Reliability Engineering along the PEP
RG1
Processin PDP
ReliabilityGates RG2 RG3 RG4
Develop/Select TestsHALT
Engine (and Vehicle-) Tests @ BoschValidation @ Customer
HASSDurability-Tests
V E R I F I C A T I O N V A L I D A T I O N S E R I E S
FIE Test /
RG0
Pressure Pulsation-/Temperature-/Vibration-TestsDurability-Tests
Develop RealizeProduct/ Product / ProcessProcess
RampUp
SeriesProduction
PB4 PB5PB2 PB3
DevelopProduct/Process
DevelopProduct/ProcessConcept Platform Project
PB0
Customer Project
A-sample B-sample C-sample series
Select Product/ ProcessConcepts
AssessProductIdeas
PB2PB1PB0PBAPA
ProvideCustomerOrder
pre-series
Test Plan B-Sample
Test Plan C-Sample
.DefinePV
Define relia goalsTest PlanA-Sample
Carry Out TestsB-Sample
Carry Out TestsA-Sample
ValidationC-Sample (+ D)
QZ-TestsQualifying Tests(for concepts)
DS/ETM | 7/12/2005 | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.