11 July

download 11 July

of 13

Transcript of 11 July

  • 7/29/2019 11 July

    1/13

    11 july 11

    Things done:

    1) Organisation details

    Basically 3 divisions:

    CARS- Cable accessoriesEMIP- Surge arresters, Energy meters

    CFIP- connectors and fittings, overhead line insulation.

    2) Product understanding

    Gone through the browsers and manuals available.

    CARS

    - Cable accessories for all type of cables upto 245kv

    - LV terminations- Terminations are designed for 3 and 4 core polymeric insulated

    cables with or without armour and 3 and 4-core paper insulated cables, including

    cables with reduced neutral conductor.- MV terminatios- heat shrinkable termination systems for paper and polymeric

    insulated cables up to 33kV.- HV termination- The slim, compound-free Raychem 72 kV terminations are

    suitable for indoor and outdoor use on all polymeric cables.

    EMIP

    Surge arresters

    Distribution Class Surge Arrester

    - Station Class Surge Arrester- Surge Counter with Leakage Current Indicator

    Polymeric Indoor Surge Arresters

    Energy meters

    Single phase two wire meters

    CFIP

    Connectors and fittings, overhead line insulation.

  • 7/29/2019 11 July

    2/13

    12 july 11

    Things done:Searching for live tenders available on different sites.

    Government tenders: Maharashtra govt.

    MSEDCL

    MSETCL

    Gujrat govt.

    MGVCLUGVCL

    DGVCL

    Madhya Pradesh govt.

    MPPKVVCLMPUKVVCL

    MPDKVVCL

    Power grid corp. India

    Mahavitran

    Sites:

    Indiamart

    Also searched about the product details:

    Surge Arresters

    CARS

  • 7/29/2019 11 July

    3/13

    13 th july 11

    Met Mr. Anupam AgarwalInduction plan was prepared.

    Plan1) Organisation- Raychem RPG

    2) Energy T&D Division

    3) Understanding product rangeProduct catalogues

    Presentation

    Plant visits

    4) Understand MarketMajor customer segments

    Competitors

    Alternative technologies

    5) Understanding buying patternsEnquiry

    Tender (ltd)Open Tender

    Global bidding

    6) Sales CycleInvoice

    Collections

    Statutory forms

    Bank grantee/ EMDs etc

    Customer Visit 1Godrej

    Meet 1: MSEDCL projectPurchase manager: Deepa Sharaf

    Regarding: BG pending payments

    BG given approval for clearance of pending payments.

    Discussed about the reasons for failures and difficulties caused to the customerspreviously.

    Assuring them not to repeat the things.

    Informing them about the precaution measures taken.Asking about further upcoming projects.

    Meet 2:Purchase: Mr. Umesh Kharate

    Regarding: Order enquiry

    Give proper information regarding the products.

  • 7/29/2019 11 July

    4/13

    14th july 11

    Things done:

    Gone through customer Purchase files.

    File1

    Kirloskar elec. Comp.

    1. Drawing details all dimensions2. Payment details- DD, letters

    3. Routine test , package list, BG certificate details.

    4. Invoice

    5. Dispatch details

    File 2

    S.T. Electricals

    Supply of 9kv 5kA lighting arrestor gapless with Disconnector18kv 5kA LA

    18kv 10kA Station Class LA9KV 10kA Station Class LA

    Technical particulars.

    Routine test details.

    A.B Industries

    18kv cerasafe Disribution class outdoor LA

    File 3

    Kirloskar brothers LTD

    NHPC ltd LA order9kv 5 KA LA.

    IS 3070 IEC 60099-4

    PO detailsTerms n conditions

    File 4

    LC processing against POTax invoice

    File 5BVG India

    Tax invoice

    Inspection reportsRoutine test certificate

  • 7/29/2019 11 July

    5/13

    File 6

    MPKVVCL tender11kv & 33kv LA Station type

    11kv LA Line type

    Tender study

    Gone through the presentations:

    Presentations regarding1) E T& D corporate

    2) Tarang T&D

    3) CARS detailed presentation

    Covers organization details & also information about CARS.

    Customer Segmentation

    Utilities

    Tata Reliance Torrent Bhiwadi & Guj.Goa

    Industries & Construction

    Reliance

    IOCL Grasim KEC L&T IVRCL ABB Siemens Areva

    OEMs

    ABB Siemens

    L&T Emerson CG Lucy Schneider

    Generation

    NTPC NHPC Nuclear Power

  • 7/29/2019 11 July

    6/13

    Contractors Lanco

    Bajaj electricalsRohini electricalsGodrej electricalsSunil HitechSMS infraShreem capacitorsKirloskar brothersSpace age associatesHitech electrification

    Service Providers

    PoshyaDeshmukhNene

    Competitors3M (MECP)Yamuna Power &InfrastructureElastimoldHari Consolidated

    15th July 11

    Things done:

    Customer File:

    SEW Services (EMIP)9kv 10kA SA

    12kv 10kA polymer SA

    Talk with Mr. Amol regarding the further plan in Multifunction panel meters n digitalmeter range.

    List of customers to go through study & get further information about them.

    Catalogs n information about the product or MFP.

    Initially a brief infro about the company.

    Inform them abt the products.

  • 7/29/2019 11 July

    7/13

    About the new range of our prodct.

    try and gather information about the exsisting demand

    About there purchse managerAbout there live as well as coming up projects.

    Expand the available data and information.

    Added information regarding Customer segments

    Go through the PO files.

    Got data and catalogues regarding MFP

    Study of MFP Digital meters.

    Purchase order files details:

    Gone through the Terms n conditions.

    16th

    July 11Gone through the Purchase oder file.

    19th July 11

    Had a talk with Amol Karnik regarding the further planning of MFM.

    Got the list of panel building people.Initial get information regarding their current data and give information about the

    product.

    Get information about their current projects or any small projects they can offer us.

    Also saw a reliance auction.

    Understood how offer letter and read price list from Mr. Sanjay

    20th July 11

    Customer Visit 2:

    (CFIP)

    Visited Petron engg construction. Met Mr. Somya Mujumdar.Regarding the NTPC product delivery.

    Also tried to get information about upcoming tenders.

    (CFIP)

    Customer visit 3:Visited Sterling and Wilson for details regarding further upcoming tenders.

    Met Mr. Pramod Singh Sr. Manager in Purchase.

    Also prepared offer letters.

    21st July 11

    Prepared offer letters.

  • 7/29/2019 11 July

    8/13

    Gone through catalogues.

    Prepared introduction letter for digital meters.

    22nd July 11

    Read catalogues.

    Went to HO planned about future programs.1) Sales policy

    2) Dealer agreements

    3) Channel management

    4) Customer segments5) Market intelligence

    6) Polices & processes

    7) Oracle OM

    8) Go through last 3 quarter MIS9) Meet local channel partners.

    What business are they in?

    What support are they getting from our sales force?

    Their expectations from us?

    How they can keep in business development.10) Competition

    Product categories

    Benchmarks.11) Identify

    Drivers of our business

    What needs to be strengthened12) Capture voice of individual employees for

    Business challenges

    Managerial support

    Planning & execution mechanism

    13) Study oracle work environment at thane office

    +ve

    -ve

    14) Prepare a 30 mins business ppt at the end of 2 months.

    25th July 11

    Gone through Sales policy.Dealer agreement.

    Catalogues.

    Sales Policy:

  • 7/29/2019 11 July

    9/13

    26th July 11

    Made offer letters on Raychem RPG Limited enquiry and walingo enquiry.

    Customer Visit 4:

    ETA engineering.ONGC project is given to them.

    So discussion for up coming projects and order.

    27th July 11

    Competitors Study.

    1) Denson: Yamuna Cable Accessories Pvt. Ltd. (YCAPL) an ISO 9001-2008 certifiedCompany, specialising in Development, Manufacturing & Marketing of Cable

    Accessories, Heat Shrink Cable Joints, Heat Shrinkable Tubing, Pre-MouldedSlip-On, Cold Shrink Joints, Cold Shrink Tubing, Resin Pour, Tapex and all

    Types of Cable Jointing Accessories upto 400 kV. Our Pow er Cable Accesories

    products and Telecom Jointing products find application in Power Distribution,Electrical Insulation, Telecommunication & other tailor made solutions in similar

    industries & applications.

    2) HEX house

    Cable Terminal EndsConnectors

    Crimping Tools

    Brass Cable Gland Kits & Accessories

    3) ABB CABLE ACCESSORIES

    High voltage cable accessoriesConnectors, joints and terminations

    for 52-420 kV.

    LOw voltage cable accessories

    Connectors, joints and terminations up to 1 kV.Medium voltage cable accessories

    4) 3M Cable accessories3M Cold Shrink technology has been used by the power industry.

    66 KV Cable Accessories

    110 KV Cable Accessories132 KV Cable Accessories

    5) Brass cable accessories.

    6) Compaq International

    http://www.yamunadensons.com/heat-shrinkable-tubing.phphttp://www.yamunadensons.com/heat-shrinkable-tubing.phphttp://www.hexworldwide.com/cable-terminal-ends.htmlhttp://www.hexworldwide.com/connectors.htmlhttp://www.hexworldwide.com/crimping-tools.htmlhttp://www.hexworldwide.com/brass-cable-gland-accessories.htmlhttp://www.yamunadensons.com/heat-shrinkable-tubing.phphttp://www.hexworldwide.com/cable-terminal-ends.htmlhttp://www.hexworldwide.com/connectors.htmlhttp://www.hexworldwide.com/crimping-tools.htmlhttp://www.hexworldwide.com/brass-cable-gland-accessories.html
  • 7/29/2019 11 July

    10/13

    Heat Shrinkable Termination Kits

    Heat Shrinkable Straight Through Joints

    Heat Shrinkable TerminationsHeat Shrinkable Transition Joints

    Heat Shrinkable Single Core Cables- 11/12KV, 22/24KV, 33/36KV Single Core

    Heat Shrinkable Power Cable Accessories-Composite Polymeric Insulator- 11/12KV, 22/24KV, 33/36KV, 45KV & 66KV.

    28th July 11

    Offer letter and authorization & manufacturing letter.

    29th July 11

    Market intelligence basically deals with the market study.

    The types of customers in market. The demand of the product requirement in the

    company.The area of product procurement we would get through each company ie the

    scope of different companies.The competition we have in industry.

    Order booking on oracle.Start going with the customers.

    Startup with Energy meters. Would call up and add up with the data base.

    Start meeting the customers and inform them about the products.Tender notices.

    Point 12) Drivers or factors of our business are:Brand name Raychem RPG

    A mutual collaboration which helps

    Quality of the product.Standard set my our company.

    What needs to be Strengthen:

    Regarding:13.7.11 work

    Sales cycle:

    InvoicingCollections

    The collection of money after the supply within the duration of receipt.

    Statutory formsThe tax given to the government.

    Bank grantee/ EMDs money deposits.

    1st Aug 11

    http://www.compaqinternational.com/shrinkable-termination-kits.htmlhttp://www.compaqinternational.com/shrinkable-joints.htmlhttp://www.compaqinternational.com/shrinkable-termination.htmlhttp://www.compaqinternational.com/heat-shrinkable-products.htmlhttp://www.compaqinternational.com/heat-shrinkable-single-core-cables.htmlhttp://www.compaqinternational.com/shrinkable-power-cable.htmlhttp://www.compaqinternational.com/composite-polymeric-insulator.htmlhttp://www.compaqinternational.com/shrinkable-termination-kits.htmlhttp://www.compaqinternational.com/shrinkable-joints.htmlhttp://www.compaqinternational.com/shrinkable-termination.htmlhttp://www.compaqinternational.com/heat-shrinkable-products.htmlhttp://www.compaqinternational.com/heat-shrinkable-single-core-cables.htmlhttp://www.compaqinternational.com/shrinkable-power-cable.htmlhttp://www.compaqinternational.com/composite-polymeric-insulator.html
  • 7/29/2019 11 July

    11/13

    Called the list of panel builders.

    Questions came infront are:

    1) Whats the prices you offer and the discount structure?2) Who is your dealer?

    3) Is your product approved?

    A1)The price depends on the quantity of order. We would certainly give proper

    discount to you.

    A2) Presently we are not with any dealer. The transactions will be direct.A3) No presently our product is new . So we will need your help for its approval.

    2nd Aug 11

    Send mail ie introduction letter & catloges to all the people with positiveresponse.

    Called further customers.

    3

    rd

    Aug 11Call further panel builders. Gathered infro.

    Catlogs and intro mail letters send.

    Mostly the energy meters used are:

    L& T metersHPL meters

    4th Aug 11

    Prepared offer letters of Jaypee Rohini order.Catalogs & letters to panel builders.

    Further Kaman plans.

    Product management group to study regarding the product details.

    5th Aug 11

    Kaman visit.

    Saw assembly if kits.

    Product gallery.

    8th Aug 11

    Meeting

    Presentation on CARS.

    Feedbacks & corrections in CARS ppt.

    Find regarding several questions.

    Meeting regarding further planning.

    List of consultants in Mumbai making cable joint and terminations.

  • 7/29/2019 11 July

    12/13

    9th Aug 11

    Customer visit 5)

    Dealer visit Spectra Solutions.Mr.Sameer Nadkarni

    Mr. Jigar Punjabi

    Talk about general CFIP introduction. Office is at Goregaon Outlet is in Vasai.Spectra Customers:

    Siemens

    ABB pvt NashikVedantta

    Tata

    10th Aug 11Im office.

    Gone through intranet data of cable accessories.

    Met Mr. Himanshu Sharma.

    Have design study details initially.

    11th Aug 11Dealer Visit:

    Nene

    Regarding there problems & introduction.

    12th Aug 11

    Office

    Open order shipment plans.Talked with Mr. Slany & Mr. Pradeep Godse.

    16th Aug 11

    Tuesday

    In office

    Aker price scheduleDone with ppt.

    Made a list of power cable consultants.

    17th Aug 11

    Office

    Made & submitted offer letters.Mahindra & Aker enquiry.

    S.K enterprises enquiry of Nene.

    18th Aug 11

    Gathering information regarding several enquiries received.

  • 7/29/2019 11 July

    13/13