2. Section 2 : to be completed by the principal company of the Bidder, if the
Servicesis to be performedby it.
SECTION 1
1.2 Please provide the following information with regard to your company.
(a) Nature of company: (Private Limited, Public, Corporation, Proprietorship, Partnership orothers)
1.1 PARTICULARS OF COMPANY
Company Registered
Name
Registered Business
Address
Correspondence
Address
Contact Person and
Email Address
Telephone and
Cell-phone
Fax
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
35/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 32 of 67
(b) Date of company registration:
(c) File registration number: (Registrar of Companies)
(d) Date of commencement of business operations:
1.3 Is your company a tax-resident in the Republic of Iraq? Please answer YES or NO.
If so, provide a copy of its tax withholding exemption certificate, as issued by the
proper Tax Bureau.
1.4 Bidders confirmation on taxes
Taxes
Please refer to Contract Articles on TAXES AND
CUSTOMS.
Bidder shall confirm that it has understood and
accept the taxes provision as stipulated in the
Contract Articles.
Please indicate YES or
NO here
1.5 Bidders confirmation on Bank Guarantee
Bank Guarantee
Please refer to Contract Article on Bank
Guarantee Bidder confirm Bank Guarantee
Provision
Bank Guarantee
1.6 Provide COMPANY with evidence of your companys authorized scope of business.
1.7 COMPANY SHAREHOLDERS
No. Name of Shareholders Percentage Held
(a)
(b)
(c)
(d)
(e)
(f)
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
36/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 33 of 67
(g)
(h)
(i)
(j)
(k)
1.8 COMPANY DIRECTORS
Please attach a copy of the most recent list of directors of your company from the
Registrar of Companies in the jurisdiction in which your company is established.
No. Name of Directors Designation Period
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
1.9 Please complete the following table with respect to your staff:
No. Description Number of Staff
Members
Total
(%)
(a) Management
(b) Technical
(c) Non-technical
(d) Others
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
37/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 34 of 67
1.10 Please attach a list of your key management staff with the following details:
(a) their designation;
(b) their qualification; and
(c) their length of service with your company.
1.11 Is your company a local affiliate of an overseas parent/principal company involved
in similar nature of work?
Please answer YES or NO:
I f YES, please provide a corporate organization chart indicating the structure of
Bidder in relation to its parent/principal company, affiliated companies and
subsidiaries and the ultimate holding company.
I f No, is your company registered as a foreign company doing business in the
Republic of Iraq? Please answer YES or NO:
I f YES, please give specific details as to the names of these companies and services
you offer for them.
1.12 Does your company have joint venture/consortia partner(s) for this Bid?
Please answer YES or NO:
I f YES, please list your joint venture/consortia partners:
Attach a copy of your Joint Venture/Consortia Agreement which shall include inter
alia joint and several liability.
1.13 Does your company have any subsidiary company(s)?
Please answer YES or NO:
I f YES, please list the name of the subsidiary company(s).
1.14 Has or are there any litigation, suits or court action been taken or taken against your
company?
Please answer YES or NO:
I f YES, please provide details.
1.15 Who is authorized to sign this AGREEMENT on behalf of your company?
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
38/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 35 of 67
1.16 We also require any printed technical and operational information detailing the
general capabilities, services offered and any information which would be helpful in
the analysis of your company. Please attach the information to this Form G1.
Information provided by : ..(signature)
Name :
Designation :
Date :
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
39/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 36 of 67
SECTION 2
(To be completed by the principal company of the Bidder, if any if the Servicesis to be
provided by it)
2.1 PARTICULARS OF PRINCIPAL COMPANY
Principal Company
Name
Registered Business
Address
Correspondence
Address
Contact Person
Telephone
Fax
Name of Local
Agent appointed by
Principal
2.2 Who, either your company or your associate or subcontractor, will performthe Services?
2.3 We also require any printed technical and operational information detailing your
companys general capabilities, services offered, etc. Please attach the information
to this Form G1.
Information provided by : ....(signature)
Name : .
Designation : .
Date :
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
40/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 37 of 67
FORM G2: BIDDERS QUESTIONNAIRE (FINANCIAL INFORMATION OF
BIDDER)
1. Bidder shall attach the following information as evidence of the Bidder's creditworthiness and financial soundness:
(a) Capital structure
i) authorized capital
ii) paid-up capital
iii) working capital
iv) amount of loan/overdrafts and sources
v) amount of loan repayment and sources
(b) A certified copy of each of Bidder's and its parent company's last three (3)
years audited accounts, including:
i) statement of Financial Position
ii) profits and loss account and statement of Comprehensive Income
iii) Statement of Cash Flows; and
iv) Notes to and forming part of the Financial Statements
Certified last three (3) years audited accounts of joint-venture partners shall
also be submitted where applicable.
2. Bidder shall provide Bank Statement, listing details ofBidders account.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
41/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 38 of 67
FORM G3: PARENT COMPANY GUARANTEE
Bidder confirms that if it is the successful bidder, it shall submit a Parent Company
Guarantee in the form provided in Appendix F of the AGREEMENT concurrent with the
execution of the AGREEMENT.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
42/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 39 of 67
FORM G4: CONFIDENTIALITY STATEMENT
Bidder shall submit the following statement duly signed by its authorized representative:
Date :
To : PetroChina International Iraq FZE Iraq Branch
Department of Contract, Procurement and Logistics
P.O. Box: 500486, Fourth Floor,
Building No. 10, Dubai Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190
Email :[email protected]
Attn: Tender Committee Secretary
Tender title : Provision of Engineering Feasibility Study for the Construction of a
Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No. : 61000171
Subject : Confidentiality Undertaking
We hereby declare that the Letter of Invitation to Bid and all documents attached thereto
and any other documents subsequently issued by COMPANY to us (collectively referred to
as the ITB Documents) in connection with the preparation of a Bid for the cap tioned
Tender, shall remain COMPANYsproperty.
We hereby agree to maintain all ITB Documents in strict confidence and acknowledge that
any use of the information contained in the ITB Documents for purposes other than for
bidding is strictly prohibited.
We hereby agree to immediately destroy all ITB Documents and supplements furnished by
COMPANY upon notification that COMPANY has decided to reject our Bid.
__________________________
Company
__________________________
Signature
__________________________
Name of Bidders
Authorized Representative
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
43/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 40 of 67
FORM G5: DECLARATION
Bidder shall submit the following statement duly signed by its authorized representative:
Date : _______________
To: PetroChina International Iraq FZE Iraq Branch
Department of Contract, Procurement and Logistics,
P.O. Box: 500486, Fourth Floor,
Building No. 10, Dubai Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190
Email :[email protected]
Attn: Tender Committee Secretary
Tender title : Provision of Engineering Feasibility Study for the Construction of a
Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No. : 61000171
Subject : Declaration
We hereby declare that we have carefully examined the ITB Documents in sufficient detail
and to our satisfaction and have acquainted ourselves with the AGREEMENT, and hereby
accept all responsibility for having properly evaluated all costs and contingencies for
successfully performing the Services and satisfying all Contractual obligations (as modified
by the Bid Exceptions pursuant to Form E) and agree to bear all and any consequences
resulting from improper valuation. Should any conflict or ambiguity transpire during theperformance of the Services which is not disclosed by us herein whether inadvertently
omitted or otherwise, we shall be solely responsible for and shall not be excused from
complying with the terms and conditions of the AGREEMENT or any of our obligations
thereunder.
__________________________
Company
__________________________
Signature
__________________________
Name of Bidders
Authorized Representative
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
44/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 41 of 67
FORM G6: LETTER OF INDEMNITY
Bidder shall submit the following letter duly signed by its authorized representative:
Date : _______________
To: PetroChina International Iraq FZE Iraq Branch
Department of Contract, Procurement and Logistics,
P.O. Box: 500486, Fourth Floor,
Building No. 10, Dubai Internet City, Dubai, United Arab Emirates
Fax : +971 04 4404190
Email :[email protected]
Attn: Tender Committee Secretary
Tender title : Provision of Engineering Feasibility Study for the Construction of a
Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No. : 61000171
Subject : Letter of Indemnity
We hereby acknowledge to COMPANY as follows:
1. at our request, COMPANY has extended the above mentioned ITB Documents to us
to enable us to submit a Bid for the Services for consideration by COMPANY; and
2. we note and have understood that this Letter of Indemnity shall form part of the Bid
documents.
In consideration of the foregoing and in acknowledgement of the sole right, prerogative and
control of COMPANY over its Bid evaluation and AGREEMENT award processes, we
hereby expressly agree to indemnify and hold harmless COMPANY against all Claims and
damages, whether brought by our company, Bid partner(s)/associate(s), proposed
subcontractor(s) and/or any party(ies) who participated with us or related to us in the Bid in
any manner whatsoever, for any matter in relation to the above mentioned Bid and any
decision(s) arising therefrom.
This Letter of Indemnity shall be valid from the date hereof and shall continue to survive
beyond the Bid Closing Date and the subsequent AGREEMENT Award Date.
__________________________
Company
__________________________
Signature
__________________________
Name of Bidders
Authorized Representative
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
45/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 42 of 67
FORM G7: ITB SUPPLEMENTS
1. Bidder confirms receipt of the following notice-to-Bidders and addendum, the
effects of which have been included in the Bid.
Notice-to-Bidders No.* Dated
Addendum No.* Dated
* Bidder to list
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
46/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 43 of 67
GENERAL AND TECHNICAL BID
PART 3.2
TECHNICAL
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
47/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 44 of 67
3.2 TECHNICAL
FORM T1: PERSONNEL AND KEY PERSONNEL
Bidder shall provide the following information:
1. Bidder shall list in tabular form the names and functions of all personnel and Key
Personnel that it proposes to use for the performance of the Services. The Bidder
shall notify the COMPANY of the Bidders representative. Such representative shall
have the right to bind the Bidder in all matters, financial and otherwise, related to the
Services.
2. Bidder shall provide an overall company level organization chart and a detailed team
organization chart for the purpose of performing the Services in family tree form.
3. Bidder shall submit detailed resumes of all personnel and Key Personnel proposed
and shall include the following information as a minimum:
(a) Name
(b) Date of birth
(c) Nationality
(d) Academic and professional qualifications
(e) Experience and levels of responsibility held to-date
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
48/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 45 of 67
FORM T2: EXECUTION PLANS AND MANAGEMENT OF THE SERVICES
(a) Bidder shall provide the following information:
1. Bidder shall submit detailed Execution Plans.
2. Bidder shall confirm, in writing, its ability to perform the Services by the required
time specified in the AGREEMENT.
(b) Management of the Services
1. Provide management team experience/qualification required for personnel
proposed to perform the Services
2. Management methodology that demonstrates the responsibility, authority and
accountability of the management team
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
49/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 46 of 67
FORM T3: SUBCONTRACTOR(S) AND SUBCONTRACT PLAN
Bidder shall provide the following information:
1. Bidder shall state in the enclosed Subcontract Plan, the names, addresses and other
details listed therein of Subcontractor(s) whom it proposes to employ to perform anyof the Services upon which the Bid is based.
2. Bidder shall submit a brief report on financial status, summary of relevant work
experience and technical capabilities of each of its proposed Subcontractors.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
50/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 47 of 67
ANNEX 1 TO FORM T3
SUBCONTRACT PLAN
Description
Of
Services
Date of
Award
(Planned)
Proposed
Subcontractor
Basis For
Selection Of
Subcontractor
(Proposed) **
Remarks
**Please indicate the basis for selection of Subcontractor:
(1) Lowest bidder
(2) Proprietary
(3) Others
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
51/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 48 of 67
FORM T4: PREVIOUS AND CURRENT WORK
1. Bidder shall provide details of previous and current work and all those works and
services that Bidder is presently tendering. Emphasis shall be given to those
contracts which are similar. Provide details for those since the year 2000. Biddershall also provide the names and details of the last three (3) companies that have
contracted your services in the world with a contact number for their focal point for
information evaluation.
2. Bidder may provide the same information for its Parent Company but on separate
sheets.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
52/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 49 of 67
FORM T5: COMPULSORY INSURANCES
Bidder shall provide the following information which, following review and evaluation by
COMPANY, will be incorporated in full or in part in the Contract which may result fromthis Bid:
Types of
Insurances
Limit
Of Insurances
Name and Address
of Insurer
(1) Workmen's
Compensation and
Employer's Liability
Insurance
(2) Comprehensive
General Liability
Insurance
(3) Any other
Insurance(s)
Notes:
(i) Bidder shall insert any other insurances that it intends to take out.
(ii) The above shall not prejudice Bidders liabilities as set forth in the AGREEMENT
upon a successful Bid by the Bidder.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
53/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 50 of 67
FORM T6: QUALITY ASSURANCE DOCUMENTATION
Bidder shall provide the following information:
A. QUALITY ASSURANCE DOCUMENTATION
1. Bidder shall establish, implement and maintain an effective and documented quality
assurance system with respect to the Services.
2. Bidder is required to submit the following documentation:
(a) Quality assurance manuals of Bidders organization and of key
Subcontractors;
(b) Copy of the approval certificate for the quality assurance system from any
authority or assessment agency for Bidders organization, if available;
(c) A quality assurance plan; and
(d) A completed quality assurance questionnaire in the form of Annex 1 to this
Form T6. The questionnaire shall also be filled in by Bidders key
Subcontractors.
B. QUALITY ASSURANCE EVALUATION
1. COMPANY may perform a pre-award assessment of technical and quality assurance
capabilities based on the quality assurance requirements set out in the
AGREEMENT.
2. Bidder shall confirm in its Bid that COMPANY will be given access to Bidders and
Subcontractors facilities and sites for the purpose of such evaluation.
In the event of an AGREEMENT being awarded, COMPANY reserves the right to
require the Contractor to take remedial actions within the time specified by the
COMPANY if any of the stated system requirements are not met.
ANNEX 1 TO FORM T6: QUALITY ASSURANCE QUESTIONNAIRE
This questionnaire shall be completed by Bidder and is intended to help the COMPANY's
assessment of Bidders quality assurance system and its ability to comply with the
requirements of the ITB Documents.
Please answer all questions accurately and comprehensively. If a particular question is not
applicable, write N/A.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
54/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 51 of 67
1. BIDDERS DECLARATION
We confirm that the COMPANY and/or its representative will be given access to all
relevant matters/persons/facilities/sites to conduct a pre-award on-site evaluation, if
deemed necessary by the COMPANY.
We confirm that the information provided in response to this questionnaire is correct
to the best of our knowledge.
__________________________
Company
__________________________Signature
__________________________
Name of Bidders
Authorized Representative
__________________________
Date
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
55/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 52 of 67
2. QUALITY ASSURANCE SYSTEM
2.1 What national/international quality assurance system standard is the basis for the
quality assurance system of your organization?
____________________________________________________________________
__________________________________________
____________________________________________________________________
__________________________________________
2.2 When was a formal documented quality assurance system first established?
____________________________________________________________________
__________________________________________
______________________________________________________________________________________________________________
Does the quality assurance system meet the full quality assurance requirements
stated in the Contract?
_________ Yes _________ No __________ Partly, give details
2.3 Does the organization hold a valid certificate of approval from any authority or
assessment agency?
_________ No _________ Yes, give details
If yes, please attach a copy of this certificate and state its validity date.
2.4 If the organization does not hold a valid certificate of quality assurance system
approval from any authority or assessment agency,
does it intend to get a certificate in future?
____________Yes ___________ No
If yes, state when____________________________________________________________________
__________________________________________
2.5 Have you been audited by COMPANY or its representative?
____________Yes ___________ No
If yes, please state date of last audit.
____________________________________________________________________
__________________________________________
______________________________________________________________________________________________________________
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
56/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 53 of 67
2.6 Is the quality assurance manual/system description submitted with this enquiry an
accurate description of the present quality assurance manual/system adopted by the
organization? Please give details in answer
_____________________ Requirements fully implemented_____________________ Requirements partly implemented
____________________________________________________________________
_________________________________________
Were there any relevant recent changes in the organization or procedures which are
not addressed in your quality assurance manual? Give details.
____________________________________________________________________
__________________________________________
____________________________________________________________________
__________________________________________
Provide details of the nominated quality assurance manager/representative for each
respective organization
Name: _______________________
Job title: _______________________
To whom does he/she report: _______________________
What function does he/she perform? (State all functions and not only those
performed as quality assurance manager/ representative).
____________________________________________________________________
__________________________________________
____________________________________________________________________
__________________________________________
2.7 Has the quality assurance manager/representative received any formal training in
quality assurance? Please answer for each organization.
If so please provide details (i.e. training received, dates, where, etc.)
____________________________________________________________________
__________________________________________
______________________________________________________________________________________________________________
2.8 Are quality assurance system audits performed within the organization?
_____________ Yes __________________ No
If Yes, please state who performed these audits. When the last audit wasperformed
(month/year)?
Please attach a sample copy of an audit report and a copy of your audit schedule.
______________________________________________________________________________________________________________
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
57/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 54 of 67
____________________________________________________________________
__________________________________________
2.9 How are the organizations Subcontractors evaluated and followed-up on? (Tick as
applicable)
__________________ Quality surveys/quality assurance system audits
__________________ Record of Subcontractors performance
__________________ Planned inspection visits to Subcontractors
__________________ Others (Please specify):
2.10 List planned procedures to be employed for this Bid.
____________________________________________________________________
__________________________________________
____________________________________________________________________
__________________________________________
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
58/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 55 of 67
FORM T7: SAFETY PROGRAMME
Bidder shall provide the following information:
1. Bidder shall provide details of its proposed safety programme and measures to be
taken to ensure safe competent behaviorof Bidders and Subcontractors employeesin order to comply with the provisions of the AGREEMENT.
2. The programme shall address such items as training, induction courses, medical
facilities and safety equipment to be provided by Bidder.
3. Bidder shall submit its last five (5) years and year-to-date safety record. The record
shall indicate Bidders overall safety statistics.
As a minimum the following information shall be furnished:
(a) number of lost time injury;
(b) number of minor injuries;
(c) number of fatalities;
(d) total lost workdays;
(e) lost time injury frequency;
(f) severity; and
(g) major fires.
4. Bidder shall submit a copy of its latest safety manual together with the safety plan.
The safety plan shall include, but not be limited, to the following:
(a) safety organization for the performance of the Services;
(b) ratio of supervisors to workers;
(c) a register of hazards identified in performing the Services;
(d) control measures to manage item (c);
(e) management audits and inspections;
(f) name(s) of competent safety officer(s); and
(g) safe handling and storage of substances hazardous to health.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
59/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil Field
Tender No: 61000171 Page 56 of 67
FORM E PART A - BID EXCEPTIONS
(To be submitted In Technical Bid Proposal submission only without revealing any cost impact)
No ITB Reference
(Section no.
or Appendix no.)
Exact New Wording
Proposed By Bidder
Reason(s) For
Exceptions
Effect On The Works
(time, scope etc.)Cost Impact
(Value to be revealed in
Commercial Bid Proposal only.
For Part A, please indicate withthe asterisk [*] sign in the
corresponding row the item
which has cost impact)
1 *
2 *
3 *
4 *
Note
If Bidder cannot accept COMPANY's wording at any price, and is willing to take risk having its Bid Proposal rejected on this basis, then Bidder must
state FIRM- will not accept COMPANY's wording at any price"in the Cost Impact column.
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
60/93
Provision ofEngineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil
Field
Tender No:61000171 Page 57 of 67
PART 4
COMMERCIAL BID SUBMISSION
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
61/93
Provision ofEngineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil
Field
Tender No:61000171 Page 58 of 67
PART 4. COMMERCIAL
FORM C1: FORM OF QUOTATION
4.0 INTRODUCTIONAll quotation submitted herein shall be deemed to be inclusive for the satisfactory
performance of the Work as detailed in the Invitation To Bid Document.
All quotation submitted herein shall then form Exhibit IIISchedule of Compensation
for the satisfactory performance of the Contract.
Bidder shall provide the following information:
1. Bidder shall specify a detailed breakdown of the:
(a) price/fee for performing the Services on daily rate basis; and
(b) the prices of Equipment and goods and other consumables to be supplied in
connection with the performance of the Services; for the avoidance of doubt,
the successful Bidder shall be responsible for delivering all such Equipment,
goods and other consumables to the worksite specified in the Contract.
All prices, fees and rates shall be inclusive of any applicableTaxes.
2. Bidder shall specify the price/fee adjustment to extend the Bid validity for each
30-calendar day period up to an additional period of 60 calendar days beyond the
initial Bid Validity Period.
3. In providing such information, please use the form provided in APPENDIX C SCHEDULE OF COMPENSATION
Bidder shall specify the price/fee adjustment to extend the Bid validity for each 30-calendar
day period up to an additional period of 60 calendar days beyond the initial Bid Validity
Period.
For extension of Bid Validity period beyond the date specified above, the price adjustment,
if any, shall be as follows:
% Increase
For the first 30 days extension of Bid Validity ..
For the second 30 days extension of Bid Validity ..
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
62/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil
Field
Tender No: 61000171 Page 59 of 67
FORM E PART A - BID EXCEPTIONS
(To be submitted In Commercial Bid Proposal submission with cost impact revealed.
The items must be simil ar to Form E , Part A)
Note
If Bidder cannot accept COMPANY's wording at any price, and is willing to take risk
having its Bid Proposal rejected on this basis, then Bidder must state FIRM- will not
accept COMPANY's wording at any price"in the Cost Impact column.
o ITB Reference(Section no.
Or Appendix no.)
Exact New
Wording
Proposed By
Bidder
Reason(s) For
Exceptions
Effect On The
Works(time, scope etc.)
Cost Impact(Please state cost addition or red
are to be rejected or accepted
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
63/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil
Field
Tender No: 61000171 Page 60 of 67
PART 5
FORM OF BID BOND
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
64/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil
Field
Tender No: 61000171 Page 61 of 67
FORM B1: FORM OF BID BOND
Date: []
To: PetroChina International Iraq FZE Iraq BranchDepartment of Contract, Procurement and Logistics
P.O. Box: 500486, Fourth Floor,
Building No. 10, Dubai Internet City, Dubai, United Arab Emirates
Email :[email protected]
Attn: Tender Committee Secretary
Tender title : Provision of Engineering Feasibility Study for the Construction
of a Temporary Hazardous Waste Storage Facility at Halfaya Oil
Field
Tender No. : 61000171
Subject : Bid Bond
We, [name of bank] (the Bank), hereby issue in favour of PetroChinaInternational Iraq
FZE Iraq Branch (the COMPANY) our bid bond number [], in the aggregate maximum
amount of [] (hereinafter referred to as the Bid Bond) on behalf of [insert name of
Bidder] in connection with its bid for Tender No. 61000171
We unconditionally and irrevocably undertake to pay to COMPANY, without deduction or
set-off of any kind, the above-mentioned amount upon our receipt of a payment demand inthe form attached hereto as Annex 1 (a Payment Demand) and without COMPANY
having to substantiate its demand. Partial drawings and multiple presentations are permitted
hereunder;provided, however, that the aggregate amount of such drawings shall not exceed
the amount set forth in this Bid Bond. Payment under this Bid Bond shall be made by wire
transfer of immediately available funds to the account specified in the Payment Demand.
All correspondence and any drawings under this Bid Bond are to be directed to our office at
[] (the Payment Office), attention: [] and shall mention this BidBond number [].
Our customer inquiry number is []. Our facsimile number is [].
Drawings under this Bid Bond may be by presentation of paper documents or by facsimileor other electronic communication received at our office stated above. If we receive your
complying Payment Demand at or prior to 11:00 a.m., local time in the location of the
Payment Office on any banking day, we will honour the Payment Demand and make
payment by 2:00 p.m., local time in the location of the Payment Office on the first banking
day after the day on which such Payment Demand is received. If we receive your complying
Payment Demand after 11:00 a.m., local time in the location of the Payment Office on any
banking day, we will honour the drawing and make payment by 2:00 p.m., local time in the
location of the Payment Office on the second banking day after the day on which such
Payment Demand is received. If a Payment Demand does not comply with the terms and
-
7/22/2019 1102-MOC-31-HALFAYA-24-5-ZA.pdf
65/93
Provision of Engineering Feasibility Study for the Construction of a Temporary Hazardous Waste Storage Facility at Halfaya Oil
Field
Tender No: 61000171 Page 62 of 67
conditions of this Bid Bond, we will give notice of dishonour within one banking day after
the banking day on which such drawing is received.
All drawings under this Bid Bond must be made on or before _______ [ insert the one
hundred and fiftieth day following Bid Closing Date].
Upon the Expiry Date, this Bid Bond shall become null and void, whether returned to the
Bank for cancellation or not and any cl