Transcript of 1 1 Xodus Develop Presenter / date if required.
1
www.xodusgroup.com
1
Xodus Develop
Presenter / date if required
2
Xodus DevelopWhat we do
Identifying and defining optimal concepts that create value and achieve business goals
Appraise / Select (Concept Screening)
> Understand opportunity, look wide
> Understand uncertainties
> Identify at least one feasible concept across TECOP
> Identify decisions for development
> Identify major risks> Field redevelopment /
re-engineering
Concept Select
> Evaluate all concept decisions and select optimum concept
> Optimum concept is not just technical, but optimum across TECOP
> Evaluate major risks
Gooddefinition
Va
lue
APPRAISE / FEASIBILITY
Feasibilitydecision
OPTION ID / SELECTION DEFINITION EXECUTION OPERATION
Conceptdecision
Investmentdecision
Poordefinition
Poor execution
Good execution
Poor execution
Good execution
33
Development PlanningXodus Develop
Surfacedisciplines
Subsurfacedisciplines
Economics
Wells Commercial
Operations
HSSE Construc-tion
Contracts& procure-
ment
We are the first – and currently only – specialist consultancy with integrated wells, surface and subsurface expertise
4
Xodus DevelopOptimising Business Value
TECOPUncertaintiesto Realisation
Decisions to Concepts
Decision MakingObjectives
5
Xodus DevelopOptimising Business Value
> Gain common understanding of opportunity
> Identify decisions and options for development
> Understand uncertainties> Identify one feasible concept across
TECOP> Identify major risk areas
Brownfield – DPP weight increase – threat
DPP and jacket
Brownfield
T&I
PM
LQ module
PLQ refurbishment
T&I – barge / SV required for pipeline removal – threat
Sale of IDD
T&I – protracted seabed debris removal – threat
0.66
0.39
0.16
0.13
0.12
0.06
0.03
0.02
0.02
0.01
Total project cost including risk (regression coefficients)
TECOPUncertaintiesto Realisation
Decisions to Concepts
Decision MakingObjectives
6
Objectives TECOPUncertaintiesto Realisation
Decisions to Concepts
Decision Making
Xodus DevelopOptimising Business Value
Subsurface, surface, infrastructure, operability, availability, HSSE…Technical
Lifecycle costs, NPV, IRR, cash sink…Economical
C&P, legal, financing, sales agreements, tariffs…Commercial
Resources, competencies, interfaces…Organisational
Government, communities, NGOs, regulation, employment…Political
7
Xodus DevelopOptimising Business Value
Identify key uncertainties> Assess data> Bracket uncertainties
Define realisation> Deterministic stringing of subsurface
uncertainties> Subsurface modelling to quantify impact
Objectives TECOPUncertaintiesto Realisation
Decisions to Concepts
Decision Making
Allocated chance factor (subjective) 15% 30% 40% 15%
Parameter IV V II I
Frac network development Excellent Excellent Average Poor
Matrix support to frac system Poor Good Poor Poor
Aquifer support to frac system Good Good Poor Poor
Initial well productivity High High Base Low
Pressure decline Low Low Medium High
Well decline Low Low Medium High
Water production Early Base Late Late
Gascap forming None None Early-ish Early
Timing of ESP requirement Base Base Early-ish Early
Timing of secondary recovery Late Late Early-ish Early
8
Xodus DevelopOptimising Business Value
> Identify development concepts (or strategies)
> Identify key decisions and options> Define concepts> Conduct specific assessments / studies:
operations, safety, environment, flow assurance…
Objectives TECOPUncertaintiesto Realisation
Decisions to Concepts
Decision Making
Strategy
Key decisions
Water injectionOil and gas processing Plateau Ramp-up rate
Reference
200 kbwpd plus expansion as required
Decentralised (east-west) 400
2 trains per year
Aggressive400 kbwpd from start
Central (+ degassing stations) 600
4 trains per year
Cautious
No water injection from start, install as required
Decentralised (east-west) 200 1 train per year
9
Xodus DevelopOptimising Business Value
Concept select phase> Identify concept select and group decisions> Decision based study plan
Frame decisions upfront> Options, givens, assumptions, uncertainties> Decision dependencies> Selection criteria> Specific work plan
Outcome> Options selected> Risks with mitigations
Decision Making
Decision 4
Decision 3
Decision 2
Decision 1
Assumptions
Givens
Uncertainties
Selection criteria
Givens
Risks
Decisions can be interconnected or
dependent
Objectives TECOPUncertaintiesto Realisation
Decisions to Concepts
10
Xodus DevelopKey People
Stuart BarrField Development
> 30+ years’ experience> Extensive development
planning experience in a wide range of international locations and project types
James McAreaveyField Development
> 19+ years’ experience> UKCS experience focused mainly
on West of Shetland, Central North Sea and Southern North Sea
> International experience in Norway, North Africa, India and Australasia
Kent MasseyProject Management
> 20+ years’ experience> Design, operations and
management experience in both upstream oil and gas and downstream refining and petrochemical industries
11
Xodus DevelopKey People
Andrew SewellSubsurface
> 23+ years’ experience> Experience includes project
management, seismic survey design, geophysical operations management, seismic data processing and supervision
Caragh McWhirrProcess and Facilities
> 13+ years’ experience> Broad and multidisciplinary
technical base, covering study management, process and safety engineering
Harry van ElkProcess and Facilities
> 22+ years’ experience> Expertise covers all phases in the
development of oil and gas fields
1212
Global ExperienceXodus Develop
Development experience in
Canada . The AmericasEurope . FSU . Middle-EastAfrica . Asia
13
BG Norge, Jordbær (Knarr) Development, Norwegian North Sea
Field Development
Concept select phase for full field development, followed by full facilities and SURF pre-FEED engineering
Xodus DevelopGlobal Experience
Project scope> Concept screening / selection (multiple green / brownfield options)> Pre-FEED (multi-discipline engineering, HSE, risk, cost +/- 25%,
schedule L2)> FEED design reviews (topsides, subsea)
Key features> Flow assurance philosophies> Subsea / drilling architecture optimisation> High design P&T subsea> Riser configuration selection> Hull design for severe metocean conditions> Topsides optimisation (process, layout)> Conceptual QRA and environmental BAT demonstration
14
Gulf Keystone, Shaikan field, Kurdistan region
Field Development
Conceptual field development and FEED, integrated subsurface and surface development
Xodus DevelopGlobal Experience
Project scope> Business drivers and development strategies> Subsurface realisations> Development concepts > Development scenarios> Costs and schedules> Risks> Constructing associated cost and production profiles for commercial
analysis
Key features> Giant carbonate oil field> Early stages of appraisal > Unknown long term production characteristics> Optimise appraisal and production from EPS> Full field development planning
Kurdistan region
Shaikan field
15
Maersk Oil, Dunga field, Kazakhstan
Asset Redevelopment
Developing a solids management strategy to support 140 new production and WI wells
Xodus DevelopGlobal Experience
Project scope> Gathering network modelling and benchmarking – hydraulics / wax
deposition> Design of solids separation and treatment plant> Existing plant benchmarking and debottlenecking> Design of new separation trains, gas compression system, LPG plant,
WI treatment plant> Identify and solve existing operating problems (scale, wax deposition,
reservoir souring H2S)
Key features> Complex waxy fluid characterisation and thermal hydraulic modelling > Review of existing operations and documentation (including site
evaluation)> Plant integrity and materials review> Plant safety system upgrade to international best practice> Brownfield / greenfield interfaces and modification planning> Extensive debottlenecking analysis of existing processing facility
16
Talisman, Auk South, UK Central North Sea
Asset Redevelopment
Extending and refurbishing existing drilling facility
Xodus DevelopGlobal Experience
Project scope> Field development options> Piping and layout> Process system design> Structural topsides and jacket concept design> CAPEX cost and weight estimates> 3D design> Risk and reliability analysis
Key features> Integrated multidiscipline team offering a complete development
solution> Close client liaison> Risk / reliability / cost analysis using in-house tools> Preliminary sizing of major equipment> Layout, costs and weight estimating demonstrated option feasibility
17
Talisman, Auk South, UK Central North Sea
Risk and Uncertainty Management
A cost / schedule risk analysis using our Value, Decision and Risk Management (VDRM) approach
Xodus DevelopGlobal Experience
Project scope> Generation of project risk register> Quantification of background risk and uncertainty> Combine risk and uncertainty – cost and schedule risk analysis
Key features> Clear indication of project risk drivers> Definition of confidence levels for project costs and completion dates> Ability to set appropriate levels of contingency
18
Confidential client, Nigeria
Asset Redevelopment
Integrated surface and subsurface, multi-block, multi-field redevelopment
Xodus DevelopGlobal Experience
Project scope> Reserves estimation> Well planning> Facilities redevelopment> Multi-block / area redevelopment strategies> Field development plans for each field
Key features> Existing plant debottlenecking> Design of new production trains, gas compression system > Water and gas management> Review of existing operations and documentation (including site
evaluation)
100 km
ENUGUBENIN CITY
WARRI
PORT HARCOURT
NIGERIA
BRASS RIVERTERMINAL
BONNYTERMINAL
CALABAR
QUA IBOETERMINAL
N
FORCADOSTERMINAL
OWERRI
19
Lamu Oil and Gas Ltd., Kenya, block L1
Frontier Exploration
Our experienced and knowledgeable team reacts quickly and advises on appropriate strategies for exploring a frontier block in a timely fashion
Xodus DevelopGlobal Experience
Project scope> Play concepts to be targeted for exploration> Review of regional geology and analogues > Interpret legacy seismic data and tie with gravity, magnetics and wells> Identify contractors for seismic operations> Create ITT documents> Bid evaluations, negotiations and contractor management> 2D seismic design and parameterisation> Overall supervision of field operations> Processing supervision and QA / QC> Seismic interpretation and geological modelling> High grading of basin areas (basin modelling)> Lead and prospect generation> Exploration well proposal
Key features> Complicated rift and inversion geology> Poor quality legacy data (seismic and wells)> Sparse data and lack of well control> Poorly understood petroleum system> Logistically challenging area to acquire new data> Time pressure from government as per PSC terms
20
www.xodusgroup.com
20
Thank you