B.Tech (Pass) Mechanical Level/Temperature/Flow Control Trainer SECOND TERM TECHNICAL PROJECT (TP-202)B.TECH (PASS) MECHANICALBATCH (2013-14)
LEVEL/TEMPERATURE/FLOW CONTROL TRAINER
GROUP MEMBERS: ROLL NO1. MUHAMMAD ALAMGIRMP-130132. AZMAT-UL-ALLAHMP-130053. BASIT NISARMP-130064. AHMED ALIMP-130045. MUHAMMAD HASSANMP-130156. MUHAMMAD MANNAN RAFIQMP-13017
SUBMITTED TO:MR.BABAR SAYEED(PROJECT ADVISOR)
PCSIR- PAK SWISS TRAINING CENTRE KARACHIAFFILIATED With N.E.D University of Engineering & Technology University Road, Karachi - 75280
TABLE OF CONTENTSSR.#DESCRIPTIONPAGE NO
1Introduction1
2Main diagram of the Trainer2
3Level/Temperature/Flow Control Trainer Main Elements3
4A Main Frame:4
4.1Mild steel.4
5The Main Tank7
6A Dual Process Tank10
7Centrifugal pump13
7.1Centrifugal pumps work14
7.2Basic Components15
7.2.1Impeller15
7.2.2Vanes of Impeller15
7.2.3Eye of Impeller15
7.2.4A single-Suction15
7.2.5A Double-Suction15
7.3Magnetically coupled pumps16
7.3.1Advantages16
7.3.2Disadvantages17
7.3.3Principle of operation17
TABLE OF CONTENTSSR.#DESCRIPTIONPAGE NO
7.4Priming17
8Rota meter18
8.1Advantages19
8.2Disadvantages19
9Solenoid valve21
9.1Operation21
9.2Components22
9.3Structure.25
9.4Materials25
9.5Types26
9.6Common uses26
10Temperature sensor RTD PT10027
10.1Function29
10.2Advantages29
10.3RTDs vs Thermocouples30
11Analogue/ bimetallic strip Temperature Meter31
11.1Applications31
12Proximity Sensor34
12.1OPERATING PRINCIPLES35
TABLE OF CONTENTSSR.#DESCRIPTIONPAGE NO
12.2Photoelectric36
12.3Magnetic36
12.4Outputs:37
12.4.1DC Voltage 3& 4 wire DC37
12.4.2Analog & Linear:37
12.4.3NPN Output:38
12.4.4PNP Output:38
13Glass Immersion Heaters39
14Pipes Of PVC40
14.1Materials used40
14.2Applications40
14.3Components of Plastic Pipe Systems41
14.4Physical properties Of PVC:42
14.5Mechanical properties:42
14.6Thermal and Fire properties:43
14.7Electrical properties:43
15Electrical Panel of Level/Temperature/Flow Control Trainer:44
16Power Supply.46
16.1DC power supply.46
TABLE OF CONTENTSSR.#DESCRIPTIONPAGE NO
16.2AC-to-DC supply47
17Breaker49
17.1Operation.49
18Indication Blub.52
18.1LED display ac line indicator circuit53
19Electronic Temperature Controller54
19.1Features & Specifications:54
20Relay.57
20.1Basic design58
21Switch.59
21.1Detent Switch59
22Connector Strip60
22.1Description60
22.2Multiway versions60
22.3Applications60
23Wire62
23.1Colour code62
23.2Cables62
23.3Copper conductors64
PROJECT CERTIFICATION
It is certified that batch (2013-2014) of B-Tech (pass) comprising the following members:
1. MUHAMMAD ALAMGIRMP-130132. AZMAT-UL-ALLAHMP-130053. BASIT NISARMP-130064. AHMED ALIMP-130045. MUHAMMAD HASSANMP-130156. MUHAMMAD MANNAN RAFIQMP-13017
Has successfully completed the assigned task of fabrication of Level/Temperature/Flow Control Trainer under the supervision of Mr. Babar Sayeed.
Mr. Babar Sayeed(Project Advisor)
Engr. Ejaz Hussain Khan (Director of PSTC, Karachi)
PREFACE This project is prepared to provide knowledge about control of flow, level and temperature of liquid stored in tank. After completely studying the report and working on training module. He/she can easily understand about controlling the rate of flow, level and temperature of water under prescribed conditions. The process unit and the control loops used in measuring experiments for level, flow and temperature are described in detail.The monitoring and control of level, temperature and flow of liquid are an integral part of most of the processes in industry. The project Level/Temperature/Flow control Trainer is an effort to introduce the measurement, monitoring and control of level, Temperature and flow by means of a simple trainer utilizing water as a medium.The characteristics and term have been described from basic, making it easy for reader to understand the technology and the components used in the project.The project report is well illustrated by drawing and images to make it easier for the reader to understand.We hope that the short comings may be waived helping in view that project and report was completed in a short period of time. ACKNOWLEDGMENT
All praises and thanks to Almighty ALLAH. The lord and creator of this universe whose power and glory all things are accomplished. He is the merciful, who bestowed on us the potential, ability and an opportunity to work on this project.Our first experience of project has been successfully, thanks to the support staff of many friends & colleagues with gratitude. We wish to acknowledge all of them. However, we wish to make special mention of the following.First of all we are thankful of our project advisor Mr. Babar Sayeed under whose guideline we were able to complete ourproject. We are whole heartedly thankful to him for giving us hisvalue able time, attention and for providing us a systematic way for completing our project in time.We express our special thanks to honorable Engr. EjazHussainKhan (Director of Pak Swiss Training Centre Karachi) for extending his good support. We are thankful to our institute and all our faculty members without whom this project would have been a distant reality. We are also appreciate and thankful to our family for their moral and monetary support.
LEVEL/TEMPERATURE/FLOW CONTROL TRAINER
After complete fabrication pictures
PCSIR-Pak Swiss Training CentreNED University of Engg. & Technology