1 July 13, 2011 Some morning photos Tank Valve Box.
-
Upload
ella-small -
Category
Documents
-
view
214 -
download
0
Transcript of 1 July 13, 2011 Some morning photos Tank Valve Box.
1
July 13, 2011Some morning photos
TankValve Box
2
“Action” Shots
All four Z tubes moved to C floor, one installed on valve boxTo locate position of hole in floor
3
July 13, 2011
Ricardo and Rodrigo practice with LN2 and vacuum fittings
Jorge attached the tank to the console room roof
Electrical outlets installed on old console post, ready to hook up now
4
July 13, 2011
• Tubes installed in Coude room
5
July 13, 2011
• Hole in floor to secret stair case and Coude room in progress at 4pm
Photo shows railings & diagonal braces
6
Plans
• Install two Z-shaped pipes and attach to hoses in Coude room
• Store or install the other two z pipes• Install the Coude room valve box.• Note: it will take ~500 liters of LN2 to fill the tank
the 1st time (next week)