1 UCI Information Systems May 2005. 2 Vision Easy to use Web based Modular design Platform for...
-
Upload
loren-gardner -
Category
Documents
-
view
214 -
download
2
Transcript of 1 UCI Information Systems May 2005. 2 Vision Easy to use Web based Modular design Platform for...
1
UCI Information SystemsUCI Information Systems
May 2005May 2005
2
Vision
• Easy to use
• Web based
• Modular design
• Platform for Quality and Process improvement
• An information tool for all employees
A common integrated system for Umicore Canada information management
Turn “Data” into “Information”
3
IS Approach
Development of Information Systems…
• Driven by Need• Efficiency – must have
• Productivity Improvement – must be an outcome
• Payback – must be reasonable
• Integration – systems must be linked where applicable
• Universal – data must be accessible to all users world-wide
4
Demo Systems
• LIMS – Lab Information Management System
• Order/Shipping System
• Customer Feedback / Complaints
• CRM – Customer Relationship Management
• PIMS - Production Information Management
• A/I – Accident / Incident Management
• Improvement Ideas / Internal Feedbacks
5
LIMS Situation 1998
• Analytical Costs Too High• Staff 10
• 6,000 analyses per year
• Efficiency Low
• Data Errors about >30 per month
6
Custom vs. Package
UCNet
• Customer service focus
• Integration with PIMS, SPC and other business units
• Web based
• Turnaround performance measurement
• Seamless implementation
• Low administration
Typical Off-the-shelf
• Lab mgmt. focus
• Extra development required to add desired features
• Lengthy implementation
• High administration
7
LIMS Features
• Specifications built in
• Automated product certification
• Analytical test procedures built in
• Calibration and maintenance schedules
• Announcements
• Automated SPC runs
• Web based – access anywhere
• Automated customer billing
8
Options available are based on role permissions
Main Page Announcements
Tasks & Appointment
s
9
Announcements for new or revised
procedures
Analytical Lab activity, performance,
certifications due to expire, etc.
10
11
View “Submitted”, “In Progress”, or “Completed”
samples
View details on individual samples
12
Track performance
Results available when tests
approved…no waiting for all tests for the sample to be
complete
13
Links to instrument output
files
14
LIMS Situation 2003/04
1998 2003/04
Staff 10 5
Analyses per year 6,000 23,500
Total analytical cost (per year) 100% 50%
Cost per analysis 100% 21%
Errors per month >30 ~7
15
Order/Shipping
• Need to Improve Customer Service
• Productivity Low
• Errors High
• Stock Levels High
• Containers Not Full
16
Manage Production
and Customer
specs.
17
Track Approval
s
18
Search inventory for lots that meet customer
specs.
19
Shipping documen
ts automate
d
20
Ability for Umicore Sales Offices to enter and view orders for their offices entering
test phase
21
Order/Shipping
• Productivity Up
• Containers Filled: 20 for 228t vs. 21 for 295t
• Freight Costs: Dropped by 22%
• Air freight the same
22
Customer Feedback
• Need to Improve Customer Service
• Numbers of Complaints provides only one view
• Quantify the Types of Complaints
• Track the “Price of Non-Conformance”
23
24
$0.00
$10,000.00
$20,000.00
$30,000.00
$40,000.00
$50,000.00
$60,000.00
Warehouse/Shipping
Packaging Contamination
Feedbacks - 2004
25
iTrak® CRM
• Need to manage our Customer Relations
• Application Managers unable to satisfy Customers
• Need to manage our “Sample” process
26
27
28
PIMS
• Need to understand Real Time Production Information
• Improve Supervisor Productivity
• Ensure Operators Read Instructions
• Need to Define the Controllability of the Process
• Need for Product Traceability
29
30
31
PIMS and LIMS data
available for Pivot Table
ad-hoc analysis
32
Product Quality
Statistical Process Control
Lab Control Charts Production Control Charts
All Density (True, Tap, Apparent)Combustion (C, S, O)Fisher NumberICP/AAMoistureParticle Size DistributionSurface AreaXRD
All Density (True, Tap, Apparent)Combustion (C, S, O)Fisher NumberICP/AAMoistureParticle Size DistributionSurface AreaXRD
Current in-house standards for all products
Cycles and Lots for all Applicable Products
33
34
Accident/Incident System
• Need to Simplify the Accident/Incident Data Collection Process
• Need to analyse and identify trends to turn “Data” into “Information”
35
36
Internal Feedbacks
• Need to track non-conformance of Raw Materials and Umicore products with standards
• Need to manage internal change requests and related actions
• Handle changes that are accepted “improvement ideas” that can be implemented without defining a project.
37
Improvement Ideas
• A vehicle to encourage the communication ideas for improving processes and practices
• Need to systematically review and analyse ideas
• Starting point for project management
38
UCNet
AccidentIncidents
N/C
Mgmt.
OrderShipping
iTrak®
CRM
PIMS
LIMS
Doc Mgmt. & Admin
39
Future Considerations
• Extend Sales/Shipping to allow Umicore Sales Offices to place and inquire on orders
• Automate month-end plant reporting
• Integrate instruments with LIMS system
• Integrate plant equipment with PIMS system.
• Key Performance Indicator management system
• Online help/training systems
• Umicore Canada Intranet Portal
40
Thank you