1 REALTIME REUTILIZATION ASSET MANAGEMENT William Rhodes RRAM Program Manager Naval Supply Systems...
-
date post
19-Dec-2015 -
Category
Documents
-
view
216 -
download
3
Transcript of 1 REALTIME REUTILIZATION ASSET MANAGEMENT William Rhodes RRAM Program Manager Naval Supply Systems...
1
REALTIME REUTILIZATION ASSET MANAGEMENT
William Rhodes RRAM Program Manager Naval Supply Systems Command Phone 717 605-6607 (DSN 430)
Ready. Resourceful. Responsive! 19 Jun 02
2
Agenda
Background
Description
Composition
Warehouse Management (WM)
Virtual Management (VM)
RRAM Today
Summary
3
Background: Goldpiles
Originally Residual Asset Management System (RAM) - 1995
Created to manage “Gold Piles”
Reengineered using LAWSON Insight - 2000Renamed Reengineered RAM (RRAM)
efficiently manage warehouse
Expanded to accommodate new business processes - 2002
Restricted InventoriesVirtual Inventories
A new name came with the expansionRealtime Reutilization Asset Management (RRAM)
No Billing or Financial Transactions
4
Background: TAV
Provide Total Asset Visibility (TAV)Comply with Government Performance Results Act (GPRA - Congress)
Achieve DoD Logistics Strategic Plan
100% TAV by FY06
Accomplish TAV per NAVSUP Strategic Objective 5.5.06
5
Description: Technology
Mid-Tier (Client-Server)Thin Client
Relies on Internet Connectivity
Web Page Access and Visibility
Linear Barcode Capability Today 2D Barcode Capability by 30 SEP 02
Supports DOD PKI Security
6
Description: Visibility
Offset ICP Procurements via IM Toolkit
Offset ICP Backorders via Flashpoint
“A” Purpose “A” Condition Requisition Processing via CPEN/VMSIR
Offset DLA Procurements/Backorders via DZE Processing
Visibility is not equal to Accessibility
7
Composition: RRAM
Free Issue Restricted Issue
W arehouse M anagem ent
Sponsor O w ned Material Shipyard Material
V irtual M anagem ent
RRAM
8
Composition: WM – Free Issue
Residual M aterial Excess Material
Free Issue
SOM Foreign M ilitary Sales
Sponsor Owned Material
Sea W olf
Closed Com m unity
Restricted Issue
W arehouse M anagem ent
RRAM
9
Business Rules: Free Issue
Centralized database at DECC, Chambersburg
Sites operate as remote warehouses
Assets currently include all Navy Cog and 9 Cog Material
Only Ready for Issue (RFI) material available for CPEN/VMSIR
No NAVICP capitalization of assets
IPG II & III requisitions screened (Limited IPG I)
Screening limited to Fleet and NAVSEA SCN and TOB Requisitions
RRAM assets screened first, wholesale/retail second
Requisitions processed as Free Issue using “BN” status
No backorders established in RRAM
10
Business Rules: Free Issue
$100 threshold for cross country referralsDD-1348-1 Standard issue/release/receipt documentRealtime posting of receipts and issuesInventory accuracy responsibility resides with ownerSubstitutability and Interchangeablity applicableNo Special Handling Material (HAZMAT, Shelf Life)No RODs, QDRs limited to Category I OnlyLimited carcass tracking of DLRsRRAM assets screened daily against IM Toolkit requirementsConsumables excessed after 12 Months of no issue activityDepot Level Reparables excessed after 24 months of no issue activity
CPEN Referral Rules
IPG IIPG II(Air eligible)
IPG II & III
CONUS
Navy Wholesale
Consumer (9-Cog)
*RRAM* ICP
* RRAM* ICP
*RRAM* ICP
* CRIF Site* POE FISC* RRAM* VMSIR* IMM
* CRIF Site* POE FISC* RRAM* VMSIR* IMM
* RRAM* POE FISC* VMSIR* IMM
11
12
Metrics: Free Issue
As of 31 May 200211 Sites with combined inventory of $795M
Over 6,000 requisitions per month @ $7.4M
FY02
Free Issues 52M
NAVICP MTIS Credits $7.2M
DLA MTIS Credits $5.5M
Web Page Hits 120,459
13
RRAM: WM – Restricted Issue
Residual M aterial Excess Material
Free Issue
SOM Foreign M ilitary Sales
Sponsor O wned Material
Sea W olf
Closed Com m unity
Restricted Issue
W arehouse M anagem ent
RRAM
14
Business Rules: Restricted Issue
All Material VisibleDZE Processing against ‘A’ Condition NSN material only
Owner Maintains ControlDetermines what material is accessible
Material not Capitalized into NWCF/RRAM doesn’t load ICP MDF
Owner Determines if/where credit appliedDLA pays acquisition price plus 5.5% for PO
DLA pays standard price plus 5.5% for LR
FT Processing Available
Price Negotiable
Asset UsagePer DoD 4140.1R (Super Reg), assets above RO are available to satisfy any priority requisition or Procurement Offset via MRP
Assets Below RO only used to fill IPG 1
Same service or reciprocating service only
15
Status: Restricted Issue
SOM PilotOrange Park, FL (NAVAIR) 4/02
Inventory of $547M
16
Composition: Virtual Management
Free Issue Restricted Issue
W arehouse M anagem ent
Sponsor O w ned Material Shipyard Material
V irtual M anagem ent
RRAM
17
Composition: VM
Why VirtualWarehouse Management System in use
Global Asset Visibility Required
Inventory Owner ProvidesList of NIINs
Desired Action Code
Daily Updates
RRAM ProvidesProcesses DZE Queries against NIINs
Submits FTE/DZF to DLA
18
RRAM: Virtual Status
NAVSEA Site at Crane, INPilot Implemented 3/02
SPAWAR Site at San Diego, CAPilot Targeted for 9/02
RRAM Warehouse Sites
Puget Sound
San Diego
North Island
Portsmouth Chesapeake
NAVAIR ISSP
CSCRAMPPWP-CForce ProtectionNEWCONLHD-5ISSE-ChesapeakeHelmets/Vests
Orange Park, Fl
WRRMPPERA CV
SRF YokosukaSRF Sasebo
FISC Pearl Harbor
RMMS-ESURFLANT
SCRAMP-EASTSUBRATS/SUBLANT
PWP-PNEWCONAN/SQS 56
El Centro
Ship Repair
SEAWOLF
Ingleside, TX
North Kingstown
SOM
Crane, IN
VSOM
20
RRAM Today: Performance
Ability to screen RRAM from 12 warehouses and 25 inventories
Web Browser provides access
95 NAVAUD Estimated $400M in excess assets…today there is $1.3B Inventories
$795M Free Issue$545M Restricted Issue
Metrics5,377 free issue requisitions were filled for May 02$7.1M free issues made in May 02182 CASREPS were filled in May 02$7.8M sent to DRMO
21
Summary
RRAM contributes to Navy TAVProves COTS can operate in a legacy Navy environmentProvides high cost avoidance to fleet, NAVICP and DLA
Enhances visibility while safeguarding accessibilityRRAM – Not just free issue anymore!