1. Overview of Neighborhood Recreation
Improvements Strategy
2. Field Permits
3. Completed Improvements
4. Upcoming Improvements and Coordination
Agenda
2
Phased ESCR Construction
DRAFT – NOT FINALAreas under construction during Phase One
3
4
Permitting and Related Improvements
5
Phased ESCR Construction
OPEN PHASE ONE
• 2 Softball Fields
• 1 Mini-Soccer Field
• 12 Tennis Courts
• 2.5 Basketball Courts
• 2 Volleyball Courts
Areas under construction during Phase One
DRAFT – NOT FINAL
6
New Turf Sites for Permits
New Turf at TanaheyB
efo
reA
fte
r
• Tanahey - Completed
• Robert Moses
• St Vartan
• Peter’s Field
7
Moveable Solar Field Lights
• Coleman
• Corlears Hook
• Sara D
• Columbus
• Chelsea Park
• Baruch Field
8
Non-Parks Fields: DOE
Murry Bergtraum George Washington
9
Non-Parks Fields: Governors Island
Governors Island Fields
10
Permit Accommodations
Baseball at East River Park
To request Permits & see availability, visit:
nycgovparks.org/permits/field-and-court/map
11
Completed Park Improvements
• Al Smith Playground: sportscoat (spray shower), painting (comfort station doors, play equipment)
• Al Smith Rec Center: sportscoat (basketball), painting (building exterior, handball), updated BBQ
• Baruch Playground: turf improvement, painting (play equipment, handball, benches)
• Coleman: painting (comfort station, play equipment, railing, swings, benches, handball), new picnic tables,
removed extra fence, sportscoat (spray shower and games), new sidewalk
• Columbus Park: sportscoat (volleyball)
• Dry Dock: Cool Pools refresh
• Little Flower Playground: painting (benches, handball, play equipment, basketball backboards, comfort
station exterior), demo of bathhouse
• Sara D: sportscoat (soccer)
• St Vartan: sportscoat (basketball), painting (handball)
• Tanahey: new asphalt field, new paved basketball, painting (playground equipment, benches, railings), new
sidewalk
• Tompkins: painting (storage containers, benches, handball, CS door, adult fitness, backboards), extra fence
removal behind comfort station
12
Tanahey
Turf Sidewalks Basketball
Befo
reA
fte
r
13
Coleman
Spray Shower Comfort Station Duplicate Fences Removed, Picnic Tables Added
Befo
reA
fte
r
14
Al Smith Rec Center
Basketball Court Exterior Handball Court
Befo
reA
fte
r
15
Baruch
Re-turfed Field Handball
Befo
reA
fte
r
16
Sportscoating
Columbus Park Volleyball Sara D Pit Al Smith Playground
17
Upcoming Park Improvements• Baruch Field: new moveable field lights
• Cherry Clinton: painting (benches, handball, adult fitness, basketball backboards)
• Chelsea Park: new moveable field lights
• Columbus Park: painting (comfort station divider)
• Corlears Hook: new moveable field lights, painting (benches, planters)
• Dry Dock: new BBQs
• First Park: painting (playground equipment)
• Hamilton Fish: painting (deck tables)
• John Jay: tennis sportscoat, painting (benches, handball, adult fitness, play equipment)
• Little Flower: new passive turf, new BBQs
• Murphy Brothers Playground: sportscoat
• Peters Field: new turf field
• Robert Moses: new turf field, painting (comfort station doors and frames)
• Sara D: new moveable field lights
• St Vartan: new turf field
• Vladeck Playground: painting (play equipment)
• Waterside: new passive turf, sportscoat, new seating 18
Befo
reA
fte
rLittle Flower / LaGuardia Bath House: Fall 2020
LaGuardia Bath House Demolition/Turf InstallationLittle Flower Playground Repainting 19
Upcoming NYCHA Improvements
• Jacob Riis
• Lilian Wald
• Campos II
• Seward Ext. at Essex
• Seward Ext. at Broome
• Al Smith
20
Neighborhood Tree Planting: Fall 2019 & Fall 2020
21
GreenThumb GardensCommunity Garden Improvement Program (CGIP)
Expanded support to all licensed Greenthumb community gardens in good standing through the FY20 Play Fair
coalition, including infrastructure, materials, equipment, programming, services, and plant and garden equipment
Garden Support Kits
Providing tools, furniture and supplies to support the operations of Greenthumb gardens in good standing
22
PIER 36
EAST RVER PARK
EAST
RIVER
PIER 42 UPLAND
PIER 42 DECK
NYCDOT
MAINTENACE
YARD
CORLEARS
HOOK
PARK
NYC FERRY -
LOWER EAST
SIDE CORLEARS
HOOK STOP
New Open Space: Pier 42 Upland & Deck
23
EAST RIVER
FDR DRIVE
PIER 42 SHED DEMOLITION PHASE 1A
MO
NT
GO
MER
Y
ST
RE
ET
NYC FERRY
NYCDOT MAINTENANCE
YARDBASKETBALL CITY/ PIER 36
FUTURE SHARED PATH (ESCR)
2. COMFORT STATION
3. PLAYGROUND
4. LOWLAND GARDENS
5. LAWN
6. VIEWING PLAZA
7. PICNIC KNOLL
8. FERRY LANDING WITH BOULDER TERRACE
9. RETAINED SHED STRUCTURE FROM PHASE 1A
10.CON ED AIR VENT
11.EXISTING TREES TO REMAIN
12.ELEVATED DECK
13.ELEVATED DECK MAINTENANCE ACCESS
1
34
2
6
7
10
58
9
Key1. ENTRY PLAZA
LIMIT OF WORK
1313
12
N
100’
Pier 42 Upland Park
11
24
2. DECK ACCESS FROM PIER 42 PHASE 1B: UPLAND PARK
3. EXISTING RAMP
4. RAISED DECK, TYP.
5. EXISTING 8' HEIGHT CHAIN LINK FENCE
6. ELEVATED DOCK
7. EXISTING BOAT CLEATS, TYP.
8. COMFORT STATION
9. SYNTHETIC TURF
10. RAISED CURB AT SOCCER FIELD WITH MODIFIED 16' HEIGHT FENCE
11. ACCESS TO SOCCER FIELD (MAX 5% SLOPE)
12. OUTDOOR EXERCISE EQUIPMENT AREA
13. 16' HEIGHT CHAIN LINK FENCE ON DECK
14. PAINTED TENNIS COURT, TYP OF 4.
15. PAINTED HALF COURT BASKETBALL, TYP OF 4.
16. PICNIC TABLE, TYP 0F 13.
17. BENCH, TYP OF 17.
18. MODIFIED RAMP TO COMPLY WITH ADA REGULATIONS
Key1. EXISTING FRAME, PAINTED RED
E A S T R I V E R
NYCDOT MAINTENANCE
YARD
FDR DRIVE
FUTURE SHARED PATH (ESCR)
FUTURE PIER 42 PHASE 1 B: UPLAND PARK
300' +/-
150'+/-
10'10'
340' +/-
170'+/-
+11.19
+9.96
+11.84
+9.40
+7.66
+10.86
+10.18
+9.59
+9.07
+9.28
+8.45
+11.79+10.77
+10.31
+7.07
+10.77
1
2
+8.42
LIMIT OF WORK
18
5
3
5 2
6
8
10
9
13
14
1115
16
4
17
10
711
+9.55
Existing deck slopes north to south, toward the
East River at +/- 1.3%.
+7.08
+9.45
12
Pier 42 Interim Deck
25
Upcoming Parks Capital Completion
2020• Columbus Park Mulberry
Entrance - completed
• Sara D Comfort Station –
completed
• Baruch Comfort Station
• Luther Gulick
Playground/Comfort Station
• Joseph C Sauer Reconstruction
• Playground One Reconstruction
• Corlears Hook Dog Run
2021• Corlears Hook Comfort Station
• McKinley Playground Play Area
Reconstruction26
Upcoming Web Page for Neighborhood Open Space
Future URL: nyc.gov/parks/escr
27
Questions & Discussion